Loading...
HomeMy WebLinkAbout21-145B Ocean Harbor South - Rep 4 - 03.16.22M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-145B Report No. 4 Client: Building Official: Contractor: File Mr. Gene Ross- Elliott Merrill SLC Building Department Mr. Bob Stark-Structure-Con Mr. Khris McConnell-Structure Con Page 1 of 3 OCEAN HARBOR SOUTH CONDOMINIUMS 4200 NORTH HWY A1A – SOUTH BLDG – BLDG. B THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 2106-0288 PROJECT NAME: Ocean Harbor South – Bldg. B DATE: March 16, 2022 CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL CONTRACTOR: Structure-Con PROJECT MGR: Khris McConnell INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: Units 409 & 609 OBSERVATIONS: Unit 409 • (6) PT cables have been locked off and new cable sections have been spliced at the north balcony edge. • (2) #4 bursting bars behind the PT cables have been replaced. • All exposed reinforcing bars have been power tool cleaned and coated with the approved corrosion inhibitor. • Form boards for the first pour are in progress. Unit 609 • (1) PT cable at the north edge has been re-stressed and the post pocket is ready for repair. • The surface spall under SGD the has been repaired and concrete has been placed. • The SGD has been reinstalled and the temporary wall has been removed. RECOMMENDATIONS: Unit 409 • Place concrete at the balcony edge, leaving the PT cable splice coupler and lock off plate exposed. • Allow the concrete to cure a minimum of 72 hours prior to re-stressing the cables. • Remove the remaining abandoned core mounted railing posts at the north and west balcony edges. Unit 609 • Grout PT pocket solid with high strength non-shrink grout. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-145B Report No. 4 Client: Building Official: Contractor: File Mr. Gene Ross- Elliott Merrill SLC Building Department Mr. Bob Stark-Structure-Con Mr. Khris McConnell-Structure Con Page 2 of 3 Pic 1 – 09 stack Northwest elevation Pic 2 – Unit 409 North balcony edge removed and PT cables locked off. Pic 3 – Unit 409 PT cable lock off and new splice. M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-145B Report No. 4 Client: Building Official: Contractor: File Mr. Gene Ross- Elliott Merrill SLC Building Department Mr. Bob Stark-Structure-Con Mr. Khris McConnell-Structure Con Page 3 of 3 Pic 4 – Unit 409 Abandoned core mounted railing post Pic 5 – Unit 609 PT pocket Pic 6 – Unit 609 SGD reinstalled