Loading...
HomeMy WebLinkAboutField Density Test 12-19-17Phone 954-784-2941 ederal 800-848-1919 a Fax 954-784-7875 & TESTING INC. l 7 lg www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 112, Creekside Date: November 24, 2017 Address: - 3112 Yellowstone Circle, Fort Pierce, FL 34945 Order #: 17-DR-1153 Area Tested: Building Pad Permit #: Material Type: Brown Sand with Traces of Rock Tech: SL Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 SE Corner of Pad 12" FL 11.1 107.5 113.0 10.0 95.1 % Yes 2 1NW Corner of Pad 12" 1 FL 9.9 1 108.2 113.0 10.0 95.8% Yes 3 Center of Pad 12" FL 9.4 108.6 113.0 10.0 96.1 % Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity. Legend for Elevation: f< , PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: `vc-e�,,� SL = Springline FL Final Lift Keitha eBlanc; P:E.=. SG = Subgrade BG = Below Grade Federal Engineering & Testirig,"(hc_ BC = Basecourse BOF = Bottom of Footing Florida Reg. No: 59394 ° TOP = Top of Pipe FG = Finished Grade C&tif'icate of Authorization #5471, As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, ani aut ioriyation For publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test detarmiges-the degree of compaction,of ttra tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify 6e,uriderlying`soil materlgls%below the oioposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required ta'rerllfy &-f the-underly ng •soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommerid,4hat spil borings\ perfdrmed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy raintstorms,'retesting.must be performed on this work. PAGE 1 of 2 Compacted Soils Method D76938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. � -J � •':h .:11� r l� 1' /S r'rr--�rt Page 2 of 2 Phone 954-784 2941 eFa800-848-1919 i,a x 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed' Residence •Lot 112, Creekside, Date: November 24, 2017 Address: 3112 Yellowstone Circle, FortPierce, FL 34045 Order #:17=DR-1153 Area Tested: Building Pad Permitk Material Type: Brown Sand with Traces of Rock Tech: SL Client: 'DA. Hoiton, Inc. Address: .1430 Culverbrive NE.. Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM 'D-1557 . Test # TEST LOCATION Probe De th p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 SE Corner of Pad 1.2" FL 11.1 107.5 113.0 10.0 95.1 % Yes 2 NW -Corner of Pad , ' 12" FL 9.9 1. 1.08.2 11.3.0, 10.0 9,5.8% Yes: 3 Center of Pad 12" FL 9.4 108.6 113.0 10.0- 06.1 % Yes 4 5 6 7 8 9 10 . 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This. is a Compaction Test only on the top 12 of the pad and is not a verification of Soil:,,Rearing Legend for Elevation: PR = Proofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift KeM LeBlanc; P.E.= 4 SG = Subgrade BG = Below Grade Federal Engineetigg� t?: Testing, inc. BC = Basecourse BOF = Bottom of Footing ' Florida Reg. N8' 59394 TOP = Top of Pipe FG = Finished Grade `: Cddificate-of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property,of clients, and authorization forpubilkation of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compuctian'of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify; the underlying.soil rnatenafs 66lnw>11he proposed structure. �.. ;:, The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required'to certify that t .eiunderly�ng soils will support the proposed structure without settlement. If no soil borings have been performed'to verify the underlying soils, we recommend ti:iat soil borings bye performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rainls'orms,%testing must be performed on this work. PAGE 1 of 2 Compacted Soils Method ®-6936 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test- at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the -underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis'of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95%'6f the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances 'due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future Page 2 of 2