Loading...
HomeMy WebLinkAbout4816 WATERSONG WAY - COASTAL CONSTRUCTION & DESIGN INCFort Pierce Utilities Authority "Committed To Quality" WaterMastewater Engineering 206 South 6th Street Ft. Pierce, FL 34950 I Phone (772) 466-1600 Fax (772) 461-1938 INVOICE NO: SORD00004461983 PREPARED BY: JOHNSONCH LOCATION ID: ADDRESS: ADDITIONAL INFO: Service Order No. 10008513 4816 WATERSONG WAY FOR Charges W-3/4 MTR U/G WATER 3/4 METER ONLY U/G $250.00 $250.00 W-CAP IM CHG WATER CAPITAL IMPROVE CHARGE $0.01 $1,850.00 W-CON FEE EXIST WTR CONNECT FEE NEW CUST $0.01 $40.00 DEPOSIT INVOICE DEPOSIT FOR INVOICE NEW CUST $0.01 $60.00 Customers will be assessed wastewater charges the day they connect to the wastewater system or within 365 days from date wastewater Connection Charge is paid - whichever is first. The cost of the service line from the point of delivery at the property line to the house/building is the responsibility of the customer and is not included in this invoice . State laws require that a permit from the Health Department must be obtained prior to initiating a septic tank abandonment. Contact the Health Department at (772) 873-4931. Construction cost estimates are based on current labor , equipment and material prices . Actual costs of construction will be determined at the completion of the project . Should unforeseen circumstances be encountered during construction , including but not limited to adverse weather conditions and construction conflicts , the customer will be responsible for increased costs . Additional costs incurred by the customer shall not exceed fifteen ( 15 ) percent of the total estimated construction costs shown above . Estimated costs paid by the customer that exceed the actual cost of construction will be refunded by Fort Pierce Utilities Authority.All fees are due prior to any construction. Customer Signature: Printed Name: PAGE 1 OF 1 PRINTED ON: 03/18/2022 AT 11:35 AM