HomeMy WebLinkAboutEnergy Efficiency Codec -Qoa.o(V9
FORR405-2020
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
n r_nrnrr_n
Project Name: 167 SE LUCERO DRIVE
Builder Name:
Street:
Permit Office:
FEB 2 3 2022
City, State, Zip: PORT ST. LUCIE, FL,
Permit Number:
Owner:
Design Location: FL, Fort Pierce-,,,,,�
Jurisdiction:
County: St. Lucie(Florida
6t, Lucie CAbnty
ZP nQ
Climate oneerml
1. New construction or existingExisting (Projected)
10. Wall Types(864.0 sgft.)
Insulation Area
2. Single family or multiple family "
Detached
a. Concrete Block - Int Insul, ExteriorR=4.1 864.002
b. N/A
R= it
3. Number of units, if multiple family
1
c. N/A
R= it
4. Number of Bedrooms
2
d. N/A
R= it
5. Is this a worst case?
No
11. Ceiling Types(796.0 sqft.)
Insulation Area
a. Under Attic (Vented)
R=38.0 796.00 it)
6. Conditioned floor area above grade (ft2)
796
b.
Conditioned floor area below grade (ft2)
0
N/A
R= it
7. Windows(113.0 sqft.) Description
Area
12. Ducts, location & insulation level R it
a. U-Factor: Sgl, U=0.65
113.00 ft2
a. a. Sup: Attic, Ret: Attic, AH:
AHU 6 125
SHGC: SHGC=0.25
b.
b. U-Factor: N/A
it
C.
SHGC:
13. Cooling Systems
kBtu/hr Efficiency
c. U-Factor: N/A
ft2
a. Central Unit
23.6 SEER:16.00
SHGC:
Area Weighted Average Overhang Depth:
2.000 it
Area Weighted Average SHGC:
0.250
14. Heating Systems
kBtu/hr Efficiency
8. Skylights Description
Area
a. Electric Strip Heat
17.0 COP:1.00
U-Factor:(AVG) N/A
N/A ft2
SHGC(AVG): N/A
15. Hot Water Systems
9. Floor Types Insulation
Area
a. Electric
Cap: 50 gallons
a. Slab -On -Grade Edge Insulation R= 0.0
796.00 ft2
E F: 0.950
_
2
it
b. Conservation features
c. N/A R=
it
None
16. Credits
None
Glass/Floor Area:0.142 Total Proposed Modified Loads: 29.96
PASS
Total Baseline
Loads: 32.70
I hereby certify that the plans and specifications covered by
Review of the plans and
STq��
this calculation are in compliance with the Florida
Energy
specifications covered by this
�1
Code.
calculation indicates compliance'`.`��'
`
b&?_ab9]2Q
with the Florida Energy Code.
""'
PREPARED BY:
Before construction is completed
this building will be inspected for
ir?j
DATE: 2-15-2022
compliance with Section 553.908
Florida Statutes.
I hereby certify that this building, as designed, is in complianceGrj�t�
with the Florida Ener Co
or
OWNER/AGENT:
_
BUILDING OFFICIAL:
DATE: �i / ` Z '2
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance with a proposed duct leakage On requires a PERFORMANCE Duct Leakage Test Report confirming duct
leakage to outdoors, tested in accordance with ANSVRESNETACC 380, is not greater than 0.000 On for whole house.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project
requires a PERFORMANCE envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2).
