HomeMy WebLinkAboutBlower Door TestDate: 04 /16 tt 8
Contractor:
Job Address:
Construction:
& Development Services; Building & Code Regulation Division
2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982
772-462-2165 , Fax 772-462-6443
- FSVENERGY CONSERVATION CODE R402.4.1.2
House Infiltration Test (Blower Door) Certification
Prescriptive and Performance Method
Permit #: i 7 C)G" 035 7
ew Construction — Complete
House Infiltration Test Results
CFM (50) = ZQ
Volume = k �_ 1 _ 5
ACH (50) = CFM (56) x 60 / Volume =
Passing results must be & ACH (50) or less
�__►- 3'- 4s
( ) Existing —After Addition
SLC Climate Zone 2
Test Date: -• L f 1 g
Mech ica/ Ventilation required less than 3 ACH
( Pass ( ) Fail
FBC, Energy
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting
shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105
(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party
conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
FBC, Residential
R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when
tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida
Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in
accordance with Section M1507.3.
Testing Company _ (�� O D u � �� Jl /
Company Name: ec_ Address: 1 7 IL''��( � �� ��C I e 'l
I hereby certify that the above House Infiltratii results demonstrate compliance with FBC Energy Conservation
requirements in ccorda ce with Sectign-R402.4.1.2 Climate Zone 2.
Signature:
Printed Name:
Lice n se/Ce rtific
Date: 4 LA It 16 145
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Permit #: 170& — `2 5 / Lot #:
Contractor: Address:
Construction: most Construction Test ❑ Rough -in Test
31 l2'->ws-rv� Ct I-, 4� '11�, �L
3""5
Test Conditions: n
Date: �� ` 1S - 20l1 Floor Area (ft2): ' �Zy
Time: 10 `. 3 awl Primary Location of Supply Ductwork Act" G
Indoor Temperature (F): -72 ° Primary Location of Return Ductwork
Outdoor Temperature (F): -7 4
Total Leakage Test (Outside)
Duct Leakage: ❑ D ault all-m-P. Leak Free ❑ Proposed On =
Test Pressure: r (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: 2rfass ❑ Fail
Installe Pa
A. Al .6 .5 5L . Total Leakage (cfm):
a
Total Leakage per 100 sgft: 2- +
CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sqft.
Testing Company �p
Company Name: �I L_(2_ Address: 9 ' ` G,%O `�--G �1 ��V l' e� F_L
I hereby certify a above Duct Sealing Leakage results demonstrate compliance with 5'h Edition FBC Energy Conservation requirements in accordance with
Section R 2.
Signature:
Printed Name: 6S\-,_)0 License/Certificate #: