HomeMy WebLinkAboutTruss Drawingf
y.ada,,i♦;..ail
f
®=LIFE SAFETY WARNING
This symbol identifies Life Safety Warnings that should be read
given special attention by all persons installing trusses.
IRWIN
SPACING NOTE.
ALL TRU55ES ARE TO BE SET
AT 2.-0: ON CENTER
EXCEPT A5 NOTED
n
DON'T LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
CONSULT BCSI
30' Span or less 30' to 60' Span
60 degrees Spreader Bar
or less
1/2
lag Line Span approx.
REFER TO BCSI
Truss must be set this way if crane used.
Truss is an example, your truss may not match.
rsist crane operator sets truss this way.
I.
g Line*_ 1/2
APprox 2/3 to
Line 1/2 of Span
REFER TO BCSI
uss must be set this way if crone used.
This is an example, truss may not match.
Insist crone operator sets truss this way.
All load bearing walls, headers,
beams & lintels must be in place
at indicated height before trusses
are installed.
A I R 11-1 A. N® 1_ F= FR N ®T FE=
UNLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUSSES
ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR
ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLICT
WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS.
CONSULT WITH BUILDING DEPARTMENT AND A:'C CONTRACTOR.
Carrying Girder
For Truss to Truss
Connections see
hanger/connector
schedule in engineering
package.
U REPRESENTS A HANGER
Haneer Schedut
t
T Tse M TS26 for 2X4. 91 TH46 for 4X2 except as shown
Nails must be as
shown. Guide tabs o
Dome angle nails.
Carried
truss
Carrying truss
Hanger ID
Fasteners for
Carried truss
Fasteners for
Carrying truss
GR7
ORB
THD26-2
F � tivfl 'k ;
16d
GRL
GRD & GRD 1
`' . THI i210s3
` " 2 - ' ' a' ..
46-16d
GRM
GRD & GRD1
THDH210-3
20-16d
46-16d
*Please refer to Standard Engineering package for general instructions on installing hangers.
1 Od=0.148"x 3" 16d=0.162" x 3 1/2"
INDICATES LOAD BEARING
REQUIRED BY TRUSSES
SUPPLIED BY BUILDER
AT A HEIGHT OF 10•-0"
ABOVE FINISHED FLOOR
INDICATES LOAD BEARING' 4 x .w ,
REQUIRED BY TRUSSES
SUPPLIED BY BUILDER
AT A HEIGHT OF 25'-0"
ABOVE FINISHED FLOOR
ARRANGE WITH CRANE OPERATOR IN ADVANCE FOR A SPREADER BAR OF 26 . 35"IN LENGTH!i
Do not stand on trusses until they are braced per BCSI & properly nailed to straps & hir ngers
PIGGY BACK TRUSSES MUST BE ATTACHED AND BRACED PER ENGINEERING DET,,,
UNSUPPORTED JACK CONNECTION DETAIL
MTS16 sbsp (or equal) over Top Child and under Bottom Ch m
with 10dxl.5' nags: 7 nails in Cartier Jack; 71n Hip Carrier
Double straps for & Jacks
CARRIED JACK HIP CARRIER
I
I
MATERIAL & LABOR TO Al I ACH PIGGYSA('KS
IS THE RESPONSIBILITY Oe THE BUILDER
FAILURE TO ATTACH AS SHOWN CAN RESULT N FAILURE OF
ROOF, INJURY AND LOSS LIFE. K-+RtILURE CAN C CCUR DURING
INSTALLATION OR LATER
I ky 8 %ems'P OX PLYWOOD Gaa AND
enuou. feral aracng
aaro :.
TN..
24" MAX OC
�-- 36" MAX 0
e,Wx/rnae M.taNa to DttaM piggy bo W.a t. boo
tvae wIu 8'xe'x1 /2' P1yWood Gmaert a m..hnum a8' on
® tar ♦IM 4 80 comma. Bogs la Dot Mob of Phpy
9ork True antl toP Maio of Bain TNai�a.e.et. f F on
�mm/cam of trufHa Bettom M.re of Piggy Ba k
tau eb.ra .f Dee. TN.. m. If , maamwn n
2 � �centx_wM yx4 oonem,.a. wt.1 brvu,g,
11
I 1
t I -7r
1 • 16'A" 1 6'-3• 1G-4• i I
I
1� ,
NOTES: ;
e
* ®! GY A KS SN N OFFSET FOR CLARITY.
/
If %%
t
D
£
r
d
/
f
WALL HEIGHT VARIES /
% TYPICAL END DETAIL
„ s
--- -.Of 69 TRUSS DRAWINGS ARE AT T �H D TO LPN*()
FABRICATION AGREEMENT
TRUSSES CANNOT BE STARTED UNTIL THIS AGREEMENT IS SIGNED & RETURNED
The legal description of the property where the trusses Will be lnatalied is:
The underslgned acknowledges and agrees:
1: Trusses will be made in sMct accordance with this hose placement diagram layout,
which Is the soleautho�ityfordeterminI UT Oil
2. All dimensions th thla layout have been veritied by the undersigned.
days ofldeliveryhthe un 1gned ere s that nno ackicharges wtl ba Ibwed,l. nl the eten vent such written notice Is furnished Chambers Tmas shell have three CJ) buugglje, days In vASleh
Ito begin repairs required, or to substitute othectrussesThe undersigned acknowled, e4 Chambers cbuV4n.
