Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTRUSS Lumber design values are in accordance with ANSI/TPI 1-2014 section 6.3
These truss designs rely on lumber values established by others.
RE: Job CRMSBM1674132 A-1 Roof Trusses
4451 St Lucie Blvd
Site Information: Fort Pierce, FL 34946
Customer Info: RENAR DEVELOPMENT CO. Project Name: MORNINGSIDE
Lot/Block: Model: BERMUDA 1674
Address: MORNINGSIDE, FORT PIERCE Subdivision:
City: County: St Lucie State: FL
Name Address and License#of Structural Engineer of Record, If there is one, for the building.
Name: License#:
Address:
City:
General Truss Engineering Criteria Design Loads(Individual Truss Design Drawings Show Special Loading
Conditions):
Design Code: FBC 7th Ed. 2020 Res. /TPI 2014 Design Program: Alpine Engineered Products
Wind Code: ASCE 7-16 Wind Speed: 160
Roof Load: 37.0 psf Floor Load: 0.0 psf
This package includes 38 individual,dated Truss Design Drawings and 16 Additional Drawings.
With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet
conforms to 61 G15-31.003,section 5 of the Florida Board of Professional Engineers Rules.
No. Seq# Truss Name Date No. Seq# Truss Name Date No. Seq# Truss Name Date
1 2581 A01 5/10/21 13 2593 B01 5/10/21 25 2605 CJ5 5/10/21
2 2626 A02 5/10/21 14 2594 B02 5/10/21 26 2607 HJ3 5/10/21
3 2583 A03 5/10/21 15 2595 B03 5/10/21 27 2608 HJ7 5/10/21
4 2537 A04 5/10/21 16 2596 B04 5/10/21 28 2609 HJ7S 5/10/21
5 2540 A06 5/10/21 17 2597 B05 5/10/21 29 2610 HJB1 5/10/21
6 2586 A07 5/10/21 18 2598 B06 5/10/21 30 2611 J3 5/10/21
7 2587 A08 5/10/21 19 2599 C01 5/10/21 31 2612 J34 5/10/21
8 2588 A09 5/10/21 20 2600 CO2 5/10/21 32 2613 J3GE 5/10/21
9 2589 A10 5/10/21 21 2601 CA 5/10/21 33 2614 J7 5/10/21
10 2590 All 5/10/21 22 2602 CAA 5/10/21 34 2615 J7C 5/10/21
11 2591 Al2 5/10/21 23 2603 CJ3 5/10/21 35 2616 VM02 5/10/21
12 2592 A13 5/10/21 24 2604 CJ3A 5/10/21 36 2617 VM04 5/10/21
The truss drawing(s)referenced have been prepared by Alpine Engineered Products,Inc.under my direct supervision based on the parameters provided byA-1 RoofTrusses,Ltd.
Myiceg rh Name: Pranavz�m I '��I
license dattefor tte state off FloridaFebruary Ay
NOTE:The seal on these drawings indicate acceptance of professional engineering `� �Q;.•�\C ENS
responsibility solely for the truss components shown.
The suitability and use of components for any particular building is the responsibility of the building * NO. 88 6
designer,perANSffPI-1 Sec.2. _
The Truss Design Drawing(s)(TDD[s])referenced have been prepared based on the construction = _
documents(also referred to at times as'Structural Engineering Documents')provided by the Building AT OF ~
Designer indicating the nature and character of the work. �{� ;• ti
The design criteria therein have been transferred to Rama Pranav Kristam PE by[Al Roof Trusses or
speciric location].These TDDs(also referred to at times as'Structural Delegated' I%� �'-•. _� OR 1 q�;•'-•����
,1�
Engineering Documents')are specialty structural component designs and may be part of the project's ���`Sc• •"" ��\\�Q)
deferred or phased submittals.As a Truss Design Engineer(i.e.,Specialty i,�� SIoA+iALt� \`��
Engineer),the seal here and on the TDD represents an acceptance of professional engineering I r Y�
responsibility forthe design of the single Truss depicted on the TDD only.The Building Designer is
responsible for and shall coordinate and review the TDDs for
compatibility with theirwritten engineering requirements.Please review all TDDs and all related notes. Rama Pranav Kristam,P.E. 6rgiem( signed by Rama N.—
DN:
4451 St Lucie Blvd.Suite 201 E=—kdstem@w!,oghbb,og—t,
Fort Pierce,FL 34946 Rama Pranav Kristam CN=Rama P.—KHM—,o=whale
House Engineering LLC,L-Fort
Pl r-S-Florida,C-US
Reason:I have reviewed this
document
Date:2021.05.10 16:43'.32-04'00'
Page 1 of 2
Lumber design values are in accordance with ANSI/TPI 1-2014 section 6.3
These truss designs rely on lumber values established by others.
RE: Job CRMSBM1674B2
No. Seq# Truss Name Date
37 2618 VM05 5/10/21
38 2619 VM06 5/10/21
39 STDL01 STD.DETAIL 5/10/21
40 STDL02 STD.DETAIL 5/10/21
41 STDL03 STD.DETAIL 5/10/21
42 STDL04 STD.DETAIL 5/10/21
43 STDL05 STD.DETAIL 5/10/21
44 STDL06 STD.DETAIL 5/10/21
45 STDL07 STD.DETAIL 5/10/21
46 STDL08 STD.DETAIL 5/10/21
47 STDL09 STD.DETAIL 5/10/21
48 STDL10 STD.DETAIL 5/10/21
49 STDL11 STD.DETAIL 5/10/21
50 STDL12 STD.DETAIL 5/10/21
51 STDL13 STD.DETAIL 5/10/21
52 STDL14 STD.DETAIL 5/10/21
53 STDL15 STD.DETAIL 5/10/21
54 STDL16 STD.DETAIL 5/10/21
Rama Pranav Kristam,P.E.
#88906
Page 2 of 2 4451 St.Lucie Blvd,suite 201
Fort Pierce,FL 34946
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A01 GABL 1 1
Seal#: 2581
83k 83k 83k 83k
1 I I
20'8-3/4'�
�e'S-3I8'�, 20'8-VC 911
17'e' I 2D'4"
Ilsxs(R)13
a)L
G
�%
o5X6F AE AF GA4 AIAJ AN AO AK PO\6X8
6 IX14D
T� %X(R) AL
_7X6
%3 63a
T T A3X PAABe =4X1U X (a)
I m ° An Ill 5X4
1 1 1 1 5 - 4 5�3X6(Ai)
�eX6Y -3X8 -3X6 3X4
SEAT 18-3-13116" 19'8-31i6" PLATE REO.
110. 19'e 4.:,
38
8'7-5/8' j 2'+-2'-t2 j
btk 51k btk 51k
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LQ: 0.179 E 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.367 E 601 240 AS 916 /- /- /- /442 /13
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.080 F - - Y 5335 /- /- /- /1241 /-
EXP:B Kzt:NA HORZ TL: 0.165 F S 992 /- /- /- /374 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf AS Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.830
P Y Brg Width=7.6 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.986
Re Fac:Varies b Ld Case Max Web CSI: 0.841 S Brg Width,7.6 Min Req= 1.5
Spacing:24.0" C&C Dist a:3.80 ft P y Bearings AS,Y,&S are a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearings AS,Y,&S require a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber Loading
B-C 2851 -863 J-K 1955 -296
Top chord:2x4 SP M-30;T3,T4,T6 2x4 SP#2; Truss designed to support 2-0-0 top chord outlookers C-D 1483 -2032 K-L 1996 -337
Bot chord:2x4 SP#2; and cladding load not to exceed 8.00 PSF one face Webs:2x4 SP A-B 75 16 L-M 1994 378
#3;W7,W9 2x4 SP#2; and 24.0"span opposite face.Top chord must not be B_AS 2075 -2141 M-N 1992 -378
cut or notched,unless specified otherwise.
453
Bracing D-E 1729 -584 N-O 2040 -540
(a)Continuous lateral restraint equally spaced on Bearing Block(s) E-F 1759 -517 O-P 1918 -544
member. Brg blocks:0.131"xY,min.nails F-G 1762 -439 P-Q 1962 -600
brg x-loc #blocks length/blk #nails/blk wall plate G-H 1807 -379 Q-R 301 -455
Special Loads 2 18.000' 1 181, 12 Rigid Surface H-I 1787 -299 R-S 357 -983
------(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) Brg block to be same size and species as chord. I-J 1795 -271 S-T 75 -16
TC:From 62 plf at -3.97 to 62 plf at 8.55 Refer to drawing CNNAILSP1014 for more information.
TC:From 31 plf at 8.55 to 31 plf at 15.03 Additional Notes Maximum Bot Chord Forces Per Ply(Ibs)
ona oes
TC:From 62 plf at 15.03 to 62 plf at 36.70 Chords Tens.Comp. Chords Tens. Comp.
BC:From 14 plf at 0.00 to 14 plf at 8.40 See Al Std Detail for gable wind bracing and other
BC:From 7 plf at 8.40 to 7 plf at 15.62 requirements. C-AC 934 -147 Y-W 45 -185
BC:From 14 plf at 15.62 to 14 plf at 35.36 AC-AB 130 -25 W-V 364 -259
TC: 83 lb Conc.Load at 8.64,10.64,12.64,14.64 AA-Z 304 -103 V-U 364 -259
BC: 51 lb Conc.Load at 8.64,10.64,12.64,14.64 Z-X 1165 -3265 U-S 724 -172
Plating Notes
All plates are 1.5X3 except as noted. Maximum Web Forces Per Ply(Ibs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins D-AC 108 -147 J-AL 314 -1861
In lieu of structural panels or rigid ceiling use purlins D-AD 1036 -3158 AL-X 953 -4243
to laterally brace chords as follows: D-AA 771 -187 AL-AN 1631 -292
Chord Spacing(in oc) Start(ft) End(ft) AC-AA 816 -128 AM-K 83 -268
TC 24 3.81 26.02 AD-AE 1039 -3169 X-Y 1240 -5318
BC 97 0.20 8.25 AA-AB 62 0 X-AP 1162 -3459
BC 36 8.25 15.67 AA-AH 1548 -400 X-W 263 -337
BC 75 15.77 35.22
Apply purlins to any chords above or below fillers AE-AA 220 -608 AN-AO 1634 -293
at 24"OC unless shown otherwise above. AE-AF 1050 -3227 AO-M 136 -376
AF-AG 1054 -3240 AO-AP 1640 -294
Wind AG-AH 1056 -3247 AP-W 315 -50
Wind loads and reactions based on MWFRS. AH-Z 371 -1382 AP-AQ 866 -1629
Wind loading based on both gable and hip roof types. AH-AI 627 -1594 W-Q 48 -448
Z-AL 3727 -972 AQ-AR 862 -1617
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Truss Truss Type Qty Ply 0 511 012 02 1
2581
A01 GABL 1 1
AI-AJ 629 -1602 AR-Q 859 -1610
AJ-AK 629 -1602 U-Q 599 -227
AK-AL 629 -1604 U-R 294 -690
Maximum Gable Forces Per Ply(lbs)
Gables Tens.Comp. Gables Tens. Comp.
E-AD 107 -292 1-AK 27 -148
F-AF 150 -444 AN-L 54 -173
G-AG 100 -356 AQ-N 177 -488
H-Al 147 -514 AR-P 69 -187
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER('BUYER")ACKNOWLEDGMENT'form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only AI ine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Ra P=
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the content of the IRC,the IBC,local building code and TPI-1.The approval of the TDD and any field
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor.All notes set out in the TDD and the practices and OBlvd,Suita=
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A02 COMN 2 1
Seal#: 2626 AO _
17'8" 20'4"
=6X6D
E III1.5X3
12 lk 5X6
6 1\5X10(R)C F
io
M �
p (a)
O
5X8(610R G 41.5X3
=8X14
T _ A
N L
v °_ 1111.5X3
1 1 H=3X6(A1)
M K J
1112X4 =3X6=4X16
SEAT PLATE REQ. SEAT PLATE REQ.
38'
j= 18'4-5/8" -{- 19'7-3/8" 4—{
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.350 C 999 360 Loc R+ /R- /Rh /Rw /Ll /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.656 C 680 240 A 1431 /- /- /770 /373 /290
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.237 J - - H 1512 /- /- /900 /374 /-
EXP:B Kzt:NA Des TL: 0.445 J Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 A Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf H Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.594
P Bearings A&H are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.969
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.813 Bearings A&H require a seat plate.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 298 -622 E-F 700 -2141
Lumber B-C 793 -2818 F-G 714 -2322
C-D 665 -1995 G-H 786 -2660
Top chord:2x4 SP#2;T1 2x8 SP 2400f-1.8E; D-E 766 -2015 H-I 35 0
T2 2x6 SP#2;
Bot chord:2x4 SP M-30;B2 2x4 SP#2;
Webs:2x4 SP#3; Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing
(a)Continuous lateral restraint equally spaced on B-N 2594 -547 K-J 19 1
member. N-L 2592 -542 J-H 2310 -598
M-K 19 -1
Purlins
In lieu of structural panels or rigid ceiling use purlins Maximum Web Forces Per Ply(Ibs)
to laterally brace chords as follows: Webs Tens.Comp. Webs Tens. Comp.
Chord Spacing(in oc) Start(ft) End(ft)BC 120 0.11 15.85 C-N 214 20 L-F 219 318
BC 118 15.83 35.16 C-L 377 -1045 L-J 2133 -460
Apply purlins to any chords above or below fillers D-L 1488 -539 F-J 93 -207
at 24"OC unless shown otherwise above. L-M 120 0 J-G 236 -400
L-E 170 -125
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A03 COMN 1 1
Seal#: 2583
17'8" 20'4"
-5X6 F
G 1111.5X3
6 12 -3X4E H g3X4
io i 3X6 D �-1 3X6
M I(a)
ro
16 �3X4C =5X14
�i1.5X3
T =3X6(A1)B 5X8 O
4_I„ A
1 i 1115X8(R) III1.5X4 K=3X6(A1)
P N M
1112X4 =3X6 5X14
38'
�4-}�11'0-3/8" T4-1/4" 19'7-3/8" 1 4-{
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.205 G 999 360 Loc R+ /R- /Rh /Rw /L1 /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.386 G 999 240 B 1530 /- /- /871 /375 /313
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.099 M - - K 1530 /- /- /908 /378 /-
EXP:B Kzt:NA ft HORZ(TL): 0.187 M Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00
NCBCLL: 10.00 Building Code: Creep Factor:2.0 B Brg Width=7.6 Min Req= 1.8
TCDL:4.2 psf K Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.520
P Bearings B&K are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h TPI Std: 2014 Max BC CSI: 0.992
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.898 Maximum Top Chord Forces Per Ply(Ibs)
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 35 0 G-H 711 -2185
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 B-C 761 -2722 H-1 724 -2270
Lumber C-D 838 -2932 I-J 709 -2361
D-E 847 -2850 J-K 795 -2698
Top chord:2x4 SP#2; E-F 666 -2001 K-L 35 0
Bot chord:2x4 SP#2;B4 2x4 SP M-30;
Webs:2x4 SP#3; F-G 769 -2054
Bracing Maximum Bot Chord Forces Per Ply(Ibs)
(a)Continuous lateral restraint equally spaced on Chords Tens.Comp. Chords Tens. Comp.
member. B-S 2362 -539 P-N 16 -3
Purlins S-R 55 -21 N-M 16 -3
In lieu of structural panels or rigid ceiling use purlins Q-O 2571 -529 M-K 2344 -604
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply(Ibs)
BC 104 0.15 10.89 Webs Tens.Comp. Webs Tens. Comp.
