Loading...
HomeMy WebLinkAbout_CRMSCMB1L15X10-SEALS-sldLumber design values are in accordance with ANSI/TPI 1-2014 section 6.3 These truss designs rely on lumber values established by others. RE: Job CRMSCMB1L15X10 Page 1 of 2 A-1 Roof Trusses 4451 St Lucie Blvd Fort Pierce, FL 34946Site Information: Customer Info: RENAR DEVELOPMENT CO. Project Name: MORNINGSIDE Lot/Block:Model: CAYMAN 1763 / ELEV: B1 Subdivision: Address: City: FORT PIERCE County: SAINT LUCIE State: FL Name Address and License # of Structural Engineer of Record, If there is one, for the building. Name: License #: Address: City: General Truss Engineering Criteria Design Loads (Individual Truss Design Drawings Show Special Loading Conditions): Design Code: FBC 7th Ed. 2020 Res. / TPI 2014 Design Program: Alpine Engineered Products Wind Code: ASCE 7-16 Wind Speed: 160 Roof Load: 37.0 psf Floor Load: 0.0 psf This package includes 40 individual, dated Truss Design Drawings and 16 Additional Drawings. With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet conforms to 61G15-31.003,section 5 of the Florida Board of Professional Engineers Rules. The truss drawing(s) referenced have been prepared by Alpine Engineered Products, Inc. under my direct supervision based on the parameters provided by A-1 Roof Trusses, Ltd. Truss Design Engineer's Name: Ryan Bays My license renewal date for the state of Florida is February 28,2023. NOTE: The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of components for any particular building is the responsibility of the building designer, per ANSI/TPI-1 Sec. 2. The Truss Design Drawing(s)(TDD[s]) referenced have been prepared based on the construction documents (also referred to at times as 'Structural Engineering Documents') provided by the Building Designer indicating the nature and character of the work. The design criteria therein have been transferred to Ryan Bays PE by [A1 Roof Trusses or specific location]. These TDDs (also referred to at times as 'Structural Delegated' Engineering Documents') are specialty structural component designs and may be part of the project's deferred or phased submittals. As a Truss Design Engineer (i.e., Specialty Engineer), the seal here and on the TDD represents an acceptance of professional engineering responsibility for the design of the single Truss depicted on the TDD only. The Building Designer is responsible for and shall coordinate and review the TDDs for compatibility with their written engineering requirements. Please review all TDDs and all related notes. Ryan Bays, P.E. 4451 St Lucie Blvd. Suite 201 Fort Pierce, FL 34946 No.Seq #Truss Name Date 1 2652 A01 1/27/22 2 2549 A02 1/27/22 3 2552 A03 1/27/22 4 2568 A04 1/27/22 5 2571 A05 1/27/22 6 2574 A06 1/27/22 7 2585 A07 1/27/22 8 2582 A08 1/27/22 9 2595 A09 1/27/22 10 2600 A10 1/27/22 11 2603 A11 1/27/22 12 2611 A12G 1/27/22 No.Seq #Truss Name Date 13 2517 B01G 1/27/22 14 2520 B02 1/27/22 15 2523 B03 1/27/22 16 2514 C01G 1/27/22 17 2501 C02 1/27/22 18 2504 C03 1/27/22 19 2511 C04 1/27/22 20 2626 D01G 1/27/22 21 2526 E01 1/27/22 22 2529 E02 1/27/22 23 2629 E03 1/27/22 24 2632 E04 1/27/22 No.Seq #Truss Name Date 25 2623 HJ5P 1/27/22 26 2486 HJ7 1/27/22 27 2489 HJ7A 1/27/22 28 2463 J1 1/27/22 29 2614 J1P 1/27/22 30 2466 J3 1/27/22 31 2492 J3A 1/27/22 32 2617 J3P 1/27/22 33 2469 J5 1/27/22 34 2495 J5A 1/27/22 35 2620 J5P 1/27/22 36 2472 J7 1/27/22 Lumber design values are in accordance with ANSI/TPI 1-2014 section 6.3 These truss designs rely on lumber values established by others. RE: Job CRMSCMB1L15X10 Page 2 of 2 No.Seq #Truss Name Date 37 2895 VM03 1/27/22 38 2475 VM05 1/27/22 39 2478 VM07 1/27/22 40 2481 VM09 1/27/22 41 STDL01 STD. DETAIL 1/27/22 42 STDL02 STD. DETAIL 1/27/22 43 STDL03 STD. DETAIL 1/27/22 44 STDL04 STD. DETAIL 1/27/22 45 STDL05 STD. DETAIL 1/27/22 46 STDL06 STD. DETAIL 1/27/22 47 STDL07 STD. DETAIL 1/27/22 48 STDL08 STD. DETAIL 1/27/22 49 STDL09 STD. DETAIL 1/27/22 50 STDL10 STD. DETAIL 1/27/22 51 STDL11 STD. DETAIL 1/27/22 52 STDL12 STD. DETAIL 1/27/22 53 STDL13 STD. DETAIL 1/27/22 54 STDL14 STD. DETAIL 1/27/22 55 STDL15 STD. DETAIL 1/27/22 56 STDL16 STD. DETAIL 1/27/22 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4 2x4 SP 2400f-2.0E + SP M-31; Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; W3 2x4 SP #2; W8,W9,W10, W11 2x4 SP 2400f-2.0E + SP M-31; Lt Slider: 2x6 SP #2; block length = 1.833' Rt Slider: 2x6 SP #2; block length = 1.833' Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 24.00 BC 120 0.29 11.74 BC 93 11.71 19.22 BC 120 19.22 37.71 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL Y 1532 /- /- /868 /211 /260 N 1531 /- /- /866 /220 /- Wind reactions based on MWFRS Y Brg Width = 8.0 Min Req = 1.8 N Brg Width = 8.0 Min Req = 1.8 Bearings Y & N are a rigid surface. Bearings Y & N require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1120 -2672 C - D 1133 -2612 D - E 1940 -4531 E - F 1951 -4452 F - G 2071 -4509 G - H 1724 -3743 Chords Tens. Comp. H - I 2761 -6289 I - J 2751 -6263 J - K 1050 -2033 K - L 1028 -2068 L - M 1132 -2557 M - N 1120 -2621 N - O 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - X 2290 -887 X - W 33 -13 V - U 3327 -1164 U - S 4906 -1845 Chords Tens. Comp. T - R 25 -10 R - Q 2223 -872 Q - P 2223 -872 P - N 2226 -871 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - X 577 -1286 D - V 1718 -626 X - V 2615 -1011 F - V 221 -243 V - W 67 0 V - G 1171 -581 G - U 2462 -1041 U - H 1503 -3445 Webs Tens. Comp. H - S 2212 -913 I - S 228 -180 S - T 61 0 S - R 2504 -904 S - J 4941 -1941 R - J 559 -1442 R - L 284 -557 L - P 241 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.507 I 884 360 VERT(CL): 0.958 I 468 240 HORZ(LL): 0.305 N - - HORZ(TL): 0.575 N - - Creep Factor: 2.0 Max TC CSI: 0.675 Max BC CSI: 0.856 Max Web CSI: 0.938 Weight: 238.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A01 Truss Type SPEC Qty 1 Ply 1 Seal #: 2652 01/27/2022 T4 B2W3 W8 W9 W10 W11 38' SEAT PLATE REQ.SEAT PLATE REQ. 15'6"1'6"6'11"15 14' 11'10"10 7'2"4 18'11"21'4"1'4" 4"3 7'4"32'9"124'7"58'1"38'8"2(a) A B C D E F G H I J K L M N O PQR S T U V WXY 6 12 3 123X6(C5) 4X6(C5)3X4 4X4 5X6 3X6 1.5X4 7X8 1.5X4 6X6 7X6(R) 7X6 1.5X4 10X10 1.5X4 6X8 8X12 3X6 3X6 3X4 1.5X4 3X4 3X6(C5) 4X6(C5) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4 2x4 SP 2400f-2.0E + SP M-31; Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; W3 2x4 SP #2; W8,W9,W10, W11 2x4 SP 2400f-2.0E + SP M-31; Lt Slider: 2x6 SP #2; block length = 1.833' Rt Slider: 2x6 SP #2; block length = 1.833' Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 24.00 BC 120 0.29 11.74 BC 93 11.71 19.22 BC 120 19.22 37.71 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL Y 1532 /- /- /868 /211 /260 N 1531 /- /- /866 /220 /- Wind reactions based on MWFRS Y Brg Width = 8.0 Min Req = 1.8 N Brg Width = 8.0 Min Req = 1.8 Bearings Y & N are a rigid surface. Bearings Y & N require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1120 -2672 C - D 1133 -2612 D - E 1940 -4531 E - F 1951 -4452 F - G 2071 -4509 G - H 1724 -3743 Chords Tens. Comp. H - I 2761 -6289 I - J 2751 -6263 J - K 1050 -2033 K - L 1028 -2068 L - M 1132 -2557 M - N 1120 -2621 N - O 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - X 2290 -887 X - W 33 -13 V - U 3327 -1164 U - S 4906 -1845 Chords Tens. Comp. T - R 25 -10 R - Q 2223 -872 Q - P 2223 -872 P - N 2226 -871 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - X 577 -1286 D - V 1718 -626 X - V 2615 -1011 F - V 221 -243 V - W 67 0 V - G 1171 -581 G - U 2462 -1041 U - H 1503 -3445 Webs Tens. Comp. H - S 2212 -913 I - S 228 -180 S - T 61 0 S - R 2504 -904 S - J 4941 -1941 R - J 559 -1442 R - L 284 -557 L - P 241 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.507 I 884 360 VERT(CL): 0.958 I 468 240 HORZ(LL): 0.305 N - - HORZ(TL): 0.575 N - - Creep Factor: 2.0 Max TC CSI: 0.675 Max BC CSI: 0.856 Max Web CSI: 0.938 Weight: 238.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A01 Truss Type SPEC Qty 1 Ply 1 Seal #: 2652 01/27/2022 T4 B2W3 W8 W9 W10 W11 38' SEAT PLATE REQ.SEAT PLATE REQ. 15'6"1'6"6'11"15 14' 11'10"10 7'2"4 18'11"21'4"1'4" 4"3 7'4"32'9"124'7"58'1"38'8"2(a) A B C D E F G H I J K L M N O PQR S T U V WXY 6 12 3 123X6(C5) 4X6(C5)3X4 4X4 5X6 3X6 1.5X4 7X8 1.5X4 6X6 7X6(R) 7X6 1.5X4 10X10 1.5X4 6X8 8X12 3X6 3X6 3X4 1.5X4 3X4 3X6(C5) 4X6(C5) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8,W9 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.00 23.00 BC 116 0.15 11.74 BC 93 11.71 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1532 /- /- /869 /225 /253 K 1531 /- /- /869 /225 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1171 -2709 C - D 1973 -4496 D - E 1985 -4417 E - F 2099 -4483 F - G 2255 -5019 Chords Tens. Comp. G - H 2249 -4994 H - I 1052 -2003 I - J 1025 -2045 J - K 1167 -2667 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2345 -937 T - S 24 -13 R - P 3572 -1345 Q - O 13 -7 Chords Tens. Comp. O - N 2295 -914 N - M 2295 -914 M - K 2297 -912 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 602 -1290 C - R 1633 -616 T - R 2670 -1062 E - R 212 -243 R - S 70 0 R - F 882 -420 F - P 1857 -758 Webs Tens. Comp. G - P 213 -162 P - Q 30 0 P - O 2811 -1025 P - H 4045 -1567 O - H 714 -1847 O - J 320 -644 J - M 265 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.468 G 966 360 VERT(CL): 0.884 G 511 240 HORZ(LL): 0.298 K - - HORZ(TL): 0.562 K - - Creep Factor: 2.0 Max TC CSI: 0.911 Max BC CSI: 0.988 Max Web CSI: 0.913 Weight: 218.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A02 Truss Type HIPS Qty 1 Ply 1 Seal #: 2549 01/27/2022 B2 W3 W8 W9 38' SEAT PLATE REQ.SEAT PLATE REQ. 15'7'11"15 15' 11'10"10 7'2"4 18'11"21'4"1'4" 4"32'9"124'7"57'10"38'5"2(a) (a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X4 5X10 1.5X4 5X6 1.5X4 10X10 1.5X4 7X8 6X10 3X6 3X6 3X4 1.5X4 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8,W9 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.00 23.00 BC 116 0.15 11.74 BC 93 11.71 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1532 /- /- /869 /225 /253 K 1531 /- /- /869 /225 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1171 -2709 C - D 1973 -4496 D - E 1985 -4417 E - F 2099 -4483 F - G 2255 -5019 Chords Tens. Comp. G - H 2249 -4994 H - I 1052 -2003 I - J 1025 -2045 J - K 1167 -2667 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2345 -937 T - S 24 -13 R - P 3572 -1345 Q - O 13 -7 Chords Tens. Comp. O - N 2295 -914 N - M 2295 -914 M - K 2297 -912 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 602 -1290 C - R 1633 -616 T - R 2670 -1062 E - R 212 -243 R - S 70 0 R - F 882 -420 F - P 1857 -758 Webs Tens. Comp. G - P 213 -162 P - Q 30 0 P - O 2811 -1025 P - H 4045 -1567 O - H 714 -1847 O - J 320 -644 J - M 265 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.468 G 966 360 VERT(CL): 0.884 G 511 240 HORZ(LL): 0.298 K - - HORZ(TL): 0.562 K - - Creep Factor: 2.0 Max TC CSI: 0.911 Max BC CSI: 0.988 Max Web CSI: 0.913 Weight: 218.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A02 Truss Type HIPS Qty 1 Ply 1 Seal #: 2549 01/27/2022 B2 W3 W8 W9 38' SEAT PLATE REQ.SEAT PLATE REQ. 15'7'11"15 15' 11'10"10 7'2"4 18'11"21'4"1'4" 4"32'9"124'7"57'10"38'5"2(a) (a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X4 5X10 1.5X4 5X6 1.5X4 10X10 1.5X4 7X8 6X10 3X6 3X6 3X4 1.5X4 3X6(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T1,T3 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 21.00 BC 120 0.15 11.74 BC 93 11.70 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1532 /- /- /869 /198 /281 K 1531 /- /- /869 /198 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1036 -2706 C - D 1717 -4511 D - E 1728 -4432 E - F 1869 -4531 F - G 1426 -3598 Chords Tens. Comp. G - H 1424 -3584 H - I 985 -2145 I - J 948 -2188 J - K 1051 -2682 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2341 -816 T - S 24 -11 R - P 3248 -952 Q - O 9 -4 Chords Tens. Comp. O - N 9 -4 N - M 2317 -815 M - K 2318 -814 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 529 -1287 C - R 1655 -511 T - R 2666 -925 E - R 254 -322 R - S 70 0 R - F 1223 -579 F - P 890 -245 Webs Tens. Comp. G - P 217 -116 P - Q 85 0 P - H 2188 -583 P - N 3366 -983 H - N 494 -1801 N - J 342 -623 J - M 208 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.361 Q 999 360 VERT(CL): 0.681 Q 664 240 HORZ(LL): 0.247 K - - HORZ(TL): 0.466 K - - Creep Factor: 2.0 Max TC CSI: 0.865 Max BC CSI: 0.880 Max Web CSI: 0.992 Weight: 225.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A03 Truss Type HIPS Qty 1 Ply 1 Seal #: 2552 01/27/2022 T1 T3 B2 W3 W8 38' SEAT PLATE REQ.SEAT PLATE REQ. 17'4'17' 11'10"10 7'2"4 18'11"21'4"1'4" 4"32'9"124'7"58'10"39'5"2(a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X4 5X8 1.5X4 5X6 1.5X4 8X8 2X4 6X6 3X6 6X12 3X6 3X4 1.5X4 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T1,T3 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 21.00 BC 120 0.15 11.74 BC 93 11.70 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1532 /- /- /869 /198 /281 K 1531 /- /- /869 /198 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1036 -2706 C - D 1717 -4511 D - E 1728 -4432 E - F 1869 -4531 F - G 1426 -3598 Chords Tens. Comp. G - H 1424 -3584 H - I 985 -2145 I - J 948 -2188 J - K 1051 -2682 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2341 -816 T - S 24 -11 R - P 3248 -952 Q - O 9 -4 Chords Tens. Comp. O - N 9 -4 N - M 2317 -815 M - K 2318 -814 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 529 -1287 C - R 1655 -511 T - R 2666 -925 E - R 254 -322 R - S 70 0 R - F 1223 -579 F - P 890 -245 Webs Tens. Comp. G - P 217 -116 P - Q 85 0 P - H 2188 -583 P - N 3366 -983 H - N 494 -1801 N - J 342 -623 J - M 208 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.361 Q 999 360 VERT(CL): 0.681 Q 664 240 HORZ(LL): 0.247 K - - HORZ(TL): 0.466 K - - Creep Factor: 2.0 Max TC CSI: 0.865 Max BC CSI: 0.880 Max Web CSI: 0.992 Weight: 225.