Fl. # FL17147-RI
Application Type Reylslon
Code Version 2014
Application Status Approved
Comments
Archlved
L.
Product Manufacturer Huber -Engineered Woods LLC
Address/Phone/Emall 10925 David Taylor Drive
Sulte:300
Charlotte, NC 28262
(704) 548-5442
kurt.koch@huber:com
Authorized Signature Kurt Koch
kurt.koch@hpber.com .
Technical Representative Ken W. Hix
Address/Phone/Emall 1446.FIwy 334
Commerce, GA 30530
336-3041
ken.hlx®f huber.bom
Quality Assurance Representative Walker Campbell
Address/Phone/Emali.' ' 1446 Hwy 334
..Commerce, GA 30530
(704) 562-1053 '
walker.cam pbellO. huber.com
Category Structural Components -
Subcategory Products Introduced as a Result:of New Technology
Compliance Method Evaluation Report from a Product Evaluation Entity
Evaluation Entity ICC Evaluation service,'LLC
Quality Assurance Entity" ICC Evaluation Service
•
Quality Assurance Contract Expiration Date 10/01/20i7.
Vallttated By ICC Evaluation Service, LLC. "
Certificate of Independence EL17147 R1 COI CertlOr wro of indena o v,; F i
n
Referenced Standard and Year(of Standard)
year
ICC-Evaivation Service'AC310 .. 2015
Equlvalence of Product Standards
Certified By Approved Evaluation Entity
ELI7147 RI Ea uiv AC310 odf -
Section§'from: the Code ��
Florida Building Code,OnIine
P4ge'2 of 2
Product Approval Method "
Method 1 Option C
Date Submitted
OB/31j2o15
Date. Validated
09/16/2015..
Date Pending FBC Approval
Date Approved r09j20/2015
'of Products
Model, Number or Name DescriptionZIP'System
FAPpr
(R) Wall Sheathing ZIP System (R) Wall Sheathing
Use
use in HVHZ:'Noall
Installation Instructionsd.for
d for use outside HVHZYes
esistant: NoCreated
M mr i �m�fa
Verified By; ICC Evaluation Servlce,:LLC
ressure: N/A
by Independent Third Party:
Other: limited.to structural aspects of panel
P P
Evaluation Re ports
_
FL37147 RSA R-1474 f 1 Iv
FL17147 Rl _ALE 9R1474 Ddf
.
6atle Next .
Contact 11j::3nd1 alafr
The State of Florida Is an AA/EEC employer. [eevdehf tom-7n1�
etorte Re^d Tbill^h- ^tiny Phen': P50.4a7.fe7i -
�t e1 Flees ' ;: Pfl:mcv statement :; Ams�ihfllN eb
rrr t :; .. -�la defend 4.temaat
under Florida law, emall addresses are public remrds. R.you do niatwant your e-mail address reloaaed'h, response to a public -records u
eleMonk mail to this entity. Instead, contact the office by phone or by traAtvonal mall. 1f u have an ref est, do not send
- Section 455.275(1); Florida Statutes, effective October 1, 2012, licensees
licensed under Chapter 455, F.S. must p vlde the peppaarriment with g5emit. address if
they have one. The emaits provided may be used for oNidarcommunication with the licensee. However einali addresses are public record. If you do not wish to
supply a personal address, please provide the Department with an email address which can be maids available to the public - -
datermin..
. -
-'To f you are a licensee under
chapter 455, F.S., please djo ick p, -
-
Product Approval Acoepts:.
®
'Credit Card .
Safe
httpS://wwW.#loridabuilding:org/pr/pr app dtl.aspx?param—WGEVXQwtDgvCo3EapiIlBd..:-4/12/2017
�• 1
. JS �. J
4� t- ....s'Y'.�' - �3. JCS.
� :ZtPy�System®� 040_ & W��i' � •4 h"9 � . .
R� f, ' `
r w _ She`athi , s
� ISeles Dl�Ce ,10825s�evtd Taylor{Or'LSulte,'S001 Phone.�80Q-933=g22Q �' _ } '' ;____
ifCh'artottecNG28Z62 ''psyskti6lcoin ombB?iu6s Wooda�isd�
r - `s't `•. � r + �FB�(;70.4 5479228' �'�� _�y` � �Fi2iaErSgrmsdW`m`ILrJ��Pbr�.yan"'tq ah and jM.Ne:.I.,G�e�mdaA�dyy�,�lt�ecro+�n�pb��re�gd�tr�dc„�alybf:�
i..,,a.rw ` - _�Y Cl � � '�' ll i•. f IO�fE�1?�tleCdi�SV:ir•r9�68f��/'•un ��Id.: rfilaV.ml�_,R1CR 81Q_ I
- ... - ' .dUBE� ENGINEEgEp
Woans"
ZIP:System®Roof & Wall Sheathing
INSTALLATION MANUAL
/?ysteM
ROOF i 11M SMMMINp .
Contents
FASTER. TIGHTER. ENERGY EFFICIENT.
02 ZIP $ysfern® Sheathing Installation On Roofs
0I3 ZIP System® Roof &Wall Sheathing -: Window
03. :ZIP System" Tape. installation -
Installation Flanged Windows Brick Mould Windows.
Roof Panel Seams
09 ZIP System® Roof & Wall Sheathing : Window
04 ZIP System" Tape Installation -
Installation Brick: Mould Windows (continued)
Roof Panel Seams: (continued}
10 ZIP System® Roof & Wali. Sheathing -
05 Roof Covering Installation Instructions
Penetration -Openings
06 ZIP System® Roof &Wall Sheathing Installation
11 ZIP System® Roof & Wall Sheat find
Installation Details
07 ZIP System" Tape Installation -Panel Seams 12 ZIP System® Roof &Wall Sheathing
Installation Details (continued)
ATTENTION: This installation guide is intendedto .provide general
Information for designer and end user. The following
ZIP System Roof &Wall sheathing can be used with a range of exterior
guidelines
will help you safely and properly install the ZIP System• Roof & Wall
claddings and roof coverings. Approved wall coverings include brick,
vinyl,
wall sheathing. We urge you,.and anyone installing this product, to
stone, wood fiber cement, wood and cedar shakes, traditional hard
coat stucco and specified dralnable EIFS
read. there guidelines in order p minimize any risk of safety hazards
and to prevent voiding any applicable
applications, however it is
not recommended for use with odheslMy attached EiFS. Approved roof
warranties. This manual -is
a general installation guide and does not cover every installation
coverings Include asphalt -fiberglass shingles, metal files and panels, day and
.concrete tiles, slate and siate=type shingles
condition. Proper installation shall be deemed to mean the most
restrictive requirement specified
and wood shakes and shingles.
