Loading...
HomeMy WebLinkAboutProduct Approval`e; � /101� BM Home, 1 Lao In I User Registration j HotTopics l SuhreitSurcbarge f Stets t Facts- i Publintioi �0t1�3 @q Product Approval USER: public User Protldcr Aonroval Menu > P adurf or Attrdication 6carrb'> Anolication List > Application Detail " • , FL # FL16048-113 Application Type Revision Code Version 2014 Application Status Approved Comments Archived Product Manufacturer TRI-BUILT Roofing. Products Address/Phone/Email 0080 Louisiana Street Merrillville, IN 46410 (201)842-2449 david.ruiz@tribuiitmaterialsgroup.com Authorized Signature David Ruiz david.ruiz@tribuiltmaterialsgroup.com Technical Representative David Ruiz Address/Phone/Email 250 Route 17 North East Rutherford, NJ 07073 (201)842-2449 davidiruiz@tribuiltmaterfaisgrdup.com Quality Assurance Representative Address/Phone/Email a Category Roofing Subcategory Underlayments Compliance Method Evaluation Reportfroma Florida Registered Architect or a Licensed Florida, Professional Engineer (valuation Report- Hardcopy Received Florida Engineer or Architect Name who developed Robert Nieminen the Evaluation. Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date '10/16/2017 Validated By John W.,Knezevich, PE Validation Checklist - Hardcopy Received Certificate of Independenc,4 FL16048 R3 COI 2015 01 COI Nieminen.ndf Referenced Standard -and Year (of Standard) Standard year ASTM D1970 2009- ASTM G1SS 2005 FRSA/TRI Aprii 2012 (04-12) 2012 TAS 103 1995 Equivalence of Product Standards Certified By Sections from the Code a,Ile Copy Product Approval Method Method I Option D Date Submitted 10/08/2015 Date Validated 10/19/2015 Date. Pending F.BC Approval 10/21/2015 Date Approved 12/15/2015 Date Revised 10/06/2016 Summary'of"Products i FL O Model, Number or Name Description 16048.1 TRI=BUILT Roof Underlayments Self -adhering, modified bitumen roof underlayments Llmits of Use Installation Instructions Approved'for use in HVHZ:-No FL16048 R3 11 2015 10 FINAL ER TRI- Approved for use. outside, HVHZ: Yes BUILT UNDERLAYMENTS FL16048-R3.odf Impact Resistant- N/A Verified By: Robert Nieminen PE-SR166 Design Pressureh +N/A/-45' Created by Independent Third Party: Yes, Other: 1.) The design pressure noted herein pertains -to, use . Evaluation Reports of foam -on: tile systems overtop the self -adhering FI 16 4B u3 AE' 2015 10 FINAL ER TRT- underlayment for one particular application. See ER Section gSJ�T UNDERLAYMENT3 FL16048-R3 odf 5.6 for details. 2:j Refer to ER Section 5 for other Limits of Created by Independent Third Party: Yes Use. back Next Contact Us :: 2601'81air Stone Road, Tallahassee FL 32399 Phone: 850.487-1824 The State of Florida is an AA/EEO employer. Coovrl4ht 2007 Z013atate of. Florida::p Priyacr'Statement4: gcc¢ssibifitvSt, ement :: 12rfund Statement Under Florida law, email addresses are public records. If you donot want your e-mail address releasedan response toa public -records request, do not send electronic maiLto this entity. Instead, contact the office by phone or by traditional mail. If you have any questions,. please contact850:487.1395. 417ursuant to Section'455.275 (1); Florid statutes, effective October 1, 2812, licenseeslicensed under Chapter 455, F.S. must provide. the Departmentwith an email address if they have one. The emails provided may be used for official communication with the licensee.:floweverernail addresses ate public record. If you do hot wish to supply a personal address, please provide the Department with an ema8.address whkh:can be made available to the public. To determine Iryou are a licensee under Chapter455, F.S., please dick here . Product Approval Accept= C EMER, 0ii E Card'Credit EXTERIOR RESEARCH&;DESIGN, LLC. certificate of Authorizatio.n.0503 T 1N, ITY I ERD 353 CHRISTIAN STREET, UNIT #13 OXFORD, CT 06478 PHONE; (203) 262-9245 FAX: ;(203): 262-9243 EVALUATION REPORT dba TRl-BUILT Roofing