Loading...
HomeMy WebLinkAboutProject Instruction4 I'LL s �.•�� C t F ! C •� OLIVER TECHNOLOGIES, INC. f= s RI �•, �� FLORIDA -INSTALLATION INSTRUCTIONS FOR THE ,.. �, • MODEL 1101 "V" SERIES ALL STEEL FOUNDATION SYSTEM ` .� No. 15896 6 , ' s MODEL 1101"7" (STEPS 1-15) o MODEL 1101-L%-LONGITUDINAL ONLY. FOLLOW STEPS 1-9 a • STATE OF FOR ADDING LATERAL ARM: •�� 1�IGI ERS STAMP :�i• Follow Steps 10-15 ENGINEERS STAMP 1. SPEC' � I�iI 0IICES: If the following conditions occur - STOP! Contact Oliver Technology 1-800-264-7437 : a) Pier he�_48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96" e) Location is within 1500 feet of coast INSTALLATION OF GROUND PAN 2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) . 3. Place ground pan (C) directly below chassis I-beam . Press or drive pan firmly into soil until flush with or below soil. SPECIAL NOTE: The longitudinal "V" brace system serves as a pier under the home and should be loaded as any other pier. It is recommended that after leveling piers, and one-half inch (1/2") before home is lowered completely on to piers, complete steps 4 through 9 below. INSTALLATION OF LONGITUDINAL "V" BRACE SYSTEM NOTE: WHEN INSTALLING THE MODEL # 1101-L"V" LONGITUDINAL SYSTEM ONLY, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION Is REQUIRED. SOIL TEST PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER -SOIL CLASSIFICATION. IF PROBE TEST READINGS ARE BETWEEN 175 & 275 A 5 FOOT ANCHOR MUST BE USED. IF PROBE TEST READINGS ARE BETWEEN 276 & 350 A 4 FOOT ANCHOR MAY BE USED. USE GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4" . VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH VERTICAL TIE CONNECTION POINTS (PER FLORIDA REG.) . 4. Select the correct square tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a 40 to 45 degree angle is maintained. PIER HEIGHT 1.25" ADJUSTABLE (Approx. 45 degrees Max.) Tube Length 1.50" ADJUSTABLE Tube Length 7 314" to 25" 22" 18" 24 3/4" to 32 114" 32" 18" 33" to 4 " 44" 18" 40" to 48" 54" 18" 5. Install (2) of the 1.50" square tubes (E (18" tube) ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final adjustment. 6. Place I-beam connector (F) loosely on the bottom flange of the I-beam.. 7. Slide the selected 1.25" tube (E) into a 1.50" tube (E) and attach to 1-beam connectors (F) and fasten loosely with bolt and nut. 8. Repeat steps 6 through 7 to create the .."V" pattern of the square tubes loosely in place. The angle is not to exceed 45 degree and not below 40 degrees. 9. After all bolts are tightened, secure 1.25" and 1.60" tubes using four(4) 1K'-14 x 3/4" self -tapping screws in pre -drilled holes. INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM THE MODEL 1101 "V" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STABILIZER PLATES & FRAME TIES. NOTE: THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 514". FOUR FOOT (4') GROUND ANCHOR MAY USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. 10. Install remaining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline anchors to be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 lbs. require a 5' anchor. 