Loading...
HomeMy WebLinkAboutTruss Placement PlanWARNING* -THIS is A PLACEMENT PLAN FOR ENGINEERED BRACING: SEE FINAL ENGINEERING SEETS FOR THE ACK CHARGES WILL NOT BE ACCEPTED UNLESS OUR ALL BEARING POINTS MUST BE COMPONENTS AS DEFINED BY WTCA 1 - 1995. 1) FOR THE ERECTION BRACING FOLLOW STRUCTURAL DATA, NUMBER OF GIRDER AND TRUSS DESIGN DEPARTMENT APPROVES THEM IN ADVANCE DIAPHRAMS HAVE NOT BEEN ANALYZED BY NSTRUCTIONS ON THE BCSI-B1 SUMMARY SHEETS PLIES AND THE CONNECTION INFORMATION. ALL HANGERS ARE SIMPSON STRONG -TIE UNLESS INSTALLED PRIOR TO INSTALLING EAST COAST TRUSS. 2) PERMANENT BRACING FOR THE STRUCTURE IS HE OUR DESIGN DEPARTMENT MUST APPROVE OTHERWISE NOTED. INSTALL HANGERS ACCORDING ANY TRUSSES! FAILURE TO DO SO MAY RESULT FOR ERECTION AND INSTALLATION OF TRUSSES FOLLOW INSTRUCTIONS ON THE BCSI-B1 SUMMARY RESPONSIBILITY OF OTHERS. 3) INSTALL WEB BRACING AS STATED ON SEALED ALTERATIONS AND/OR REPAIRS TO TRUSSES IN ADVANCE. TO THE CURRENT SIMPSON STRONG -TIE CATALOG N DAMAGED TRUSSES AND WILL VOID ALL WARANTIES. I SHEETS AND SEALED ENGINEERED TRUSS DRAWINGS JENGINEERING TRUSS DRAWINGS. BEARING ELEVATION 10'-8" BRG HGT 9'-4" BRG HGT HANGERS TYPICAL END DETAIL HEEL HEIGHT 4" 1 10 1/211to-4. CANTILEVER ROOF PITCH 3r-, ENGINEERED TIMBER TRUSS SYSTEMS PRODUCTS r- ECT 4- O or, - EAST COAST TRUSS N 5285 ST. LUCIE BLVD. FT. FIF,RCE, FL 349646 OFFICE: U72) 466-2480 FAX: (772)466-5336 ^� I..L :USTOMER:Mel-Ry Construction OB NAME: Ledyard Res ,DDRESS:775 Venture 1TY/COUNTY:Venture/Martin Cty # 27909 SQ FT 1620 DATE 12/04/14 KLATEST=03/04/15 ilSS,31.003 (3) (c), EAST COAST TRUSS is the "Truss Benign Englnmr" Trusses are designed in accordance with the Florlda Building Code NOTE: By approving this placement plan(s), signatured anywhere on this sheet, the customer or his representitive acknowledges that this placement plan complies with the structural intent of the project. The customer also acknowledges that this approval authorizes EAST COAST TRUSS to manufacture these trusses and deliver them to the project indicated on this drawing. The customer also acknowledges that he/she accepts financial responsibility for any repair, engineering, and labor required due to errors other than those of EAST COAST TRUSS. Z Signed: Date: LL CODE = FBC 2010/TP12007 ASCE 7-10 W CL DESIGN CRITERIA = C&C Hybrid MWFRS OCCUPANCY CATEGORY=11 EXPOSURE = D Q MWF SPEED =170 BUILDING TYPE =ENCLOSED MEAN HEIGHT: 22.00 GRAVITY LOADS U) W FLOOR: DUR FACTOR= 1.0 ^J PSF=TCLi_-TCDL-BCLL-BCDL Z 40.0,20.0,0.05.0 D ROOF: DUR FACTOR= 1.25 U) PSF=TCLL-TCDL-BCLL-BCDL LI J 20.0515.0310.0110.0 U) LOADS PER FBC & FRC U) 'NON -CONCURRENT BC LL 10psf D CONCURRENT BC STORAGE LL 20 psf �— W ` f9 , DEFINITIONS U) RCE 0 C CF 2Q\fig = OMPONENTSMAIN WIND OAND CLADDING I— MpR e TOB = TOP OF BEARING F4 TC = TOP CHORD W V10k. cp°P� BC = BOTTOM CHORD U)a`• V016 LL =LIVE LOAD DL = DEAD LOAD psf = POUNDS PER SQUARE FOOT I-- # =POUNDS O UPLIFT MUST BY-PASS FLOOR TRUSSES Z UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. O ALL GIRDER/COLUMN LOADS MUST 0 BY-PASS FLOOR TRUSS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. x6 STRONG BACK BRACING, 10'-0" O.C., /S RECOMMENDED ON FLOOR TRUSSES I1 SPANNING 20'-0" OR MORE 0..e. AUTION: SPANS GREATER THAN 30'-0" IUST BE SET WITH A SPREADER BAR. THE U POREADER BAR SHOULD BE AT LEAST 1/2 '3 IN LENGTH AS THE SPAN OF THE TRUSS EING SET. EFER TO BCI-B1 FOR COMPLETE > RECTION AND SAFETY PROCEDURES. _ ALL BEAMS BY BUILDER aL NOTE: TRUSSES DO NOT ILL SUPPORT ANY PLANT SHELVES _oe 1-03-04-15: JC: REVISED ENTRY, REMOVED roo FLOOR SYSTEM y_ 2- O 3- 4-� },1 r- 5- TRUSS PLACEMENT PLAN (1/4" if plotted 24x36) . Designed By: JC