Loading...
HomeMy WebLinkAboutField Density Test 12-19-17t i era800-848-1919 & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 - h Phone 954-784-2941 Fax 954-784-7875 www.fed-eng.com Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 108, Creekside :Date: August 22, 2017 Address: 8504 Cobblestone Drive, Fort Pierce, FL 34945 Order #: 17-DR-846 Area Tested: Building Pad Permit #: Material Type: Light Yellowish Brown Sand Tech: BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture /o Compaction Pass 1 Center of Pad 12" FL 7.1 108.9 110.5 14.0 98.6% Yes 2 SW Corner of Pad 12" FL 1 7.6 108.0 110.5 1 14.0 97.7% Yes 3 NE Corner of Pad 12" FL 6.3 109.2 110.5 14.0 98.8% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil -Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc,P',E. SG = Subgrade BG = Below Grade Federal 1=ngineering & Testing, Inc: , BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394 " TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authoikatior�for publication tf statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test deterrrrine jthe degree of compaction ofllhe4sted layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying saii'materials`below h?praposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required;to, cA tlfy that -the uriderly n jjsoifs will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that-soihiborings''tie� p`erfor`med to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain%stofms, retesting4nust be performed on this work. PAGE 1 of 2 Compacted Soils ,Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to ,determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the,client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction._ test does not warranty any underlying soil materials "or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. -If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 Phone 954-784 2941 -eder"800-848-1919 i (+ - Fax 954-784-7875 & TESTING INC. www.fed-eng-com 2W SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 108, Creekside, Date: August 22, 2017 Address: - 856' Cgbblestone Drive, Fort}Pie'rce, FL 34945' Order #: 17-DR=846 Area Tested: Builaing.Pad Permit #: Material Type: Light Yellowish Brown Sand . Tech: BK Client: D.R. Horton, Inc. Address: ' 1430 Culver Drive NE, Compaction Req.: Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe De th p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture Compaction Pass 1 Center of Pad 12" FL. 7.1 108.9 - 110.5 . 14.0 98.6% Yes 2 SW Corner of Pad 12'r FL 7.6" . 108 0 110.5 14.0, .97' Yes 3 NE Corner of Pad 12" FL 6.3 109.2 110.5 14.0 98.8% Yes q 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and Is not a verification of oil,Bearing,Capacity. Legend for Elevation: , ' i _' PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by:G-/ SL = Springline FL = Final Lift Keith LeBlanc;<P.E. SG = Subgrade BG =Below Grade Federal Engineering & Testipg, Inc J BC = Basecourse BOF = Bottom of Footing Florida Peg. No. 593y4 ;;V TOP = Top of Pipe FG = Finished Grade Certificaie of Authorizati6645471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization eof publication of sti!ements, conclusions or extracts from or regarding our reports Is reserved pending our written approval. A density test determines-thie ;de ree of compaction of the,e6et layer of 9 9 P P 9 PP tY � S P y material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the undedyings�il materials below the pr6ps setl structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certifvi iat,the underlying soils Wil supportthe proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil,bbrio-gs,kt-, perfor' ed'to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/stomis, retesting must be performed on this work. ' ' PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials, is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2