Products 9050 Louisiana Street Merrillville, IN 46410 SCOPE: FL160U-R3 Date -of Issuance:10/25/20I2 Revision :3: 10108/3I71S This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations • governing the use .of construction'materials in fihe State of Florida. The documentation submitted has been reviewed by Robert Nieminen, PE. for use of the -product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been. evaluated for compliance with the .5th 'Edition (2014) Florida Building Code sections noted herein. DE5cRIPTiom TRI-BUILT Roof Underlayments. LABEUNG: Labeling ;shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named products) changes, the,referenced Quality Assurance documentation changes, .or provisions of the Code thatrelateto the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity)-ERD requires a complete -review of this Evaluation Reportielative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report :number preceded by-the.words- `Trinity)ERD Evaluated" may be; displayed in advertising,literature. If any portion of the Evaluation Report is displayed; then it shall `,be done in its entirety. INSPECTION. -,Upon req"uest, a'copy of this entire` Evaluation Report shall •be,provided to the user by the manufacturer or its distributors: and shall be available for inspection at the job site'at the request of the Building Official. This Evaluation Report consists of pages 1 through 5. Preparedby: Robert".IiM. Nieminen,-P.E. Florida Registration No.59166, Florida DCAANE1983 'the facsimile seal appeadpgwas authorized byRobert 'N rninen, P.E:;on 101�!?41s. 'rills does :not serve as an electronicalMMstg.nee doameni signed, sealed hardmpies have been tansm cted to the. Product Apprbvai Administrator.and to the .namedclient CERTIFICATION of INDEPENDENCE: 1. Trinityl'ERD; does not have, nor does it intend t6 acquire or will It acquire, a financial interest' in any company manufacturing or distributing products it evaluates. 2. Trinity:lE= D.is iotowned, operated or controlled by -any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor-will:acquire, a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4, Robert Nieminen; P.E: does. not have, nor wilt acquire, a financial interest in. any other; entitylnvol'ved in the approval. process-ofthe product. 5. This is: a building code evaluation. Neither Trinity ERD nor Robert Nieminen, P.E are, in anyway, the Designer of Record for any project_on which'this Evaluation Report, or previous versions; thereof, is/was:used for permitting oe design guidance unless retained specifically forthat purpose. l �.I 1 RINITY�ERD ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category: Roofing Sub -Category: Underlayment Compliance Statement: TRI-BUILT Roof Undeelayments, as produced by. TRI-BUILT; •have demonstrated :compliance with thefollowing sections ofthe Florida 8uilding.Code through.testing in accordance with the following -..Standards. Compliance is subjectto'thednstallation Requirements and Limitations/ Conditions of Use'set forth herein. 2. STANDARDS: Section Property Standard Year 1507.2.4, 1507.2.8,1507.2.9.2, Physical Properties: ASTM D1970 2009 1507.4.5.1,1507.5.3,1507.7.3 1504.6 AcceleratedWeathering ASTM'6155 2005 1507.3:3. Installation Practice FRSA/TRI April 2012 (0412) 2012 1523.6.5.2.1 Physical Properties TA5103 1995 3. REFERENCES: Ent Examination Reference Date, ERD (TST6049) Physical Properties S46540.02.11-1 02f19/2013 ERD (TST6049) Physical Properties S40540.1113 11/19/2013 ERD(TST6049)Physical Properties. S40540.03.14 03/26/2014 ERD (TST6049) Physical Properties 544870.64.14-2 04/02/2014 ERD (TST604% Physical Properties S44870.04.14-3 04/02/2014 ERD (TST6049) Physical' Properties S44870.04.14-1 04/10/2014 ERD (TST6049) Physical Properties S44870.04.14-4: 04:/10/2014 BU(TST6049) Physical•Properties S43530.02.14-1-R1 65/14/20.14 ERD (T5T6049) Physical Properties 543530.05.14 05/2.8/2014 ERD (TST6649) Physical Properties s40540.10.14 10/31/2014 ERD (TST6049) Physical Properties: SC7645.02:15 02/13/2015 ERD, (TST6049) Accelerated Weathering SC8520.04.15 05/27/2015 UL, LEC..