HomeMy WebLinkAbout27 Concrete Placement - North Building (3-19-22)6U/ NW
Port St. Lucie, Florida 34986 Phone: (772) 924-3575 Fax: (772) 924-3580
ENGINEERING SCIENCES
CONCRETE PLACEMENT
INSPECTION REPORT
GFA PROJECT#
3310.2100058.0000
PROJECT
Cristelle Cay Condos - North Bldg.
4804 North Al
LOCATION
Fort Pierce, Floriuda 34949
PERMIT NO.
1908-0215
OWNER
Cardinal Ocean Development,LLC
WEATHER
CONTRACTOR
Cardinal Ocean Development, LLC
TEMPERATURE
ARCHITECT
Frank C. Snedaker
WIND
ENGINEER
Stirling & Wilbur Engineering
HUMIDITY
DATE Saturday, March 19, 2022
DAY
S
M
T
W
TH
F
S
I
I
I X
BRIGHT SUN
CLEAR
OVERCAST
RAIN
X
BELOW 60
60-75
75-90
ABOVE 90
X
LOW
MODERATE
HIGH
X
Report No
LOW
MODERATE
HIGH
27
X
MEMBERS/AREA INSPECTED: Concrete Placement monitor 3rd floor columns and shear walls at elevator.
THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED
CONTRACT DOCUMENTS AND ACCEPTED PRACTICES.
COMPLIES
YES NO N/A
X
1 SPARE VIBRATOR ON HAND
X
2 FORMS WETTED/OILED
X
3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW)
X
4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW)
X
5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAYS POUR
X
6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME
X
7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET
X
8 SUFFICIENT VIBRATION PERFORMED
X
9 STEEL REMAINED IN PLACE DURING POUR
X
10 PIT CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS
Disposition of Inspection
X Section / Area Observed Re -Inspection
Work In Progress RRe-Inspection Required
COMMENTS/ACTION REQUIRED: _,aS; 12Paa ,
{C
Inspection Performed Ely:
Inspection Certified By:,
Registered Professional Nia -PI rod )53,. `
Certified Special Inspector No: $11103
FBPE Certificate No: 4930
EnvimnmeMal a Geotechnical • Consa oson Materials Testing • Special & Threshold Inspections a %en Review & Code Compliance
Florida's Leading Engineering Source