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A03 Truss Type HIPS Qty 1 Ply 1 Seal #: 2552 01/27/2022 T1 T3 B2 W3 W8 38' SEAT PLATE REQ.SEAT PLATE REQ. 17'4'17' 11'10"10 7'2"4 18'11"21'4"1'4" 4"32'9"124'7"58'10"39'5"2(a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X4 5X8 1.5X4 5X6 1.5X4 8X8 2X4 6X6 3X6 6X12 3X6 3X4 1.5X4 3X6(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP M-30; B1 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; Filler: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.52 19.00 BC 120 19.00 37.48 BC 120 27.73 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1538 /- /- /862 /198 /310 J 1538 /- /- /858 /200 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 J Brg Width = 8.0 Min Req = 1.7 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1567 -4776 C - D 1327 -4301 D - E 1351 -4251 E - F 1023 -3219 Chords Tens. Comp. F - G 1032 -3219 G - H 1353 -4243 H - I 1329 -4293 I - J 1570 -4764 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - S 4298 -1327 S - R 3674 -971 R - Q 3693 -964 Q - P 3691 -952 P - O 3672 -958 Chords Tens. Comp. O - N 3641 -963 N - M 4267 -1306 M - L 4251 -1314 L - J 4254 -1321 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - S 332 -409 S - E 507 -73 E - Q 450 -813 F - Q 2472 -679 Q - G 455 -806 G - N 487 -80 Webs Tens. Comp. T - O 97 0 T - U 15 -1 N - I 335 -473 U - M 157 0 U - L 13 -3 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.529 Q 855 360 VERT(CL): 0.983 Q 460 240 HORZ(LL): 0.382 J - - HORZ(TL): 0.725 J - - Creep Factor: 2.0 Max TC CSI: 0.838 Max BC CSI: 0.951 Max Web CSI: 0.942 Weight: 191.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A04 Truss Type COMN Qty 3 Ply 1 Seal #: 2568 01/27/2022 B1 27'4"14 9'10"8 8"10 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 19'8'1"6 10'2"8"101'4" 1'4" 4"34'7"19'10"310'5"2A B C D E F G H I J K L M NO P Q R S T U 6 12 3 12 3X8(F1) 1.5X4 3X6 3X4 3X4 H0308 5X6 6X8 H0308 3X4 1.5X4 1.5X4 3X4 3X6 1.5X4 1.5X4 1.5X4 2X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP M-30; B1 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; Filler: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.52 19.00 BC 120 19.00 37.48 BC 120 27.73 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1538 /- /- /862 /198 /310 J 1538 /- /- /858 /200 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 J Brg Width = 8.0 Min Req = 1.7 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1567 -4776 C - D 1327 -4301 D - E 1351 -4251 E - F 1023 -3219 Chords Tens. Comp. F - G 1032 -3219 G - H 1353 -4243 H - I 1329 -4293 I - J 1570 -4764 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - S 4298 -1327 S - R 3674 -971 R - Q 3693 -964 Q - P 3691 -952 P - O 3672 -958 Chords Tens. Comp. O - N 3641 -963 N - M 4267 -1306 M - L 4251 -1314 L - J 4254 -1321 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - S 332 -409 S - E 507 -73 E - Q 450 -813 F - Q 2472 -679 Q - G 455 -806 G - N 487 -80 Webs Tens. Comp. T - O 97 0 T - U 15 -1 N - I 335 -473 U - M 157 0 U - L 13 -3 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.529 Q 855 360 VERT(CL): 0.983 Q 460 240 HORZ(LL): 0.382 J - - HORZ(TL): 0.725 J - - Creep Factor: 2.0 Max TC CSI: 0.838 Max BC CSI: 0.951 Max Web CSI: 0.942 Weight: 191.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A04 Truss Type COMN Qty 3 Ply 1 Seal #: 2568 01/27/2022 B1 27'4"14 9'10"8 8"10 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 19'8'1"6 10'2"8"101'4" 1'4" 4"34'7"19'10"310'5"2A B C D E F G H I J K L M NO P Q R S T U 6 12 3 12 3X8(F1) 1.5X4 3X6 3X4 3X4 H0308 5X6 6X8 H0308 3X4 1.5X4 1.5X4 3X4 3X6 1.5X4 1.5X4 1.5X4 2X4 3X8(F1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 :SP 2400f-2.0E + SP M-31:; B2 2x4 SP M-30; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.52 19.00 BC 120 19.00 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1538 /- /- /862 /197 /310 J 1538 /- /- /862 /197 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1565 -4778 C - D 1326 -4303 D - E 1350 -4252 E - F 1023 -3218 Chords Tens. Comp. F - G 1032 -3218 G - H 1341 -4252 H - I 1317 -4303 I - J 1557 -4778 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 4300 -1326 P - O 3668 -971 O - N 3693 -968 Chords Tens. Comp. N - M 3693 -950 M - L 3668 -953 L - J 4300 -1310 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - P 332 -396 P - E 510 -72 E - N 449 -810 F - N 2470 -679 Webs Tens. Comp. N - G 450 -810 G - L 510 -71 L - I 334 -396 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.524 N 864 360 VERT(CL): 0.993 N 455 240 HORZ(LL): 0.377 J - - HORZ(TL): 0.714 J - - Creep Factor: 2.0 Max TC CSI: 0.674 Max BC CSI: 0.845 Max Web CSI: 0.941 Weight: 172.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A05 Truss Type COMN Qty 10 Ply 1 Seal #: 2571 01/27/2022 B2 B2 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 19'19'1'4"1'4" 4"34'7"19'10"310'5"2A B C D E F G H I J K L M N OP 6 12 3 12 3X8(F1) 1.5X4 3X6 3X4 H0308 3X4 5X6 6X8 3X4 H0308 3X4 3X6 1.5X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 :SP 2400f-2.0E + SP M-31:; B2 2x4 SP M-30; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.52 19.00 BC 120 19.00 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1538 /- /- /862 /197 /310 J 1538 /- /- /862 /197 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1565 -4778 C - D 1326 -4303 D - E 1350 -4252 E - F 1023 -3218 Chords Tens. Comp. F - G 1032 -3218 G - H 1341 -4252 H - I 1317 -4303 I - J 1557 -4778 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 4300 -1326 P - O 3668 -971 O - N 3693 -968 Chords Tens. Comp. N - M 3693 -950 M - L 3668 -953 L - J 4300 -1310 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - P 332 -396 P - E 510 -72 E - N 449 -810 F - N 2470 -679 Webs Tens. Comp. N - G 450 -810 G - L 510 -71 L - I 334 -396 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.524 N 864 360 VERT(CL): 0.993 N 455 240 HORZ(LL): 0.377 J - - HORZ(TL): 0.714 J - - Creep Factor: 2.0 Max TC CSI: 0.674 Max BC CSI: 0.845 Max Web CSI: 0.941 Weight: 172.