Follow all cladding and roof covering manufacturer's installation instructions.
by Huber Engineered Woods (NEW),
local Building code, engineer or architect of record or other authority
having
ZIP• System Roof & Wall sheathing can be used
jurisdiction. You are fully and solely responsible for all safety
requirements and code compliance. For additional
on buildings of Type
III. (Roof Applications ONLY) and Type V construction and construction
information contact
Huber fngineered Woods LLc.
permitted under the Md.
ZIP System* Roof &Wall Sheathing Safety Guidelines
Follow
ZIP System• Roof & Wall Sheathing Includes;
- ZIP System sheathing panels with built-in
all OSHA regulations and any other safety guidelines and safety
moisture barrier With preprinted
fastening and tape guides
practices during installation and construction.
ZiP System tape
- Use approved safety befts and/or harnesses or other fall protection equipment
- Install ZIP System panels and tape only in dry conditions and on dry_. surfaces.
Storage and Handling
Do not install in rain, snow, frost or other slippery conditions.
Set panel.stack on three supports (stickers) to keep off the ground.
- Wear rubber -soled or other high -traction footwear while firstaping ZIP System
' Outdoors, cover panels loosely with waterproof protective material.
sheathing in a roof.application. Do not wear footwear with wom soles or heels.
Anchor covers on top of the stack, but keep away from sides and bottom
- Ensure the roofing surface is free from oil, chemicals, sawdust, dirt, tools,
to assure good air circulation.
electric cords, air hoses, clothing and, anything else that might; create a
In high niolsture.environments, cut.banding on the panel stack to prevent
gipping hazard.
edge'damage.
- Install temporary toe boards along the ZIP System sheathing roof surface:
ZIP System• Ro f &
What is ZIP System• Roof & Wall. Sheathingl
ZIP:System Roof & Wall sheathing is code -recognized as a wood structural
panel, roofing underlayment (ICC-ES ESR-1473), water -resistive barrier
and air barrier (ICC-ES ESR-1474). ZIP System Roof & Wall sheathing
has a built-in moisture barrier that lets you say goon -bye to building paper
or housewrap on the walls and felt paper on the root.* Simply Install the
panels, tape the seams, and you have a structural wall sheathing; water -
resistive barrier and air barrier or a structural roof sheathing and roofing
underlayment all from one product.
o WeU-Sheathing Notes and Limitations:
Do not use on roofs with'slopes less than 2/12.
Do not use abutted against general stone or masonry without providing a
minimum of a 1/2' gap.
Do not lnstali'ZIP System tape in temperatures less than W F
ZIP System products are not recommended for manufactured housing
appiications'that are built under a federal building code administered by
the U.S.:Department of Housing and Urban Development (HUD).
Do.not use panel edge dips (H-Clips) with ZIP System Roof & Wall sheathing
Without expressed written approval from Huber Englneered woods."
Do not use ZIP System tape to permanently serf around circular roof
projections (plumbing vents, pipes, curved walls, etc.)
Contents (continued) .
Wail Coverings
ZIP System Roof & Wall sheathing should be covered with the,fihished
roof. covering or exterior cladding within 180 days of Installation.
Finished roof. and exterior cladding products. should be' installed per
the manufacturer's iristaliation instructions.
Per the recommendation of the Western Red.6edac Lumber Association
andthe.U.S. Forest Products Laboratory, wood siding shouid.be primed
before installation.
When original roofing or claddings are removed and replaced on existing ZIP
System sheathing; the roof or wall should be covered wfth an additional:
roofing.undedayment or water resistive barter priorto installationof the
new finished roofing or cladding.
Note: in cladding systems requiring muitipia layers of water -resistive barriers,
like traditional hard -coat stucco, ZIP System sheQthing is intended only to
replace the firstlayer.
Wet Blown Cellulose Irisula can
In addition to following manufacturer installation Instructions, we recommend
a maximum moisture content of the cellulose of less than 25% measured at
the inside suiface of the ZIP System panel before closing the will cavity.
Sacondery.Coatings
Do not apply secondary coatings or treatments to ZIP System Roof & Wail
sheathing.parieis with the exceptionof-the following:
NEW approved fire resistant coatings. Fire resistant coatings must be
tested and approved by HEW for use with ZIP System panels.
Field applied water soluble borate insecticide or fungicide: treatments
applied -to the non overlay side .of the panel. See technical tip, °Termite
Treatments an Z1P System Roof & Wall Sheathing,". on. zipsystem:cori for
more information.
Permeable laminated radiant barrier foil or paint For a radiant barter toil or
coating to be considered permeable, it must have an applied perrriearice of
five perms or greater as tested by the: ASTM E 96 wet cup standard. For
radiant foil, the perneance evaluation would include any adhesive and/or
backer used to laminate a:foik For a radiant pairiUcoati69, the perneance
evaluation should be coridtided at the applied thickness of the painf/ceating.
ZIP System Roof and yGall sheaftif replaces only the first layer, in mold uMedayment systems.
" Edge support is not required by code with 12 (32/16 span rated) and N8 (40120 span rated) periarmance'category. sfisaftg 1 the tram ng does not exceed 24` d.c.
and the Mo load does not exaeed 93 pal lot M and 156 psl for 5r8 performance categories. This is based on U180 deflection rlitada m total load.
ZIP.System' Roof & Wall Sheathing installation Manual
02
ZIP Systeme Sheathing n'stallation on Roofs
Overview: ZIP System Roof &Wall sheathing'
:IS composed of ZIP System, panels and ZIP System sears sealing tape. ZIP System° Roof & Wall Sheathing
panels should be' fully installed before the seam sealing tape is applied. In general; the ZIP System roof sheathing panels should be installed . fro m the lowest point:
on the roof to the highest It is at the discretion of the installer whether to apply tape from the top down or from the bottom up.; However, working from the:higFiest'
sections of. the roof and warldng down will minimize foot, traffic "on the tape., The folio
sections steps are.presented as guidelines and.a general oiitllne of
the installation process. These are manufacturer installation recommendations -please visit zipsystem.com fora library of flashing and.installation details. You are
fully and solely responsible for all safety requirements Good construction and:eafnty nr—fi— �ti....ra s •._nL:.._�
Step 1:
Ensure that the panel surface is dry and dean of any nailsr sawdust, or. .
other debris.or protrusions prior to installing or walking on the panels.
• After erisurfrig 'compliance with all 'OSHA and local code safety
guidelines, install ZIP System •sheathing panels with " the moisture
'barrier surface facing "outSide.:The long edge (8') should be oriented
perpendicular to the framing members, and panels should'be installed
4'
with the edge: seams staggered a minimum of 24•.
1.0 spacing between square edges of al] ad)adeht panels is recommended,
In accordance with industrystandards for wood sheathing: (Tongue &
Groove panels are designed-to.seif-space and,do not require manual
spacing on the B. edges.)
Step:2 .'
= • Ensure that ZIP System panels span at least three framing members and
a framing member supports the entire 4' edge: of the panels.
Fasten the 21P System Roof & Wall sheathing panel to the framing
members with code approved" fasteners spaced at the appropriate
edge and intermediate spacing..IPis the responsibility of ihe.general
contractor to verify proper fastener type and spacing prior to installation.
Apply the fasteners 3/8' from the panel ends and comers.
• An ideal installation would be where fastener heads are flush with the "
panel surface. However, due ;o variations in materials and limitations
on equipment, this may be difficult to achieve in some situations. It
Is not "required to tape over overdriven fasteners. unless the fastener
head creates_a holo through the entire panel. thickness. Please see
the.technic l UPi °Overdriven. Fasteners in ZIP System Roof and" Wall
Sheathing; for more information.
Step 3.
Instal( temporary toe boards as necessary when "applying the ZIP System "
sheathing panels,up the slope of the roof planes.
b' Panel Edges
i
The unique edge profile is
designed to acc it modats
Incremental panel
expansion and does not
require manual gapping
along the 9' edges.
4' Penal Edges
Maintain 1/a' space :
where V edges: meet.
Unique edge profile is on
e' edges only.
03
ZIP System"' Tape. Installation - Roof Panel Seams
APPIY ZIP System tape after all ZIP System Roof &Wall sheathing panels ere fully fastened to roof -framing members. Only ZIP System tape should be used to
seal the seams of ZIP System panels. Ensure that the panel surfaces are dry and free of any nails, sawdust and other debris, or. protrusions. Avoid step"ping.
on, tape in high temperature environments. ZIP System tape. is a: contact tape that requires pressure for an edequate:seaF
Step 1.
AppIy-ZIP Systehh'tapa to every vertical and horizontal panel seam. it is
at th6 discretion of the Installer whether to apply tape from the top down
PP Y P
or from the bottom up. However, working.irom.the highest sections of
the roof and•working down will minimize foot traffic on the tape.
Ensure thatthe tape is centered over the seam within +/-1/2" to provide -
adequate coverage and to ensure that wrinkles in the tape are minimized.
Ensure that tape lengths are continuous across the B' horizontal edge
of the panels. if splices are unavoidable, create an overlapping splice
of at least T Apply moderate pressure onto the surface of the tape to
ensure a secure bond between. the panel and the tape.
"Use ZIP System tape gym or tape:roller to apply pressure'to the tape
and smooth out any.wrinkles:
Take special care to remove any voids andlor trapped air at splice
areas and T4oints.
Step 2.
For,valley areas of framing, we recommend you use'6" wide ZIP System
tape. This tape is wider than panel seam tape and Is designed to give you
optimal protection in valley areas.
Starting from the Bottom and working your way up; apply one continuous
piece of '6' tape so that the center of the tape Is over the valley seam.
Use the tape gun or tape roller to apply pressure to the tape to ensure
proper contact with the panel and to eliminate any wrinkles that might
have occurred In the tape. Take special care to seat tape completely
Into the valley.
Note: . .
-. It is. important to pay extra attention to valley taping: as water is
directed, toward the valleys during rain events.
Self -adhering ice and water barriers, maybe required by code. ZIP .
System tape is not considered a repikei man't.for self -adhering ice.
and water barriers. Therefore; when self -adhering Ice and water
.barbers are required, they should be installed in additlon to ZIP
System tape.
Step 3.
IV ZIP System tape is riot available, use two continuous plebes -of 3.75-
Zip'System panel seam tape over: the entire length of the valley seam,
overlapping -the-places on the Valley seam by at least 1'.'
• Starting from the bottom, Install the first place of tape overlapping the:
valley seam' by at least 1 °.
Usethe tape gun or tape roller to'apply pressure to.the.tapei to ensure
Proper contact with the -panel andto eliminate any wrinkles that might
have occurred In the tape.
Apply the second piece of tape, overlapping the first piece in the valley
seam by 1'.
i Repeat use of the tape'guri.or rbller to make sure the tapelse dequately
adhered and tightly pressed into the valley seam.
Note:
It is important to pay extra attention to valley taping as water is
directed toward the valleys during rain events.
- Self -adhering ice and water bOriers may -be required by code. ZIP
System tape is not considered a replacement for self-adhering.lce. .
and water barriers. Therefore, when self -adhering ice and water
barriers are required, they should be installed in addition to ZIP
System tape.
StO..4.
To -provide temporary we ather.protectlon to rootMall intersections I
of dormers or other wood• h h
s eat ed protection, apply 2 of the tape
width up- the vertical projection from where it intersects with the riot.
The remaining tape width can be adhered to the ZIP System roof
sheathing panels.
Use the tape gun or tape roller to apply pressure to the tape and smooth
out any wrinkles.
step S.
Install ZIP System tape over hips and ridges by centering the tape over .
the peak seam. Apply tape in sufficient length to completely extend the
length of the hip or ridge.
- Starting from, the lowest point of the hip and working up, press tape into
Place keepingdape centered over the' hip.-ApplV moderate pressure .
onto the surface of.the tape to ensure a secure:bond between the panel
and the tape.
Cut ridge tape as required, for ventilation prior to installing ridge vent.
Step 6:
Tape over toe board nail holes once the toe boards are removed, working
from the highest toe boards to the Ibuvest
05
Roof. Covering installation Instructions
ZIP System Root 8 Waif sheathing is a code recognized sheathing and underayment and is approved for: use with the following of coverings:
-..Asphalt-fiberglass Shingles
Metal Roofs (shingles and panels)
- :Clay ile
- Concrete Tile
- Slate and Slate -type Shingles
- Wood Shingles
-. Wood Shakes
conventlo ailing roof coverings, follow applicable codes and mariufacturer's.suggested' instructions. Some roof coverings require a slip -sheet. in addition to
conventlonal underlayment. Where slip -sheets are:required, they should be Installed over ZIP System sheathing panels.