(QUA9625) Quality:Control Multiple-UsiingR16814 09/04/2015 UL, LLC. (QUA9625) Quality Control Service. Confirmation Exp.10/16/2017 4. PRODUCT DESCRIPTION: 4.1 Self-Adherine Underlayments: 4.1.1 Tri-Built Sand-R -SA Shingle Underlayment is a self -adhering, glass -mat reinforced, sand -surfaced, SBS modified bitumen roof underlayment, with a 36-inch sheet width. 4.1.2 Tri-Built'S/A HT TU Underlayment is a self=adhering, non -woven polyester fabric surfaced,-SBS modified bitu .men roof underlayment 4.1.3 Tri=Built Smooth HT S/A Underlayment is a self -:adhering, glass -mat reinforced; film -surfaced, SBS modified bitumen.roof underlayrent; 5. LIMITATIONS: 5.1 This; is. a building code evaluation. Neither Trinity) ERD :nor Robert Nierninen, P.E. are, in any way, the Designer of Record for any- project Lon which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless`retained specifically for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ. 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory for fire ratings of this product. Exterior Research and resign, LLC. Evaluation ReportA42960.10.12 R3 [ertij7rnteof.Authudi6Non #9503 F1.16048-113 Revision 3; 30/08/2015 Page. 2 of 5 TRINITY- JERD 5:4 TRI-BUILT Roof Underlayments maybe used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not.listed, a request may be made to the AHJ for approval based on this. evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable roof covers applied atop the uriderlayrrents are as follows• TABLE 1 `Root COVER OPTICIYS Underlayment. Asphalt Shingles Nall -On Tile Foam -On Tile Mai wood Shakes Slate &Shingles Tri-Built Sand-R'SA Shingle Underlayment Yes No No No Yes yes Tri`Built S/A HT TU yes Underlayment Yes Yes See 5.5.1 Yes Yes Yes Tri-Built Smooth HT S/A Underlayment Yam' N9 No Yes Yes Yes 5.5.1 "Foam -On Tile"'is limited to use of the following Approved file adhesive-t unless tensile adhesion / long term aging data from an.accredited testing laboratoryy is provided. Tri-Built S/A HTTU Underlayment with 31VIN 2-Component Roof Tile Adhesive.AH-160-(FL6332) or Dow TileBond'"° Roof Tile Adhesive (FL717) 5.6 Allowable substrates are noted below: 5.6:1 Direct -Bond to Deck: Tri-Built Sand-R SA Shingle. Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlaymentapplied to. Plywood; ASTM D41 primed, plywood; 056; ASTM D41 primed OSB; ASTM D41 primed structural concrete. While not required over plywood, OSB or Southern Yellow Pine substrates, TRI-BUILT recommends priming the deck if the final roof cover is not slated for'installation within 24 hours: Note:. TRI-BUILT requires tongue -and -groove board decking be covered With plywood or. OSB prior to installation' of the self - adhering underlayment. 5.6.2 Bond -to -Insulation: Tri-BuiltS/A HTTU Underlayment applied to: Dens Deck Prime; SECUROCk Gypsum -Fiber Roof Board.. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the p"repared roof covering manufacturer's Product Approval. For installations under foam=on the systems, insulation attachment shall be designed by a_ qualified'design professional and installed based on testingof the insulation/underlayment system in accordance with FM 4474,;Appendix D orTAS 114; AppendixJ. 