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A05 Truss Type COMN Qty 10 Ply 1 Seal #: 2571 01/27/2022 B2 B2 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 19'19'1'4"1'4" 4"34'7"19'10"310'5"2A B C D E F G H I J K L M N OP 6 12 3 12 3X8(F1) 1.5X4 3X6 3X4 H0308 3X4 5X6 6X8 3X4 H0308 3X4 3X6 1.5X4 3X8(F1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP M-30; Bot chord: 2x4 SP M-30; B2 2x4 SP #2; B3 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W5 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 114 0.15 23.07 BC 96 23.10 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /865 /406 /310 J 1535 /- /- /860 /409 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 948 -2695 C - D 861 -2374 D - E 879 -2290 E - F 761 -1699 Chords Tens. Comp. F - G 1405 -3949 G - H 1266 -3958 H - I 1239 -4004 I - J 1481 -4713 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Q 2339 -730 Q - P 1882 -499 P - O 1882 -499 Chords Tens. Comp. O - N 15 -5 M - L 4275 -1246 L - J 4228 -1227 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Q 263 -388 Q - E 481 -88 E - O 353 -666 F - O 39 -698 F - M 3527 -1003 Webs Tens. Comp. O - M 1925 -349 M - N 35 -7 M - G 286 -360 M - I 367 -612 I - L 139 -77 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.420 G 999 360 VERT(CL): 0.794 G 570 240 HORZ(LL): 0.253 J - - HORZ(TL): 0.478 J - - Creep Factor: 2.0 Max TC CSI: 0.640 Max BC CSI: 0.985 Max Web CSI: 0.852 Weight: 210.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A06 Truss Type COMN Qty 1 Ply 1 Seal #: 2574 01/27/2022 T3 T4 B2 B3 W5 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 23'2"9 14'9"71'4"1'4" 4"33'6"79'10"310'5"2(a) (a) A B C D E F G H I J K L M NOPQ 6 12 3 12 3X6(A1) 1.5X4 3X6 3X4 3X6 3X4 6X10 5X8 8X10 1.5X4 1.5X4 3X6 3X4 1.5X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP M-30; Bot chord: 2x4 SP M-30; B2 2x4 SP #2; B3 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W5 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 114 0.15 23.07 BC 96 23.10 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /865 /406 /310 J 1535 /- /- /860 /409 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 948 -2695 C - D 861 -2374 D - E 879 -2290 E - F 761 -1699 Chords Tens. Comp. F - G 1405 -3949 G - H 1266 -3958 H - I 1239 -4004 I - J 1481 -4713 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Q 2339 -730 Q - P 1882 -499 P - O 1882 -499 Chords Tens. Comp. O - N 15 -5 M - L 4275 -1246 L - J 4228 -1227 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Q 263 -388 Q - E 481 -88 E - O 353 -666 F - O 39 -698 F - M 3527 -1003 Webs Tens. Comp. O - M 1925 -349 M - N 35 -7 M - G 286 -360 M - I 367 -612 I - L 139 -77 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.420 G 999 360 VERT(CL): 0.794 G 570 240 HORZ(LL): 0.253 J - - HORZ(TL): 0.478 J - - Creep Factor: 2.0 Max TC CSI: 0.640 Max BC CSI: 0.985 Max Web CSI: 0.852 Weight: 210.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A06 Truss Type COMN Qty 1 Ply 1 Seal #: 2574 01/27/2022 T3 T4 B2 B3 W5 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 23'2"9 14'9"71'4"1'4" 4"33'6"79'10"310'5"2(a) (a) A B C D E F G H I J K L M NOPQ 6 12 3 12 3X6(A1) 1.5X4 3X6 3X4 3X6 3X4 6X10 5X8 8X10 1.5X4 1.5X4 3X6 3X4 1.5X4 3X8(F1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W7 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 79 0.15 11.49 BC 75 11.50 23.07 BC 25 20.97 23.07 BC 83 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /865 /551 /310 J 1535 /- /- /860 /554 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 947 -2664 C - D 999 -2642 D - E 1010 -2588 E - F 774 -1850 Chords Tens. Comp. F - G 1298 -3857 G - H 1635 -4480 H - I 1625 -4525 I - J 1547 -4662 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2294 -714 U - T 69 -33 S - R 2317 -649 R - P 0 -6 Chords Tens. Comp. Q - O 1 -5 P - N 5 -5 M - L 4009 -1156 L - J 4174 -1282 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 182 -362 C - S 77 -29 U - S 2263 -692 S - T 44 0 S - E 539 -155 E - R 427 -909 F - R 75 -595 F - M 3122 -822 Webs Tens. Comp. R - M 1961 -369 Q - P 37 0 M - N 27 0 M - G 381 -611 N - O 34 0 V - M 0 0 G - L 426 -168 L - I 206 -244 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.411 O 999 360 VERT(CL): 0.777 O 582 240 HORZ(LL): 0.250 J - - HORZ(TL): 0.472 J - - Creep Factor: 2.0 Max TC CSI: 0.742 Max BC CSI: 0.999 Max Web CSI: 0.862 Weight: 226.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A07 Truss Type COMN Qty 3 Ply 1 Seal #: 2585 01/27/2022 T3 T4 B4 W7 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 11'7"9 9'4"1 2'2"15 14'9"71'4"1'4" 4"38"3'6"79'10"310'5"2(a) (a) A B C D E F G H I J K L M NOPQR STU V 6 12 3 12 3X6(A1) 3X4 4X8(R) 3X6 5X8 3X4 7X8 5X8 8X10 3X3 3X4 3X6 3X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W7 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 79 0.15 11.49 BC 75 11.50 23.07 BC 25 20.97 23.07 BC 83 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /865 /551 /310 J 1535 /- /- /860 /554 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 947 -2664 C - D 999 -2642 D - E 1010 -2588 E - F 774 -1850 Chords Tens. Comp. F - G 1298 -3857 G - H 1635 -4480 H - I 1625 -4525 I - J 1547 -4662 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2294 -714 U - T 69 -33 S - R 2317 -649 R - P 0 -6 Chords Tens. Comp. Q - O 1 -5 P - N 5 -5 M - L 4009 -1156 L - J 4174 -1282 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 182 -362 C - S 77 -29 U - S 2263 -692 S - T 44 0 S - E 539 -155 E - R 427 -909 F - R 75 -595 F - M 3122 -822 Webs Tens. Comp. R - M 1961 -369 Q - P 37 0 M - N 27 0 M - G 381 -611 N - O 34 0 V - M 0 0 G - L 426 -168 L - I 206 -244 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.411 O 999 360 VERT(CL): 0.777 O 582 240 HORZ(LL): 0.250 J - - HORZ(TL): 0.472 J - - Creep Factor: 2.0 Max TC CSI: 0.742 Max BC CSI: 0.999 Max Web CSI: 0.862 Weight: 226.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A07 Truss Type COMN Qty 3 Ply 1 Seal #: 2585 01/27/2022 T3 T4 B4 W7 38' SEAT PLATE REQ.SEAT PLATE REQ. 19'19' 11'7"9 9'4"1 2'2"15 14'9"71'4"1'4" 4"38"3'6"79'10"310'5"2(a) (a) A B C D E F G H I J K L M NOPQR STU V 6 12 3 12 3X6(A1) 3X4 4X8(R) 3X6 5X8 3X4 7X8 5X8 8X10 3X3 3X4 3X6 3X4 3X8(F1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 18.06 19.94 BC 79 0.15 11.49 BC 75 11.48 23.07 BC 25 20.97 23.07 BC 82 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /867 /552 /296 K 1535 /- /- /862 /555 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.5 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 957 -2666 C - D 1031 -2643 D - E 1040 -2586 E - F 1188 -2684 F - G 826 -1633 Chords Tens. Comp. G - H 1381 -3884 H - I 1647 -4480 I - J 1638 -4529 J - K 1569 -4663 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2295 -734 V - U 64 -37 T - S 1634 -393 S - Q 1 -5 Chords Tens. Comp. R - P 2 -7 Q - O 8 -5 N - M 4026 -1228 M - K 4175 -1303 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 189 -365 C - T 99 -39 V - T 2270 -708 E - T 257 -328 T - U 43 0 T - F 1100 -505 F - S 239 -194 S - G 438 -1472 S - N 2279 -517 Webs Tens. Comp. G - N 3407 -954 R - Q 39 0 N - O 0 -43 N - H 369 -583 O - P 32 0 W - N 0 0 H - M 418 -172 M - J 213 -252 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.424 O 999 360 VERT(CL): 0.802 O 564 240 HORZ(LL): 0.258 K - - HORZ(TL): 0.487 K - - Creep Factor: 2.0 Max TC CSI: 0.760 Max BC CSI: 0.990 Max Web CSI: 0.868 Weight: 239.