BC 92 10.90 18.55
BC 118 18.53 37.85 C-S 172 -473 O-P 120 0
Apply purlins to any chords above or below fillers C-Q 227 0 O-G 161 -161
at 24"OC unless shown otherwise above. S-Q 2357 -527 O-H 219 -318
Q-R 76 0 O-M 2171 -465
Wind Q-E 554 -74 H-M 93 -210
Wind loads based on MWFRS with additional C&C E-O 354 -997 M-J 234 -397
member design. F-O 1446 -512
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A04 COMN 2 1
Seal#: 2537
17'8" 20'4"
1115X6(R)E
F 1111.SX3
12 g5X6D -5X6
6 F71 G
io
M ro
o $1.5X3C (a) (a) _
H 01.5X3
3X6(A1)B =5X8
a3/f6^ A
1 =3X4 =X6 =3X4 M 1=3X6(A1)
N L K
1112X4 =3X6=7X8
38'
4„ 18'4-5/8" 19'7-3/8" 1 4—{
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.256 M 999 360 Loc R+ /R- /Rh /Rw /L1 /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.482 M 938 240 B 1527 /- /- /870 /374 /313
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.089 K - - 1 1527 /- /- /908 /378 /-
EXP:B Kzt:NA HORZ TL: 0.168 K Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 B Brg Width=7.6 Min Req= 1.8
TCDL:4.2 psf I Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.868
P Bearings B&I are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h TPI Std: 2014 Max BC CSI: 0.984
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.739 Maximum Top Chord Forces Per Ply(Ibs)
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s): A-B 35 0 F-G 664 -1905
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 B-C 780 -2709 G-H 721 -2373
Lumber C-D 739 -2455 H-1 798 -2708
D-E 666 -1851 1-1 35 0
Top chord:2x4 SP#2; E-F 627 -1579
Bot chord:2x4 SP#2;132,134 2x4 SP M-30;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Bracing Chords Tens.Comp. Chords Tens. Comp.
(a)Continuous lateral restraint equally spaced on B-Q 2358 -558 N-L 106 -29
member.
Q-P 2000 -413 L-K 106 -29
Purlins P-O 2000 -413 K-I 2355 -610
In lieu of structural panels or rigid ceiling use purlins O-M 1499 -201
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply(Ibs)
BC 101 0.15 18.54 Webs Tens.Comp. Webs Tens. Comp.
BC 118 18.53 37.85
Apply purlins to any chords above or below fillers C-Q 188 -315 M-F 336 -107
at 24"OC unless shown otherwise above. Q-D 398 -30 M-G 279 -584
D-O 256 -595 M-K 1939 -414
Wind E-O 835 -286 G-K 252 -23
Wind loads based on MWFRS with additional C&C M-N 125 0 K-H 230 -390
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A06 COMN 11 1
Seal#: 2540 AO _
17'8" 20'4"
1115X6(R)E
F 1111.5X3
12 X6
6 � \\5X10(R)D GH-3X4
io
an 03X4 C (a) (a)
16
o4X12(B10R =10X10 I'i3X4
1111.5X3 =3X3
T A T S R-3X4(-) III1.5X3 O
v °�[}.5_T. 1111.5X3 -5X6 U V
1 1 J_3XK(A1)
P N M L
1112X4 =4X10=3X6 1111.5X3
SEAT PLATE REQ. SEAT PLATE REQ.
38'
I.2'8-3/8" - -1?,4„
r =T- 15'8-1/8" -�- 19'7-1/2" �{
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.213 O 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.399 O 999 240 A 1431 /- /- /770 /373 /290
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.137 L - - J 1512 /- /- /900 /374 /-
EXP:B Kzt:NA ft Building TL): 0.256 L Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00
NCBCLL: 10.00 Building Code: Creep Factor:2.0 A Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf J Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.469
P Bearings A&J are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h TPI Std: 2014 Max BC CSI: 0.985
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.756 Bearings A&J require a seat plate.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 300 -622 F-G 706 -2168
Lumber B-C 914 -3263 G-H 687 -1963
C-D 835 -2810 H-1 685 -2135
Top chord:2x4 SP#2;T1 2x8 SP 2400f-1.8E; D-E 665 -2010 I-J 752 -2663
T2 2x6 SP#2; E-F 756 -2007 J-K 35 0
Bot chord:2x6 SP#2;B3,B4 2x4 SP#2;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Bracing Chords Tens.Comp. Chords Tens. Comp.
(a)Continuous lateral restraint equally spaced on B-T 3167 -714 P-N 18 3
member. T-S 3157 -711 N-M 2302 -568
Plating Notes S-R 3157 -711 M-L 2302 -568
(**)1 plate(s)require special positioning.Refer to R-Q 2498 -519 L-J 2304 -566
scaled plate plot details for special positioning Q-O 2480 -510
requirements.
Maximum Web Forces Per Ply(Ibs)
Tray Scab(s) Webs Tens.Comp. Webs Tens. Comp.
(2)2x8x9-3-5 x SP 2400f-1.8E scabs at left end.Attach T-C 70 -158 O-F 156 94
one scab to each outer face of chord with:0.131"x3",
min.nails @ 8"oc,Plus additional nail clusters at:BRG.: C-R 240 -768 O-G 228 -175
(4),heel:(6),1st panel point:(2). D-R 440 -34 O-N 1983 -411
D-O 340 -892 V-P 83 0
Purlins Q-U 35 0 G-N 124 -447
In lieu of structural panels or rigid ceiling use purlins U-V 17 -6 N-1 217 -545
to laterally brace chords as follows: E-O 1365 -490 I-L 217 0
Chord Spacing(in oc) Start(ft) End(ft) O-V 118 0
BC 116 0.28 15.84
BC 98 15.82 35.16
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A07 COMN 1 1
Seal#: 2586
j= 16'4" -1- 2'8" -1 19, -
U\5X6(R) =5X6
D E
12
g F�:;;- \\\5X10(R)C 3X4
ro
C'�3X6
M (a) Eo
0
On ;4X10(B10R H a3X4 0
B
T A =5XB
W V UT N
a-sits^ =4X6= 1112X4(—)
N T =3X3 1=3X6(A1)
1 1 1113X4 3
RP M L K
1113X6 =4X10=3X6
SEAT PLATE REQ. SEAT PLATE REQ.
38'
16'4" 2'0-1/2" 19'7-1/2" 1 4—I
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.370 N 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed ILL:NA Cs:NA VERT(CL): 0.693 N 644 240 A 1431 /- /- /770 /126 /272
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.255 K - - 1 1512 /- /- /900 /126 /-
EXP:B Kzt:NA HORZ TL: 0.478 K Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 A Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf I Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.696
P Bearings A&I are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:h to 2h TPI Std: 2014 Max BC CSI: 0.894
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.913 Bearings A&I require a seat plate.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 314 -622 F-G 761 -2052
Lumber B-C 882 -2794 G-H 754 -2186
C-D 807 -2178 H-1 819 -2673
Top chord:2x4 SP#2;T1 2x8 SP 2400f-1.8E; D-E 754 -1845 I-J 35 0
T2 2x6 SP#2; E-F 785 -2148
Bot chord:2x4 SP#2;B2,B3 2x4 SP M-30;
Webs:2x4 SP#3;W6 2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Bracing Chords Tens.Comp. Chords Tens. Comp.
(a)Continuous lateral restraint equally spaced on B-W 2570 -636 R-P 39 4
member. W-V 2566 -631 Q-O 68 -27
Plating Notes V-T 2566 -631 P-M 76 -18
All plates are 1.5X3 except as noted. U-Q 107 -30 M-L 2314 -635
T-S 1842 -344 L-K 2314 -635
(")1 plate(s)require special positioning.Refer to S-N 1763 -335 K-I 2315 -633
scaled plate plot details for special positioning
requirements.
Maximum Web Forces Per Ply(Ibs)
Purlins Webs Tens.Comp. Webs Tens. Comp.
In lieu of structural panels or rigid ceiling use purlins C-W 197 -7 N-E 793 -208
to laterally brace chords as follows: C-T 360 -937 N-F 241 -242
Chord Spacing(in oc) Start(ft) End(ft) U-S 87 17 N-M 1964 483
BC 120 0.11 16.19 TC 24 13. 16. D-T 639 -206 F-M 139 -385
BC 30 13.63 16.18 R-Q 260 -135 M-H 195 -495
BC 120 15.68 35.16 O-P 172 -243 H-K 201 0
Apply purlins to any chords above or below fillers N-O 102 -51
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A08 COMN 1 1
Seal#: 2587
14'4" 6'8" 17'
:6X6 =6X6
D E F
12 %\5X10(R)C
6
3X6
G H Z`s3X4
M
o :4X10(1310R (a) 17
B o
AEHI =SXB (a)
T� 4site• 11(6 =3X4 O
1 1 =3X3 1=4X4)(A2)
P M L K
1112X4 =6X8 =3X6
SEAT PLATE REQ. SEAT PLATE REQ.
38'
16'4" _12'0-1/2+ 19'7-1/2" _I 1 4-•{
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.359 U 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed ILL:NA Cs:NA VERT(CL): 0.672 U 664 240 A 1431 /- /- /767 /128 /244
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.265 K - - 1 1512 /- /- /898 /160 /-
EXP:B Kzt:NA HORZ TL: 0.497 K Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 A Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf 1 Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.744
P Bearings A&I are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:h to 2h TPI Std: 2014 Max BC CSI: 0.877
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.830 Bearings A&I require a seat plate.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 336 -622 F-G 811 -1867
Lumber B-C 989 -2738 G-H 779 -1884
C-D 981 -2341 H-1 912 -2589
Top chord:2x4 SP M-30;T1 2x8 SP 2400f-1.8E; D-E 978 -2207 I-J 35 0
T3 2x6 SP#2;T4 2x4 SP#2; E-F 976 -2201
Bot chord:2x4 SP#2;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Bracing Chords Tens.Comp. Chords Tens. Comp.
(a)Continuous lateral restraint equally spaced on B-U 2504 -729 Q N 1947 515
member.
U-T 2503 -724 P-M 37 -14
Plating Notes T-S 2503 -724 M-L 2217 -695
All plates are 1.5X3 except as noted. S-Q 1977 -530 L-K 2217 -695
R-O 34 -14 K-I 2220 -693
Purlins
In lieu of structural panels or rigid ceiling use purlins Maximum Web Forces Per Ply(Ibs)
to laterally brace chords as follows: Webs Tens.Comp. Webs Tens. Comp.
Chord Spacing(in oc) Start(ft) End(ft)TC 24 11.63 18.30 C-U 226 0 N-F 1568 474
BC 120 0.11 15.82 C-S 301 -814 N-M 2178 -596
BC 26 13.63 15.82 S-D 549 -187 O-P 0 -9
BC 120 15.82 35.16 D-N 499 -180 F-M 327 -1068
Apply purlins to any chords above or below fillers R-Q 45 0 M-H 297 -739
at 24"OC unless shown otherwise above. E-N 138 -144 H-K 302 0
N-O 18 -9
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 A09 COMN 1 1
Seal#: 2588
12'4" 10,81, 15,
=7X6
D E M6X6F
12
6 p
3X4 C 3G6
H ss3X4
o =5X8(1310R r°
A =6X8 (a) oo
T T S N
1 =3X3
1 I 4X4t(A2)
P M L K
=4X10 =3X6
SEAT PLATE REQ. SEAT PLATE REQ.
38'
2'8-3/8" 1 13'7-5/8" 2'0-1/2" 19'7-1/2" 1 4-I
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.235 E 999 360 Loc R+ /R- /Rh /Rw /L1 /RL
BCLL: 0.00 Enclosure:Closed ILL:NA Cs:NA VERT(CL): 0.439 E 999 240 A 1431 /- /- /759 /132 /217
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.144 K - - 1 1512 /- /- /892 /175 /-
EXP:B Kzt:NA HORZ TL: 0.269 K Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 A Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf I Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.678
P Bearings A&I are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:h to 2h TPI Std: 2014 Max BC CSI: 0.670
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.723 Bearings A&I require a seat plate.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 359 -622 F-G 934 -1978
Lumber B-C 1308 -3201 G-H 908 -2005
C-D 1138 -2569 H-1 1027 -2630
Top chord:2x4 SP#2;T1 2x8 SP 2400f-1.8E; D-E 1254 -2618 I-J 35 0
Bot chord:2x4 SP#2;B1 2x4 SP M-30;
Webs:2x4 SP#3; E-F 1250 -2610
Bracing Maximum Bot Chord Forces Per Ply(Ibs)
(a)Continuous lateral restraint equally spaced on Chords Tens.Comp. Chords Tens. Comp.
member. B-T 3071 -1105 P-M 40 -20
Plating Notes T-S 3064 -1102 M-L 2264 -808
All plates are 1.5X3 except as noted. S-Q 2240 -754 L-K 2264 -808
R-O 41 -23 K-I 2266 -806
Tray Scab(s) Q-N 2200 -730
(2)2x8x9-4-12 x SP 2400f-1.8E scabs at left end.
Attach one scab to each outer face of chord with: Maximum Web Forces Per Ply(Ibs)
0.131"x3",min.nails @ 8"oc,Plus additional nail Webs Tens.Comp. Webs Tens. Comp.
clusters at:BRG.:(4),heel:(6),1st panel point:(2).
T-C 111 -122 N-O 74 0
Purlins C-S 382 -904 N-M 1898 -632
In lieu of structural panels or rigid ceiling use purlins D-S 435 -83 N-F 1394 -568
to laterally brace chords as follows: D-N 600 -264 M-F 240 -547
Chord Spacing(in oc) Start(ft) End(ft) R-Q 44 0 M-H 269 -653
TC 24 9.63 20.30 E-N 271 -287 H-K 264 0
BC 120 0.11 15.82 O-P 47 0
BC 26 13.63 15.82
BC 120 15.82 35.16
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 A10 HIPS 1 1
Seal#: 2589
10'4" + 14'8" + 13'
5X8 III 1.5X3
D E = X F
T6 12 �36
1.5X3 C
H 3X4
M �
O
u7
=3X6(A1)B
4 =5X8
l �„ A
1 =3X4=3X6 N 1=3X6(A1)
O M L K
1111.5X4 =6X8=3X6 1111.5X3
SEAT PLATE REQ. SEAT PLATE REQ.