Note: Visit zipsystencom for,updates and installation details.
Asphalt -fiberglass Shingles
Apply asphalt shingles directly to ZIP System sheathing: For roofs with a:slope of 2112 or greater but less than 4/12, additional underlayment maybe required.
Install asphalt -fiberglass shingles according to applicable codes and mariufacturees:Installation Instructions.
Metal Roof Coverings
Metal roof coverings may be applied to ZIP System sheathing- provided that the roof covering manufacturer's Installation instructions and applicable
codes are followed..
Fasteners used to: secure the ZIP System.Roof 8 Wall sheathing panels to. supporting framing must be compatible with the specific metal roof covering
used. Galvanized to
shall be used with galvanized roof coverings; aluminum -zinc coated fasteners shall be used with aluminum -zinc coated roof
coverings and 300 series stainless steel fasteners shall be used with copper roofs. Stainless steel fasteners are acceptable with all metal roof types.
In addition, metal roof, flashing shall also be made of a material compatible with. the specific metal roof covering used. Apply metal shingle roofs with
Slopes of 3112' or,greater.
Clay and Concrete Tile Roof Coverings
ZIP System Roof &Wall sheathing is intended to replace the frst layer in a two -layer or.miriti-layer underlayment system. When installing clay. or
concrete tile roof coverings, follow the Installation recomrriehd' ations of FRSA/TR1073W. Instal[ file
Installation instructions. roots according to applicable codes and manufacturers
Slate and Slate4ype Shingles
Apply slate and slate -type shingles on roofs with slopes of 4/12.or greater. Install slate and slate -type shingles acco installation instructions. rding to -applicable codes and manufacturer s
Wood Shingles
ZIP System. Roof '& Wall sheathing is Intended to replace the first layer of underlayment required b
may by the IBC and/or the IRC. Additional layers of underlayment
e required by code depending on the local climate. Apply wood shingles on roofs with slopes of 3/12 or greater. Install wood shingles according to
applicable codes and manufacturer's installation instructions.
Wood Shakes
ZIP System Roof & Wall sheathing is Intended to.replace the first layer of underlayment required by the IBC and/or the IRC. Additional layers of underlayment -
may be required by code depending on the local climate. ZIP System roof sheathing is not to be construed as a replacement for interlayment. Apply wood
d
:shakes on roofs with slopes'of 4/12 or greater. Install wood shakes according to applicable codes and manufacturer s installation Instructions.
VV
ZIP: System® Sheathing Installation on. Walls
Overview: ZIP System Hoof &Wall sheathing _is composed of ZiP System'pariels and ZIP System seam sealing tape. ZIP System° Root. S Wall Sheathing
Panels should be fully Installed before the seam sealing.tape. is applied. The following installation steps are presented as a general outline of the installation
process: These are manufacturer.iristallatlon recommendations=please visit zipsystem.com for a Library of flashing .and installation details. You are tall and
solely responsible for all safety requirements. Good constructlon'and safety practices should.be followed at all times'
Step 1. Install ZIP System Roof & Wall sheathin g.paneis, positioned'
with the water -resistive barrier facing outside: The panels may
be installed with the long side of the panel oriented: either
horizontally or vertically to the framing rnpTbers. Walls that are
designed to resist lateral shear.forces .and sheathed with wood:
strUctirW panels .typically require solid framing, or blocking behind
all panel edges, of oriented horizontally, block horizontai joints If
wag is designed for bi icing or as a shear wall.
1/8' spacing between square edges of -all adjacent panels is
recommended in accordance with industry standards for wood
sheathing Installation.
8' Panel Ed
9es Panel Edges 4' Panel Edges
7.
The unique edge profite is Maintain 1/a" space where Maintain 1/8' space
designed to accommodate 8' panel edges meet 4 where 4' edges meet,
Incremental panel panel edges; Unique edge Unlqua edge.profile 1e�ori
expansion and does noF profile does not provide 8' edges only.'
require manual gapping the full 1/8' recommended
8'
along the edges.- :space in this situation.'
Step 2. Fasten the: panels to the framing members. with code approved . .
fasteners. Space fasteners 6' o.c: along supported edges and 12' '
o.c. at Intermediate supports,'pnless otherwise spebi ied by local
code or the designer of record. It Is the responsibility of the general
contractor to verify-prope'r fastener type and spacing prior to
installation, Apply the fasteners 3/8'•from the ends and corner's.
An ideaf installation would be where fastener heads are flush with
the panel surface.. However, .due to variations -in materials and
limitations on equipment, this may be difficult to:acbieve In:some
situations: it Is not *required to.tape over overdriven 'fasteners
unless.the fastener head creates'a hole through the entire panel
thickness. Please see the technical tip "Oveiddven.Fasteners'in
Zip System Roof and Wall Sheathing," on ilpsystem.cum for
more information.
07
ZIP:System'" Tape Installation - Wall Panel, Seams
Apply ZIP System tape after all ZIP System Roof & Wall sheathing panels are'fUl�ly fastened to wall fremiri 'members. Only Zip S stem to d be used
to seal the seams_of:ZiP System panels. Ensure that the panel surface is dry la
and free. of.sawdust and�dirt prior to tap(n0. ZIP.Syatem tape a
tape that requires pressure for.ah adequate seal. contact
e all seams using ZIP System: tape: Ensure that the tape.. _
entered over, the. seam within +/- 1/2"• to provide adequate
rage and that wrinkles,ln tape are minimal.
riand
the ZIP. System tape gun or roller to apply pressure to the tape
smooth cut any wrinkles.
Step 2. Wherever tape splices occur at a horizontal or vertical seam, create.
an overlapping splice of•at.least a".
At T-Joints, the tape pieces should overlap by at least .i'.'Apply
moderate pressure onto the surface of the tape to ensure a secure
bond between the panel and the tape:
Use the ZIP System tape gun or roller to apply pressure tc the tape
and smooth out any Wrinkles. .
Take special care to remove any Voids and/or trapped air at splice:.
areas and T-joints.
StepS. Tape inside and outside comer seams.
