Loading...
HomeMy WebLinkAbout16 Concrete Placement - South Bldg (3-7-22)Ae 1 I A Universal our vvv wnerwuny wve, run at. t-ucre, rrur,ua ageoo A� �_ tip I "1y11141ne ,y rnone: trr�/ r�4-aoro rax: liiq atg-a�au Sciences Company CONCRETE PLACEMENT INSPECTION REPORT GFA PROJECT# 3310.210035 DATE Monday, March 7, 2022 PROJECT Cristelle Cay Condos S M T W TH F S LOCATION 4804 N. Al Fort Pierce, FL. 34949 DAY x PERMIT NO. South Building - 1908-0215 OWNER Cardinal Ocean Development, LLC CONTRACTOR Cardinal Ocean Develepment, LLC ARCHITECT Frank C Snedaker ENGINEER Stirling & Wilbur Engineering MEMBERS/AREA INSPECTED: 3rd Floor Slab for the entire bl WEATHER TEMPERATURE WIND HUMIDITY BRIGHT SUN CLEAR OVERCAST RAIN x x BELOW 60 60-75 75-90 ABOVE 90 x LOW MODERATE HIGH Report No x LOW MODERATE HIGH 16 x + North and South stairs. THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED CONTRACT DOCUMENTS AND ACCEPTED PRACTICES. COMPLIES YES NO N/A x 1 SPARE VIBRATOR ON HAND x 2 FORMS WETTED/OILED x 3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW) x 4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW) x 5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAYS POUR x 6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME x 7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET x 8 SUFFICIENT VIBRATION PERFORMED x 9 STEEL REMAINED IN PLACE DURING POUR x 10 P/T CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS AREA POURED YDS PSI TYPE MIX SLUMP IN t IN START TIME END TIME METHOD OF PLACEMENT SUPPLIER x 205 5,000 50000401 5 5:30 AM 1:00 PM pump Maschme er Disposition of Inspection BSection / Area Observed Work In Progress COMMENTS/ACTION REQUIRED: BRe -Inspection Re -Inspection Required Inspection Performed By: Fady Bo A [CC Inspection Certified By: Registered Professional No: P.E. 44653 Certified Special Inspector No: SI 1103 FBPE Certificate No: 4930 Environmental. Geotechnical , Construction Malenals Testing. Special & Threshold Inspections • Plan Review& Code Compliance Florida's Leading Engineering Source