Loading...
HomeMy WebLinkAboutAirport Industrial Final Fasteners 031522.pdfgUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 31� S IZZ Permit No. 21 0, — 0967 Project: �� S 2 � ODD Address: _:f�'52 �5r " r-- A3LjQ Check one: VRegular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: J Z/ �i a�- �= kEC�tL>, ) c 4" Fi-) Area Inspected/Code: Inspection Results:�kP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. -- 2. 3. 4. S. 6. 7. R TeSr�r, Lic.tt: bt4 1 1.611 OFFICES THROUGHOUT FLORIDA Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com