Irslde comer seam
ouWa comer seats
ZIP System® Roof &-Wall Sheathing Installation Manual
IT
ZIP :System - Window -Installation DISCLAIMER:The foAoxdngsteps represent a general avennew for the proper instelladon'o . I Wndow flashing. please defer lolconsuft
the installation instructions of your window manufaGurer as well as code requirements in yo6rluriadeon for full insialladon.detatls;
Flanged Windows
1. Fasten the ZIP System. sheathing
to the wood frame and install
ZIP System tape to all wall panel
seams, as detailed In sections
02 and 63. -
i
7 �
r f
2. ZIP System:tape may be used as pan flashing if
installed in accordance with flanged window
Installation details posted on zipsystem.com.
Other adhesive -based flashing tapes (must meet
ICC-ES'Acceptance Criteria for Flashing Materials
(AC148)) may be used as pan flashing if Installed
per ASTM 2112-07. Apply the flashing to cover
the bottom of the opening, overhanging onto the
sheathing by at least 2' and extending a minimum
of 6' up each jamb.
3. Apply sealant around inside face of mounting
flange. Sealant must be gapped. at the sill
to permit drainage. Install and level window per
manufacturers installation instructions. Verify
sealant compatibility with window manufacturer.
When using ZIP System tape as pan flashing,
tiutyl, -100% silicone or polyurethane sealants
are acceptable. Do not use latex or other water -
based sealants.
4. Cut two pieces of ZIP System tape or another
adhesive -backed flashing tape (must meet ICCilkl
-
E$ Acceptance Criteria for Flashing Materials
(AC148)) and apply to each of the window jamb
flanges, ensuring the jamb flashings .ovedap the
sill flashing.
Once the tape is in place, use the tape gun or roller
to seal the flashing to the sheathing.
S. Cut a iength. of ZIP System tape or another
ad hesive-backed flashing tape:(must meet ICC-
ES Acceptance Criteria for Flashing Materials
(AC148)) and apply to the header, ensuring that
the flashing overlaps the jamb Ilashings.'
Once the tape is in place, use the tape gun or roller
-to seal the flashing to the. sheathing.
'00 NOT tape bottorn Rings
6. From the interior, apply low-pressure polyurethane
foam (for windows] between the rough opening
and the window frame. (Caulk sealant compatible
with the, sill flashing may be used.at.the.sill if the
.opening between the sill flashing and window i
Is too narrow to allow the use of low-pressure
polyurethane foam.) _.
When using ZIP System tape, butyl, 100% t
silicone or polyurethane:sealants are acceptable.
Do not use latex sealants with ZIP System tape. If
using another flashing tape, follow the flashing
manufacturer's recommendation In selecting a
sealant compatible with that flashing.
Brick Mould Windows
1. Fasten the ZIP System sheathing
to the wood frame and install
ZIP System tape to all wall panel
seams, as detailed in sections
02 and 03:
2. If recommended by the window
manufacturer, cut a strip of wood
to function;as a back dam at the
sill. The wood slip shouldhave
a length equal to the width of the
rough opening and a height and
width of at least 1/2'. Position the
black 'at the inside edge of the
window frame.
NO
ZIP System — 1NInCIQ1A/ Installation
DISCLAIMER: The toUowingslepsrepresentegeneralti0ervewforthaproperhiyyapatlonolwindowfleshUig,plaasedeferldconeuil
the insla0atkn ins Wcilons of your w ndow mehulaeNier ohd,sd
as well as code requirements in your ctbrr for full Installat on data is
Brick Mould Windows (continued)
3. ZIP.System tape maybe used as.pan flashing if
installed in accordance• with brick mould window
Cut a piece of rigid head flashing so that when
Installation details posted on' zipsystem:cam.
, itflush with the edges of the exterior
Other adhesive -based flashing tapes (must meet•
'Insta"ed
moulding of the window: Apply a bead of sealant
ICAcceptance Criteria for Flashing Materials
to the back and bottom surface of the rigid .
(AC149)) may be used as pan flashing If Installed
head flashing..Use sealant recommended. by the
per ASTM 2112.07. Apply.the flashing to cover
flashing manufacturer.
the bottom of the opening, overhanging onto the
sheathing by. at feast 2' and extending a minimum
of 6' up each jamb.
B. Secure the rigid head flashing to ZIP System
wall sheathing.
4. For vertical jambs, cut ZIP System tape & another
adhesive -backed flashing tape (must meet ICC-
ES Acceptance Criteria for Flashing Materials
(AC148)) and apply to each of the window Jambs,
Ensure that they cover the entire inside of the rough
opening as well as overfap onto the sheathing by
at least 2". Flashing shall also extend above the �\ - ;
9• Cut a length of ZIP System tape or, another
rough opening, such that it will project 1' beyond
adhesive -backed flashing tape (must meet ICGES
the exterior trim of fife window.
Acceptance Criteria for Flashing Materials (AC148))
Once the tape is in place, use the tape gun or roller
and apply to the rigid head flashing, ensuring
that the adhesive -backed flashing overlaps
to'seal the flashing to the sheathing.
the
Jamb fleshings.
.Once the tape is in -place, use the tape gun or roller
to seal the flashing to the'sheathing.
5. Apply sealant to Jambs and header allowing for
drainage at the sill in accordance with window
manufacturer's. Installation instructions. When
using ZIP:Systemtape, use a butyl, polyurethane
From the interior, apply low-pressure polyurethane
or 100°/, silicone sealant Do notuse latex or
foam (for windows) between the rough opening and
other water -based sealantswith Z1P System
the window frame. (Caulk sealant compatible with
rb
When using another flashing tape, follow the
the sill. flasFiirgmay be used at the sill if the o enintape.
P 9fiashing
manufac-turer's recommendations :in
etween the sill flashing and window is too narrow j
selecting a sealant compatible with. that flashing.
to allow the use of iowrpessure polyurethane foam.)
When using ZIP System tape, butyl, I 000A silicone
or polyurethane sealants are acceptable. Do not i i ' •'
use latex or other water -based sealants with ZIP
System tape. If using another flashing tape, follow
6. Install and level window per manufacturer's
the flashing manufacturer's 'recommendation In
installation instructions.
selecting a sealant compatible with thatflashing.
ZIP System - Penetration :Openings yowSCWIMEFI: The tallow n
your judSftvon lo; futinste9agon Details. g steps represent B general overview for the proper instelletlan of penehat on fleshing. Please deter loPoor wR
ur Lode requlrert ents in
NULL ASSEMBLY
zIP SYSTEMD WALL SHEATHING
WOOD OR LT. GA. METAL STUDS
134NCH CAP RECOMMENDEDAT
PANEL EDGES UNLESS . .
