Loading...
HomeMy WebLinkAbout30 Day Temporary Power Release 2022-03-18 14:38 Wynne BuiLdoing Corp 7728787656 >> P 2/2 Planning .& Development Services Building & Code ReguBation Division ;® 2300.Virginia Ave Fort Pierce, FL 34982 - - 772-462-2165 Fax 772-462-6443 Request for 30-Day Temoorary Power Release Date: �� - Permit Number: � � - \a Project Address: .. VA�`'�'� THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE AROVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY(30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. 'Mis temporary power release Is requested for the above Mated purpose only,and there:will be no occupancy of any type,other than Thal permitted by c-onstruclio►i during this time period. 2. As witness by our signatures,we hereby agree-Co abide by all terms and conditions of this agreement, Including Building Dlvlsion Policy,which is incorpurated herein by reference. 3. All conditions and recluirements lisLed In the attached Document ennaW"RequlrementS for 30 Day Power for Testing"Have been fulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be made In writing to tiic Building Official stdurlg the reason for the request Power may be removed from the site and/or a Stop Work Order Issued if the Final rnspectlon has not been approved within 30(lays. A fee of$100.00 will be required to lift the Stop Work Order_ WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY;AND THEIR-EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHTt;H MAY BE INCURRED DUE 1"0 THE DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. OWNER ST.GNAVR?-.----- DATE j �r Cr�_r�_�=-• fib GFN _CON"iTACTOR S RE DATE DATE ELECTRICAL CONTRACTOR SIGNATURE