38'
�4+ 18'4-1/2" + 4
19'7-1/2" �
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.199 E 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.374 E 999 240 B 1530 /- /- /851 /383 /212
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.075 K - - 1 1530 /- /- /890 /385 /-
EXP:B Kzt:NA HORZ TL: 0.142 K Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 B Brg Width=7.6 Min Req= 1.8
TCDL:4.2 psf I Brg Width=7.6 Min Req= 1.8
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.542
P Bearings B&I are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h TPI Std: 2014 Max BC CSI: 0.972
Spacing:24.0" C&C Dist a:3.80 ft Rep Fac:Yes Max Web CSI: 0.774 Bearings B&I require a seat plate.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 35 0 F-G 1076 -2119
Lumber B-C 1236 -2710 G-H 1062 -2192
C-D 1156 -2411 H-1 1147 -2699
Top chord:2x4 SP#2;T2 2x4 SP M-30; D-E 1432 -2724 I-J 35 0
Bot chord:2x4 SP#2;B1 2x4 SP M-30;
Webs:2x4 SP#3; E-F 1429 -2716
Purlins Maximum Bot Chord Forces Per Ply(Ibs)
In lieu of structural panels or rigid ceiling use purlins Chords Tens.Comp. Chords Tens. Comp.
to laterally brace chords as follows: B-Q 2357 -967 M-L 2334 925
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 10.33 25.00 Q-P 2105 -812 L-K 2334 -925
BC 120 0.15 18.52 P-N 2107 -812 K-1 2336 -923
BC 96 18.52 37.85 O-M 34 -16
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above. Maximum Web Forces Per Ply(Ibs)
Wind Webs Tens.Comp. Webs Tens. Comp.
Wind loads based on MWFRS with additional C&C C-Q 177 -286 N-M 1894 -732
member design. D-Q 386 0 N-F 1062 -563
Wind loading based on both gable and hip roof types. D-N 727 -446 M-F 121 -79
E-N 421 -485 M-H 221 -517
N-O 89 0 H-K 208 0
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 A11 HIPS 1 1
Seal#: 2590
8'3-1/4" 18'8" 11'�
e5X6 =3X6 =5X6
D E F G H
T 12
6 T
a 1.5X3 O (a)
M (a) 1 1.5X3
0
A B /1=6X6 20
IT $"'6 =3X8 S J=3X6(A1)
L 13 K 4- „
R Q =3X8 PI-I O N M L_
1113X6(R) ill1.5X3 =4X4 =3X6 =3X8 =3X6
SEAT PLATE REQ. SEAT PLATE REQ. SEAT PLATE REQ.
13'3-1/16" 24'8-3/16"
1'4-3/4" 37'11-1/4" 1 4�
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.046 L 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.088 L 999 240 R 459 /- /- /423 /160 /186
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.015 L - - P 1772 /- /- /985 /405 /-
EXP:B Kzt:NA HORZ TL: 0.030 L J 934 /- /- /596 /230 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf R Brg Width=6.9 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.667
TPI Sid: 2014 Max BC CSI: 0.838 P Brg Width=7.6 Min Req= 2.1
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h
Spacing:24.0" C&C Dist a:3.79 ft Rep Fac:Yes Max Web CSI: 0.960 J Brg Width= J Min Req. 1.5
p g� Bearings R,P,&J are a rigid surface.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearings R,P,&J require a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 37 0 F-G 547 -213
Top chord:2x4 SP#2; B-C 168 -465 G-H 404 -571
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; C-D 2 - H-I 491 -1058
D-E 203 03 --91 91 I-J 597 -1421421
Bracing E-F 547 -213 J-K 35 0
(a)Continuous lateral restraint equally spaced on
member. Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Plating Notes
R-Q 633 -480 N-M 881 -244
All plates are 3X4 except as noted.
Q-P 633 -480 M-L 881 -244
Purlins P-O 288 -257 L-J 1214 -440
O-N 288 -257
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply(Ibs)
TC 24 8.27 26.94 Webs Tens.Comp. Webs Tens. Comp.
BC 75 0.00 37.79
Apply purlins to any chords above or below fillers B-R 241 -392 T-U 300 -286
at 24"OC unless shown otherwise above. B-S 355 -97 E-U 591 -803
R-S 473 -435 P-U 1000 -1598
Wind C-T 224 -316 U-G 677 -1239
Wind loads based on MWFRS with additional C&C S-Q 344 -334 U-N 826 -396
member design. S-T 518 -300 G-N 273 0
Wind loading based on both gable and hip roof types. S-P 770 -786 N-H 177 -425
D-T 179 -295 H-L 421 -25
Left bottom chord exposed to wind. T-E 636 -403 L-1 222 -379
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 Al2 HIPS 1 1
Seal#: 2591 AO _
61-1/4" -{- 22'8" -}- 9' j
%7X6(R) =4X4 III1.5X3=3X6 :5X6
12 C D E F G H
T 6 11111.5X3 T
o (a)
o B
-� A =5X6
T ra-sns° K= I
=6X6 1111.5X3 R Q P C -3X6(A1) 1
1 X W V U T S -4X8=3X6 1111.5X4 M L a-
III 3X6 =3X8 1114X4 1111.5X3 =4X4
SEAT PLATE REQ. SEAT PLATE REQ. SEAT PLATE REQ.
I-13'3-1/16" 24'8-3/16"
1f4-3/4" 15'6-7/8" 14'5-3/8" T11" 4-�
3T 11-1/4"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.070 1 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.133 1 999 240 X 463 /- /- /426 /205 /158
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.023 M - - V 1833 /- /- /979 /405 /-
EXP:B Kzt:NA Des TL: 0.044 M K 894 /- /- /560 /231 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf X Brg Width=6.9 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.668
TPI Std: 2014 Max BC CSI: 0.802 V Brg Width=7.6 Min Req= 2.2
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h
Spacing:24.0" C&C Dist a:3.79 ft Rep Fac:Yes Max Web CSI: 0.661 K Brg Width=7.6 Min Req. 1.5
p g� Bearings X,V,&K are a rigid surface.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearings X,V,&K require a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 37 0 G-H 664 -1097
Top chord:2x4 SP#2; B-C 359 -353 H-1 858 -1591
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; C-D 866 -344 I-J 786 -1623
D-E 321 -395 J-K 636 -1447
Bracing E-F 321 -395 K-L 35 0
(a)Continuous lateral restraint equally spaced on F-G 321 -395
member.
Maximum Bot Chord Forces Per Ply(Ibs)
Plating Notes Chords Tens.Comp. Chords Tens. Comp.
All plates are 3X4 except as noted. X-W 181 -144 R-Q 1085 -445
Purlins W-V 46 -81 Q-P 1085 -445
U-T 542 -817 P-N 1201 -475
In lieu of structural panels or rigid ceiling use purlins V-S 8 -15 O-M 39 -20
to laterally brace chords as follows: T-R 542 -832 M-K 1253 -502
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 6.27 28.94
BC 75 0.00 15.57 Maximum Web Forces Per Ply(Ibs)
BC 75 13.29 30.19 Webs Tens.Comp. Webs Tens. Comp.
BC 92 30.17 37.79
Apply purlins to any chords above or below fillers B-X 348 -425 R-G 449 -869
at 24"OC unless shown otherwise above. B-W 227 -203 G-P 240 0
C-W 260 -255 P-H 46 -132
Wind C-U 739 -1047 H-N 611 -260
Wind loads based on MWFRS with additional C&C W-U 381 -244 N-O 68 0
member design. U-V 1101 -1735 N-1 145 -170
Wind loading based on both gable and hip roof types. U-D 784 -1240 N-M 1246 -493
Left bottom chord exposed to wind. D-R 1493 -752 N-J 160 -67
T-S 56 -39 M-J 188 -310
E-R 241 -315
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 A13 HIPS 1 1
Seal#: 2592 AO _
280# 187# 187# 187# 187# 187# 190# 190# 190# 190# 190# 190# 190# 432#
+ + + b + + + 7'0-3/8"
4'3-1/4" 26'8" 7'
12 =3X10 =6X8 1111.5X3 =4X6 N7X6(R)
6 F C= X D E FG= X H I J
T - - T
1a1 (a) :Ka4X4
B (a)
o a l A =H07
11 7X8 U- T S R L=4X6(A2)3X6
l AB AA Z Y X Z111.5X3 =H0308 N M aIM
1113X6 =3X8 1116X6 III1.5X3 =6X6 1
SEAT PLATE REQ. SEAT PLATE REQ. SEAT PLATE REQ.
13'3-1/16" 24'8-3/16"
-3/ - 166-7/8" -}- 14'5-3/8"71/�T3-1/2" 4-
TI�Z 0� 37'11-1/4"
4'3-5/8" i 3/8" 2,�2,�J.�2,�2,�J.�2, ii3-1/If3-1 2, 2,-f 2, 2,f 2, i2'0-!/'-
213# 111 111# 111# 111# 111# 98#98# 98# 988# 98# 988# 98# 98# 601#
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LQ: 0.243 R 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.453 R 649 240 AB 538 /- /- /- /252 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.067 N - - Y 4897 /- /- /- /1875 /-
EXP:B Kzt:NA INHORZ TL: 0.124 L 2006 /- /- /- /679 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf AB Brg Width=6.9 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.858
TPI Std: 2014 Max BC CSI: 0.990 Y Brg Width=7.6 Min Req= 2.8
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
Re Fac:Varies b Ld Case Max Web CSI: 0.738 L Brg Width,7.6 Min Req a 2.4
Spacing:24.0" C&C Dist a:3.79 ft p y Bearings AB,Y,&L are a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearings AB,Y,&L require a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE,HS VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber Purlins
A-B 37 -15 G-H 224 -870
Top chord:2x4 SP#2;T2,T3 2x4 SP M-30; In lieu of structural panels or rigid ceiling use purlins B-C 277 -486 H-I 1091 -3465
Bot chord:2x4 SP M-30;B1 2x4 SP#2; to laterally brace chords as follows: 50
Webs:2x4 SP#3;W7,W12 2x4 SP#2; Chord Spacing(in oc) Start(ft) End(ft) C-D 717 4668
D-E 3511 -1-50 I-J 1541 -J-K 1843 -5229
4668
W8 2x4 SP M-30; TC 24 4.27 30.94
BC 75 0.00 15.57 E-F 224 -870 K-L 1268 -3712
Bracing BC 42 13.30 30.84 F-G 224 -870 L-M 35 -14
(a)Continuous lateral restraint equally spaced on BC 81 30.02 37.79
member. Apply purlins to any chords above or below fillers Maximum Bot Chord Forces Per Ply(Ibs)
at 24"OC unless shown otherwise above. Chords Tens.Comp. Chords Tens. Comp.
Special Loads
------(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) AB-AA 6 0 T-S 3356 -1063
TC:From 62 plf at -1.40 to 62 plf at 4.27 AA-Z 386 -229 S-R 4650 -1542
TC:From 31 plf at 4.27 to 31 plf at 30.94 Z-Y 113 -319 R-O 4767 -1677
TC:From 62 plf at 30.94 to 62 plf at 39.27 Y-V 21 -68 Q-P 0 0
BC:From 14 plf at 0.00 to 14 plf at 4.30 X-W 1142 -3348 P-N 106 -38
BC:From 7 plf at 4.30 to 7 plf at 30.65 W-U 1162 -3414 N-L 3254 -1109
BC:From 14 plf at 30.65 to 14 plf at 37.94 U-T 3356 -1063
TC: 280 lb Conc.Load at 4.30
TC: 187 lb Conc.Load at 6.33,8.33,10.33,12.33
14.33 Maximum Web Forces Per Ply(Ibs)
TC: 190 lb Conc.Load at 16.33,17.60,18.87,20.87 Webs Tens.Comp. Webs Tens. Comp.
22.87,24.87,26.87,28.87 B-AB 271 -522 F-U 321 647
TC: 432 lb Conc.Load at 30.91
BC: 213 lb Conc.Load at 4.30 B-AA 402 -242 U-H 979 -2916
BC: 111 lb Conc.Load at 6.33,8.33,10.33,12.33 C-AA 290 -29 H-S 970 -245
14.33 C-Z 353 -1138 S-I 532 -1403
BC: 98 lb Conc.Load at 16.33,17.60,18.87,20.87 Z-D 1040 -339 I-R 157 0
22.87,24.87,26.87,28.87 Z-X 0 -460 R-J 155 -117
BC: 601 lb Conc.Load at 30.91 D-X 1299 -3285 O-P 636 -238
X-Y 1715 -4531 0-1 1625 -543
Plating Notes X-E 1122 -3154 O-N 3269 -1110
All plates are 3X4 except as noted. E-U 4978 -1619 O-K 1450 -550
W-V 16 -55 N-K 401 -1047
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 B01 JACK 2 1
Seal#: 2593
12 C
6
00
2X4(A1) B M o
_T_ o
4-3/�16"
A D
SEAT PLATE REQ.
1'4" -1 o 1'10-15/16"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 193 /- /- /154 /49 /53
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.000 D D 24 /- /- /14 /2 /-
EXP:B Kzt:NA HORZ TL: 0.000 D C 27 /- /- /18 /18 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.204
TPI Std: 2014 Max BC CSI: 0.037 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 B-C 12 -34
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins B-D 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 21 0.15 1.91
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 B02 JACK 2 1
Seal#: 2594
D
12 =1.5X3 C
- T.
ib
Ln
_ CO
2X4(A1)B 1111.5X4 FVB 7-1/4" rn
4_3„ (V
A GF
III 1.5X3
SEAT PLATE REQ.
1,4"�{�2'7-5/8"�7 1/4 {
3'2-7/8"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.006 G 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.011 G 999 240 B 229 /_ /_ /169 /49 /77
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.004 G - - E 34 /- /- /17
EXP:B Kzt:NA HORZ TL: 0.007 G D 76 /- /- /47 /36 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.208
TPI Std: 2014 Max BC CSI: 0.048 E Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
D Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.038 Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 C-D 34 -61
Top chord:2x4 SP#2; B-C 5 -63
Bot chord:2x4 SP#2;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp. Chords Tens. Comp.
In lieu of structural panels or rigid ceiling use purlins B-F 7 -15 G-E 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) C-G 21 -4
BC 30 0.15 2.64
BC 13 2.18 3.24 Maximum Web Forces Per Ply(Ibs)
Apply purlins to any chords above or below fillers Webs Tens.Comp.
at 24"OC unless shown otherwise above.
G-F 41 0
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 B03 JACK 4 1
Seal#: 2595 A_
C
12 T T
6 -
cm
LO CD
2M(A1) B LO
4-3/_T_�16"
CV
A D
SEAT PLATE REQ.
1'4" 2'5-9/1 6"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 206 /- /- /158 /48 /63
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.000 D D 34 /- /- /15
EXP:B Kzt:NA HORZ TL: 0.001 D C 48 /- /- /26 /29 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.206
TPI Std: 2014 Max BC CSI: 0.035 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 B-C 22 -58
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins B-D 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 28 0.15 2.46
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 B04 JACK 1 1
Seal#: 2596
D
12
=1.5X3 C `'
6 v m
M 7
N =2X4(A1)B 111 1 4 m
N
4-3/]I, 1
A GIF JJJ
III 1.5X3
SEAT PLATE REQ.
1'4" 27-5/8" 1'4-3/8"
4'
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.018 G 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.033 G 999 240 B 254 /- /- /183 /51 /91
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.011 G - - E 46 /- /- /23
EXP:B Kzt:NA HORZ TL: 0.019 G D 101 /- /- /64 /49 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.196
TPI Std: 2014 Max BC CSI: 0.070 E Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
D Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.067 Bearing B is a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 C-D 45 -70
Top chord:2x4 SP#2; B-C 2 -74
Bot chord:2x4 SP#2;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp. Chords Tens. Comp.