OTHERWISE PROVIDED BY
MACHINED PROFILED EDGES
INSTALL Z1P SY6'TEAIS TAPED (
ABHESNE BACKED FLASHING (MUST C
MEET ACi{a) W SEQUENCE FROM
BOTTOM, SIDE$ TNEN TOENSURP TO'
BACKED FLASHINGLNO LAP OF AQHESNE
ZIP SYSTEMSTME
OVERALLJOINTS IN ZIP BYS}EAjS
WA L SHEATHW%
OVERLAP TAPE A MINIMUM OF
14NCH AT AL T.)OINrS
Vv
USE FUW GEG ELECTRICAL.
BOXES OR MEMBRANE FLASHING
TO PROVIDE FLANGES FOR
ELECTW CAL BOXES '
w'
a� T shvMlcw
weOO f>A LT, eL 11ErAL371®e.
-
1GAF AETOIWONO6o AT
PANEL
PANEL TnaaehAAaea
IM 25p= p�Es
1
mlY6TElyTAFFP4rNlm
µOKP 6YSTEND
SWAT
APPPgH
-OL
E
Ov06MTAPEA PRVMIN OF.
,�MATALLTJ .
u ALLefyiTDWTAFEATALL
FXTENpA CI)Rle 9
•. �jw
FASMK1 IyPTDI0v
91FA11C1l6 A8 RECIXNm pY
5L%DM CDDE CORD OF lOAJL
WALL ASSEMBLV .. .. ..
ZIP SYSTEMS WALL SHEATHING
WOOD OR LT. GA. META. STUDS
IM4NCH GAP RECOMMENDED AT
PANEL EOGESUNLESS '
OTHERWISE PROVIDED BY
MACKNED PROFILED EDGES —
INSTALL ZIP SYSTEMOTAPE OR
ACHE SNE BACKED FLASHING tMU9T
MEET ACI<6)WSEOUENCE FROM
BOTTOM, SIDES; THEN TOP TO
ENSURE SHINGLE LAP Of ADHESIVE
BACKED FL/LSNIING -
ZIP SYSTEMS TAPE iINSTALLEO
OVER ALL JOINTS W ZIP SYSTEM®
WALL SHEATHINGL
OVERLAP TAPE MINIMUM OF
14NCH AT A L T,MIHTS
USE FLANGED VENT HOODS
`\ L
Z!P System Sheathing Installation Details on Walls— visit zipsystem.com for. more details.
WALL ASSEMBLY
VINYLAVOODMBER CEMENT SIDING
(INSTALLED IN ACCORDANCE WITH . .
CLADDING MANUFACTURER'S
INSTALLATION RECOMMENDATIONS)
ZIP SYSTEM® WALL SHEATHING
WOOD OR LT. GA. METAL STUDS
TOP EDGE OF FLASHING TAPED.TO
WALL SHEATHING WITH Zip SYSTEM®
TAPE OR ADHESIVE BACKED
FLASHING -'(MUST MEET AC148)
CODE APPROVED FLASHING
FOUNDATION,--,
wALL:AsbEiu�r
(INSTARCEMmC 6CW0
ACACRIANCE WITH.
INSTALL INSTALLATION
REACAURSDA
ZIP SySrEIO WALLSMEATHI TION4).
DPSY'B RLT. WALL YA"TUDS
'NG
RING OFIIT, CA METAL STUDS
LAL�NOFD AT
PANELUNLEBS - ..
GMERWISE PROVDEp BY �,
YALNRIEO PRO}$ED EDGES
ZIP
F
OVER ALTLEjGTAPE (WSSySTEn
DYERSHEA 9 W aPSYBTFJLO
WALL 6HEA1NWG1
Y
4'
OVERLAP TAPE A MYAMLIMCF
IiNCH ATALL T~$
PANELEGAP COMMENDEOAT. \
NLESS
OTHERWISE PROYOEG BY
NACNWEO PRCFLFD EDGES
FASTER 2p
M WALL
SHFATXWGASREOUWEDBY
DESKWERGFaLSCORO CA LOCAL
BUIDWGCODE
-----------------
Note• For 1 i'
WALL ASSEMBLY
BRICK VENEER
AIR SPACE (AS PRESCRIBED BY
LOCAL BUILDING. CODE)
ZIP SYSTEM® WALL SHEATHING
WOOD OR LT. GA, METAL STUDS
TOP EDGE OF FLASHING TAPED
WITH ZIP SYSTEM® TAPE OR
ADHESIVE BACKED'FLASHING.
(MUST MEET AC148)'
CODE APPROVED BASE
FLASHING- '
IWEEP HOLES (AS PRESCRIBED
BY LOCAL BUILDING COPE)
WALL Aars'um
BRICK VENEE
AIRSPACE (AS PRESCRIBED BY
LOCH. BUBORtG COOE)
LP SYSTEMS WALL SHEATHWB
WDGO,OR LT. GA METAL STU0.5
7/B-INCH OM RECOMMENDED AT
OTHERWISE
EPRovIG
MACHINED
G
MACHINED PROFILED EDGES �
AP SYSTEAID TAPE (INSTALLED
OVE R ALL JOMS IN 21P SYSTFJiS
WALL'SNEATHW% .
OVERLAPTAPEA WWtMIjw OF
1•INCX ATALLTJOWTS '
=CN GAP RECOMMENDED AT
PANEL EOOEg UNLESS
OTHEfNASE PROVIG W BY
NACHWED PRGF%ED EDGES
FASTEN ZIP SYSTEMO WALL
SHEATHING AS REOUIRED BY
DENGNER-0F•RECORO OR LOCAL
BUILDING CODE
opttme a r leakage reduction, all untaped edges of the panels can be caulked, gasketed or, sealed with a weather stripping material.
ZIP Systemm Rod.& Wall Sheathing Installation Manual
12
ZIPSystem Sheathing Installation Details'on Walls (cointinued)
WALL BEYOND. '
WALL ASSEMBLY M71
BACKDAM PER WINDOWBRICK VENEERMANUFACTURER'S INSTALLATIONAIR SPACE (AS PRESCRIBED BY RECOMMENDATIONS:—�
LOCAL BUILDING CODE)
ZIP SYSTEMS WALL SHEATHING
:WOOD OR LT. GA. METAL STUDS
TOP EDGE OF FLASHING TAPED
WITH ZIP SYSTEMS TAPE OR
ADHESIVE BACKED FLASHING.
(MUST MEET AC148)
CODE APPROVED FLASHING
WEEPS (AS PRESCRIBED BY
LOCAL BUILDING CODE) —
STEEL LINTEL'
INSTALL WINDOW IN
ACCORDANCE WITH DETAILS
24A-24D OR 25A-25D .
