Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Airport Industrial Final Electric 031522.pdf
gUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: G�,X S 122 Permit No. _2 t' 01- 0067 Project: �3 J 21 (DOC) Ir-0 r t� Address: -'2ckone: Regular Inspection: Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLAMBINGMECHAINICALG MECHANICALFooting Underground Unund Duct Rough-InSlab Floor Rough -In Ro Steam Piping & Test Masonry Wall Rough -In Staing & Test HW Pi ing & TestWall/Ceiling Ceiling Rough -In Waing & Test CHW Piping & TestFraming Panel/Feeder Gasg & Test Cond. Piping & Test Structural Service/Ground Stoing & Test InsulationAppliance/Equipment FixtWall &CeilingRoofing Lighting Protection Equt EquipmentRe-inspection Re -inspection Re-tion Re-inspectionFinal Building Final Electrical Finabing Final Mechanical Other Inspection Type:AQ — 1 t / ) L r= L EC rt_ j c Area Inspected/Code: Inspection Results:�kl`-Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: , \ �C' �C Y l Licit: Bti � 1.6t'1 OFFICES THROUGHOUT FLORIDA ❑ DA-Disallowed 7 NW Commodity Cove, Port St. Lucie, Florida 34986 • (771) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com