Loading...
HomeMy WebLinkAbout25 Reinforcing Steel - North Bldg (3-11-22)out N" GFA PROJECT# PROJECT LOCATION PERMIT NO. OWNER �r. I A Universal VOrr aL LOCIe, r/or/Oa 14voo wy, 21-9325.00 Cristelle Cay Condos 4804 N. At Fort Pierce FL 1908-2014 North Cardinal Ocean Development. LLC CONTRACTOR Cardinal Ocean Development. LLC ARCHITECT Frank C. Snedaker ENGINEER Stirling & Wilbur Engineering cngrneenny Prone: 77Z 924-3575 Fax: 7729Z4-35E0 Sciences Company REINFORCING STEEL INSPECTION REPORT DATE Friday, March 11, 2022 WEATHER TEMPERATURE WIND HUMIDITY S M T W TH F S DAY x BRIGHT SUN CLEAR OVERCAST RAIN x BELOW 60 60-75 75-90 ABOVE 90 x LOW MODERATE HIGH Report No x 25 LOW MODERATE HIGH x MEMBERS/AREA INSPECTED: Reinforcing Steel: North Bldg. for Rebars Placement on the 3rd floor and layout for Columns and Shear Walls. THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED CONTRACT DOCUMENTS AND ACCEPTED PRACTICES. COMPLIES YES NO NIA 1 SOIL BEARING CAPACITY 2 BUILDING LOCATION 3 BUILDING SLAB ELEVATION 4 TERMITE TREATMENT VERIFIED 5 COMPACTION TESTING 6 FORMING DIMENSIONS 7 INSIDE OF FORMS CLEAN 8 WIRE MESH REINFORCING SIZE AND LAP 9 REBAR GRADE, SIZE, SPACING, QUANTITY, SHAPE, TYING 10 SPLICES 11 REBAR CLEAN AND FREE OF OIL 12 REBAR CLEARANCE FROM FORMS AND EARTH 13 EMBEDS/ANCHOR BOLTS IN PLACE AND SECURED 14 SHORING AND RE -SHORING 15 POST TENSIONED CABLE LAYOUT AND PROFILE Disposition of Inspection Px x Section / Area Approved Re -Inspection Work In Progress RRe-Inspection Required COMMENTS/ACTION REQUIRED: Partial inspection. Inspection Performed By/ Inspection Certified B Registered Professional N4:. Certified Special Inspector No: FBPE Certificate No: 4930 4046 Environmental . Grnt. nical . Constmdion Matenals Testing. Special & Threshold Inspections. Plan Review & Code Compliance Florida's Leading Engineering Source wwwAserngfiecon,