Loading...
HomeMy WebLinkAboutField Density Test 11-28-17RECF-IVE[ NOV'$ 2017 Phone 954-784-2941 1919 ederal 954-784-7875 Public Works. FaX 954-784-7875 L 4 & TESTING INC. St. Lucie•County, FL www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 118, Creekside Date: November 24, 2017 Address: 3107 Yellowstone Circle, Fort Pierce, FL 34945 Order #: 17-DR-1151 Area Tested: Building Pad Permit #: Material Type: Brown Sand with Some Rock Tech: SL Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist ova Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 NW Corner of Pad 12" FL 8.6 106.3 111.5 10.5 95.3% Yes 2 ISE Corner of Pad 12" FL 7.9 107.0 111.5 10.5 96.0% Yes 3 Center of Pad 12" FL 8.8 106.0 111.5 10.5 95.1 % Yes 4 5 6 7 8 9 10 11 12 13 14 %HiN L Remarks: See Reverse Side Page 2 of 2 for Additional Information for Disclaimer This is a Compaction TesLqnly on the top 12" of the pad and is not a verification of SO$ lw4ding:capacity. i Legend for Elevation: _ PR = Proofroll 1,2,3 =1st, 2nd, 3rdi y bmitted by: SL = Springline FL = Final Lift ; ` R Keith LeBlanc, STATE Q 1,&1 61 SG = Subgrade BG = Below Grade r°,o' Federal Enginee�c `Testing, Inc. lV BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 5$�s��, LpRI_O_ P•�G�'���� TOP = Top of Pipe FG = Finished Grade Certificate of Authov* As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authoriza�CoMmpaf ements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of sted layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will supportthe proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 Compacted) -Soils Method D-6938 Disclaimer Pursuant to your request. Federal Engineering- & Testing, - Inc. (FET) has performed a compaction test at the referenced project .on the reverse side. The purpose of our test. was to determine the degree of compaction of .the .tested layer of material only. In no way shall: a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify: subsoil conditions. Our scope of services only included:testing the. top 12" of added fill material. FET was not, contracted to: perform supervision of the 7building pad preparation. This testing of the added fill material does not include an analysis of. the underlying soil materials to -determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or. conditions below the tested top. 12 inches of material. if no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify -the underlying soil conditions. . Environmental analysis of th.e soil materials is not part of the scope of services. If environmental analysis of the soils is required,. we can provide a proposal for performing anenvironmental analysis of the soil materials. The scope of services is for. determination of the degree of compaction -of the tested layer of. material only. No other analysis is implied .or warranted. Job.project.specifications were not available at the time the work was performed. Determination.of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard. for paved areas such as roadways andparking lots. If different.specifications are required, Federal Engineering & Testing, Inc. shall, be notified. Our findings are relative to the date and -areas of our site work and should not be relied upon to represent condition, on other areas or dates. Any subsequent site disturbances due to water erosion, rain. waters,construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior.to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential .property of clients and authorization :for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending -written :approval. It has been -a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2