Loading...
HomeMy WebLinkAboutROOF WORKSHEET.pdfForm RoofInfoFeb21 Rev Feb 18, 2021 ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A, B, C Prescriptive BUR-RAS 150 A, B, C 2,4,5,6,7 Asphaltic Shingles A, B, D Concrete or Clay Tile A, B, D, E Metal Roofs A, B, D Wood Shingles and Shakes A, B, D Other As Applicable ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: ________________________ Product Approval No.:________________________ Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': ___ Zone 1: _____ Zone 2: ____Zone 3: _____ Max. Design Pressure, from the specific product approval system: ______________________________________ Deck: Type:___________________________________ Gauge Thickness: _________________________ Slope: __________________________________ Anchor/Base Sheet & No. df Ply(s): _______________ Anchor/Base Sheet Fastener/Bonding Material: ___________________________________________ Insulation Base Layer: _________________________ Base Insultation Size and Thickness: _____________ Base Insulation Fastener/Bonding Material: ___________________________________________ Top Insulation Layer: __________________________ Top Insulation Size and Thickness: _______________ Top Insulation Fastener/Bonding Material: ___________________________________________ Base Sheet(s) & No. of Ply(s): ___________________ Base Sheet Fastener/Bonding Material: ___________________________________________ Ply Sheet(s)' & No. of Ply(s): ____________________ Ply Sheet Fastener/Bonding Material: ___________________________________________ Top Ply: _________________________________ Top Ply Fastener/Bonding Material: Surfacing: ___________________________________ Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':" oc @ Lap, # Rows Zone 1:" oc @ Lap, # Rows Zone 2:" oc @ Lap, # Rows Zone 3:" oc @ Lap, # Rows Number of Fasteners Per Insulation Board: Zone 1':Zone 1:Zone 2:Zone 3: Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc. Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 1 11 and Chapter 16. FT. FT. Parapet Height Mean Roof Height Section D (Steep Slope Roof System) Roof System Manufacturer: Notice of Acceptance Number: Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1:Zone 2e:Zone 2n:Zone 2r:Zone 3e:Zone 3r: CERTAINTEED FL5444-R16 PLYWOOD 7 SAND-R SA PEEL & STICK N/A N/A SEE NOA N/A SHINGLE N/A N/A N/A ROOD CEVENT Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mf. If the Mf values are greater than or equal to the Mr values, for each area of the roof, then the tile attachment method is acceptable. Method 1 'Moment Based Tile Calculations Per RAS 12T (Zone 1: Product Approval Ml (Zone 2e:Product Approval Mf (Zone 2n:Product Approval Mf (Zone 2r: Product Approval Mf (Zone 3e:Product Approval Mf (Zone 3r: Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below Product Approval Mf Mr required Moment Resistance* Mean Roof Height Roof Slope 15’ 20’ 25' 30’ 40’ 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 *Must be used in conjunction with a list of moment based tile systems • For Uplift based tile systems use Method 3. Compare the values for F' with the values for Fr If the F' values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: ______x L_____=x W:=______) -W:______ cos r______=Fr1______ Product Approval F’____________ (Zone 2e: ______x L_____=x W:=______) -W:______ cos r______=Fr2e_____ Product Approval F’____________ (Zone 2n: ______x L_____=x W:=______) -W:______ cos r______=Fr2n_____ Product Approval F’____________ (Zone 2r: ______x L_____=x W:=______) -W:______ cos r______=Fr2r_____ Product Approval F’____________ (Zone 3e: ______x L_____=x W:=______) -W:______ cos r______=Fr3e_____ Product Approval F’____________ (Zone 3r: ______x L_____=x W:=______) -W:______ cos r______=Fr3r_____ Product Approval F’____________ Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope θ Job Site Aerodynamic Multiplier ג Product Approval Restoring Moment due to Gravity Mg Product Approval Attachment Resistance Mf Product Approval Required Moment Resistance Mg Calculated Minimum Attachment Resistance F’ Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L = length W = width Product Approval All calculations must be submitted to the building official at the time of permit application.