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A08 Truss Type COMN Qty 1 Ply 1 Seal #: 2582 01/27/2022 T4 T5 B4 W8 38' SEAT PLATE REQ.SEAT PLATE REQ. 18'0"11 1'10"10 18'0"11 11'7"9 9'4"1 2'2"15 14'9"71'4"1'4" 4"38"3'6"79'4"89'11"7(a)(a)(a) A B C D E F G H I J K L M N OPQRS TUV W 6 12 3 12 3X6(A1) 3X4 4X8(R) 3X6 5X8 5X6 6X8 7X6 10X10 3X3 3X4 3X6 3X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 18.06 19.94 BC 79 0.15 11.49 BC 75 11.48 23.07 BC 25 20.97 23.07 BC 82 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /867 /552 /296 K 1535 /- /- /862 /555 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.5 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 957 -2666 C - D 1031 -2643 D - E 1040 -2586 E - F 1188 -2684 F - G 826 -1633 Chords Tens. Comp. G - H 1381 -3884 H - I 1647 -4480 I - J 1638 -4529 J - K 1569 -4663 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2295 -734 V - U 64 -37 T - S 1634 -393 S - Q 1 -5 Chords Tens. Comp. R - P 2 -7 Q - O 8 -5 N - M 4026 -1228 M - K 4175 -1303 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 189 -365 C - T 99 -39 V - T 2270 -708 E - T 257 -328 T - U 43 0 T - F 1100 -505 F - S 239 -194 S - G 438 -1472 S - N 2279 -517 Webs Tens. Comp. G - N 3407 -954 R - Q 39 0 N - O 0 -43 N - H 369 -583 O - P 32 0 W - N 0 0 H - M 418 -172 M - J 213 -252 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.424 O 999 360 VERT(CL): 0.802 O 564 240 HORZ(LL): 0.258 K - - HORZ(TL): 0.487 K - - Creep Factor: 2.0 Max TC CSI: 0.760 Max BC CSI: 0.990 Max Web CSI: 0.868 Weight: 239.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A08 Truss Type COMN Qty 1 Ply 1 Seal #: 2582 01/27/2022 T4 T5 B4 W8 38' SEAT PLATE REQ.SEAT PLATE REQ. 18'0"11 1'10"10 18'0"11 11'7"9 9'4"1 2'2"15 14'9"71'4"1'4" 4"38"3'6"79'4"89'11"7(a)(a)(a) A B C D E F G H I J K L M N OPQRS TUV W 6 12 3 12 3X6(A1) 3X4 4X8(R) 3X6 5X8 5X6 6X8 7X6 10X10 3X3 3X4 3X6 3X4 3X8(F1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP 2400f-2.0E + SP M-31; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 16.06 21.94 BC 79 0.15 11.49 BC 120 11.48 23.07 BC 25 20.97 23.07 BC 80 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /869 /554 /268 J 1535 /- /- /864 /557 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1092 -2669 C - D 1181 -2631 D - E 1190 -2573 E - F 1298 -2626 Chords Tens. Comp. F - G 992 -1810 G - H 1600 -3856 H - I 1568 -3903 I - J 1856 -4739 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2300 -856 U - T 81 -33 S - R 1809 -594 R - P 5 -1 Chords Tens. Comp. Q - O 0 -32 P - N 36 0 M - L 4293 -1593 L - J 4254 -1572 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 218 -364 C - S 99 -75 U - S 2258 -836 E - S 188 -228 S - T 43 0 S - F 915 -435 F - R 228 -104 R - G 599 -1564 Webs Tens. Comp. R - M 3015 -1003 Q - P 30 0 G - M 2556 -820 M - N 97 0 M - I 487 -882 N - O 47 0 V - M 0 0 I - L 164 -48 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.397 O 999 360 VERT(CL): 0.750 O 603 240 HORZ(LL): 0.247 J - - HORZ(TL): 0.467 J - - Creep Factor: 2.0 Max TC CSI: 0.824 Max BC CSI: 0.995 Max Web CSI: 0.974 Weight: 233.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A09 Truss Type COMN Qty 1 Ply 1 Seal #: 2595 01/27/2022 T4 T5 B2 B4 W8 38' SEAT PLATE REQ.SEAT PLATE REQ. 16'0"11 5'10"10 16'0"11 11'7"9 9'4"1 2'2"15 14'9"71'4"1'4" 4"38"3'6"78'4"88'11"7(a) A B C D E F G H I J K L M NOPQR STU V 6 12 3 12 3X6(A1) 3X4 4X8(R) 3X6 5X8 5X6 6X8 7X10(R) 12X14 3X3 3X6 3X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP 2400f-2.0E + SP M-31; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 16.06 21.94 BC 79 0.15 11.49 BC 120 11.48 23.07 BC 25 20.97 23.07 BC 80 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1531 /- /- /869 /554 /268 J 1535 /- /- /864 /557 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1092 -2669 C - D 1181 -2631 D - E 1190 -2573 E - F 1298 -2626 Chords Tens. Comp. F - G 992 -1810 G - H 1600 -3856 H - I 1568 -3903 I - J 1856 -4739 J - K 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2300 -856 U - T 81 -33 S - R 1809 -594 R - P 5 -1 Chords Tens. Comp. Q - O 0 -32 P - N 36 0 M - L 4293 -1593 L - J 4254 -1572 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 218 -364 C - S 99 -75 U - S 2258 -836 E - S 188 -228 S - T 43 0 S - F 915 -435 F - R 228 -104 R - G 599 -1564 Webs Tens. Comp. R - M 3015 -1003 Q - P 30 0 G - M 2556 -820 M - N 97 0 M - I 487 -882 N - O 47 0 V - M 0 0 I - L 164 -48 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.397 O 999 360 VERT(CL): 0.750 O 603 240 HORZ(LL): 0.247 J - - HORZ(TL): 0.467 J - - Creep Factor: 2.0 Max TC CSI: 0.824 Max BC CSI: 0.995 Max Web CSI: 0.974 Weight: 233.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A09 Truss Type COMN Qty 1 Ply 1 Seal #: 2595 01/27/2022 T4 T5 B2 B4 W8 38' SEAT PLATE REQ.SEAT PLATE REQ. 16'0"11 5'10"10 16'0"11 11'7"9 9'4"1 2'2"15 14'9"71'4"1'4" 4"38"3'6"78'4"88'11"7(a) A B C D E F G H I J K L M NOPQR STU V 6 12 3 12 3X6(A1) 3X4 4X8(R) 3X6 5X8 5X6 6X8 7X10(R) 12X14 3X3 3X6 3X4 3X8(F1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W9 2x4 SP 2400f-2.0E + SP M-31; Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 14.06 23.94 BC 78 0.15 11.49 BC 111 11.50 23.81 BC 75 20.97 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1530 /- /- /866 /557 /239 K 1530 /- /- /866 /557 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1688 -2668 C - D 1793 -2620 D - E 1803 -2562 E - F 1630 -2227 F - G 1524 -1986 Chords Tens. Comp. G - H 1544 -2020 H - I 1603 -2293 I - J 1581 -2325 J - K 1681 -2638 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2299 -1375 V - U 84 -48 T - S 2278 -1298 S - Q 2123 -1141 R - P 66 -79 Chords Tens. Comp. Q - O 2058 -1061 P - N 150 -128 N - M 150 -128 M - K 2264 -1317 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 318 -362 C - T 115 -92 V - T 2254 -1349 T - U 45 0 T - E 608 -402 E - S 573 -671 F - S 739 -478 S - G 259 -333 Webs Tens. Comp. G - O 231 -331 R - Q 16 -11 O - P 181 0 O - H 701 -432 O - M 2132 -1197 O - J 350 -379 M - J 202 -176 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.185 R 999 360 VERT(CL): 0.387 R 999 240 HORZ(LL): 0.079 K - - HORZ(TL): 0.149 K - - Creep Factor: 2.0 Max TC CSI: 0.952 Max BC CSI: 0.987 Max Web CSI: 0.859 Weight: 228.