Loading...
HomeMy WebLinkAboutAirport Industrial final for glycol chiller 030922.pdfUl" A Univemal Engineering Sciences Company �rano'L INSPECTION RESULTS Inspection Date: _ -;5I I 1 D-)— Project: _3� 15 Z l Address: r '�{ ���nt -t�s� �Z • a` C �� 32g�j5�;rti}L�c'�� Blvd, Check one: )%. Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): Permit Lt N)T ovf-- BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Mason Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder as Piping & Test Cond.Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: 1 „AAAt- 1'�� `(ce-)C0C LH �Z Area Inspected/Code: Inspection Results,124P-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name � 1i t tN Lic.#: OFFICES THROUGHOUT FLORIDA 607TJW Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com