In lieu of structural panels or rigid ceiling use purlins B-F 16 -25 G-E 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) C-G 29 -9
BC 30 0.15 2.64
BC 22 2.18 4.00 Maximum Web Forces Per Ply(Ibs)
Apply purlins to any chords above or below fillers Webs Tens.Comp.
at 24"OC unless shown otherwise above.
G-F 44 -4
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 B05 COMN 1 2
Seal#: 2597
27# 76# 73#101# 73# 76# 27#
+ + + + + �-2'1-1/2-
F 1^4-7/8"i^TF 3'8" 1'47/
12
4.24 p =5X6
E=5X6 P
T 12 83X31) 3 T
6 7'�05M $5X6H
4 � III3X6')T =2X4 N IM1111.5X3A O K 1
SEAT PLATE REQ. SEAT PLATE REQ.
1'8"
-7/�1'5-1111��5'10-13/16" 1 5 11/
1'4" 1'4.
2'1-1/2"-I-1.10-112"�{1 0 7/8' /> 1/8",1'0-7/8"i 1'10-1/2"�{
24# 34#♦ 5046#r'50## 24#s
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.265 L 515 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.472 L 288 240 B 700 /- /- /- /210 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.174 K - - 1 700 /- /- /- /210 /-
EXP:B Kzt:NA HORZ TL: 0.314 K Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 0.00 Building Code: Creep Factor:2.0 B Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf I Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.757
P Bearings B&I are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.280
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:No Max Web CSI: 0.074 Bearings B&I require a seat plate.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 18 -7 F-G 283 -1026
Lumber Purlins B-C 54 -218 G-H 24 -77
C-D 24 -77 H-1 54 -218
Top chord:2x4 SP#2;T2 2x6 SP#2; In lieu of structural panels or rigid ceiling use purlins D-E 282 -1026 1-J 18 -7
Bot chord:2x6 SP#2; to laterally brace chords as follows: E-F 283 -1049
Webs:2x4 SP#3; Chord Spacing(in oc) Start(ft) End(ft)
TC 24 5.07 6.59
Nailnote BC 33 0.15 2.88 Maximum Bot Chord Forces Per Ply(Ibs)
Nail Schedule:0.131"x3",min.nails BC 63 3.21 8.46 Chords Tens.Comp. Chords Tens. Comp.
Top Chord:1 Row @12.00"o.c. BC 33 8.78 11.52
Bot Chord:1 Row @12.00"o.c. Apply purlins to any chords above or below fillers B-P 43 -8 M-G 1077 -295
Webs :1 Row @ 4"o.c. at 24"OC unless shown otherwise above. P-O 0 0 L-K 0 0
Use equal spacing between rows and stagger nails D-N 1077 -294 K-1 43 -8
in each row to avoid splitting. Wind N-M 1060 -288
(1)1/2"bolts may be used for Wind loads and reactions based on MWFRS.
(2)0.131"xY,min.nails on Wind loading based on both gable and hip roof types. Maximum Web Forces Per Ply(Ibs)
The Bottom Chord Only. Webs Tens.Comp. Webs Tens. Comp.
Special Loads P-C 191 -36 M-F 33 -68
------(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) E-N 31 -62 H-K 191 -36
TC:From 62 plf at -1.33 to 62 plf at 1.41 E-M 6 -29
TC:From 31 pIf at 1.41 to 31 pIf at 10.26
TC:From 62 pIf at 10.26 to 62 pIf at 13.00
BC:From 7 plf at 0.00 to 7 plf at 11.67
TC: 27 lb Conc.Load at 2.12,9.54
TC: 76 lb Conc.Load at 4.00,7.67
TC: 73 lb Conc.Load at 5.07,6.59
TC: 101 lb Conc.Load at 5.83
BC: 24 lb Conc.Load at 2.12,9.54
BC: 34 lb Conc.Load at 4.00,7.67
BC: 50 lb Conc.Load at 5.07,6.59
BC: 46 lb Conc.Load at 5.83
Plating Notes
(**)2 plate(s)require special positioning.Refer to
scaled plate plot details for special positioning
requirements.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 B06 COMN 1 1
Seal#: 2598 AO _
= 5-10" -}- 5'10" -
Dar4X4(R1)
T 12
6 7-
io
r> �—z3X6(++)C E 1114X6(++)
ch
M FO
1 =2X4(A1)B J I F-2X4(A1)
4-3/11111.5X3
A L K III 1.5X4 C'
III 1.5X4
SEAT PLATE REQ. SEAT PLATE REQ.
11'8"
1'4" 2-7-5/8" 64-3/4" 2-7-5/8" 1'4"�{
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.292 K 467 360 Loc R+ /R- /Rh /Rw /LI /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.539 K 253 240 B 525 /- /- /320 /133 /111
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.295 H - - F 525 /- /- /320 /133 /-
EXP:B Kzt:NA HORZ TL: 0.544 H Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 B Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf F Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.970
P Bearings B&F are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.306
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.453 Bearings B&F require a seat plate.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 35 0 D-E 421 -795
Lumber B-C 244 -328 E-F 237 -328
C-D 412 -795 F-G 35 0
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Plating Notes
B-K 132 -73 J-H 749 -248
(++)-This plate works for both joints covered. C-L 601 -163 1-F 132 -69
Purlins L-J 749 -248 H-E 601 -174
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows: Maximum Web Forces Per Ply(Ibs)
Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp. Webs Tens. Comp.
BC 30 0.15 2.64 L-K 81 -16 1-H 81 -15
BC 88 2.18 9.48
BC 30 9.03 11.52 D-J 184 0
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 C01 GABL 1 1
Seal#: 2599
107# 67# 67# 67#
+ 67 i + 67# + 67#
+ 107#
3'0-3/8"
37-7/8" 12'8-1/4" 37-7/8"
10' 10'
PB4X6(R1)
�4E2 H
figfiXBC ikfiXB
m3X10(R3)6 0�3X10(63)
dT A K 1II
N M L
=5X6
SEAT PLATE REQ. SEAT PLATE REQ.
20'
I-T4"'i F-1'4"-�
30-3/8"---I-2'0-3/8"T 2'-T-2' 1 1 2'44#♦T 2'T 2'0-3/8".Jy
104# 44# 44# 44#1 44# 44# 104#
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LQ: 0.212 D 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.411 D 575 240 B 2322 /- /- /- /512 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.089 D - - J 2322 /- /- /- /512 /-
EXP:B Kzt:NA ft HORZ(TL): 0.172 D Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00
NCBCLL: 10.00 Building Code: Creep Factor:2.0 B Brg Width=7.6 Min Req= 2.7
TCDL:4.2 psf J Brg Width=7.6 Min Req= 2.7
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.699
P Bearings B&J are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.985
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Varies by Ld Case Max Web CSI: 0.418 Bearings B&J require a seat plate.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 75 -16 F-G 522 -2198
Lumber Wind B-C 767 -4103 G-H 469 -2260
C-D 427 -2450 H-1 427 -2450
Top chord:2x4 SP M-30; Wind loads and reactions based on MWFRS. D-E 469 -2260 I-J 767 -4103
Bot chord:2x4 SP M-30; Wind loading based on both gable and hip roof types. E-F 522 -2198 J-K 75 -16
Webs:2x4 SP#3;
Additional Notes
Special Loads Maximum Bot Chord Forces Per Ply(Ibs)
(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) See Al Std Detail for gable wind bracing and other Chords Tens.Comp. Chords Tens. Comp.
requirements.
TC:From 62 plf at -1.33 to 62 plf at 3.03
TC:From 31 plf at 3.03 to 31 plf at 16.97 B-N 3601 -587 M-L 3608 -581
TC:From 62 plf at 16.97 to 62 plf at 21.33 N-M 3608 -581 L-J 3601 -587
BC:From 14 plf at 0.00 to 14 plf at 3.03
BC:From 7 plf at 3.03 to 7 plf at 16.97 Maximum Web Forces Per Ply(Ibs)
BC:From 14 plf at 16.97 to 14 plf at 20.00 Webs Tens.Comp. Webs Tens. Comp.
TC: 107 lb Conc.Load at 3.03,16.97
TC: 67 lb Conc.Load at 5.06,7.06,9.06,10.94 C-N 159 0 F-Q 1098 -259
12.94,14.94 C-O 327 -1357 Q-R 332 -1373
BC: 104 lb Conc.Load at 3.03,16.97 C-M 90 -267 R-S 330 -1366
BC: 44 lb Conc.Load at 5.06,7.06,9.06,10.94 O-P 330 -1366 S-1 327 -1357
12.94,14.94 P-Q 332 -1373 L-1 159 0
Plating Notes M-1 90 -267
All plates are 1.5X3 except as noted.
Maximum Gable Forces Per Ply(Ibs)
Purlins Gables Tens.Comp. Gables Tens. Comp.
In lieu of structural panels or rigid ceiling use purlins D-O 63 -214 R-G 86 -267
to laterally brace chords as follows: E-P 86 -267 S-H 63 -214
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 3.01 16.99 Q M 379 39
BC 117 0.15 19.85
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Loading
Truss designed to support 2-0-0 top chord outlookers
and cladding load not to exceed 8.00 PSF one face
and 24.0"span opposite face.Top chord must not be
cut or notched,unless specified otherwise.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 CO2 COMN 2 1
Seal#: 2600
t= 10, '{ 10,
D=4X4
12
6 1.5X3 C E_1.5X3
M
v
in
rn
3X4(A1)B F=3X4(A1)
4-3/16" A G.
H
=5X6
SEAT PLATE REQ. SEAT PLATE REQ.
20'
�-1'4" 1'4"-{
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.039 H 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.074 H 999 240 B 843 /- /- /491 /210 /167
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.017 H - - F 843 /- /- /491 /210 /-
EXP:B Kzt:NA HORZ TL: 0.033 H Wind reactions based on MWFRS
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 B Brg Width=7.6 Min Req= 1.5
TCDL:4.2 psf F Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.285
P Bearings B&F are a rigid surface.
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.779
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.201 Bearings B&F require a seat plate.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 A-B 35 0 D-E 398 -926
Lumber B-C 515 -1253 E-F 515 -1253
C-D 398 -926 F-G 35 0
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Purlins
B-H 1068 -354 H-F 1068 -357
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply(Ibs)
BC 120 0.15 19.85 Webs Tens.Comp. Webs Tens. Comp.
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above. C-H 257 -344 H-E 257 -344
D-H 518 -147
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 CJ1 JACK 6 1
Seal#: 2601
12
6 C
2X4(A1) B
0
4-3/16" � LO
A p
SEAT PLATE REQ.
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 197 /- /- /171 /69 /36
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): -0.000 D D 6 /-11 /- /14 /12 /-
EXP:B Kzt:NA HORZ TL: 0.000 D C - /-33 /- /31 /40 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.205
TPI Std: 2014 Max BC CSI: 0.027 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 B-C 46 -29
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins B-D 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 10 0.15 0.97
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 CJ1A JACK 1 1
Seal#: 2602
12
6 C
III 1.5X3B
T
io A iv
rn
HB 7-7/16" (�l
00
1113X6E D
SEAT PLATE REQ.
1-4-3/4"-1 /�
1f 0 15/16d
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.000 B 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.000 B 999 240 E 178 /- /- /171 /81 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.000 B - - D 15 /- /- /6
EXP:B Kzt:NA HORZ TL: 0.000 B C - /-32 /- /49 /58 /36
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf E Brg Width=6.9 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.161
TPI Std: 2014 Max BC CSI: 0.007 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.098 Bearing E is a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing E requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 37 0 B-C 157 -60
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp.
Purlins
E-D 0 0
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply(Ibs)
BC 11 0.00 0.91 Webs Tens.Comp.
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above. B-E 329 -172
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 CJ3 JACK 3 1
Seal#: 2603
C
12
6 [7- T
0
2X4(A1) B LO
4_3„
A D
SEAT PLATE REQ.
1'4" B I 2'11-11/16"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 220 /- /- /165 /49 /72
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.001 D D 43 /- /- /20
EXP:B Kzt:NA HORZ TL: 0.001 D C 66 /- /- /38 /38 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.210
TPI Std: 2014 Max BC CSI: 0.058 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 B-C 30 -78
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins B-D 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 34 0.15 2.97
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 CJ3A JACK 1 1
Seal#: 2604
C
12
6
III1.5X3B
T o
A N
rn
HB 1'11-7/16"
co
1
1113X6 E D
SEAT PLATE REQ.
3p1/2 1-11-7/16"
1'4-3/4"
2'2-15/16"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.000 B 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.000 B 999 240 E 193 /- /- /170 /78 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): -0.000 B - - D 38 /- /- /16
EXP:B Kzt:NA HORZ TL: 0.000 B C 45 /- /- /35 /21 /60
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf E Brg Width=6.9 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.159
TPI Std: 2014 Max BC CSI: 0.044 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.088 Bearing E is a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing E requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 37 0 B-C 147 -56
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp.
Purlins
E-D 0 0
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply(Ibs)
BC 27 0.00 2.24 Webs Tens.Comp.
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above. B-E 295 -178
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 CJ5 JACK 3 1
Seal#: 2605
C
12
6
_o
(V
M
2X4(A1)B
4-6„
A p
SEAT PLATE REQ.
1'4" 'I` 4'11-11/16" -i
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 288 /_ /_ /257 /79 /109
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.005 D D 77 /- /- /102 /47 /-
EXP:B Kzt:NA HORZ TL: 0.008 D C 128 /- /- /85 /69 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.444
TPI Std: 2014 Max BC CSI: 0.240 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 B-C 57 -138
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins B-D 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 58 0.15 4.97
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 HJ3 HIP_ 2 1
Seal#: 2607
-20#
T-2'9-5/8"
C
12 T T
4.24 p ____E
00
2X4(A1)B
I
A D
SEAT PLATE REQ.
1'10-5/8" 42-3/16"
1'4-1/2"1
12#
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LQ: NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 169 /- /- /- /97 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): -0.002 D D 61 /-1 /- /- /9 /-
EXP:B Kzt:NA HORZ TL: 0.003 D C 40 /-5 /- /- /14 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
.00 TCDL:4.2 psf Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
NCBCLL: 10
Soffit: 0..0 p FBC 7th Ed.2020 Res. Max TC CSI: 0.089 B Brg Width=10.0 Min Req= 1.5
BCDL:4.2 psf D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.121
Re Fac:Varies b Ld Case Max Web CSI: 0.000 C Brg Width i 1.id Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft p y Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 19 -8 B-C 21 -11
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Special Loads Chords Tens.Comp.
------(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) B-D 0 0
TC:From 0 plf at -1.89 to 61 plf at 0.00
TC:From 2 plf at 0.00 to 2 plf at 4.18
BC:From 2 plf at 0.00 to 2 plf at 4.18
TC: -20 lb Conc.Load at 1.38
BC: 12 lb Conc.Load at 1.38
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 48 0.15 4.18
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 HJ7 HIP_ 1 1
Seal#: 2608
-20# 256#
132 6
}
2'9-5/8"
DT
12
4.24 p
3X4j!g;: °J
o
m
ro
"v
=2X4(A1)B
4-3%i 66" GG FF EE
i A 1111.SX3 =4X4
SEAT PLATE REQ.