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A10 Truss Type SPEC Qty 1 Ply 1 Seal #: 2600 01/27/2022 B2 W9 38' SEAT PLATE REQ.SEAT PLATE REQ. 14'0"11 9'10"10 14'0"11 11'7"9 9'4"1 17'0"61'4"1'4" 4"38"7'4"87'11"7A B C D E F G H I J K L MNOPQRS TUV 6 12 3X6(A1) 4X8(R) 3X6 5X8 1.5X4 5X6 3X8 1.5X4 1.5X4 5X8 1.5X4 5X6 3X6 3X6 5X6(R) 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W9 2x4 SP 2400f-2.0E + SP M-31; Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 14.06 23.94 BC 78 0.15 11.49 BC 111 11.50 23.81 BC 75 20.97 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1530 /- /- /866 /557 /239 K 1530 /- /- /866 /557 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 1688 -2668 C - D 1793 -2620 D - E 1803 -2562 E - F 1630 -2227 F - G 1524 -1986 Chords Tens. Comp. G - H 1544 -2020 H - I 1603 -2293 I - J 1581 -2325 J - K 1681 -2638 K - L 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2299 -1375 V - U 84 -48 T - S 2278 -1298 S - Q 2123 -1141 R - P 66 -79 Chords Tens. Comp. Q - O 2058 -1061 P - N 150 -128 N - M 150 -128 M - K 2264 -1317 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 318 -362 C - T 115 -92 V - T 2254 -1349 T - U 45 0 T - E 608 -402 E - S 573 -671 F - S 739 -478 S - G 259 -333 Webs Tens. Comp. G - O 231 -331 R - Q 16 -11 O - P 181 0 O - H 701 -432 O - M 2132 -1197 O - J 350 -379 M - J 202 -176 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.185 R 999 360 VERT(CL): 0.387 R 999 240 HORZ(LL): 0.079 K - - HORZ(TL): 0.149 K - - Creep Factor: 2.0 Max TC CSI: 0.952 Max BC CSI: 0.987 Max Web CSI: 0.859 Weight: 228.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A10 Truss Type SPEC Qty 1 Ply 1 Seal #: 2600 01/27/2022 B2 W9 38' SEAT PLATE REQ.SEAT PLATE REQ. 14'0"11 9'10"10 14'0"11 11'7"9 9'4"1 17'0"61'4"1'4" 4"38"7'4"87'11"7A B C D E F G H I J K L MNOPQRS TUV 6 12 3X6(A1) 4X8(R) 3X6 5X8 1.5X4 5X6 3X8 1.5X4 1.5X4 5X8 1.5X4 5X6 3X6 3X6 5X6(R) 3X6(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.56 25.44 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 837 /- /- /524 /309 /218 M 1882 /- /- /1061 /595 /- H 466 /- /- /501 /192 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 M Brg Width = 7.6 Min Req = 2.2 H Brg Width = 8.0 Min Req = 1.5 Bearings B, M, & H are a rigid surface. Bearings B, M, & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 729 -1247 C - D 499 -717 D - E 540 -556 Chords Tens. Comp. E - F 654 -326 F - G 500 -145 G - H 463 -532 H - I 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 1052 -550 P - O 1050 -551 O - N 197 -149 N - M 197 -149 Chords Tens. Comp. M - L 469 -384 L - K 469 -384 K - J 427 -290 J - H 436 -297 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - C 185 0 C - O 490 -552 D - O 160 -78 O - E 587 -384 E - M 967 -1200 Webs Tens. Comp. M - F 920 -854 K - G 747 -633 F - K 454 -571 G - J 351 -289 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.036 P 999 360 VERT(CL): 0.072 P 999 240 HORZ(LL): 0.013 H - - HORZ(TL): 0.024 M - - Creep Factor: 2.0 Max TC CSI: 0.854 Max BC CSI: 0.755 Max Web CSI: 0.723 Weight: 197.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A11 Truss Type HIPS Qty 1 Ply 1 Seal #: 2603 01/27/2022 23'4"3 14'7"13 SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ. 12'6"11 12'10"10 12'6"11 38'1'4"1'4" 4"36'7"87'2"7(a) A B C D E F G H I JKLMNOP 6 12 3X6(A1) 1.5X4 3X4 5X6 3X8 3X6 3X4 4X6 3X6 5X6 3X4 3X4 1.5X4 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.56 25.44 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 837 /- /- /524 /309 /218 M 1882 /- /- /1061 /595 /- H 466 /- /- /501 /192 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 M Brg Width = 7.6 Min Req = 2.2 H Brg Width = 8.0 Min Req = 1.5 Bearings B, M, & H are a rigid surface. Bearings B, M, & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 729 -1247 C - D 499 -717 D - E 540 -556 Chords Tens. Comp. E - F 654 -326 F - G 500 -145 G - H 463 -532 H - I 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 1052 -550 P - O 1050 -551 O - N 197 -149 N - M 197 -149 Chords Tens. Comp. M - L 469 -384 L - K 469 -384 K - J 427 -290 J - H 436 -297 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - C 185 0 C - O 490 -552 D - O 160 -78 O - E 587 -384 E - M 967 -1200 Webs Tens. Comp. M - F 920 -854 K - G 747 -633 F - K 454 -571 G - J 351 -289 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.036 P 999 360 VERT(CL): 0.072 P 999 240 HORZ(LL): 0.013 H - - HORZ(TL): 0.024 M - - Creep Factor: 2.0 Max TC CSI: 0.854 Max BC CSI: 0.755 Max Web CSI: 0.723 Weight: 197.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A11 Truss Type HIPS Qty 1 Ply 1 Seal #: 2603 01/27/2022 23'4"3 14'7"13 SEAT PLATE REQ.SEAT PLATE REQ.SEAT PLATE REQ. 12'6"11 12'10"10 12'6"11 38'1'4"1'4" 4"36'7"87'2"7(a) A B C D E F G H I JKLMNOP 6 12 3X6(A1) 1.5X4 3X4 5X6 3X8 3X6 3X4 4X6 3X6 5X6 3X4 3X4 1.5X4 3X6(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B3 2x4 SP M-30; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.27 11.06 TC 24 11.06 26.94 TC 24 26.94 39.27 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Additional Notes See A1 Std Detail for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B* 106 /- /- /52 /37 /9 R 636 /- /- /609 /247 /- Wind reactions based on MWFRS B Brg Width = 284 Min Req = - R Brg Width = 8.0 Min Req = 1.5 Bearings B & R are a rigid surface. Bearing R requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 36 0 B - C 123 -189 C - D 116 -108 D - E 123 -46 E - F 126 0 F - G 150 -11 G - H 165 -10 H - I 165 -10 I - J 165 -10 Chords Tens. Comp. J - K 165 -10 K - L 165 -10 L - M 165 -10 M - N 161 -9 N - O 162 -9 O - P 542 -343 P - Q 520 -379 Q - R 757 -756 R - S 36 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AH 259 -99 AH-AG 266 -103 AG-AF 269 -105 AF-AE 272 -106 AE-AD 275 -108 AD-AC 276 -109 AC-AB 276 -109 AB-AA 276 -109 Chords Tens. Comp. AA- Z 315 -151 Z - Y 315 -151 Y - X 315 -151 X - W 315 -151 W - V 315 -151 V - U 288 -203 U - T 288 -203 T - R 620 -534 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C -AH 165 -158 D -AG 126 -118 E -AF 163 -127 F -AE 221 -139 G -AD 46 -143 V -AI 662 -647 AI- U 147 -121 Webs Tens. Comp. N -AJ 132 -115 AJ- O 675 -676 O - T 712 -723 T -AK 508 -458 P -AK 108 -53 AK- Q 475 -432 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. H -AC 135 -141 I -AB 125 -127 Gables Tens. Comp. K - Y 129 -130 L - X 121 -116 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.036 P 999 360 VERT(CL): 0.063 P 999 240 HORZ(LL): -0.016 R - - HORZ(TL): 0.021 R - - Creep Factor: 2.0 Max TC CSI: 0.592 Max BC CSI: 0.581 Max Web CSI: 0.641 Weight: 233.