Site visit and observation Report:
Project: Island Crest Condominium Association
Address: 10680 South Ocean Drive, Jensen Beach, FL 34957
Permit Number: SLC 2111-0697
Site Visit Date: Mar 18, 2022
Floor 1
Unit Report Details,
101 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
102 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
103 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
104 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
106 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
107 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
Island Crest Condominium Association 5 of 8 Zuhair Jalloul, P.E., FL Lic. #35416
10680 South Ocean Drive, Jensen Beach Florida Consulting Engineers, Inc
PERMIT NUMBER: SLC 2111-0597
Floor 2
Unit Report Details
201 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
Floor 3
Unit Report Details
301 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
305 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
306 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut.
Floor 4
Unit Report Details
401 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
403 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
405 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
407 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
408 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
409 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
Island Crest Condominium Association 6 of 8 Zuhair Jalloul, P.E., FL Lic.#35416
10680 South Ocean Drive, Jensen Beach Florida Consulting Engineers, Inc
PERMIT NUMBER: SLC 2111-0597
I '
Floor 6
Unit Report Details
503 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
505 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
508 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
509 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
Floor 6
Unit Report Details
601 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
603 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable. `\
608 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
609 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable. --
Island Crest Condominium Association 7 of 8 Zuhair Jalloul, P.E., FL Lic.#35416
10680 South Ocean Drive, Jensen Beach Florida Consulting Engineers, Inc
PERMIT NUMBER: SLC 2111-0597
Floor 7
Unit Report Details
707 Rebars were cleaned using a wire brush, treated with an anti-corrosive
coating, and concrete edges were saw cut. Concrete was poured, cured and
forms removed. Observed work was found to be acceptable.
Island Crest Condominium Association 8 of 8 Zuhair Jalloul, P.E., FL Lic. #35416
10680 South Ocean Drive, Jensen Beach Florida Consulting Engineers, Inc
PERMIT NUMBER: SLC 2111-0597