�-110-5/8" -}- 9'10-1/16" -
1�4-9/16" 2'9-15/16" 2'9-15/16"
86#
12# 155#
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LQ: 0.043 G 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed ILL:NA Cs:NA VERT(CL): 0.078 G 999 240 B 739 /- /- /- /344 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.012 F - - E 490 /- /- /- /181 /-
EXP:B Kzt:NA HORZ TL: 0.021 F D 245 /- /- /- /112 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
.00 TCDL:4.2 psf Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
NCBCLL: 10
Soffit: 0..0 p FBC 7th Ed.2020 Res. Max TC CSI: 0.677 B Brg Width=10.0 Min Req= 1.5
BCDL:4.2 psf E Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.999
Re Fac:Varies b Ld Case Max Web CSI: 0.904 D Brg Width i 1.id Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft p y Bearing B is a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 37 -16 C-D 82 -115
Top chord:2x4 SP M-30; B-C 608 -1457
Bot chord:2x4 SP#2;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Special Loads Chords Tens.Comp. Chords Tens. Comp.
------(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25)
B-G 1355 -546 F-E 0 0
TC:From 61 plf at -1.89 to 61 plf at 9.84
BC:From 14 plf at 0.00 to 14 plf at 9.84 G-F 1339 -544
TC: -20 lb Conc.Load at 1.38
TC: 132 lb Conc.Load at 4.21 Maximum Web Forces Per Ply(Ibs)
TC: 256 lb Conc.Load at 7.03 Webs Tens.Comp. Webs Tens. Comp.
BC: 12 lb Conc.Load at 1.38
BC: 86 lb Conc.Load at 4.21 G-C 253 -23 C-F 568 -1397
BC: 155 lb Conc.Load at 7.03
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 88 0.15 9.84
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 HJ7S HIP_ 1 1
Seal#: 2609
66# -12# 173#
♦ ? 2'9-5/8"
C
2 t 4.24 p
III1.5X3 B
T -
A
1 111
E D
III1.5X4
SEAT PLATE REQ.
F-1'11-11/16" 1/r' 5'8-1/4"
611-3/4"
4�3/ 5/16" 1'10-5/8"
43# 116#
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LQ: -0.000 B 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.001 B 999 240 E 320 /- /- /- /156 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): -0.000 B - - D 102 /- /- /- /16 /-
EXP:B Kzt:NA HORZ TL: 0.000 B C 93 /- /- /- /57 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf E Brg Width=9.0 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.723
TPI Std: 2014 Max BC CSI: 0.557 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
Re Fac:Varies b Ld Case Max Web CSI: 0.044 C Brg Width i 1.id Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft p y Bearing E is a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing E requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 20 -8 B-C 41 -49
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp.
Special Loads
E-D 0 0
------(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25)
TC:From 0 plf at -1.97 to 61 plf at 0.00
TC:From 2 plf at 0.00 to 2 plf at 5.98 Maximum Web Forces Per Ply(Ibs)
BC:From 2 plf at 0.00 to 2 plf at 5.98 Webs Tens.Comp.
TC: 66 lb Conc.Load at 0.35
TC: -12 lb Conc.Load at 1.29 B-E 149 -207
TC: 173 lb Conc.Load at 3.17
BC: 43 lb Conc.Load at 0.35
BC: 15 lb Conc.Load at 1.29
BC: 116 lb Conc.Load at 3.17
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 72 0.00 5.98
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 HJ131 HIP_ 2 1
Seal#: 2610 AO _
97#
D T
12
5.54 p =-1.5X3C
v I �
2X4(A1)B
1
A II1.5X G
4
SEAT PLATE REQ.
1'5" 210-1/4" 1'5-3/4"�{
4'3-15/16"
2'8-5/16"
68#
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LQ: 0.023 G 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.044 G 999 240 B 161 /- /- /- /37 /-
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.012 G - - E 50 /- /- /- /4 /-
EXP:B Kzt:NA Des TL: 0.024 G D 73 /- /- /- /23 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=8.3 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.320
TPI Std: 2014 Max BC CSI: 0.100 E Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
Re Fac:Varies b Ld Case Max Web CSI: 0.100 D Brg Width i 1.id Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft p y Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 18 -8 C-D 30 -12
Top chord:2x4 SP#2; B-C 17 -47
Bot chord:2x4 SP#2;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Special Loads Chords Tens.Comp. Chords Tens. Comp.
------(Lumber Dur.Fac.=1.25/Plate Dur.Fac.=1.25) B-F 13 -7 G-E 0 0
TC:From -0 plf at -1.42 to 62 plf at 0.00
TC:From 2 plf at 0.00 to 2 plf at 4.33 C-G 9 0
BC:From 2 plf at 0.00 to 2 plf at 4.33
TC: 97 lb Conic.Load at 2.69 Maximum Web Forces Per Ply(Ibs)
BC: 68 lb Conc.Load at 2.69 Webs Tens.Comp.
Purlins G-F 75 0
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 32 0.15 2.85
BC 23 2.39 4.33
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses-Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 J3 EJAC 8 1
Seal#: 2611
C
12
6
M -
O W
2X4(A1)B
4-36„
N
A p
SEAT PLATE REQ.
1'4" B I a 3'
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 221 /- /- /166 /49 /73
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.001 D D 44 /- /- /20
EXP:B Kzt:NA HORZ TL: 0.001 D C 67 /- /- /39 /39 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.210
TPI Std: 2014 Max BC CSI: 0.059 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 B-C 30 -79
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins B-D 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 34 0.15 3.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 J34 JACK 4 1
Seal#: 2612
C
12
6
ao
M �
t �
O ,
2X4(A1) B N N
4-33 6" A
D
1, 31411
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 201 /- /- /180 /56 /74
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.001 D D 51 /- /- /67 /31 /-
EXP:B Kzt:NA HORZ TL: 0.002 D C 83 /- /- /55 /45 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=3.0 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.141
TPI Std: 2014 Max BC CSI: 0.093 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber:
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11
Lumber A-B 26 0 B-C 37 -76
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2; Maximum Bot Chord Forces Per Ply(Ibs)
Chords Tens.Comp.
Purlins
B-D 0 0
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 39 0.13 3.33
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674132 J3GE JACK 1 1
Seal#: 2613
III 1.5X3C
12
6T I
SO
2X4(A1) B T SO
CV
4-3/16"
A D III 1.5X4
SEAT PLATE REQ.
2r7-11/16"
1 r4rr
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs),or*=PLF
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA D* 106 /- /- /77 /13 /18
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.000 D Wind reactions based on MWFRS
Des Ld: 37.00 EXP:B Kzt:NA HORZ(TL): 0.001 D D Brg Width=31.7 Min Req= -
Mean Height:15.00 ft Building p Code: Creep Factor:2.0 Bearing B is a rigid surface.
NCBCLL: 10.00 TCDL:4.2 psf Bearing B requires a seat plate.
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.137
Load Duration:1.25 MWFRS Parallel Dist:h to 2h TPI Std: 2014 Max BC CSI: 0.041 Maximum Top Chord Forces Per Ply(Ibs)
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.048 Chords Tens.Comp. Chords Tens. Comp.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: A-B 35 0 B-C 23 -56
GCpi:0.18 Plate Type(s):
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Maximum Bot Chord Forces Per Ply(Ibs)
Lumber Chords Tens.Comp.
Top chord:2x4 SP#2; B-D 178 -39
Bot chord:2x4 SP#2;
Webs:2x4 SP#3;
Maximum Web Forces Per Ply(Ibs)
Purlins Webs Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins C-D 113 -54
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 30 0.15 2.64
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 J7 EJAC 7 1
Seal#: 2614
C
12
6 F�e;- io
M
O �
(M 7
V
2X4(A1)B
J� A
D
SEAT PLATE REQ.
1r4r + T _I
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA B 361 /- /- /324 /94 /145
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.015 D D 111 /- /- /148 /69 /-
EXP:B Kzt:NA HORZ TL: 0.027 D C 187 /- /- /126 /100 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.711
TPI Std: 2014 Max BC CSI: 0.457 D Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2
C Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 Bearing B is a rigid surface.
Loc.from endwall:not in 4.50 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 B-C 84 -150
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Maximum Bot Chord Forces Per Ply(Ibs)
Purlins Chords Tens.Comp.
In lieu of structural panels or rigid ceiling use purlins B-D 0 0
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 75 0.15 7.00
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 J7C EJAC 8 1
Seal#: 2615
D
T
12
6 F h
0
M (V
W
O
� 1113X4(++)C
v
2X4(A1)B HB 4-5-7/8" E
a-�• 1
A �GG
III 1.5X4
SEAT PLATE REQ.
1'4" 2'6-1/8" 1 Tr 4'4-3/8"
7'
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.171 F 482 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.316 F 260 240 B 361 /- /- /246 /62 /145
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.081 G - - E 98 /- /- /52
EXP:B Kzt:NA HORZ TL: 0.151 G D 190 /- /- /122 /98 /-
Des Ld: 37.00 Mean Height:15.00 ft ( )
NCBCLL: 10.00 Building Code: Creep Factor:2.0 Wind reactions based on MWFRS
TCDL:4.2 psf B Brg Width=7.6 Min Req= 1.5
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.786
TPI Std: 2014 Max BC CSI: 0.348 E Brg Width=1.5 Min Req= -
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h
D Brg Width=1.5 Min Req= -
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.279 Bearing B is a rigid surface.
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber: Bearing B requires a seat plate.
GCpi:0.18 Plate Type(s): Maximum Top Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 35 0 C-D 85 -121
Top chord:2x4 SP#2; B-C 0 -197
Bot chord:2x4 SP#2;
Webs:2x4 SP#3;
Maximum Bot Chord Forces Per Ply(Ibs)
Plating Notes Chords Tens.Comp. Chords Tens. Comp.
(++)-This plate works for both joints covered. B-H 84 -84 G-E 0 0
Purlins C-G 79 -36 H-F 0 0
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows: Maximum Web Forces Per Ply(Ibs)
Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp.
BC 30 0.15 2.64
BC 58 2.18 7.00 G-H 72 27
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 VM02 VAL 2 1
Seal#: 2616
1'3-9/16"
12
6
B
77
A2M(MR) iv
t
CD
1'1 0-1/2"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs),or*=PLF
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.005 B 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.009 B 999 240 D* 76 /- /- /38 /8 /12
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.002 B - - Wind reactions based on MWFRS
Des Ld: 37.00 EXP:B Kzt:NA HORZ(TL): 0.004 B D Brg Width=22.5 Min Req= -
Mean Height:15.00 ft BuildingCode: Creep Factor:2.0 Bearing A is a rigid surface.
NCBCLL: 10.00 TCDL:4.2 psf p
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.059 Maximum Top Chord Forces Per Ply(Ibs)
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.098 Chords Tens.Comp.
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.000 A-B 0 -21
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber:
GCpi:0.18 Plate Type(s): Maximum Bot Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp.
Lumber A C 72 8
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 23 0.00 1.88
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See Al Std Detail for valley details.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 VM04 VAL 2 1
Seal#: 2617 AO _
12 III 1.5X3 B
6 � T
(V
A
3:yZ„
C III1.5X4
�2X4(D8R)
3'411
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs),or*=PLF
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl L/# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): NA Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): NA C* 76 /- /- /49 /17 /17
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): 0.002 C Wind reactions based on MWFRS
Des Ld: 37.00 EXP:B Kzt:NA HORZ(TL): 0.004 C C Brg Width=40.0 Min Req= -
Mean Height:15.00 ft BuildingCode: Creep Factor:2.0 Bearing A is a rigid surface.
NCBCLL: 10.00 TCDL:4.2 psf p
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.186 Maximum Top Chord Forces Per Ply(Ibs)
Load Duration:1.25 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.117 Chords Tens.Comp.
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.061 A-B 36 -81
Loc.from endwall:Any FT/RT:10(0)/10(10) Mfg Specified Camber:
GCpi:0.18 Plate Type(s): Maximum Bot Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp.
Lumber A-C 162 -20
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Web Forces Per Ply(Ibs)
Webs Tens.Comp.
Purlins
B-C 160 -86
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 40 0.00 3.33
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See Al Std Detail for valley details.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 VM05 VAL 1 1
Seal#: 2618 AO _
1111.5X3C
12
6
N
1112X4 B \
7 A N
N
M
1
E D
113X4 1111.5 4
j= 3'4"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs),or"=PLF
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.000 C 999 360 Loc R+ /R- /Rh /Rw /U /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.000 C 999 240 D* 94 /- /- /66 /11 /16
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): -0.035 C - - Wind reactions based on MWFRS
Des Ld: 37.00 EXP:B Kzt:NA HORZ(TL): 0.045 C D Brg Width=40.0 Min Req= -
Mean Height:15.00 ft BuildingCode: Creep Factor:2.0 Bearing E is a rigid surface.
NCBCLL: 10.00 TCDL:4.2 psf p
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.227 Maximum Top Chord Forces Per Ply(Ibs)
Load Duration:1.25 MWFRS Parallel Dist:h to 2h TPI Std: 2014 Max BC CSI: 0.112 Chords Tens.Comp. Chords Tens. Comp.
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.267 A-B 26 0 B-C 38 -65
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber:
GCpi:0.18 Plate Type(s): Maximum Bot Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp.
Lumber E-D 143 -32
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Web Forces Per Ply(Ibs)
Webs Tens.Comp. Webs Tens. Comp.
Bracing B-E 165 -171 C-D 167 -95
Fasten rated sheathing to one face of this frame.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 40 0.00 3.33
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See Al Std Detail for valley details.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
Job: Truss Truss Type Qty Ply 05/10/2021
CRMSBM1674B2 VM06 VAL 1 1
Seal#: 2619 AO _
III1.5X3C
12
6
=3g4(R
T A M
N
C;
(V
1
E D
III .5X4 1113X6( )
j= 3'4"
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs),or*=PLF
TCLL: 20.00 Wind Std: ASCE 7-16 Pg:NA Ct:NA CAT:NA PP Deflection in loc L/defl U# Gravity Non-Gravity
TCDL: 10.00 Speed: 160 mph Pf:NA Ce:NA VERT(LL): 0.000 C 999 360 Loc R+ /R- /Rh /Rw /L1 /RL
BCLL: 0.00 Enclosure:Closed Lu:NA Cs:NA VERT(CL): 0.001 C 999 240 D* 94 /- /- /66 /24 /37
BCDL: 7.00 Risk Category:II Snow Duration:NA HORZ(LL): -0.001 C - - Wind reactions based on MWFRS
Des Ld: 37.00 EXP:B Kzt:NA Des 0.001 C D Brg Width=40.0 Min Req= -
Mean Height:15.00 ft BuildingCode: Creep Factor:2.0 Bearing E is a rigid surface.
NCBCLL: 10.00 TCDL:4.2 psf p
Soffit: 0.00 BCDL:4.2 psf FBC 7th Ed.2020 Res. Max TC CSI: 0.187 Maximum Top Chord Forces Per Ply(Ibs)
Load Duration:1.25 MWFRS Parallel Dist:h/2 to h TPI Std: 2014 Max BC CSI: 0.096 Chords Tens.Comp. Chords Tens. Comp.