WALL BEYOND
WALL ASSEMBLY
CODE APPROVED CLADDING
(INSTALLED IN ACCORDANCE WITH
CLADDING MANUFACTURER'S
IN$TAL LATION' RECOMMENDATIONS)
EXTERIOR RIGID INSULATION
DRAINAGE'PLANE (MIN. Y")
ZIP SYSTEMS WALL SHEATHING
WOOD OR LT. GA. METAL, STUDS
TOP EDGE.OF FLASHING TAPED TO
WALL SHEATHING WITH ZIP SYSTEM@
TAPE OR ADHESIVE BACKED
FLASHING. (MUST MEET AC7481-:-�
CODE APPROVED FLASHING
INSTALL CODE -RECOGNIZED
SILUPAN FLASHING IN ROUGH
OPENING PRIOR TO WINDOW
INSTALLATION.
TOP EDGE OF FLASHING TAPED
WITH ZIP SYSTEMS TAPE OR
ADHESIVE BACKED FLASHING.
(MUST MEETAC148) —
WEEPS (AS PRESCRIBED BY
LOCAL BUILDING CODE)—=—�
CODE APPROVED FLASHING
WALL ASSEMBLY
BRICK VENEER
AIR SPACE (AS PRESCRIBED BY
LOCAL BUILDING CODE)
ZIP SYSTEMS WALL SHEATHING
WOOD OR LT. GA. METAL STUDS
IFOUNDATION
Note: For optimal air leakage reduction, all untaped edges of the panels can be caulked, gasketed. or sealed with a weather stripping material.
F. . _' .. +ai •,f ylr- ar 7.. -•+�., � MI'.+' '_,S�+T r'.' l �t .. , k• � .,
w' _� ..,e+„'•. • R> � y - sue. t : t,., �,,�+'„
it _ t .. - i • - .- sip ,j .• -
' - ` -r .. `f , a .ram?-Q�.�y:� r r ,,R n � { •T . , T�
t. a,, y:v ��'�'i yCt i,.� �s.H y r tY� ,` ., s r !vr �,, aC y�Jf►A •�`7 .. ». ' ** ;` � t3 . .. a * i � ;, ti a.��' R r ':hoc s<r ;�. 1,�. ' `•;r,+
•+'�4"•�' vT t ♦ r+, �� •TaYY; �' ♦ a4x yk }�� _ , t
KAv
s 4 } .ay ! = i *�, .� •ems_ .i.,., 1 r4i� r 4♦►h'.'7 ,``j r iP•.•p.� ?i, ' tf:",t '.�.:•}'�i.y��`',,, :.'�r-'.♦ - v"�.t�".,
^x
3 ._ •,. '' t ''i k e•.', i,-rt 4, r .♦. d � •n i � r r? i Z,^t � r:
i- - •`� S, .'y� 4j i„i rRji . �'ilS�f�i TF !"^ qr +.:`i K , -?I s.. + '!•i .r ri r �•f#. sv AM
., - .... .« .� .{ • iL ♦ M tA' dtr r.♦ 39�s .1r��K k' �^a� , afi.i ♦ #. �•?4 �vtl t
..T - y• it
r ^ ♦ r rt - '''vc d"''n . r .rt•.,, aTLi r'y., it, F »'". !+k* fir. `* -.. `r+t ■,,;r ry '# yy+Iw`+r4
. ,� r ' t ,r.. .•�• x ` S '� t Y �.. t r T .,R�' �._.;� } a.: k:♦ �• '..a♦ +i }'r�1`: `i�R� ,,�� r'S+".R t,�t t t! ! ., fir. T? � 1! '.Y K��
? r s4m++rrr+K : Y " cF" L r1q T'` r �,rri P"il
• p'f x
.,. -t �• sTi ..-'�5a.'4^ r-. � Y > � �+ ti �' �.'�•t y� « ..»a- ' rS ?aa � J t
, . ' rev.. . ^ r ' ' Y t n ♦ r t i � �a O:
rt_ r
• �` T � °' C ±r �-�A•,�•A - i T°Wrp i�t� x �� r * �yr r . •At'h iT; � r �'�.� �� ,F
• � T '•r _::r' `M "�� T+4�y. ,}.��y E } w d { ,� � #A.et• ri~ a �'" �✓ti_ i. .k»• a ' .�`y�.} -'�t� +, r i1� t♦ tj �•P"" , +
s. . x ' ' T#a•- � 'y.: 'i'a a .. � klr"' � *?<ps '>+ � "�,iy,"�.�}; `•, ��� *t,�tik g T•re e�,,,y,fA.'r 34 L `r...,.r CT'a.1� ry � .
♦„ + ♦ <a R +kr'_ f." �,'".:T�.�.,j'`y.', .,�:ar'^ ar lr t t 4 ✓ i+. r ,.• s�,
? � � *y .`. .'.T.,,,3,df"'-^ 'r s � r i � . � s c- l' -. • ✓f �' ;9 ♦•r �ff{i _
, `.Vr-x !y �� 11 y� i�f 4� '1 T" t ) }' =F fY 1W �{. i .'TS .1 ) ! +tom y •,' ! ii.
, t � ♦ *ta P �f '4Y i?" •iir�! 3..a� ` 7 i i y. � 4N'y „ ,t
< r k
-• S >r� r � : �3 's`�d's+ �i .dx� � "iro'w �r �L r i'•rv` .k� i• � ap• �,�
- •, s � . , p,. r. ♦ i � s r � t �. s+f;.b*.# ..a've ? a r ,t
�•+, � .. . ra � ::2kt rs y.<; �-�. •s' ♦{.sit � L t `*.' r w ?� et+. ��i*s' .,. �+.,y,, t•a r 'r'��{�.{.,-,a f i <$q��e�� .-ti[`�=a iy'�r+ +' �<
;.� � � . - + t.' .' i. .' `-^ � art r • t1 w s �„�r. �y +�r� • y M i� iQ�. "�' .•` � ,r _'�C�..♦ �t I •? +�
• , s S - ••d. i x,� � '. h8 Y•:3Y. ti < t• "!� s 1 �. .+` � 5 S.a.v r �.,✓ai, +, .�
• - - r - i .• � r n � t.. '`- , '�"i ��Ii,T i" ;A!. 4�e♦ } SX r Ar's /,r, � r °? i w M
.. �/,a �' e" ' _.: I'`F .��✓# y� yy g�,T` ya�y'r }` 1 L� � i .+t `a+ ?�,. d.�.�
d 3aXni'Sb"t , z" &-1n�ir� �r%4t F r� •.ycs « ,` 10,
3 ; e, " ♦f r a� 1L': pr r •�'`` + `- a �"" 4 a y+.,•
' . > � -�♦-; a 4 7'-R�' !'-i�yy�y.� r �' a is p,,T T �♦ � '�' `. '_' � '��► C * �,$+�;n ��t
r, aF• r ' , -. �''.: .. � �..:. d�1.r`... � a �.� �'� ti .- � 'r a � � �P' t .= r x + t ^' r F t:. •+ , �L$!r ` st
+ • [, ',ax. •�sy v� a'�. R+,�. f�y+•.iai r.�r df... ♦ � , 'h J "151ie fin Orr -'` y, f4t F �7� `�,,� w•
a r i j.s�, r ..'p- H'r'} u ?� a .fie R My i� ✓ S6 .a. rf } yi {'► G_. >r.c tf
:i z '`ss•� +k
: i} • '° .': t> �7 �1 u ; ♦ s y e � r... - i x," .
