HomeMy WebLinkAbout30 Day Temporary Power release (2)E ® f
JUN 0:9. 2017
n Planning Development Services BW!ding & Code Regulation Division I" 2300 VirginiaAve OQ A Port Pierce. FL 34982
772-462-216S Fau 772-462_6e43..
Request for 30-1)ay Tenrporary.ND ver Relea
Date: _ 6/7/2017 : Se
Permit Number:
Project Address;. 8508 Cobblestone DR
THE UNDERSIGNED HEREBY:REQUEST RELEASE OF ELECTRICAL PROPERTY; FOR q PERIOD. NOT TO EXCEED THIRTY (30) DAYS, FOR THE Cl RICAL. POWER. TO *E ABOVE DESCRIBED
AND EQUIPMENT TN' PREPARATION FOR A FINAL INSPECTION, IN CONSIDERATIO
REQUEST WE HEREBY ACKNOWLEDGE i4ND AGREE AS FOLLOWS: E PURPOSE OF:TESTING Sl,$TEMS
N. OF APPROVAL OF THE:
1. This temporary power release is requested for the above stated purpose only, occupancy of any type, other than ahaE permitted by construction Burin y, and there will be; no
2. As witness b your signatures, we beret a
Y 9ree to abide by all terms and Writ ionme o Period. this agreement,.
lnduding Building Division Paii ; which is incur prated herein
3. ;Ali oridir and requiremerit�listed. in. the attached document entitled "Requirements f
by reference..' .
Power far Testl .9 have been fulfilled and the premise is ready for ctled "Requirements
inspection,.
4, Ali requests for an extension beyond 30 days must be or 30 Day
the reason for the request. Power may be remgved.from the site and/or a Stop Work Order Isla
made in writing to the Building Official staring
the:Rnal Inspection has not been approved within 30 days, A fee of $IOO.Ot will be
the Stop Work Order, ed. if
required to tiff
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COl1
ALL LIA8IL1l7Fs AND CLAIMS RE ANY HYPE OF NATURE WHICH MAY ARISE NOW.
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE I� AND THEIR EMPLOYEES FROM
DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATIO OR. IN THE FUTURE OUT'
NCURRED DUE TO THE
N OF THIS AGREEMENT.
��IGN
6/7/2017
DATE
L CbNTRA SIGNATURE 6/7/2017
DATE
CAL CONTRACypR'SIGWATURE 6/7/2017
DATE
.�:ID.
JUN.: .:7017 .
. St :Lade Coau
Huilding.and Zoning Departhieret Require -Men for.30 Pay Power for Testing
l o
F rm entitled "Re' for 30-Day T em ora P'
the Building. Department record tiles prior to inspectioReleas must be d
e„
an ate
fully execute d posted in .
[l. Inspection Requirements::
1..Address numbers shall be pe poste
d r county Ord.. No., 7.05.09.
2. All entrances, exits, windows and garage doors must be lockable.
3 • All circuits on:'exterior 'shall be terminated in a, box with weathe 'roof c
to. a disconnect. If circuits are et or. above 7'6" from
be me res
rP over The sa epp!'
and taped.. de'they may capped with wire nuts
4. All breakers must -be -ins
S. tailed. Any
blank space must be closed by a breaker or approved filler
pate
5. interior Wiring; " -
All receptacles, light fxtures and fans must be trimmed. An
T6" from the floor or mezzanine that is not'"available at the.time of ' y fixture: below
lnviso plate installed. Fixtures: at or above that height. inspect-' must have an
may 6. All smoke detectors must be installed. a e capped with wue nuts and taped:
�• Kitchen cabinets must,be installed; any
have. exception for specie! conditions or cire �" "
an:approval prior to scheduled inspection. din must
8.: Sewer and water connections must be complete:, Only well " s a 'requirement: purrs A re excluded from this
9. Exterior construction must be coitiplete and' weather tight, including
stucco, soffit. g siding, roof and.
10. Permit work shall be substantially. completed except for back.ocde and/or' 000� covering, purrsp's, air conditioners and driveway. rs' paint oa exterior, carpet -