11. NoTE: Each system is required to have a frame tie and, stabilizer attached at each lateral arm stabilizing location. This frame tie & stabilizer plate needs to be located within 18" from of center ground pan. 12. Select the correct square tube brace (H) length for set-up lateral transverse at support location. The lengths come in either 60" or 72" lengths. (With the 1.50" tube as the bottom tube, and the -1.25" tube as the inserted tube.) 13. Install the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut. 14. Slide 1.25" transverse brace into the 1.50" brace and attach to adjacent I-beam connector ( I ) with bolt and nut. Secure 1.5u transverse arm totransverse arm using tour - 14 x 314 self -tapping screws In pre-drillea noles. MANUFACTURED HOUSING FOUNDATION SYSTEMS Telephone: 931-796-4556 A DIVISION OF OLIVER TECHNOLOGIES, INC. Fax: 931-796-6611 1-800.284-7437 www.olivertechnologies.com 63/20/20 --, 15:40 40762311bu u�•iv State of Florida EPARTAUM OF MGHVAY S ETY AND MCMR VMCLES TA.LLARASS09, FL(S+RMA 3239"500 rR ED C. D',XCWNSON, III Exceutive Director March 20, 2002 lvfr. Burt A. Moore, Financial ]Manager Manufactured Housing Foundation Systems Oliver Technologies, I.ue. Post Office Box 9 (467 Swart Avenue) Hohenwald, Temessee 38462 Dew Mr, Moore: We wish to acknowledge receipt of your specifications and test results certi.;fyir g that your Longitudinal Stabilizing and Lateral Bracing System,1101 V, listed below complies with the specifications and 7regulat:iozxs'set by the Department of Highway Safety and Motor Vehicles, Rules 15C-1.01051, ISC-1-0107 and 15C-1.010E, FloAd4Adwiujgtratjve Cole. Installation, instructions must be available at the installation site. MODEL # DBSCRiPuoly 1101 `V' Lonetudixxal Stabilizing and Lateral Bracing System MOTE: This systein is fir replacement of lopigitudinal anchors This system can only be used with sidewall anchor spacing o, f'5'4 ". Maximum strut angle 45'� Tf you have any questions, please advise at (407) 623-1340. Sincerely, Phil Bergelt, Program Manager Bureau of Mobile Home and Recreational Vehicle Construction Division, of Motor Vehicles P�:srb DIVISIONS / �WRIDA HIGHWAY FA,,'1 OOL - DMVER LICENSES - MC VXbr. VEMCLtS • AD1b0 NXSW"TM SERNICES Neil lKirkinari Building, T'3U0wsee, Florida 3339"500 REQUIRED NUMBER AND LOCATION OF MODEL 1101 "V" BRACES FOR UP TO 4/12 ROOF PITCH HOMES WITH 5/12 ROOF PITCH REQUIRE: PER FLORIDA REGULATIONS 6 systems for home lengths up to 52' and 8 systems for homes over 52' and up 80'. One stabilizer plate and frame tie required at each lateral bracing system. Florida approved 4' ground anchors may be used in all locations except where home manufacturers specifications for sidewall straps are in I excess of 4,000 lbs. These Vocations require a 5' anchor. D -Ground Pan transverse connectors "V" Brace Tut Top (1.25") jF Bottom (1.5") r�3 STAT$ OF419 arm connectors 1Pan Bracket C -Ground Pan I! PATENT PENDING C = GROUND PAN ❑ = GROUND PAN CONNECTOR U BRACKETS E = TELESCOPING V BRACE TUBE ASSEMBLY W/ 1.5 BOT. TOM TUBE AND 1.25 TUBE INSERT F = "V" BRACE I -BEAM CONNEC- TORS ASSEMBLY H = TELESCOPING TRANSVERSE ARM ASSEMBLY I = TRANSVERSE ARM 1-BEAM CONNECTOR J= V PAN BRACKET REVISED INSTRUCTIONS 4/23/03 NOT& 1. LENGTH OF HOUSE IS THE ACTUAL BOX SIZE 2. ® = STABILIZER PLATE AND FRAME TIE LOCATIO (needs to be located within 18" from center of ground pan) 3. [+}—• = LOCATION OF ASF MODEL 1101"V" (LATERAL & LONGITUDINAL BRACING). 4. ® = LOCATION OF MODI*L 1101-L"V" (LONGITUDINAL BRACING ONLY). MANUFACTURED HOUSING FOUNDATIONSYSTEMS A DIVISION OF OLIVER TECHNOLOGIES, INC. 1-800-284-7437 -796-8011 J