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A12G Truss Type GABL Qty 1 Ply 1 Seal #: 2611 01/27/2022 B3 38' SEAT PLATE REQ. 11'0"11 15'10"10 11'0"11 1'4"1'4" 4"35'10"86'5"7A B C D E F G H I J K L M N O P Q R S TUVWXYZAAABACADAEAFAGAH AIAJ AK 6 12 3X6(A1) 5X6 3X6 3X6 3X4 5X6 3X4 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B3 2x4 SP M-30; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.27 11.06 TC 24 11.06 26.94 TC 24 26.94 39.27 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Additional Notes See A1 Std Detail for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B* 106 /- /- /52 /37 /9 R 636 /- /- /609 /247 /- Wind reactions based on MWFRS B Brg Width = 284 Min Req = - R Brg Width = 8.0 Min Req = 1.5 Bearings B & R are a rigid surface. Bearing R requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 36 0 B - C 123 -189 C - D 116 -108 D - E 123 -46 E - F 126 0 F - G 150 -11 G - H 165 -10 H - I 165 -10 I - J 165 -10 Chords Tens. Comp. J - K 165 -10 K - L 165 -10 L - M 165 -10 M - N 161 -9 N - O 162 -9 O - P 542 -343 P - Q 520 -379 Q - R 757 -756 R - S 36 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AH 259 -99 AH-AG 266 -103 AG-AF 269 -105 AF-AE 272 -106 AE-AD 275 -108 AD-AC 276 -109 AC-AB 276 -109 AB-AA 276 -109 Chords Tens. Comp. AA- Z 315 -151 Z - Y 315 -151 Y - X 315 -151 X - W 315 -151 W - V 315 -151 V - U 288 -203 U - T 288 -203 T - R 620 -534 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C -AH 165 -158 D -AG 126 -118 E -AF 163 -127 F -AE 221 -139 G -AD 46 -143 V -AI 662 -647 AI- U 147 -121 Webs Tens. Comp. N -AJ 132 -115 AJ- O 675 -676 O - T 712 -723 T -AK 508 -458 P -AK 108 -53 AK- Q 475 -432 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. H -AC 135 -141 I -AB 125 -127 Gables Tens. Comp. K - Y 129 -130 L - X 121 -116 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.036 P 999 360 VERT(CL): 0.063 P 999 240 HORZ(LL): -0.016 R - - HORZ(TL): 0.021 R - - Creep Factor: 2.0 Max TC CSI: 0.592 Max BC CSI: 0.581 Max Web CSI: 0.641 Weight: 233.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss A12G Truss Type GABL Qty 1 Ply 1 Seal #: 2611 01/27/2022 B3 38' SEAT PLATE REQ. 11'0"11 15'10"10 11'0"11 1'4"1'4" 4"35'10"86'5"7A B C D E F G H I J K L M N O P Q R S TUVWXYZAAABACADAEAFAGAH AIAJ AK 6 12 3X6(A1) 5X6 3X6 3X6 3X4 5X6 3X4 3X6(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. J - Z 126 -129 M - V 190 -156 Truss A12G Truss Type GABL Qty 1 Ply 1 Seal #: 2611 01/27/2022 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.33 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.00 TC: 281 lb Conc. Load at 7.03 TC: 190 lb Conc. Load at 9.06,11.06 BC: 423 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,11.06 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.00 BC 88 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 901 /- /- /- /430 /- E 1206 /- /- /- /582 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 -23 B - C 618 -1300 Chords Tens. Comp. C - D 11 -20 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 1070 -493 Chords Tens. Comp. F - E 1096 -496 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 628 -95 C - E 596 -1320 Webs Tens. Comp. D - E 251 -321 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023 F 999 360 VERT(CL): 0.043 F 999 240 HORZ(LL): 0.010 E - - HORZ(TL): 0.019 E - - Creep Factor: 2.0 Max TC CSI: 0.872 Max BC CSI: 0.963 Max Web CSI: 0.864 Weight: 57.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss B01G Truss Type HIPM Qty 1 Ply 1 Seal #: 2517 01/27/2022 T2 12'4" SEAT PLATE REQ.SEAT PLATE REQ. 7'5'4" 1'4" 4"3 3'10"34'5"2A B C D E F 6 12 2X4(A1) 6X6 2X4 3X6 3X6(R) 7'0"6 423# 281# 2'0"6 109# 190# 2' 109# 190# 11"4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.33 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.00 TC: 281 lb Conc. Load at 7.03 TC: 190 lb Conc. Load at 9.06,11.06 BC: 423 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,11.06 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.00 BC 88 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 901 /- /- /- /430 /- E 1206 /- /- /- /582 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 -23 B - C 618 -1300 Chords Tens. Comp. C - D 11 -20 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 1070 -493 Chords Tens. Comp. F - E 1096 -496 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 628 -95 C - E 596 -1320 Webs Tens. Comp. D - E 251 -321 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023 F 999 360 VERT(CL): 0.043 F 999 240 HORZ(LL): 0.010 E - - HORZ(TL): 0.019 E - - Creep Factor: 2.0 Max TC CSI: 0.872 Max BC CSI: 0.963 Max Web CSI: 0.864 Weight: 57.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss B01G Truss Type HIPM Qty 1 Ply 1 Seal #: 2517 01/27/2022 T2 12'4" SEAT PLATE REQ.SEAT PLATE REQ. 7'5'4" 1'4" 4"3 3'10"34'5"2A B C D E F 6 12 2X4(A1) 6X6 2X4 3X6 3X6(R) 7'0"6 423# 281# 2'0"6 109# 190# 2' 109# 190# 11"4 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 :SP 2400f-2.0E + SP M-31:; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 12.00 BC 109 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 548 /- /- /358 /198 /262 E 447 /- /- /258 /237 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 154 -417 Chords Tens. Comp. C - D 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 257 -284 Chords Tens. Comp. F - E 263 -285 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 311 -46 C - E 518 -478 Webs Tens. Comp. D - E 161 -92 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.037 B 999 360 VERT(CL): 0.070 B 999 240 HORZ(LL): 0.024 B - - HORZ(TL): 0.044 B - - Creep Factor: 2.0 Max TC CSI: 0.611 Max BC CSI: 0.982 Max Web CSI: 0.255 Weight: 58.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss B02 Truss Type HIPM Qty 1 Ply 1 Seal #: 2520 01/27/2022 T2 12'4" SEAT PLATE REQ.SEAT PLATE REQ. 9'3'4" 1'4" 4"3 4'10"35'5"2A B C D E F 6 12 2X4(A1) 5X6 1.5X4 1.5X4 3X6(R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 :SP 2400f-2.0E + SP M-31:; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 12.00 BC 109 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 548 /- /- /358 /198 /262 E 447 /- /- /258 /237 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 154 -417 Chords Tens. Comp. C - D 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 257 -284 Chords Tens. Comp. F - E 263 -285 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 311 -46 C - E 518 -478 Webs Tens. Comp. D - E 161 -92 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.037 B 999 360 VERT(CL): 0.070 B 999 240 HORZ(LL): 0.024 B - - HORZ(TL): 0.044 B - - Creep Factor: 2.0 Max TC CSI: 0.611 Max BC CSI: 0.982 Max Web CSI: 0.255 Weight: 58.