2/15/2022 2:55:38 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1
FONM R405-2020 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: 167 SE LUCERO DRIVE
Addresstype:
Street Address
Building Type: User
Bedrooms: 2
Lot#:
---
Owner:
ConditionedArea: 796
Block/Sub Division:
---
Total Stories: 1
PlatBook:
---
BuilderName:
Worst Case: No
Street:
Permit Office:
RotateAngle: 0
County:
St. Lucie
Jurisdiction:
Cross Ventilation: No
City, State, Zip:
PORT ST. LUCIE,
FamilyType: Detached
Whole House Fan: No
FL,
New/Existing: Existing (Projected)
Terrain: Suburban
Year Construct:
Shielding: Suburban
Comment:
CLIMATE
Design Temp
Int Design Temp
Heating
Design
Dailytemp
✓Design
Location
TmySite
97.5% 2.5%
Winter Summer
DegreeDays
Moisture
Range
FL, Fort Pierce
FL_VERO_BEACH_MUNICIPA 39 90
70 75
299
62
Low
BLOCKS
Number Name
Area
Volume
1 Entire House
796
6368
SPACES
Number Name
Area
Volume Kitchen Occupants
Bedrooms
Finished
Cooled
Heated
_ 1 BEDROOM 2
111
888 No 0
1
Yes
Yes
Yes
_2 BEDROOM 1
90
720 No 0
1
Yes
Yes
Yes
_3 LIVING/KITCHEN
502
4016 Yes 0
Yes
Yes
Yes
—4 HALL
48
384 No 0
Yes
Yes
Yes
_5 AHU
9
72 No 0
No
Yes
Yes
6 BATH
36
288 No 0
Yes
Yes
Yes
FLOORS
(Total Exposed Area = 796 sq.ft.)
# FloorType
Space
Exposed Perim PerimeterR-Value Area U-Factor Joist R-Value
Tile Wood Carpet
_ 1 Slab -On -Grade Edge Ins
BEDROOM 2
22 0
111 ft 0.473
---
0.00
1.00 0.00
—2 Slab -On -Grade Edge Ins
BEDROOM 1
19 0
90 ft 0.473
---
0.00
1.00 0.00
_ 3 Slab -On -Grade Edge Ins
LIVING/KITCHEN
59 0
502 It 0.473
---
0.00
1.00 0.00
4 Slab -On -Grade Edge Ins
HALL
4 0
48 ft 0.473
---
0.00
1.00 0.00
_ 5 Slab -On -Grade Edge Ins
AHU
1 0
9 ft 0.473
---
0.00
1.00 0.00
6 Slab -On -Grade Edge Ins
BATH
4 0
36 ft 0.473
---
0.00
1.00 0.00
ROOF
Roof Gable Roof
Rad Solar
SA Emitt
Emitt
Deck Pitch
V# Type
Materials
Area Area Color
Barr Absor.
Tested
Tested
Insul. (deg)
—1 Hip
Composition shingles 839 ft2 0 ft2 Light
N 0.5
No 0.5
No
0 18.43
2/15/2022 2:55:38 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
ATTIC
#
Type
Ventilation Vent Ratio (1 in) Area FIBS IRCC
1
Full attic
Vented 150 796 ft2 N N
CEILING
(Total Exposed Area = 796 sq.ft.)
#
CeilingType
Space R-Value Ins. Type
Area U-Factor Framing Frac.
Truss Type
_ 1
UnderAttic(Vented)
BEDROOM 2 38.0 Blown
111.0ft2 0.049 0.10
Wood
_2
UnderAttic(Vented)
BEDROOM 1 38.0 Blown
90.0ft2 0.049 0.10
Wood
_3
UnderAttic(Vented)
LIVING/KITCHEN 38.0 Blown
502.0ft2 0.049 0.10
Wood
_4
UnderAttic(Vented)
HALL 38.0 Blown
48.0ft2 0.049 0.10
Wood
_5
UnderAttic(Vented)
AHU 38.0 Blown
9.0ft2 0.049 0.10
Wood
6
UnderAttic(Vented)
BATH 38.0 Blown
36.0ft2 0.049 0.10
Wood
WALLS
(Total Exposed Area = 864 sq.ft.)
Adjacent
Cavity Width
Height Area U- Sheath Frm. Solar Below
✓#
Ornt To
Wall Type
Space R-Value Ft In
Ft In sq.ft. Factor R-Value Frac.
