HomeMy WebLinkAbout21-139A - Bryn Mawr Condos 2021 - Bldg A - Rep 9 - 03.16.22M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139A Report No. 9
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 1 of 1
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. A
5061 N. HWY A1A, FORT PIERCE, FL 34949
SLC BLDG. DEPT. PERMIT NUMBER: 2106-0405
PROJECT NAME: Bryn Mawr Condominiums Concrete
Repairs 2021 – Bldg. A DATE: March 16, 2022
CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL
CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Final
OBSERVATIONS:
All work has been completed in accordance with the permit documents. A final certification letter will follow this
report.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten