Letter of Transmittal
DATE: 04/10/18
RE: 17-180
ATTN: Mr. Joe Cicio
RE:
Ocean Harbor North Condominiums
Building A
5151 North Hwy A I A
Ft. Pierce, FL 32949
St. Lucie County Bldg. Permit No. 7018-AM 0
WE ARE SENDING YOU: Attached / Via: Pick -Up / Drop Off / FedEx / Other
Conies Issue Date Number Description
1 copy
04/10/18
Final Certification letter — Signed & Sealed
1 copy
02/02/18
Threshold Inspection Report #1— Signed & Sealed
REMARKS:
Received:
Signe
D
APR 1 6 REUD
f� L
April 10, 2018
Mr. Joe Cicio, Plans Examiner
St. Lucie County Building Department
Planning & Development Services
2300 Virginia Avenue
Ft. Pierce, Florida 34982
M L Engineering Inc.
2030 —371' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
Ing �0_ [E'[i V`
1
APR 1 6 REC'D
Re: Ocean Harbor North Condominiums — Building A — Units 511, 611, & 711
5151 North Hwy AIA
Fort Pierce, Florida 34949
Engineer's Project N.: 17-180
S.L.C. Bldg. Permit # 1708-0100
Dear Mr. Cicio,
This letter shall serve as certification that to the best of our knowledge, the structural repairs
have been constructed in substantial conformance with the design documents and specifications
and as duly noted in our field reports.
Threshold inspections for the above referenced project were performed on February 2, 2018.
Copies of all field reports were distributed to the Property Management, Engineer of Record,
General Contractor and to the St. Lucie County Building Department.
If you have any qua � �s�i�ons, please call our office.
111111
PNTHo/V ode
Respectfu�`G • • • • • • . • y
�•� • °� E N
• : N 7520 •
• - - k
IN P
• - ii-LL s
chae�° , P. ;�4 O R �� ®
o sulti eer • e e
Threshold In�S c ti�NAL :
1Det�oe��
Cc: Gene Ross — Elliott Merrill Community Management
Bob Stark — Structure -con
tiLL'�� i
Q'_
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 371h Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlenp,ineering-inc.com
Project No. 17-1810
Building Official:
Contractor:
Project Manager:
File
Report No. 1
Joe Cicio, Plans Examiner
Khris McConnell, Structure -Con
Gene Ross, Elliott Merrill.
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH BUILDING A
5151 NORTH HWY AIA, FT. PIERCE, FLORIDA 34949
SLC BUILDING PERMIT NUMBER: 1708-0100
PROJECT NAME: Ocean Harbor North —Bldg A DATE: February 2, 2018
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach, Florida
CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Michael Lue WEATHER: Sunny, cool
WORK INSPECTED:
Units 411,511,611,&711
Concrete slab in this building are reinforced concrete and not a post tensioned slab.
OBSERVATIONS:
All repairs were mostly along the slab edges as indicated in the repair plan.
The full depth or surface spalls originally assessed at Unit 511 were not required. The damages were found to hairline
cracks in the slab with no corroded reinforcing bars. The cracks in the slab caused failure of the tile bond to the slab
which was thought to be spalling concrete. The cracks were epoxied.
The damages at the slab corners were due to no reinforcing bars along the edge in the existing construction and
compounded by the handrail post being in a cored pocket right at the corner of the slab. A #4 reinforcing bar was added
along the slab edge at the corner to minimize or alleviate future cracking.
RECOMMENDATIONS:
All structural repairs have been completed in compliance with the design documents