Loading...
HomeMy WebLinkAboutAirport Industrial Final Electric 031522.pdfgUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: G�,X S 122 Permit No. _2 t' 01- 0067 Project: �3 J 21 (DOC) Ir-0 r t� Address: -'2ckone: Regular Inspection: Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLAMBINGMECHAINICALG MECHANICALFooting Underground Unund Duct Rough-InSlab Floor Rough -In Ro Steam Piping & Test Masonry Wall Rough -In Staing & Test HW Pi ing & TestWall/Ceiling Ceiling Rough -In Waing & Test CHW Piping & TestFraming Panel/Feeder Gasg & Test Cond. Piping & Test Structural Service/Ground Stoing & Test InsulationAppliance/Equipment FixtWall &CeilingRoofing Lighting Protection Equt EquipmentRe-inspection Re -inspection Re-tion Re-inspectionFinal Building Final Electrical Finabing Final Mechanical Other Inspection Type:AQ — 1 t / ) L r= L EC rt_ j c Area Inspected/Code: Inspection Results:�kl`-Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: , \ �C' �C Y l Licit: Bti � 1.6t'1 OFFICES THROUGHOUT FLORIDA ❑ DA-Disallowed 7 NW Commodity Cove, Port St. Lucie, Florida 34986 • (771) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com