Spacing:24.0" C&C Dist a:3.00 ft Rep Fac:Yes Max Web CSI: 0.105 A-B 26 0 B-C 40 -84
Loc.from endwall:not in 9.00 ft FT/RT:10(0)/10(10) Mfg Specified Camber:
GCpi:0.18 Plate Type(s): Maximum Bot Chord Forces Per Ply(Ibs)
Wind Duration:1.60 WAVE VIEW Ver:20.02.01A.1209.11 Chords Tens.Comp.
Lumber E-D 39 -40
Top chord:2x4 SP#2;
Bot chord:2x4 SP#2;
Webs:2x4 SP#3; Maximum Web Forces Per Ply(Ibs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins B-E 111 -170 C-D 148 -95
In lieu of structural panels or rigid ceiling use purlins B-D 257 -77
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
BC 40 0.00 3.33
Apply purlins to any chords above or below fillers
at 24"OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.Deflection
meets L/360.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See Al Std Detail for valley details.
**WARNING** Please thoroughly review the"A-1 ROOF TRUSSES("SELLER"),GENERAL TERMS and CONDITIONS CUSTOMER("BUYER")ACKNOWLEDGMENT"form.
Verify design parameters and read notes on this Truss Design Drawing(TDD)and the Specialty Engineer reference sheet before use.Unless otherwise stated on the TDD,only Alpine
connector plates shall be used for the TDD to be valid.As a Truss Design Engineering(i.e.Specialty Engineer),the seal on any TDD represents an acceptance of the professional engineerin
responsibility for the design of the single Truss depicted on the TDD only,under TPI-1.The design assumptions,loading conditions,suitability and use of this Truss for any Building is the Rama Panay Kristam,P.E.
responsibility of the Owner,the Owner's authorized agent or the Building Designer,in the context of the IRC,the IBC,local building code and TPI-1. The approval of the TDD and any field #88906
use of the Truss,including handling,storage,installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4451 St.Lucie Blvd,Suite 201
guidelines of the Building Component Safety Information(BSCI)published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Fort Pierce,FL 34946
Designer,Specialty Engineer and Truss Manufacturer,unless otherwise defined by a Contract agreed upon in writing by all parties involved.The Specialty Engineer is NOT the
Building Designer or Truss System Engineer of any building.All capitalized terms are as defined in TPI-1.
Copyright©2016 A-1 Roof Trusses—Reproduction of this document,in any form,is prohibited without the written permission of A-1 Roof Trusses.
10/28/2020 HIP/ KING JACK (TYPICAL) STDL 01 .0
CORNERSET GENERAL SPECIFICATIONS:
MAX LOAD: 55 PSF ROOF LOAD, 175 MPH, ASCE 7-10, EXP. B &C, UP TO 60'
MEAN ROOF HEIGHT & EXPOSURE D UP TO 30' MEAN ROOF HEIGHT.
A-1 ROOF TRUSSES
4451 ST.LUCIE BLVD.
FORT PIERCE,FL. 34946
(772)409-1010
ATTACH END JACKS USING (4)
0.131"O TOE NAILS AT TOP
CHORD & (3) 0.131"O TOE
NAILS AT BOTTOM CHORD.
ATTACH KING JACK USING X
(3) 0.131"0 TOE NAILS AT Q
TOP CHORD & BOTTOM
CHORD. p
ATTACH CORNER JACKS USING
(2) 0.131"0 TOE NAILS AT TOP &
BOTTOM CHORDS (TYP).
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
5/28/2020 HIP/ KING JACK (HVHZ) STDL 02.2
HIGH VELOCITY HURRICANE ZONE CORNERSET SPECIFICATIONS:
MAX LOAD: 55 PSF ROOF LOAD, 175 MPH,ASCE 7-10, EXP. B &C, UP TO 60'
MEAN ROOF HEIGHT & EXPOSURE D UP TO 30' MEAN ROOF HEIGHT.
A-1 ROOF TRUSSES
4451 ST.LUCIE BLVD.
FORT PIERCE,FL. 34946
(772)409-1010
ATTACH KING & END JACK
WITH (1) THJA26 HANGER
OR EQUIVALENT AT
BOTTOM CHORD X
Q
ATTACH KING & END JACKS
WITH (1) LSTA12 TWIST STRAP AT TOP CHORD WITH (10) 1Od
NAILS PER STRAP (MIN.) & (3)
0.131"0 TOE NAILS.
ATTACH CORNER JACKS &
STD. JACKS WITH (1) LSTA12
TWIST STRAP AT TOP CHORD
& BOTTOM CHORD WITH (10)
1 Od NAILS PER STRAP
MINIMUM (TYP).
NOTE: IN ADDITION TO STRAPPING TOE- NAIL
BOTH CHORDS OF CORNER JACKS TO CARRYING
MEMBER PER THE FOLLOWING SCHEDULE:
xi • 2X4: (2) 0.131"0 TOE NAILS
• 2X6: (3) 0.131"0 TOE NAILS
LSTA12 TWIST STRAP WITH 1 OD NAILS,
MIN. (10). SEE MFR'S
\ RECOMMENDED CONNECTION.
HIP, OR KING JACK (TYP.)
JACK, OR CORNER JACK (TYP.)
IMPORTANT NOTE:
CONNECTION DESIGNED IN ACCORDANCE WITH FBC 2321.6-
2321.7 PROVIDING METAL STRAPPING (FLORIDA APPROVED
PRODUCT) TO RESIST MIN. 700LB UPLIFT AT ALL CONNECTIONS
IN HIGH VELOCITY HURRICANE ZONE.
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
FEBRUARY 17, 2017 ALTERNATE GABLE END BRACING DETAIL STDTL03
ALTERNATE DIAGONAL BRACING TO THE BOTTOM CHORD
HORIZONTAL BRACE 2X6 DIAGONAL BRACE SPACED 48'
(SEE SECTION A-A) O.C. ATTACHED TO VERTICAL WITH
USSSES @ (4) - 16d NAILS, AND ATTACHED TO
TR
US O.C. BLOCKING WITH (5) - 10d COMMONS.
NAIL DIAGONAL BRACE TO
PURLIN WITH TWO 16d NAILS.
A-1 ROOF TRUSSES
4451 ST.LUCIE BLVD. _ 2X4 PURLIN FASTENED TO FOUR
FORT PIERCE,FL 34946
772-409-1010 TRUSSES WITH (2) - 16d NAILS
1' - 3' MAX. EACH. FASTEN PURLIN TO BLOCKING
W/ (2) - 16d NAILS (MIN.).
PROVIDE 2X4 BLOCKING BETWEEN
DIAG. BRACE THE TRUSSES SUPPORTING THE
AT 1/3 POINTS BRACE AND THE TWO TRUSSES ON
IF NEEDED \ EITHER SIDE AS NOTED. TOENAIL
\ BLOCKING TO TRUSSES WITH (2) -
\ \ 10d NAILS AT EACH END. ATTACH
DIAGONAL BRACE TO BLOCKING WITH
IT IS THE RESPONSIBILITY OF THE BLDG. \ (5) - 10d COMMON WIRE NAILS.
DESIGNER OR THE PROJECT ENGINEER/ARCHITECT \
TO DESIGN THE CEILING DIAPHRAGM AND ITS
ATTACHMENT TO THE TRUSSES TO RESIST ALL
OUT OF PLANE LOADS THAT MAY RESULT FROM ;r „,:�,; .;w. {,;• : , s :.•,,
THE BRACING OF THE GABLE ENDS.
END WALL CEILING SHEATHING
BRACING REQUIREMENTS FOR STRUCTURAL GABLE TRUSSES
STRUCTURAL GABLE TRUSSES MAY BE BRACED AS NOTED:
METHOD 1: ATTACH A MATCHING GABLE TRUSS TO THE INSIDE FACE STRUCTURAL
OF THE STRUCTURAL GABLE AND FASTEN PER THE
FOLLOWING NAIL SCHEDULE. GABLE TRUSS
METHOD 2: ATTACH 2X SCABS TO THE FACE OF EACH VERTICAL
MEMBER ON THE STRUCTURAL GABLE PER THE FOLLOWING
NAILING SCHEDULE. SCABS ARE TO BE OF THE SAME
SIZE, GRADE, AND SPECIES AS THE TRUSS VERTICALS. SCAB ALONG
NAILING SCHEDULE: VERTICAL
- FOR WIND SPEEDS 120 MPH (ASCE 7-98, 02, 05), 150 MPH (ASCE
7-10) OR LESS, NAIL ALL MEMBERS WITH ONE ROW OF 10d (.131'
X 3') NAILS SPACED 6' O.C.
- FOR WIND SPEEDS GREATER 120 MPH (ASCE 7-98, 02, 05), 150
MPH (ASCE 7-10) NAIL ALL MEMBERS WITH TWO ROWS OF 10d •
(.131'X3') NAILS SPACED 6' O.C. (2X4 STUDS MINIMUM).
MAXIMUM STUD LENGTHS ARE LISTED ON PAGE 1. ALL • •
BRACING METHODS SHOWN ON PAGE 1 ARE VALID
f
AND ARE TO BE FASTENED TO THE SCABS OR
VERTICAL STUDS OF THE STANDARD GABLE TRUSS
N THE INTERIOR SIDE OF THE STRUCTURE. INLAYED STUD
STRUCTUAN ADEQUATE DIAPHRAGM OR OTHER METHOD OF BRACING
GABLE TR MUST BE PRESENT TO PROVIDE FULL LATERAL SUPPORT OF
THE BOTTOM CHORD TO RESIST ALL OUT OF PLANE LOADS.
THE BRACING SHOWN IN THIS DETAIL IS FOR
VERTICAL/STUDS ONLY.
NOTE: THIS DETAIL IS TO BE USED ONLY FOR
STRUCTURAL GABLES WITH INLAYED /
STUDS. TRUSSES WITHOUT INLAYED
STUDS ARE NOT ADDRESSED HERE.
STANDARD GABLE /
TRUSS
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
12/23/19 PIGGY-BACK TRUSS STDTL04.1
_ PIGGY-BACK DETAIL(TYPICAL)
180 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG.
LOCATED ANYWHERE AT ROOF, EXPOSURE C, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00.
OR...
160 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG.
LOCATED ANYWHERE AT ROOF, EXPOSURE D, WIND D.L.=5.0 P.S.F. (MIN.), KZT= 1.00.
IMPORTANT NOTE:
ROOFSE
4451 ST. S TOP CHORDS OF TRUSSES SUPPORTING PIGGY-BACK CAP TRUSSES MUST BE ADEQUATELY
45 LUCIE LUCIE B LVO.
FORT PIERCE,FL 34946 BRACED BY SHEATHING AND/OR PURLINS. THE BUILDING ENGINEER OF RECORD SHALL
772-409-1010 PROVIDE DIAGONAL BRACING OR OTHER SUITABLE ANCHORAGE TO PERMANENTLY
RESTRAIN PURLINS AND LATERAL BRACING FOR OUT OF PLANE LOADS OVER GABLE ENDS.
MAXIMUM TRUSS SPACING IS NOT TO EXCEED 24"O.C.
DETAIL IS NOT APPLICABLE IF CAP SUPPORTS ADDITIONAL LOADS SUCH AS CUPOLA,
STEEPLE, CHIMNEY OR DRAG STRUT LOADS.
"REFER TO ENGINEER'S SEALED TRUSS DESIGN DRAWINGS FOR PIGGY-BACK AND BASE
TRUSS SPECIFICATIONS."
OPTION #1:TEE-LOK MULTI-USE
PIGGY-BACK TRUSS. (REFER CONNECTION PLATE.
TO ACTUAL TRUSS DESIGN OPTION #2:APA RATED GUSSET.
DRAWINGS FOR ADDITIONAL OPTION #3:2X4 VERT.SCAB.
INFORMATION.)
ATTACH EACH PURLIN TO TOP
CHORD OF BASE TRUSS. PURLIN
&CONNECTIONS BY OTHERS.
BASE TRUSS. (REFER TO TRUSS
DESIGN DRAWINGS FOR
ADDITIONAL INFORMATION.)
2'-0" PURLINS SPACED ACCORDING
MAX TO MAX.SPACING OF TOP
CHORD OF BASE TRUSS.
SPACING IS NOT TO EXCEED 24"
OPTION NO. 1 -TEE-LOK O.C. & PURLINS TO BE LOCATED
3"x 8"TEE-LOK MULTI-USE CONNECTION PLATES SPACED AT JOINT OF EACH BASE TRUSS.
AT 4'-0"O.C. MAX. PLATES SHALL BE PRESSED INTO
PIGGY-BACK TRUSS AT 4'-0"O.C.STAGGERED FROM **IMPORTANT NOTE**
EACH FACE AND NAILED TO BASE TRUSS WITH 4 EACH THIS DETAIL IS VALID ONLY FOR SINGLE PLY BASE TRUSSES
6d (1.5"X 0.099") NAILS IN EACH PLATE TO ACHEIVE SPACED AT 24"O.C.OR LESS.
MAXIMUM UPLIFT CAPACITY OF 377 LBS AT EACH 3"X 8"
TEE-LOK MULTI-USE CONNECTION PLATE (MINIMUM OF 2
PLATES).
OPTION NO.2 - APA RATED GUSSET:
8"x 8"x 0-7/16" (MIN.) APA RATED SHEATHING GUSSETS
EACH FACE. ATTACH AT 8'-0"O.C.w/8 (EACH) 6d
COMMON (0.1 13"x 2") NAILS PER GUSSET: 4 (EACH) AT
CAP BOTTOM CHORD &4 (EACH) AT BASE TRUSS TOP
CHORD. GUSSETS MAY BE STAGGERED AT 4'-0"O.C.
FRONT TO BACK FACES. MINIMUM TWO (2 EA.)
CONNECTIONS AT EACH TRUSS.
OPTION NO.3 - 2X4 VERTICAL WOOD SCAB:
2X4 SPF #2, FULL CHORD DEPTH SCABS AT EACH FACE.
ATTACH AT 8'-0"O.C.w/6 (EACH) 1 Od BOX NAILS (0.128"
x 3") PER SCAB: 3 (EACH) AT CAP BOTTOM CHORD AND
3 (EACH) AT BASE TRUSS TOP CHORD. SCABS MAY BE
STAGGERED 4'-0"O.C. FRONT TO BACK FACES. Rama Pranav Kristam,P.E.
#88906
MINIMUM TWO (2 EA.) CONNECTIONS AT EACH TRUSS. 4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
JULY 17, 2017 TRUSSED VALLEY SET DETAIL - SHEATHED STDTL05
GENERAL SPECIFICATIONS:
1. NAIL SIZE=3"X 0.131"=10d
_ 2. WOOD SCREW=4.5"SDS25412 SIMPSON OR
EQUIVALENT.
3. INSTALL SHEATHING TO TOP CHORD OF BASE TRUSSES.
4. INSTALL VALLEY TRUSSES(24"O.C.MAXIMUM)AND
SECURE TO BASE TRUSSES AS PER DETAIL"A".
5. BRACE VALLEY WEBS IN ACCORDANCE WITH THE
A-1 ROOF TRUSSES INDIVIDUAL DESIGN DRAWINGS.
6. NAILING DONE PER NDS-01.
4451 ST.LUCIE BLVD. GABLE END,COMMON
FORT PIERCE,FL 34946 O 7. VALLEY STUD SPACING NOT TO EXCEED 48"O.C.