Absor. Grade
-1
S Exterior
Conc. Blk - Int Ins
BEDROOM 2 4.1 10.0 0
8.0 0 80.0 0.149 0 0
0.50 0 %
-2
W Exterior
Conc. Blk - Int Ins
BEDROOM 2 4.1 12A 0
8.0 0 96.0 0.149 0 0
0.50 0 %
-3
E Exterior
Conc. Blk - Int Ins
BEDROOM 1 4.1 10.0 0
8.0 0 80.0 0.149 0 0
0.50 0 %
-4
S Exterior
Conc. Blk - Int Ins
BEDROOM 1 4.1 9.0 0
8.0 0 72.0 0.149 0 0
0.50 0 %
_5
N Exterior
Conc. Blk - Int Ins
LIVING/KITCHEN 4.1 15.0 0
8.0 0 120.0 0.149 0 0
0.50 0 %
_ 6
E Exterior
Conc. Blk - Int Ins
LIVING/KITCHEN 4.1 24.0 0
8.0 0 192.0 0.149 0 0
0.50 0 %
_ 7
W Exterior
Conc. Blk - Int Ins
LIVING/KITCHEN 4.1 20.0 0
8.0 0 160.0 0.149 0 0
0.50 0 %
_ 8
S Exterior
Conc. Blk - Int Ins
HALL 4.1 4.0 0
8.0 0 32.0 0.149 0 0
0.50 0 %
9
E Exterior
Conc. Blk - Int Ins
BATH 4.1 4.0 0
8.0 0 32.0 0.149 0 0
0.50 0 %
DOORS
(Total Exposed Area = 20 sq.ft.)
Width Height
V#
Ornt Adjacent To DoorType
Space Storms
U-Value Ft In Ft In
Area
1
N
Insulated LIVING/KITCHEN None
0.39 3.00 0 6.00 8
20.0ft2
WINDOWS
(Total Exposed Area = 113 sq.ft.)
Wall
----- Overhang -----
✓#
Ornt ID Frame
Panes NFRC
U-Factor SHGC Imp Storm Area
Depth Separation InteriorShade
Screening
_ 1
S 1 Metal
Low-ESingle Yes
0.65 0.25 Y N 12.0ft2
2.0 ft 0 in 1.0 ft 4 in None
None
-2
W 2 Metal
Low-E Single Yes
0.65 0.25 Y N 24.0ft2
2.0 ft 0 in 1.0 ft 4 in None
None
-3
E 3 Metal
Low-ESingle Yes
0.65 0.25 Y N 12.0ft2
2.0 ft 0 in 1.0 ft 4 in None
None
-4
E 6 Metal
Low-E Single Yes
0.65 0.25 Y N 9.0ft2
2.0 ft 0 in 1.0 ft 4 in None
None
_ 5
W 7 Metal
Low-E Single Yes
0.65 0.25 Y N 48.0ft2
2.0 ft 0 in 1.0 ft 4 in None
None
6
E 9 Metal
Low-ESingle Yes
0.65 0.25 Y N 8.0ft2
2.0 ft 0 in 1.0 ft 4 in None
None
INFILTRATION
#
Scope Method SLA CFM50 ELA EgLA
ACH ACH50 Space(s)
_1
Wholehouse ProposedACH(50) 0.00025 531 29.11 54.66
0.0902 5.0 All
2/15/2022 2:55:38 PM EnergyGaugeO USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 3
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
MASS
# Mass Type
Area
Thickness Furniture Fraction Space
_ 1 Default(8lbs/sq.ft.)
0 ft2
O ft
0.30
BEDROOM 2
—2 Default(8lbs/sq.ft.)
0 ft2
O ft
0.30
BEDROOM 1
_ 3 Default(8lbs/sq.ft.)
0 ft2
0 ft
0.30
LIVING/KITCHEN
4 Default(8lbs/sq.ft.)
0 ft2
0 ft
0.30
HALL
_ 5 Default(8lbs/sq.ft.)
