Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FBC Energy Conservation Code 4-16-18
Date: 04 -co- Ce Contractor: Construction: l5ost Construction Test Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method RECEIVED APR 7p18 Permitting Department St. Lucie County Permit 0-7®(6 — ® 2'-7 Lot#: Address:3�� ��- j �"yi�SiL ❑ Rough -in Test Test Conditions: Date: ot4ik o A Time: t2 ° '3© v5--m Indoor Temperature (F): 4v° Outdoor Temperature (F): % QQ Floor Area (ft2): Primary Location of Supply Ductwork Primary Location of Return Ductwork Total Leakage Test (Outside) Duct Leakage: ❑ Default 21110'p,. Leak Free ❑ Proposed On = Test Pressure: "ZS (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Installe Fan Press Pa - Flow (cfm) Results: 104pass ❑ Fail Total Leakage (cfm): Total Leakage per 100 sgft: '7 CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. 10 © 30 Testing Company Company Name: Address:G570 ref-C.Y Z 1FX— I hereby certi a above Duct. Sealing Leak a results demonstrate compliance with 5t' Edition FBC Energy Conservation requirements in accordance with Section 3. Signatur — Printed Name: t2A 97PR2' (n_'License/Certificate...