772-409-1010 TRUSS, R GIRDER
TRUSS
---i -- ——— -- --
� ii II
4 4 u n u u u u i� 11
i
' it II N ii ii ,I it n
ry ry n n u u it
i I u n u u
II it ij i u
1 u u i i
li li BASE TRUSSES
VALLEY TRUSS
(TYPICAL) 1
P 12 VALLEY TRUSS GABLE END,COMMON
(TYPICAL) TRUSS,OR GIRDER TRUSS
SEE DETAIL"A"
BELOW(TYP.)
TRUSS CRITERIA:
SECURE VALLEY TRUSS WIND DESIGN PER ASCE 7-98,ASCE 7-02,ASCE 7-05:146 MPH
W/ONE ROW OF 10d WIND DESIGN PER ASCE 7-10: 170 MPH
NAILS 6"O.C. MAX MEAN ROOF HEIGHT=30 FEET
ROOF PITCH=MINIMUM 3/12 MAXIMUM 6/12
CATERGORY II BUILDING
EXPOSURE C
WIND DURATION OF LOAD INCREASE:1.60
MAX TOP CHORD TOTAL LOAD=50 PSF
ATTACH 2X4 CONTINUOUS#2 MAX SPACING=24"O.C.(BASE AND VALLEY)
SYP TO THE ROOF W/TWO MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES.
SIMPSON SDS25412(1/4"X 4.5")
OR EQUIVALENT WOOD SCREWS
INTO EACH BASE TRUSS.
DETAIL A
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
FEBRUARY 5, 2018 TRUSSED VALLEY SET DETAIL STDTL06
GENERAL SPECIFICATIONS:
1. NAIL SIZE=3"X 0.131"=10d
2. WOOD SCREW=3"SDS25300 SIMPSON OR EQUIVALENT.
3. INSTALL VALLEY TRUSSES(24"O.C.MAXIMUM)AND SECURE PER DETAIL
„A„
4. BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIUAL DESIGN
DRAWINGS.
5. BASE TRUSS SHALL BE DESIGNED WITH A PURLIN SPACING EQUIVALENT
TO THE RAKE DIMENSION OF THE VALLEY TRUSS SPACING.
A-1 ROOF TRUSSES 6. NAILING DONE PER NDS-01.
4451 ST.LUCIE BLVD. GABLE END,COMMON
FORT PIERCE,FL 34946 7. VALLEY STUD SPACING NOT TO EXCEED 48"O.C.
772-409-1010 TRUSS,OR GIRDER
TRUSS
---I -- --- --
II II II II II II II II II II
II II II II II II II II II II
I I II II II II II II II II
II II I II II I II
II II II II II II �I jl
II II II II II II II II
I I II II II II
II II II II II j II
II II II II II II
I I
II II II II II II
I I
II II II Ij II
II II II II
II II II II
II li II
VALLEY TRUSS
it BASE TRUSSES
(TYPICAL) II
GABLE END,COMMON
TRUSS,OR GIRDER
-LL p �2 VALLEY TRUSS TRUSS
(TYPICAL)
SEE DETAIL"A"
BELOW(TYP.)
SECURE VALLEY TRUSS
W/ONE ROW OF 10d WIND DESIGN PER ASCE 7-98,ASCE 7-02,ASCE 7-05:146 MPH
NAILS 6"O.C. WIND DESIGN PER ASCE 7-10: 170 MPH
MAX MEAN ROOF HEIGHT=30 FEET
ROOF PITCH=MINIMUM 3/12 MAXIMUM 6/12
CATERGORY II BUILDING
EXPOSURE C
WIND DURATION OF LOAD INCREASE:1.60
ATTACH 2X4 CONTINUOUS#2 MAX TOP CHORD TOTAL LOAD=50 PSF
SYP TO THE ROOF W/TWO MAX SPACING=24"O.C.(BASE AND VALLEY)
SIMPSON SDS25300(1/4"X 3") MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES.
OR EQUIVALENT WOOD
SCREWS INTO EACH BASE
TRUSS.
DETAIL A
(NO SHEATHING) N.T.S.
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
JULY 17, 2017 TRUSSED VALLEY SET DETAIL STDTL07
HIGH WIND VELOCITY
NOTE:VALLEY STUD SPACING NOT TO
EXCEED 48"O.C.SPACING.
A-1 ROOF TRUSSES
4451 ST.LUCIE BLVD.
FORT PIERCE,FL 34946
772409-1010
ATTACH VALLEY TRUSSES TO LOWER TRUSSES
WITH USP RT7 OR EQUIVALENT.
WIND DESIGN PER ASCE 7-98,ASCE 7-02,ASCE 7-05:146 MPH
WIND DESIGN PER ASCE 7-10: 170 MPH
MAX MEAN ROOF HEIGHT=30 FEET
CATERGORY II BUILDING
EXPOSURE B OR C
WIND DURATION OF LOAD INCREASE:1.60
MAX TOP CHORD TOTAL LOAD=50 PSF
MAX SPACING=24"O.C.(BASE AND VALLEY)
SUPPORTING TRUSSES DIRECTLY UNDER VALLEY TRUSSES MUST BE
DESIGNED WITH A MAXIMUM UNBRACED LENGTH OF 2'-10"ON AFFECTED
TOP CHORDS.
NOTES:
1. SHEATHING APPLIED AFTER INSTALLATION OF VALLEY TRUSSES.
2. THIS DETAIL IS NOT APPLICABLE FOR SPF-S SPECIES LUMBER.
CLIP MAY BE APPLIED
TO THIS FACE UP TO A
NON-BEVELED MAXIMUM 6/12 PITCH NON-BEVELED
BOTTOM CHORD BOTTOM CHORD
0 0
000
00
0 0
FOR BEVELED BOTTOM CLIP MUST BE APPLIED TO
CHORD,CLIP MAY BE APPLIED THIS FACE WHEN PITCH
TO EITHER FACE. EXCEEDS 6/12(MAXIMUM
12/12 PITCH)
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
FEBRUARY 17,2017 STANDARD GABLE END DETAIL STDTL08
VERTICAL 2X6 SP OR SPF
STUDVBRACE
#2 DIAGONAL
TYPICAL 2X4 L-BRACE BRACE
NAILED TO 2X4 VERTICALS
W/lOd NAILS, 6' O.C. (4) - 16d
NAILS16d NAILS
VERTICAL SPACED 6' O.C.
STUD (2) 10d NAILS
INTO 2X62X6 SP OR
SPF #2
SECTION B-B 2X4 SP OR
A-1 ROOF TRUSSES SPF #2
4451 ST,LUCIE BLVD. L HORIZONTAL
FORT PIERCE,FL 34946 NAILED TO
772-409-1010 ERTICALS
TRUSS GEOMETRY AND CONDITIONS SECTION A-A W/(4) - 10d NAILS
SHOWN ARE FOR ILLUSTRATION ONLY.
DIAGONAL BRACE 4' - 0' O.C. MAX.
SEE INDIVIDUAL ENGINEERING DRAWINGS
FOR TRUSS DESIGN CRITERIA.
12 PROVIDE 2X4 BLOCKING BETWEEN
FIRSTAS NOTED.
A Q VARIES TO COMMON TRUSS THE TOENAILWBLOCK NGE TO TRUSSES
* WITH (2) - 10d NAILS AT EACH END.
ATTACH DIAGONAL BRACE TO
BLOCKING WITH (5) - 10d NAILS
A
(4) 8d NAILS MINIMUM, ROOF
B 3X4= PLYWOOD SHEATHING TO SHEATHING
2X4 STD SPF BLOCK
* DIAGONAL BRACING **L - BRACING REFER /
REFER TO SECTION A-A TO SECTION B-B 24' MAX. /
NOTE:
1. MINIMUM GRADE OF #2 MATERIAL IN THE TOP AND BOTTOM CHORDS. NAILS
2. CONNECTION BETWEEN BOTTOM CHORD OF GABLE ENO TRUSS AND WALL TO 12' MAX.
BE PROVIDED BY PROJECT ENGINEER OR ARCHITECT.
3. BRACING SHOWN IS FOR INDIVIDUAL TRUSS ONLY. CONSULT BLDG.
ARCHITECT OR ENGINEER FOR TEMPORARY AND PERMANENT BRACING OF ROOF
SYSTEM. /
4. 'L' BRACES SPECIFIED ARE TO BE FULL LENGTH, SPF OR SP #3 OR
BETTER WITH ONE ROW OF 10d NAILS SPACED 6' O.C. 3 / TRUSSES @ 24' O.C.
S. DIAGONAL BRACE TO BE APPROXIMATELY 45 DEGREES TO ROOF DIAPHRAGM
AT 4' - 0' D.C.
6. CONSTRUCT HORIZONTAL BRACE CONNECTING A 2X6 AND A 2X4 AS SHOWN 2X6 DIAGONAL BRACE
WITH 16d NAILS SPACED 6' O.C. HORIZONTAL BRACE TO BE LOCATED AT SPACED 48' O.C. ATTACHED
THE MIOSPAN OF THE LONGEST GABLE STUD. ATTACH TO VERTICAL GABLE TO VERTICAL WITH (4) -
STUOS WITH (3) 10d NAILS THROUGH 2X4 (REFER TO SECTION A-A) 16d NAILS, AND ATTACHED
7. GABLE STUD DEFLECTION MEETS OR EXCEEEDS L/240. TO BLOCKING WITH (5)B. THIS DETAIL DOES NOT APPLY TO STRUCTURAL GABLES. OIAG. BRACE IOd NAILS.
9. DO NOT USE FLAT BOTTOM CHORD GABLES NEXT TO SCISSOR TYPE AT 1/3 POINTS
TRUSSES. IF NEEDED
10. 10d AND 16d NAILS ARE 0.131'X3.0' AND 0.131'X3.5' COMMON WIRE NAILS HORIZONTAL BRACE
RESPECTIVELY. (SEE SECTION A-A)
11. SOUTHERN PINE LUMBER DESIGN VALUES ARE THOSE EFFECTIVE 06-01-12
BY SPIB/ALSC.
END WALL
MINIMUM STUD STUD WITHOUT 2X4 DIAGONAL (2) DIAGONAL
SIZE SPECIES SPACING BRACE L - BRACE BRACE BRACES AT
AND GRADE 1/3 POINTS
MAXIMUM STUD LENGTH
2X4 SP#31 STUD 12"O.C. 3-8-10 5-6-11 6-6-11 11-1-13
2X4 SP#31 STUD 16"O.C. 3-3-10 4-9-12 6-6-11 9-10-15
2X4 SP#31 STUD 24"O.C. 2-8-6 3-11-3 5-4-12 8-1-2
2X4 SP#2 12"O.C. 3-10-15 5-6-11 6-6-11 11-8-14
2X4 SP#2 16"O.C. 3-6-11 4-9-12 6-6-11 10-8-0
2X4 SP#2 24"O.C. 1 3-1-4 1 3-11-3 1 6-2-9 1 9-3-13
DIAGONAL BRACES OVER 6' - 3' REQUIRE A 2X4 T-BRACE ATTACHED TO ONE
EDGE. DIAGONAL BRACES OVER 12' - 6' REQUIRE 2X4 I-BRACES ATTACHED TO
BOTH EDGES. FASTEN T AND I BRACES TO NARROW EDGE OF DIAGONAL BRACE
WITH 10d NAILS 6' O.C., WITH 3' MINIMUM END DISTANCE. BRACE MUST COVER
907 OF DIAGONAL LENGTH. T OR I BRACES MUST BE 2X4 SPF #2 OR SP #2.
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
MAX MEAN ROOF HEIGHT=30 FEET Fort Pierce,FL 34946
EXPOSURE B OR C
ASCE 7-10 190 MPH STUD DESIGN IS BASED ON COMPONENTS AND CLADDING.
DURATION OF LOAD INCREASE:1.60 CONNECTION OF BRACING IS BASED ON MWFRS.
FEBRUARY 17,2017 T-BRACE / I-BRACE DETAIL STDTL09
WITH 2X BRACE ONLY
NOTES:
T-BRACING / I-BRACING TO BE USED WHEN CONTINUOUS LATERAL BRACING
IS IMPRACTICAL. T-BRACE / I-BRACE MUST COVER 907 OF WEB LENGTH.
THIS DETAIL NOT TO BE USED TO CONVERT T-BRACE / I-BRACE WEBS TO
CONTINUOUS LATERAL BRACED WEBS.
A-1 ROOF TRUSSES
4451 ST,LUCIE BLVD.
FORT PIERCE,FL 34946
772409-1010
NAILING PATTERN BRACE SIZE FOR ONE-PLY TRUSS
T-BRACE SIZE NAIL SIZE NAIL SPACING SPECIFIED CONTINUOUS ROWS OF
LATERAL BRACING
2X4 OR 2X6 OR 2X8 10d 6" O.C. WEB SIZE 1 2
NOTE: NAIL ALONG ENTIRE LENGTH OF T-BRACE / I-BRACE (ON 2X3 OR 2X4 2X4 T-BRACE 2X4 I-BRACE
TWO-PLY TRUSSES NAIL TO BOTH PLIES)
2X6 2X6 T-BRACE 2X6 I-BRACE
2X8 2X8 T-BRACE 2X8 I-BRACE
BRACE SIZE FOR TWO-PLY TRUSS
NAILS SPECIFIED CONTINUOUS ROWS OF
k LATERAL BRACING
WEB SIZE 1 2
2X3 OR 2X4 2X4 T-BRACE 2X4 I-BRACE
SPACING
k
_A2X6 2X6 T-BRACE 2X6 I-BRACE
2X8 2X8 T-BRACE 2X8 I-BRACE
k•
WEB T-BRACE / I-BRACE MUST BE SAME SPECIES
-, AND GRADE (OR BETTER) AS WEB MEMBER.
k
}
T-BRACE
NAILS NAILS
WEB
NAILS WEB
I-BRACE T-BRACE
Rama Pmm Kmtam,P.E.
SECTION DETAIL5,St L#8890vd,Suite 201
Fort Pierce,FL 34946
FEBRUARY 17,2017 LATERAL BRACING RECOMMENDATIONS STDTL10
TO MINIMIZE VIBRATION COMMON TO ALL SHALLOW FRAMING SYSTEMS,
2X6 OSTRONGBACKO IS RECOMMENDED, LOCATED EVERY 8 TO 10 FEET
ALONG A FLOOR TRUSS.
NOTE 1: 2X6 STRONGBACK ORIENTED VERTICALLY MAY BE POSITIONED DIRECTLY UNDER THE
TOP CHORD OR DIRECTLY ABOVE THE BOTTOM CHORD, SECURELY FASTENED TO THE TRUSS USING ANY
A-1 ROOF TRUSSES OF THE METHODS ILLUSTRATED BELOW.
4451 ST LUCIE BLVD.
FORT PIERCL,FI- 34946 NOTE 2: STRONGBACK BRACING ALSO SATISFIES THE LATERAL BRACING REQUIREMENTS FOR THE
772409-1010 BOTTOM CHORD OF THE TRUSS WHEN IT IS PLACED ON TOP OF THE BOTTOM CHORD, IS CONTINUOUS
FROM END TO ENO, CONNECTED WITH A METHOD OTHER THAN METAL FRAMING ANCHOR, AND PROPERLY
CONNECTED, BY OTHERS, AT THE ENDS.