5.6.3 Bond to Mechanically Attached Base Layer ➢ ASTIVI p226, Type I or II felt. For installations under mechanically attached prepared roof'coverings, base layer shall be attached per minimum codified requirements. For installations under foam -on tile.systems, base layer shall be -attached per minimum requirements of FRSA/TRI.April 2012 (04-3-2).. baerlor Research and Design; LLC. Evaluation ReportA42960.10.12-R3 Grote ofAuthorization #9503 FL16048-R3 Revision 3:10/0$11015 Page 3 of 5 1 / 1 91NITYIERD 5.6.4 Wind Resistance for Underlavment Svstems "in Foam -On Tile Applications: FRSA/TRI April 201.2 (04-12) does not address wind uplift resistance of all underlayment systems. beneath foam -on tile systems, where the underlayment forms,part of the load -path. The foliowing wind uplift limitations apply to direct -deck underlayment systems that are not addressed in FRSA/TRI April 2012 (0442) and are used in foam -on tile applications. Maximum Design Pressure .is the result of testing: for wind load resistance based on allowable wind loads, and .reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has.already'been applied). Refer to FBC 1609 for determination of design wind pressures. 5.6.4.1 Maximum Design Pressure = 45.0 psf. Deck: Min. 15/32=inchplywood to. meet project, requirements to satisfaction .ofAHJ.. Primer. (Optional) ASTMD41 Underlayment: Tri-Built S/A:HTTU Underlayment, self -adhered. 5.7 Exposure Limitations: 5.7.1 Tri=Built Sand-R SA Shingle Underlayment or Tri-Built Smooth. HT S/A Underlayment shall not be left exposed for longer than30-days after installation 5.7.2 Tri-.Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation. 6. INSTALLATIONS 6.1 TRI=BUILT Roof Underlayments shall be installed in accordance with TRI=BUILT published installation requirements subject to the Limitations set forth in Section 5 herein'and the specifics noted below. 6.2 Re -fasten any loose decking panels, :and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application, and prime the -substrate (if applicable). 6.3 Tri-Built'Sand-R SA Shingle. Underlavment Tri-Built S/A HT TU Underlavment or Tri-Built Smooth HT S/A Underlayment: 6.3.1. Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.3.2 Non -Tile applications: While priming is optional,'TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation. within 24hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to the substrate and:unroll the remaining membrane as far as possible. Once the entire length of membrane Is in place, peel -off the release film diagonally while holding the membrane tight. Firmly rol-Ithe membrane into place to achieve,a bond. Horizontal seams should be .minimum '3-inches, .configured :to shed water. Vertical seams should be 6- inches and staggered not less than 2-ft from vertical seams.in the.course below. Allover -granule end -laps shall be sealed using either heat -welding or air welding techniques. When installing at slopes :above 8:12. Allied. Building Products Corp recommends back -nailing in the overlap area at the top of 'the sheet at1.2-inch o.c. For Valleys and Ridges: Cut underlayment into 4 to-6 foot lengths. Peefthe release paper and center sheet over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in. each direction. For valleys,: apply the.sheet starting at the lowest point and work upward. 6.3.3 Tile Applications (Tri-BuiltS/A -HT TU Underlayment only Reference is made to FRSA/TRI April 2012 .(04-12) Installation Manual and Table 1 herein, using the instructions noted above as aguideline. Tile shall be loaded- and staged in a manner that prevents tile slippage and/or damage to the underlayment. Exterior Research and Design, U.C. Evaluation. Report A42960.10:12-R3 Certlfrmte of Authoilzation #9503 FL1604&R3 Revision 3:16/08/2M Page 4 of 5 QNi OTRW T Y 7. BUILDING PERMIT; REQUIREMENTS: As required by the Building Official or AuthorltV HavingAUrlsdictibn in order to prppetlyevaluate the installation of this O'rbdutt. 8. MANUFACTURING PLANTS: Contact the noted CIA agency for information -on produttfocations:covere-d'fo.rF.A.C.;Rule 9N=3 QA requirements. 9. QUAPV-AssumqGE'ENTaY.: UL, LL.0 ­QuA963.s, (314) 578-3466;:k.chancellor6,us.uf.com - END OF EVALUATION. REPORT - Exterior Researih andbeilp, Ut Evaluaiton ItellowltA429.60.16.1143' clerffftteOfAuthorl-kcrtlan #9593 FL16048-R3 Reuislan A- 10/08/2015 Page 5 of 5