Loading...
HomeMy WebLinkAboutLetter- Truss Review258 Southhall Lane, Suite 200 F D S Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com ENGINEERING ASSOCIATES November 17, 2021 Building Department Ref: Adams Homes Lot: Lot 2 Blk.1 Subdivision: Fort Pierce - Waterstone Address: 5452 Lugo St. Model: 1820 D LHG KA # 21-10141 Truss Company: Builders First Source Date of drawings: 8/10/2021 Job No.: 2866194 Wind Speed: 160 Exposure: C Truss Engineer: Joaquin Velez To whom it may concern, We have reviewed the truss design package for the project referenced above. This truss package complies with the original design intent and the underlying structure will accommodate all indicated loads. We approve the truss package without comment based upon the truss layout and truss profiles supplied to us by the Truss Company with truss profiles sealed by the Truss Engineer. Please note, this review is only for general conformance with the design concept of the project. Contractor or sub -contractor is responsible for matching all structural components and details shown in the construction documents. Contractor or sub -contractor is also responsible for confirming all quantities and dimensions; selecting appropriate fabrication processes and techniques; and coordinating work with all other trades. Note: Truss ID's may vary. If you have any questions, please do not hesitate to call. Sincerely, 11/17/2021 11/17/2021 Carl A. Brown, P.E. Scott Lewkowski, P.E. FL. # 56126 FL. #78750 FDS Engineering Associates, A TSG Company "Your Building Code Experts" ABL(��� Pva, b • a P No 8?864 b -0 0 W e. . • 4 Ile iiiYSl\ Luis Pablo To es, P.E. FL. # 87864 Z -or7 A k ' �I N�\����I �1 �1 MEN 11 l��Ill� llllllllld lllllllll� � Y NAG F• tJKU MALL.DU I U 'A 0 ZIA t/E o0 c 1lAZ XIAZ `U � c 0 0 EXPO TO MND 2-0 69()# 875 -00 2- -00 10'-0"CLG VLT 7 -)1/12 VLT 2-0-00 10' "CLG 2- -00 i 2-0 - -00 2- -00 2-0)-00 2-0)-00 2-0'-00 2-00-00 01 /12 VL - CLG 2- -00 2-0 -00 10'-0" LG 3/12 VLT 2-0)-00 7;L 17 2-0)-00 )"PACE 1- 00 A01 2-0 -00 2-e -00 3112-�LT2-0 -00 10-VC 892 gill 23- 0-00 09 2-0-00 2- -00 6 2-00-00 70'-0"CLG 8'-0' CLG 3/12 �JLT � o 00 ODD SPACE 0'-0" CLG D01S I � 1 7-08-00 REVIEWED FOR CODE COMPLIANCE BOCC CONNECTORS SCHEDULE ROOF TRUSS 10T4 ID MODEL ROOF UPLIFT SYM 0 A- LUS24 / JUS24 1 895 / 835 490 /610 ILK 9 A HTU26/ THD26 3600 / 3470 1555 / 2330 J A 0 B HTU28 / THD28 4680 / 5040 2140 / 2330 11a 0 C HTU26-2 / THD26-2 3600 / 3365 2175 / 2340 1 tD 0 1 D HTU28-2 / THD28-2 4680/5005[2155 5 / 2595 1 0 E HGUS26-2 / THDH26-2 5320 / 52455 / 2340 1 LF 0 F HGUS28-2 / THDH28-2 7460 / 80255/3330 "1 0 G HGUS26-3 / THDH26-3 5230 / 5245 / 2340 1 LG 0 H HGUS28-3 / THDH28-3 7460/78355 / 4370 10 J THJA26 / HJC26 9100/89905 / 4370 1 W 3X8NOP ❑' Reviewed and Approved ❑ Revise and Resubmit ❑ Reviewed with Notations ❑ Not Reviewed (see explanation) Corrections or comments made on equipment submittals or shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades and performing his work in a safe and satisfactory manner FDS ENGINEERING ASSOCIATES Date: 11/17/2021 By: ES Submittal No.: Project No.: 21-10141 ProjectEng.: Luis Ton- Project Name: Adams Homes - Fort Pierce - Waterston - Lot 2 Blk 1 I VERIFYA DIMENSIONS AND CEILING OONDMIONS PRIOR TO APPROVAL SOME CERING FRANUNG REQUIRED IN FlELO BY BUILDER AIAD1 WIND FORCE RESISrIND SYSTEMA:C IIYB WD 1VIND ABCEr•18 IMPORTANT ETSLasED EXPOSURE CATEGGRYC OCCUPANCY CATEOORYO This Drawing Must Be Approved And MO LOAD 180 MPH WIND WPORTANCEFACTOR 1.00 Returned Before Fabrication Will TRUSSES HAVE BEEN DESIGNED FORA 1D.0 PSF BOTTOM CHORD LNELOAD Begin. For Your Protection Check All NONCONCURRENT WITH ANY OTNER LIVE LOADS Dimensions And Conditions Prior To APPlan. ROOF LOADING FLOOR LOADING BELO I SIGNATURE BELOW INDICATES ALL NOTES AND DIMENSIONS HAVE TCLL: 20 PSF TCLL: 40 PSF BEEN ACCEPTED. TCDL: 07 PSF TCDL• 10 PSF BCDL: 10 PSF BCDL: 6 PSF By Date TOTAL: 37 PSF TOTAL: 55 PSF DURATION: 1.25 DURATION: 1.00 CAUTION W DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSCI-B1 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. tie. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders First Source. NO EXECPTIONS. The General Contractor Is Responsible For All Connections Other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanerd Bracing, And Ceiling And Roof Diaphragm Connections. ROOF PITCH: 6112 CEILING PITCH: 3/12 TOP CHORD SIZE: 2 X 4 BOTTOM CHORD SIZE: 2X4 OVERHANG LENGTH: 16" END CUT: Plumb CANTILEVER: — TRUSS SPACING: 24" BUILDING CODE FBC2020 BEARING HEIGHT SCHEDULE BUILDER: Adams Homes PROJECT: Single Family MODEL• 1820 D 3CAR ADDRESS: U52 LUGO ST LOT / BLOCK: 2/1 SUBDIVISION: WATERSTONE CITY. FT PIERCE DRAWN BY: KSANCHEZ JOB # : 1 2866194 DATE 08H0/2021 SCALE: NTS PLAN DATE: 1 2021 REVISIONS: 1. 2. 3. 4. 4408 Airport Road Plant City, FL 33563 Ph. (813) 306-1300 Fax (813) 305-1301