a • i. « x :=ram r - 9 - ^y . + a - •Er
+✓fir` 4r x �'. 4. { r'•y, _q,y, i t `•' .j; _t.�+� x ` + ♦ • ?
r
kr
�,� ,.5�.;,aNtrl�.,,fnc.,.pa,,� < 'Y�>..a�t,+6,.,.a �i i'�r''�4't ''° '� a•`' ii r w wh>. tryj, rY � n, ' ti_ •,r ., v�
ZIP SYSTEM® SHEATHING WITH HARD COAT STUCCO AT
BLOCK FOUNDATION WALL- OPTION:A
H"2
TRADITIONAL HARD -COAT STUCCO.
INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S
LATH
OR THE PORTLAND
CEMENT ASSC. (PCA)
RECOMMENDATIONS WITH THE MOST
• =• RESTRICTIVE CONTROLLLINO.
ONE LAYER OF WATER RESISTIVE
VAPOR -PERMEABLE BARRIER
WITH A PERFORMANCE AT LEAST
EQUNALIE NT TO GRADED '
BUILDING PAPER.
ZIP SYSTEMS SHEATHING'
t.,
. TOP EDGE OF WEEP SCREED
;
-''•`'"•
TAPED TO WALL SHEATHING
•�•
WITH ZIP SYSTEM® TAPE OR
•'
ADHESIIlE.BACKED FLASHING.
(MUST MEET AAMA 711 OR
AC148) '
WOOD OR LT, GA.
s
METALSTUDS
ADHESIVE BACKED MEMBRANE
BRIDGE FLASHING CENTERED
OVER TRANSITION JOINT (]JP
SYSTEM TAPE MAY 'BE USED AS
\ THE BRIDGE FLASHING)
L— CODE -APPROVED
WEEP SCREED AT
BASE OF WALL
VERTICAL AND HORI7NEEDED.
CONTROL JOINTS AS
DESIGNER-0OF-RECOSPECIFY TYPE AND LMASONRY BLOCK WA
ZIP SYSTEM® SHEATHING IS APPROVED TO REPLACE. ONLY THE
FIRST LAYER OF A TWO -LAYER UNDERLAYMENT.SYSTEM;
DRAWING_NOT TO SCALE
�I�sysinTM Sales Office:.10925 David Taylor Drive
Suite 300: Charlotte; NC 28262 �UVENGINEERED
SHEATHING 8 TAPE Telephone: 800.933.9220 - www.zipsystem,com 11 �J WOODS
These construction etails are provided to assist.in a instal a ono I ystem product s) an may'not apply to
every situation. Manufacturer accepts no responsibility or liabllity for the use of these or other coriStruction details.
ZIP SYSTEM® SHEATHING WITH HARD'COAT STUCCO AT
'BLOCK FOUNDATION WALL -OPTION A H-2
WALL ASSEMBLY
TRADITIONAL HARD -COAT STUCCO
METAL LATH
ONE LAYER WATER-RES. BARRIER
21P:SY$TEM�1 SHEATHING*
WOOD OR LT. GA. METAL STUDS
TOP EDGE OF WEEP. SCREED
TAPED TO WALL SHEATHING
WITH2IP.SYSTEM0 TAPE OR
ADHESIVE BACKED FLASHING.
(MUST MEET AAMA 711 OR
AC148)
CODE -APPROVED WEEP
SCREED AT BASE OF WALL
ADHESIVE BACKED. MEMBRANE
BRIDGE FLASHING CENTERED OVER
TRANSITION JOINT (ZIP SYSTEM / -
TAPE MAY BE USED AS THE BRIDGE
FLASHING)
MASONRY BLOCK WALL
LATH
TOP EDGE OF WEEP SCREED TAPED
TO WALL. SHEATHING WITHZIP �\
SYSTEM® TAPE OR ADHESIVE BACKED
FLASHING.:(MUST MEET AAMA 711 OR
AC148) ...
TRADITIONAL,HARD-COAT.ST000O \
INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S OR THE PORTLAND
CEMENT ASSC. (PCA)
RECOMMENDATIONS WITH THE MOST
RESTRICTIVE CONTROLLLING. '
ONE. LAYER: OF WATER -RESISTIVE . .
VAPOR -PERMEABLE BARRIER WITH A
PERFORMANCE AT -LEAST EQUIVALENT
TO GRADE D BUILDING, PAPER.
COD&APPROVED WEEP /
SCREED AT BASE OF WALL . .
ADHESIVE BACKED MEMBRANE
BRIDGE FLASHING CENTERED OVER
TRANSITION JOINT (ZIP SYSTEM
TAPE. MAY BE USED AS THE BRIDGE
FLASHING)
MASONRY BLOCK WALL
'ZIP SYSTEM®SHEATHING IS APPROVED TO REPLACE ONLY THE FIRST LAYER OF A TWO -LAYER UNDERLAYMENY`STEIyIqT TO SCALE
Sales Office:10925 David Taylor Drive
Suite 300 - Charlotte, NC.28262 Wsand
ENGINEERED
SHEATHINGBTAPE Telephone:_800.933.9220-www..zipsystem.com WOODS
ese construction etails areprovide to assistin the' instal atlon o IP. ,ystem pot apply to
every situation. INaqufaCtUrer accepts no responsibility or liabifity for the use of these or other construction details.