GFA PROJECT#
PROJECT
LOCATION
PERMIT NO.
OWNER
rorr. ar. Lucie, r- onaa eavno i1WA Engineering Phone: (772) 924-3575 Fax: (772) 924-3580
Sciences Company CONCRETE PLACEMENT
INSPECTION REPORT
3310.2100348.0000
DATE Friday, March 4, 2022
Cristelle Cav Condos
4804 N. A1A Fort Pierce, FL 34949
1908-2014 North Bldg
Cardinal Ocean Development LLC
CONTRACTOR Cardinal Ocean Development LLC
ARCHITECT Frank C Snedaker
ENGINEER
Stirling & Wilbur
WEATHER
TEMPERATURE
WIND
HUMIDITY
S M T W TH F S
DAY x
BRIGHT SUN
CLEAR
OVERCAST
RAIN
x
BELOW 60
60-75
75-90
ABOVE90
x
LOW
MODERATE
HIGH
Report No
x
23
LOW
MODERATE
HIGH
x
MEMBERS/AREA INSPECTED: Cast in Place: (1) Monitoring Concrete Placement for slab / deck 3rd floor North building.
THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED
CONTRACT DOCUMENTS AND ACCEPTED PRACTICES.
COMPLIES
YES NO NIA
x
1 SPARE VIBRATOR ON HAND
x
2 FORMS WETTED/OILED
x
3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW)
x
4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW)
x
5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAY'S POUR
x
6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME
x
7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET
x
8 SUFFICIENT VIBRATION PERFORMED
x
9 STEEL REMAINED IN PLACE DURING POUR
x
10 PR CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS
Disposition of Inspection
eSecton/Area Approved/Observed BRe-Inspection
Work In Progress Re -Inspection Required
COMMENTSIACTION REQUIRED:
Inspection
Inspection Certified
Registered Professional No: P.E. 44653
Certified Special Inspector No: SI 1103
FBPE Certificate No: 4930 - -