HomeMy WebLinkAboutLIEURANCE contract01. TAYL(o).
ROOFING CONTRACTOR
Project Address: 5404 Myrtle De Phone 2:
Fort Pierce, FL 34982 Fax:
Dateffype/Code: July 15, 2021,19Sh 4/12 Email:
and Insurance. This proposal includes labor, matedals, and all n cos Please note that "Oil Caimio he
�chummiu mamram coven[ system¢
and is note cause for rejection. Our "Professional" technicians will hereby complete te' sµcl ogfall metal roof systems
I. Completely remove existing roofing materials down to sheathing/deck and prepare as needed to ensure a clean, solid
surface in which to apply a new roof.
2. Inspect all sheathing and replace any rotten wood. (Estimate includes up to 3 sheets plywood sheathing replacement at
no charge, for additional lumber replacement costs, see attached sheet).
3. Install 8-D "ring -shank" fasteners to existing sheathingMeck to meet current Building Code Requirements,
4. Install (1) ply peel and stick mderlayment directly over sheathing, and mechanically fasten using approved fasteners
per code requirements.
5. Install new roofing accessories including: drip edge, fleshings, counter -fleshings, plumbing stack fleshings, vent
fleshings, and valley metal. (Accessories will be fabricated from 26 Gauge Galvanized materiidt standard colors, or
will be made to match metal roofing panels).
6. Seal all penetrations using approved roofing cement and/or sealants.
7. Install new roofing materiels/accessories using approved fasteners per code requirements.
8. (Flat/Low-Slope ruefulness: Aluminum structures, gutters, skylights etc. not included (See below for options)
9. Satellite dish, Solar panels, etc to be removed by others prior to commencement of work, unless disposing of items.
10. Thoroughly clean project of all "roofing related debris" and haul away. (Landfill fees are included).
Install Architectural Shingles (Lifetime Warranty/130 mph)----------.$ 7,505.00% 4
5-V Crimp Metal Roof System (Mill Finish 26 Gauge) ------ 10,450.00 I" Standing Seam Metal Roof System (Mill Finish 24 Gauge) ----- ----- —$ 12,825.00
C
Any alte scion or deviation from the above specifications involving additional costs will he executed only upon written orders, and will become
an extra charge over and above the estimme. Replacement of rotten/damaged lumber is not included in cli mmc unless specified. Customer must
provide access to building unless arrangements are made poor to estimate, therefore J.A. Taylor Roofing is not responsible for damage to
driveway/sidewalks and/or any oMer access areas needed to approach projects. Any client that is in default in the payment of money due under
[eons of this account will be charged as the rate art Y %per month on the unpaid balance, (Maximum allowable by law). if any client is reacted
to an attorney for collection, client agrees in pay all fees incurred in the collection ofthe amount due, plus all court costs and attorney fees. Work
will be scheduled upon written acceptance of this proposal. This proposal may be withdrawn from us if not accepted within 60 days. *All major
credit cards accepted, however an additional processing fee of up to 5% will be assessed m contract total depending on current monthly rare and
card used.
Payment Ts•IQ Dermit(a),C t 1/3P trio I f ftl tlD I Cidurilctim off.t
ACCEPTANCE OF PROPOSAL
Owner: �V_M$e Date:
Contractor: Date:
For further assistance please contact LA. Taylor Roofing 772-466-4040 or fax to 772-468-8397
Thank you for the opportunity to bid your project!
Serving the Treasure Coast for over 50 Years **********•
Respectfully Su bm'tted by - Jack Nil]
Cell k 772.370.9012
302 Melton Drive Fort Pierce, FL 34982 Tel. 772.466.4040 Fax 772.468.8397
REPAIRS, RE -ROOFS, NEW COMMERCIAL & RESIDENTIAL ROOFING CONTRACTORS
SERVING FLORIDA SINCE 1965
LICENSE SCCC1325720