INSERT WOOD SCREW THROUGH
OUTSIDE FACE OF CHORD INTO
EDGE OF STRONGBACK (DO NOT
USE METAL FRAMING ATTACH TO VERTICAL ATTACH TO VERTICAL USE DRYWALL TYPE SCREWS)
ANCHOR TO ATTACH WEB WITH (3) - 10d SCAB WITH (3) - 10d
TO TOP CHORD NAILS (0.131' X 3') NAILS (0.131' X 3'). ATTACH TO VERTICAL
WEB WITH (3) - 10d
3 NAILS (0.131' X ')
BLOCKING BEHIND THE VERTICAL ATTACH 2X4 VERTICAL
WEB IS RECOMMENDED WHILE TO FACE OF TRUSS. ATTACH TO CHORD
NAILING THE STRONGBACK FASTEN TO TOP AND WITH (2) #12 X 3'
BOTTOM CHORD WITH WOOD SCREWS
(2) - Iod NAILS (0.131' (0.216' OIA.)
X 3') IN EACH CHORD
USE METAL FRAMING ATTACH TO VERTICAL ATTACH TO VERTICAL INSERT SCREW THROUGH
ANCHOR TO ATTACH WEB WITH (3) - 10d SCAB WITH (3) - 10d OUTSIDE FACE OF CHORD INTO
TO BOTTOM CHORD NAILS (0.131' X 3') NAILS (0.131' X 3') EDGE OF STRONGBACK (DO NOT
USE DRYWALL TYPE SCREWS)
TRUSS 2X6 4' - 0' WALL BLOCKING
STRONGBACK (TYPICAL SPLICE) (BY OTHERS) (BY OTHERS)
.:`°i:x!'Ci� "�i;T'As�•,.n;�`y}� ;a s%c .'s:%'3.. �.+.`'='.h•'.'1`>` - !�+
.=
THE STRONGBACKS SHALL BE SECURED AT THEIR ENDS TO AN ADEQUATE SUPPORT,
DESIGNED BY OTHERS. IF SPLICING IS NECESSARY, USE A 4' - 0' LONG SCAB
CENTERED ON THE SPLICE AND JOINED WITH (12) - 10d NAILS (0.131' X 30)
EQUALLY SPACED.
ALTERNATE METHOD OF SPLICING:
OVERLAP STRONGBACK MEMBERS A MINIMUM OF 4' - 0' AND FASTEN WITH (12) -
10d NAILS (0.131' X 3') STAGGERED AND EQUALLY SPACED (TO BE USED ONLY Rama Pranav Kristam,P.E.
WHEN STRONGBACK IS NOT ALIGNED WITH A VERTICAL). #88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
FEBRUARY 17,2017 LATERAL TOE-NAIL DETAIL STDTL11
NOTES:
1. TOE-NAILS SHALL BE DRIVEN AT AN ANGLE OF 45° WITH THE MEMBER
AND MUST HAVE FULL WOOD SUPPORT (NAIL MUST BE DRIVEN
THROUGH AND EXIT AT THE BACK CORNER OF THE MEMBER END AS
SHOWN).
2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL
BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD.
A-1 ROOF TRUSSES 3. ALLOWABLE VALUE SHALL BE THE LESSER VALUE OF THE TWO
4451 ST LUCIE BLVD. SPECIES FOR MEMBERS OF DIFFERENT SPECIES.
FORT PIERCE,FL 34946
772-409-1010
TOE-NAIL SINGLE SHEAR VALUES THIS DETAIL IS ONLY APPLICABLE TO
PER NOS 2001 (LB/NAIL) THE THREE END DETAILS SHOWN BELOW.
DIA SP OF HF SPF SPF-S IVIEWS SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY.
.131 88.0 80.6 69.9 68.4 59.7
z .135 93.5 85.6 74.2 72.6 63.4
0
n .162 108.8 99.6 86.4 84.5 73.8
ri
.128 74.2 67.9 58.9 57.6 50.3
0
Z .131 75.9 69.5 60.3 59.0 51.1
0
in .148 81.4 74.5 64.6 63.2 52.5
N
M
VALUES SHOWN ARE CAPACITY PER TOE-NAIL. SIDE VIEW SIDE VIEW
APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED. (2X4) 3 NAILS (2X6) 4 NAILS
EXAMPLE: NEAR SIDE NEAR SIDE
(3) - 16d NAILS (0.162' DIA. X 3.5') WITH SPF SPECIES BOTTOM CHORD
FOR LOAD DURATION INCREASE OF 1.15: NEAR SIDE NEAR SIDE
3 (NAILS) X 84.5 (LB/NAIL) X 1.15 (OOL) = 291.5 LB MAXIMUM CAPACITY NEAR SIDE NEAR SIDE
NEAR SIDE
ANGLE MAY ANGLE MAY ANGLE MAY
VARY FROM VARY FROM VARY FROM
30° TO 60° 30" TO 60° 30° TO 60°
45.00' 45.00' 45.00'
Rama P av Kristam,P.E.
# 906
4 51 St.Lucie vd,Suite 201
Fort Pierce,FL 34946
FEBRUARY 17,2017 UPLIFT TOE-NAIL DETAIL STDTL12
TDE-NAIL WITHDRAWAL VALUES
PER NOS 2005 (LB/NAIL)
DIA. SP OF HF SPF SPF-S
L7
z 131 59 46 32 30 20
= O
J .135 60 48 33 30 20
A-1 ROOF TRUSSES Ln
4451 ST LUCIE BLVD. ( ) .162 72 58 39 37 25
FORT PIERCE,FL 34946
772409-1010
J
2 .128 54 42 28 27 19
Z
LD z OJ .131 55 43 29 28 19
W
J .148 62 48 34 31 21
__1 N
Q �
Z
.120 51 39 27 26 17
0
THIS DETAIL SHALL BE USED FOR A CONNECTION Z .128 49 38 26 25 17
RESISITING UPLIFT FORCES ONLY. BUILDING DESIGNER O
IS RESPONSIBLE FOR LOADS IN OTHER DIRECTIONS. J .131 51 39 27 26 17
.148 57 44 31 28 20
NOTES:
1. TOE-NAILS SHALL BE DRIVEN AT AN ANGLE OF 30° WITH THE MEMBER AND STARTED 1/3 THE LENGTH OF THE NAIL FROM THE
MEMBER END AS SHOWN.
2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD.
3. ALLOWABLE VALUE SHALL BE BASED ON THE SPECIE WITH LOWER NAIL CAPACITY BETWEEN THE TWO MEMBERS IN THE CONNECTION.
VALUES SHOWN ARE CAPACITY PER TOE-NAIL.
APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED.
EXAMPLE:
(3) - 16d NAILS (0.162' DIA. X 3.5') WITH SPF SPECIES TOP PLATE
FOR WIND OOL OF 1.33:
3 (NAILS) X 37 (LB/NAIL) X 1.33 (DOL FOR WIND) = 148 LB MAXIMUM ALLOWABLE UPLIFT REACTION DUE TO WIND
FOR WIND OOL OF 1.60:
3 (NAILS) X 37 (LB/NAIL) X 1.60 (DOL FOR WIND) = 177 LB MAXIMUM ALLOWABLE UPLIFT REACTION DUE TO WIND
IF THE UPLIFT REACTION SPECIFIED ON THE TRUSS DESIGN DRAWING EXCEEDS 147 LEIS (177 LEIS) BUILDING
DESIGNER IS RESPONSIBLE TO SPECIFY A DIFFERENT CONNECTION.
►+* USE (3) TOE-NAILS ON 2X4 BEARING WALL
+ * USE (4) TOE-NAILS ON 2X6 BEARING WALL
VIEWS SHOWN ARE FOR
ILLUSTRATION PURPOSES ONLY
NEAR SIDE NEAR SIDE
30°
TOP PLATE
OF WALL
/X74--Il' FOR ' NAIL
1-1/1 .25' NAIL
FAR SIDE 1-3/16' FOR 3.5' NAIL
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
SIDE VIEW END VIEW Fort Pierce,FL 34946
FEBRUARY 5, 2016 TYP 2x2 NAILER ATTACHMENT STDTLI3
2x2 NAILER ATTACHMENT
GENERAL SPECIFICATIONS
A-1 ROOF TRUSSES
FORT PIERCE,IF B34946 MAX LOAD: 55 psf Roof Load, 170 mph, ASCE
772-409-1010
7-107 29'-0" Mean Height, Exp. B, C or D.
Q \AO
2 �
2� 2x4 SP No. 2 (Min)
o°
o°
o°
o°
1 .5x4
2x2 SP No. 3
1 .5x4
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
April 11, 2016 TYPICAL ALTERNATE BRACING DETAIL STDTLI4
FO EXTERIOR FLAT GIRDER TRUSS
A-1 ROOF TRUSSES
4451 ST.LUCIE BLVD.FL 12
FORT PIERCE, 34946
772-409-1010
VARIES
(4) 12d
TRUSS 2411 O.C. (4) 12d
MAX 3011 (2'-611)
UPLIFT CONNECTION
(SEE ROOF TRUSS) 2x6 #2 SP (Both Faces)
2411 O.C.
EXTERIOR FLAT SIMPSON H5
GIRDER
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946
FEBRUARY 17,2017 STANDARD REPAIR DETAIL FOR BROKEN CHORDS, WEBS, AND STDTL15
DAMAGED OR MISSING CHORD SPLICE PLATES
TOTAL NUMBER MAXIMUM FORCE (LBS) 15% LOAD DURATION
OF NAILS EACH X
SIDE OF BREAK (INCHES)
SP OF SPF HF
2X4 2X6 2X4 2X6 2X4 2X6 2X4 2X6 2X4 2X6
20 30 24" 1706 2559 1561 2342 1320 1980 1352 2028
A-1 ROOF TRUSSES
4451ST LUCIE BLVD. 26 39 30" 2194 3291 2007 3011 1697 2546 1738 2608
FORT PIERCE,FL 34946
772409-1010 32 48 36" 2681 4022 2454 3681 2074 3111 2125 3187
38 57 42" 3169 4754 2900 4350 2451 3677 2511 3767
44 66 48" 3657 5485 3346 5019 2829 4243 2898 4347
* DIVIDE EQUALLY FRONT AND BACK
ATTACH 2X_ SCAB OF THE SAME SIZE AND GRADE AS THE BROKEN MEMBER TO EACH FACE OF
THE TRUSS ( CENTER ON BREAK OR SPLICE) WITH 10d NAILS (TWO ROWS FOR 2X4, THREE
ROWS FOR 2X6) SPACED 4' O.C. AS SHOWN (.131' DIA. X 3').
STAGGER NAIL SPACING FROM FRONT FACE AND BACK FACE FOR A NET 2' O.C. SPACING IN
THE MAIN MEMBER. USE A MIN. 3' MEMBER END DISTANCE.
THE LENGTH OF THE BREAK (C) SHALL NOT EXCEED 12'. (C=PLATE LENGTH FOR SPLICE REPAIRS)
THE MINIMUM OVERALL SCAB LENGTH REQUIRED (L) IS CALCULATED AS FOLLOWS: L = (2) X + C
BREAK
}
<�yQl
3�
• 10d NAILS NEAR SIDE �ZtJ
+10d NAILS FAR SIDE TRUSS CONFIGURATION
AND BREAK LOCATIONS
FOR ILLUSTRATIONS ONLY
X' MIN 6' MIN
THE LOCATION OF THE BREAK MUST BE GREATER THAN OR EQUAL TO
THE REQUIRED X DIMENSION FROM ANY PERIMETER BREAK OR HEEL JOINT
AND A MINIMUM OF S' FROM ANY INTERIOR JOINT (SEE SKETCH ABOVE).
DO NOT USE REPAIR FOR JOINT SPLICES
NOTES:
1. THIS REPAIR DETAIL IS TO BE USED ONLY FOR THE APPLICATION SHOWN. THIS REPAIR
DOES NOT IMPLY THAT THE REMAINING PORTION OF THE TRUSS IS UNDAMAGED. THE ENTIRE
TRUSS SHALL BE INSPECTED TO VERIFY THAT NO FURTHER REPAIRS ARE REQUIRED. WHEN
THE REQUIRED REPAIRS ARE PROPERLY APPLIED, THE TRUSS WILL BE CAPABLE OF
SUPPORTING THE LOADS INDICATED.
2. ALL MEMBERS MUST BE RETURNED TO THEIR ORIGINAL POSITIONS BEFORE APPLYING REPAIR
AND HELD IN PLACE DURING APPLICATION OF REPAIR.
3. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID
UNUSUAL SPLITTING OF THE WOOD.
4. WHEN NAILING THE SCABS, THE USE OF A BACKUP WEIGHT IS RECOMMENDED TO AVOID Rama Pranav Kristam,P.E.
LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS OR SPLICES. #88906
S. THIS REPAIR IS TO BE USED FOR SINGLE PLY TRUSSES IN THE 2X ORIENTATION ONLY. 4451 St.Lucie Blvd,Suite 201
FotPierce,FL 34946
6. THIS REPAIR IS LIMITED TO TRUSSES WITH NO MORE THAN THREE BROKEN MEMBERS.
FEBRUARY 17,2017 SCAB APPLIED OVERHANGS STDTL16
A-1 ROOF TRUSSES
4451 ST LUCIE BLVD.
FORT PIERCE,FL 34946
772409-1010
TRUSS CRITERIA:
LOADING: 40-10-0-10
DURATION FACTOR: 1.15
SPACING: 24' O.C.
TOP CHORD: 2X4 OR 2X6
PITCH: 4/12 - 12/12
HEEL HEIGHT: STANDARD HEEL UP TO 12' ENERGY HEEL
END BEARING CONDITION
NOTES:
1. ATTACH 2X-SCAB (MINIMUM #2 GRADE SPF, HF, SP, OF) TO ONE FACE OF TRUSS
WITH TWO ROWS OF 10d COMMON WIRE NAILS (.148' OIA. X 3') SPACED 6' O.C.
2. THE ENO DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH
AS TO AVOID UNUSUAL SPLITTING OF THE WOOD.
3. WHEN NAILING THE SCABS, THE USE OF A BACKUP WEIGHT IS RECOMMENDED TO
AVOID LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS OR SPLICES.
2X SCAB
(L) (2.0 x L)
24"MAX 24"MIN
NOTE: TRUSS BUILT WITHOUT AN OVERHANG. THIS DETAIL IS NOT TO BE USED
WHEN OVERHANG HAS BEEN BROKEN OFF.
IMPORTANT
THIS DETAIL TO BE USED ONLY WITH TRUSSES (SPANS LESS THAN 40') SPACED 24'
O.C. MAXIMUM AND HAVING PITCHES BETWEEN 4/12 AND 12/12 AND TOTAL TOP CHORD
LOADS NOT EXCEEDING 50 PSF.
TRUSSES NOT FITTING THESE CRITERIA SHOULD BE EXAMINED INDIVIDUALLY.
REFER TO INDIVIDUAL TRUSS DESIGN
FOR PLATE SIZES AND LUMBER GRADES
Rama Pranav Kristam,P.E.
#88906
4451 St.Lucie Blvd,Suite 201
Fort Pierce,FL 34946