Loading...
HomeMy WebLinkAboutProject Information5 Job: 211309 - wrigh softy Load Short FormJob: Dafm: 02107122 ENTIRE BUILDING By. CJH The EARTHWORKS Group MAR 2 5 2022 1111"Nal Project Information For. 5403 Sunset Blvd. Addition 5403 Sunset Blvd., Fort Pierce, FI Design Information Htg Clg Infiltration Outside db (OF) 43 91 Method Simplified Inside db (OF) 70 75 Construction quality Semi -loose Design TD (OF) 27 16 Fireplaces 0 Daily range - L Inside humidity (%) 30 50 Moisture difference (gdlb) 0 59 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual airflow Air flow factor Static pressure Space thermostat 100 EFF 10.0 kW 34121 Btuh 72 OF 430 cfin 0.020 dmBtuh 0 in H2O COOLING EQUIPMENT Make Trane Trade TRANE Cond EXISTING Coil EXISTING AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual airflow Air flow factor Static pressure Load sensible heat ratio 13.0 EER,13 SEER 28026 Btuh 6574 Btuh 34600 Btuh 1200 cfi71 0.046 cfmBtuh 0 in H2O 0.81 ROOM NAME Area Htg load Clg load HtgAVF CIgAVF (ftz) (Btuh) (Btuh) (cfm) (Cfm) EXISTING DWELLING 1000 17796 23852 355 1085 NEW OFFICE 216 3789 2521 75 115 ENTIRE BUILDING 1216 21585 26373 430 1200 Other equip loads 0 0 Equip. @ 1.00 RSM 26373 Latent cooling 6056 32 . A-% 4200 TOTALS 1216 21585 428 10 So/d/K &valueshavebeenmanuaflyovernWen Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -�:- wrightsoft, 2022-Mar-1612:56:35 .M�,•,e ��..,.;�;,� p«ry Right -Suite® Universal 202121.0.08 RSU26986 Page 1 ACCA,..TBLVD1caics1211309.ADDMON.H\IC.CALCS.REVrup Calc=MJ8 Front Door faces: E -= wrightsoft" Building Analysis ENTIRE BUILDING The EARTHWORKS Group For. 5403 Sunset Blvd. Addition 5403 Sunset Blvd., Fort Pierce, FI Location: Vero Beach Muni, FL, US Elevation: 30 ft Latitude: 28 °N Outdoor: Heating Dry bulb (OF) 43 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Job: 211309 Date: 02/07/22 By. CJH Cooling Indoor: Indoor temperature (OF) Design TD (OF Relative hums ity (%) Moisture difference (grAb) Heating 70 27 30 -0.1 Cooling 75 16 50 59.4 91 15 (L ) 78 7.5 Infiltration: Method Construction quality Fireplaces . Simplified Semi -loose 0 Heating Component Btuh/ftz Btuh % of load Walls 2.4 2599 12.0 Glazing 22.8 2786 12.9 Doors 10.5 442 2.0 Ceilings 1.2 1510 7.0 Floors 3.4 4112 19.1 Infiltration 3.1 3367 15.6 Ducts 6769 31.4 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 121585 1 100.0 Cooling Component Btuh/fl? Btuh % of load Walls 2.2 2337 8.9 Glazing 69.1 8459 32.1 Doors 11.4 480 1.8 Ceilings 2.4 2952 11.2 Floors 0 0 0 Infiltration 0.9 994 3.8 Ducts 7860 29.8 Ventilation 0 0 Internal gains 3290 12.5 Blower 0 0 Adjustments 0 Total 1 1 263731 100.0 Latent Cooling Load = 6056 Btuh Overall U-value = 0.116 Btuhr °F Data entries checked. Glazing Doors___ Collings Floors Glazing Walls umer , Celiings .Ducts filtration Internal Gains -_ Ducts Infiltration _rkwrigFrrYsoft` 2022-Mar-16 12:6635 >u =•• M- -ate Right -Suite® Universal202121,0.08 RSU25986 Page 1 ACC...TBL\,Dkalcs1211309.ADDMON.H\AC.CALCS.REV.rup Calc=W8 FrontDoorfaces: E Job: 211309 - 1- wrightsoft- Project Summary Date: 02/07/22 ENTIRE BUILDING By. CJH The EARTHWORKS Group Project Information For. 5403 Sunset Blvd. Addition 5403 Sunset Blvd., Fort Pierce, FI Notes: Weather: Vero Beach Muni, FL, US Winter Design Conditions Summer Design Conditions Outside db 43 OF Outside db 91 OF Inside db 70 OF Inside db 75 OF Design TD 27 OF Design TD 16 OF Daily range L Relative humidity 50 % Moisture difference 59 grAb Heating Summary Sensible Cooling Equipment Load Sizing Structure 14816 Btuh Structure 18513 Btuh Ducts 6769 Btuh Duds 7860 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 21585 Btuh Use manufacturer's data Rate/swing multiplier 1.00 Infiltration Equipment sensible load 26373 Btuh, Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi -loose Fireplaces 0 Structure 2954 Btuh Duds 3102 Btuh Central vent (0 cfm) 0 Btuh Heatingg Coolinngg (none) Area (11F) 1216 1216 Equipment latent load 6056 Btuh Volume (ft3) 9728 9728. Air changesthour 0.70 0.36 Equipment Total Load (Sen+Lat) 32428 Btuh Equiv AVF (cfrn) 113 58 Req. total capacity at 0.81 SHR 2.7 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trane Trade Trade TRANE Model Cond EXISTING AHRI ref coil EXISTING AHRI ref Efficiency 100 EFF Efficiency 13.0 EER,13 SEER Heating input 10.0 kW Sensible cooling 28026 Btuh Heating output 34121 Btuh Latent000ling 6574 Btuh Temperature rise 72 OF Total cooling 34600 Btuh Actual airflow 430 dm Actual airflow 1200 cfm Air flow factor 0.020 cfmBtuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.81 SoMatie values have been manuaUyovenfddden Calculations approved byACCA to meet all requirements of Manual J 8th Ed. .2022-Mar-1612.56:36 � wrfightsoTt^ Page 1 Right-Suite®Universa1202121.0.08 RSU25986 ACCK ...TBLWtcalcs1211309ADDMON,FNPG.CPLCS.REV.rup Cale =MJ8 Front Door faces; E i" ��'N 1� Job #: 211309 Performed by CJH for: 5403 Sunset BIvd.Addilion 5403 Sunset Blvd. Fort Pierce, FI Level 1 The EARTHWORKS Group Scale:1 : 87 Page 1 Right Suite® Universal 2021 21.0.08 RSU25986 2022-Mar-1612:57:43 ...1309ADDrrION.HUAC.CALCS.REV.rup