S. Delivery Is to job site. It Is U1e buy fa�responal6b Ity to make the ob sitasultable for
delivery. Chambers Truss has the sole authority toUs' detertnlne 11 be the suitability of the Job Its ofn of a
The buyer Isrtosresponslblb site fee for ra'Ivecial na dell ery expenses If ChambersIS ; hor as to del very
because job site Is riot prepared for delivery or buyer Is not prepared for delivery of trusses.
Buyer Is responsible to Chambers Truss for touring coats due to site conditions.
6. Price as shown 11 Paragraph 7 below Is subject to change If any changes are, made M
thils layout, A $50 per hour fee for revisions maybe charged by Chambers Truss.
..7. This is a PURCHASE ORDER to Chambers, Truss of 'the sum agreed to, or If na
agreement a reasonable price. Invoice will be made on delivery and paid within terms f t
on delivery. Invoice may, be made at scheduled date bf delivery If buyer cannot acoceptne-
delivery of fabricated trusses. The undersigned agrees to pay Chambers, Truss reasonable
akomoy's fee for collections In event of payment not timely made. 1.12 %per month service
charge will be added for all sums not paid within terms,
S. Signature or Initials anywhere on this sheet constitutes agreement to all tams herein.
- 8: In consideration of Chambers Truss extending credit for this material the undersigned
unconditionally guarantees payment when due of any and all Indebtedness owed to
Chambers Truss by any entity recelNng material and the undersigned agrees 10 pay such
Indebtedness Inducting atiomays fees, If default In payment for material be made by the
recipient. %
10. In the event of any litigation concerning this agreement, the hems furnished hereunder
or payments referred to herein, the, parties agree that the sole venue for any such action will
be Saint Lacle County, Florida.
11. Design responsibilities are par "National Standard And Recommended Guidelines On
Rasponslbllltles For Construction Using Metal Plate Connected Wood Trusses
ANSVrPIIWTCA 4 - 2002
DATED ^�
IFOR
Aspreaderbarmaybe reg*W Par"BCSI I -=to psverltidtuy& damage. .
Multipie ply trusses must be fastened togither per engineering
before they are set, failure to do so can result In roof collapse.
Temporary and permanent bracing are required and can save life
and property and Is the responsibility of the truss erector.
Study the contents of the information packet Included on delivery
before setting trusses.
Tnisses mustbesirtand braced perdaslgn m pneleer it'lury& damage,
Trusses must be set plumb and square
Do not set bunks or stack of plywood, roofing material or any
othei cciicentrated loads on trusses, this can cause collapse.
DO NOT SET TRUSSES USING THIS LAYOUT
USE LAYOUT DELIVERED WITH TRUSSES TO SET TRUSSES
CHAMBERS TRUSS INC
3105 Oleander Avenue
Fort Pierce; Florida 34982-6423
800-551-5932
Port Pierce 772.485-2012 Fax 772-465.8711
Vero Beach 772-569.2012 Stuart 772-286-3302
••'-`- n.a—. nuwupCCCTGIISS-.CnM
92.0/93.2 MITEK 4.2
DESIGN CRITERIA
County SAINT LUCiE
Building Department ST LUCIE COUNTY
Wind Design Criteria ASCE 7-2010
Wind Design Method Main Wind Force Resisting
Roofing Material Metal Roof
Loading in PSF Roof R.D.L.
Top Chord Live 20
Top Chord Dead 7 4.2
Bottom Chord Live 10 Non -Concurrent
Bottom Chord Dead 10 3
TOTAL Load 37 7.2
Duration Factor 1.25
Wind Speed 160mph
Top Chord C.B. Sheeting by builder.
Bottom Chord C.B. Sheeting by buifder.
Highest Mean Height €'FL ANS AN%%TQ
ALL PROPOSED WORK
Building Type
Building Category ANY CORRECTIONS
Exposure Category AID VNSPECTORS THAT'
Barrier Island [" n _ Y SE NECESSARY iN ORDER T01t`
Conforms to FBC 2010 SMPLY WI€H ALL'APPLIGASLE CODES,
R.D.L: REtstrainin Dead Load C.B.=Contnuo s Bracin
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Chambers Truss inc. Drawing Name: 72625
Scale: 3/16 = 1 !
280 total trusses, 69 different trusses.
MI 4: RLC ACAD: RLC Reviewed By:
D 4
FOR
} , vs FILE COP
DESCRIPTION:
MELVILLE
PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE
722
COPY