0 ft2
0 ft
0.30
AHU
6 Default(8lbs/sq.ft.)
0 ft2
0 ft
0.30
BATH
HEATING SYSTEM
# System Type
Subtype
AHRI # Efficiency Capacity----GeothermalHeatPump---- Ducts
Block
kBtu/hr Entry Power Volt Current
1 Electric Strip Heat
None
COP: 1.00 17.0
0.00 0.00 0.00 sys#1
1
COOLING SYSTEM
# System Type Subtype/Speed AHRI# Efficiency
Capacity
Air Flow SHR Duct
Block
kBtu/hr
cfm
1 Central Unit
Split/Single SEER:16.0 23.6
0 0.70 sys#1
1
HOT WATER SYSTEM
# SystemType Subtype
Location
EF(UEF) Cap Use
SetPnt
Fixture Flow Pipe Ins. Pipelength
1 Electric None
AHU
0.95 (0.93) 50.00 gal 61 gal
120 deg
Standard None
66
Recirculation Recirc Control
Loop Branch Pump DWHR
Facilities Equal DWHR Other
Credits
System Type
length length power
Connected Flow Eff `
1 No
NA NA NA No
NA
NA NA None
DUCTS
VDuct ---------Supply--------- --------- Return-=-- --
# Location R-Value Area Location R-Value Area LeakageType
Air
Handler
CFM 25 CFM 25 HVAC #
TOT OUT QN RLF Heat Cool
1 Attic 6.0 125 ft2 Attic
6.0 15 ft2 DefaultLeakage
AHU
(Default) (Default)
1 1
TEMPERATURES
Program able Thermostat: N
Ceiling Fans: N
Cooling I] Jan [ ] Feb [ ] Mar
[ ] Apr
[ ] May [X] Jun [X] Jul
[X] Aug
[X] Sep [ ] Oct [] Nov
[ ] Dec
Heating [X] Jan [X] Feb [X] Mar
[ ] Apr
[ ] May [ ] Jun [ ] Jul
[ ] Aug
[ ] Sep [ ] Oct [X] Nov
[X] Dec
Venting [ ] Jan [] Feb [X] Mar
[X] Apr
[ ] May [ ] Jun [ ] Jul
[ ] Aug
[I Sep [X] Oct [X] Nov
[ ] Dec
Thermostat Schedule: HERS 2006 Reference
ScheduleType 1 2
Hours
3 4 5 6 7
8 9 10 11
12
Cooling (WD) AM 78
78
78 78 78 78
78
78 80 80 80
80
PM 80
80
80 80 78 78
78
78 78 78 78
78
_ Cooling (WEH) AM 78
78
78 78 78 78
78
78 80 80 80
80
PM 80
80
80 80 78 78
78
78 78 78 78
78
Heating (WD) AM 65
65
65 65 65 65
65
68 68 68 68
68
PM 68
68
68 68 68 68
68
68 68 68 68
68
2/15/2022 2:55:38 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
TEMPERATURES(Continued)
_ Heating (WEH) AM 65 65 65 65 65 65 65 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 68 68
2/15/2022 2:55:38 PM EnergyGauge@ USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 5
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: 167 SE LUCERO DRIVE Builder Name:
Street: Permit Office:
City, State, Zip: PORT ST. LUCIE, FL, Permit Number: Y
Owner: Jurisdiction: w
Design Location: FL, Fort Pierce County: St. Lucie(Florida Climate Zone 2) U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
Acontinuous airbarriershall beinstalled in the building envelope.
Air -permeable insulation shall
requirements
The exteriorthermal envelope contains acontinuous air barrier.
not be used as a sealing material.
Breaks orjoints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
Ceiling/attic
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity with
sealed.
a material having a thermal resistance of R-3 per
Knee walls shall be sealed.
inch minimum
Exteriorthermal envelope insulation forframed walls
shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
andcantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered
Where provided instead of floor insulation, insulation
with a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Narrowcavities
Batts in narrow cavities shall be cut to fit, or narrow
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garageseparation
Air sealing shall be provided between the garage and
conditioned spaces.
Recessed lighting
Recessed light fixtures installed in the building thermal
Recessed light fixtures installed in the building
envelope shall be sealed to the finished surface.
thermal envelope shall be airtight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatlyto fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind piping and wiring.
Shower/tub
The air barrier installed at exterior walls adjacent to showers
Exterior walls adjacent to showers and tubs shall
onexteriorwall
and tubs shall separate them from the showers and tubs.
beinsulated.
Electrical/phonebox
The air barrier shall be installed behind electrical or
onexteriorwalls
communication boxes or air -sealed boxes shall beinstalled.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering
orceiling penetrated bythe boot.
Concealed
When required to be sealed, concealed fire sprinklers shall only
sprinklers
be sealed in a manner that is recommended bythe manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
voids between fire sprinkler cover plates and walls or ceilings.
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
2/15/2022 2:55:38 PM EnergyGauge@ USA 7.0 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1