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss B02 Truss Type HIPM Qty 1 Ply 1 Seal #: 2520 01/27/2022 T2 12'4" SEAT PLATE REQ.SEAT PLATE REQ. 9'3'4" 1'4" 4"3 4'10"35'5"2A B C D E F 6 12 2X4(A1) 5X6 1.5X4 1.5X4 3X6(R) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 118 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 548 /- /- /355 /163 /340 E 447 /- /- /300 /268 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 139 -623 Chords Tens. Comp. C - D 59 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 493 -398 Chords Tens. Comp. F - E 490 -399 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. F - C 239 0 C - E 462 -568 Webs Tens. Comp. D - E 168 -132 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010 F 999 360 VERT(CL): 0.019 F 999 240 HORZ(LL): -0.005 B - - HORZ(TL): 0.008 E - - Creep Factor: 2.0 Max TC CSI: 0.573 Max BC CSI: 0.982 Max Web CSI: 0.438 Weight: 60.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss B03 Truss Type MONO Qty 2 Ply 1 Seal #: 2523 01/27/2022 12'4" SEAT PLATE REQ.SEAT PLATE REQ. 12'4" 1'4" 4"3 6'6"36'4"36'11"2A B C D E F 6 12 2X4(A1) 1.5X4 3X4 1.5X4 3X6(R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 118 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 548 /- /- /355 /163 /340 E 447 /- /- /300 /268 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 139 -623 Chords Tens. Comp. C - D 59 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 493 -398 Chords Tens. Comp. F - E 490 -399 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. F - C 239 0 C - E 462 -568 Webs Tens. Comp. D - E 168 -132 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010 F 999 360 VERT(CL): 0.019 F 999 240 HORZ(LL): -0.005 B - - HORZ(TL): 0.008 E - - Creep Factor: 2.0 Max TC CSI: 0.573 Max BC CSI: 0.982 Max Web CSI: 0.438 Weight: 60.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss B03 Truss Type MONO Qty 2 Ply 1 Seal #: 2523 01/27/2022 12'4" SEAT PLATE REQ.SEAT PLATE REQ. 12'4" 1'4" 4"3 6'6"36'4"36'11"2A B C D E F 6 12 2X4(A1) 1.5X4 3X4 1.5X4 3X6(R) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP M-30; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.33 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.33 TC: From 62 plf at 12.33 to 62 plf at 19.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.30 BC: From 14 plf at 12.30 to 14 plf at 19.00 TC: 281 lb Conc. Load at 7.03 TC: 190 lb Conc. Load at 9.06,10.27 TC: 284 lb Conc. Load at 12.30 BC: 423 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,10.27 BC: 427 lb Conc. Load at 12.30 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.33 BC 74 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1699 /- /- /- /814 /- E 1640 /- /- /- /774 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 2.0 E Brg Width = 8.0 Min Req = 1.9 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 -23 B - C 1484 -3068 Chords Tens. Comp. C - D 1254 -2637 D - E 1458 -3001 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 2663 -1276 H - G 2687 -1280 Chords Tens. Comp. G - F 2687 -1280 F - E 2590 -1248 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 598 -86 C - F 32 -61 Webs Tens. Comp. F - D 579 -73 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.106 F 999 360 VERT(CL): 0.198 F 999 240 HORZ(LL): 0.049 E - - HORZ(TL): 0.092 E - - Creep Factor: 2.0 Max TC CSI: 0.888 Max BC CSI: 0.998 Max Web CSI: 0.228 Weight: 79.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C01G Truss Type HIPS Qty 1 Ply 1 Seal #: 2514 01/27/2022 T2 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 7'5'4"6'8"4" 1'4" 4"33'10"34'5"2A B C D E FGH 6 12 4X6(A2) 5X8 2X4 H0308 3X4 5X6 4X6(B2) 7'0"6 423# 281# 2'0"6 109# 190# 1'2"8 109# 190# 2'0"6 427# 284# 6'8"6 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP M-30; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.33 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.33 TC: From 62 plf at 12.33 to 62 plf at 19.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.30 BC: From 14 plf at 12.30 to 14 plf at 19.00 TC: 281 lb Conc. Load at 7.03 TC: 190 lb Conc. Load at 9.06,10.27 TC: 284 lb Conc. Load at 12.30 BC: 423 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,10.27 BC: 427 lb Conc. Load at 12.30 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.33 BC 74 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1699 /- /- /- /814 /- E 1640 /- /- /- /774 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 2.0 E Brg Width = 8.0 Min Req = 1.9 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 -23 B - C 1484 -3068 Chords Tens. Comp. C - D 1254 -2637 D - E 1458 -3001 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 2663 -1276 H - G 2687 -1280 Chords Tens. Comp. G - F 2687 -1280 F - E 2590 -1248 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 598 -86 C - F 32 -61 Webs Tens. Comp. F - D 579 -73 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.106 F 999 360 VERT(CL): 0.198 F 999 240 HORZ(LL): 0.049 E - - HORZ(TL): 0.092 E - - Creep Factor: 2.0 Max TC CSI: 0.888 Max BC CSI: 0.998 Max Web CSI: 0.228 Weight: 79.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C01G Truss Type HIPS Qty 1 Ply 1 Seal #: 2514 01/27/2022 T2 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 7'5'4"6'8"4" 1'4" 4"33'10"34'5"2A B C D E FGH 6 12 4X6(A2) 5X8 2X4 H0308 3X4 5X6 4X6(B2) 7'0"6 423# 281# 2'0"6 109# 190# 1'2"8 109# 190# 2'0"6 427# 284# 6'8"6 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 10.33 BC 82 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 809 /- /- /463 /354 /140 E 721 /- /- /379 /304 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 562 -1033 Chords Tens. Comp. C - D 607 -827 D - E 566 -1036 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 824 -375 H - G 827 -374 Chords Tens. Comp. G - F 827 -374 F - E 824 -374 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 240 -90 Webs Tens. Comp. F - D 238 -84 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.028 H 999 360 VERT(CL): 0.072 H 999 240 HORZ(LL): 0.017 B - - HORZ(TL): 0.041 B - - Creep Factor: 2.0 Max TC CSI: 0.729 Max BC CSI: 0.987 Max Web CSI: 0.091 Weight: 75.6 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C02 Truss Type HIPS Qty 1 Ply 1 Seal #: 2501 01/27/2022 T2 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 9'1'4"8'8"4" 1'4" 4"34'10"35'5"2A B C D E FGH 6 12 2X4(A1) 5X6(R) 1.5X4 4X4 1.5X4 5X6(R) 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 10.33 BC 82 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 809 /- /- /463 /354 /140 E 721 /- /- /379 /304 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 562 -1033 Chords Tens. Comp. C - D 607 -827 D - E 566 -1036 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 824 -375 H - G 827 -374 Chords Tens. Comp. G - F 827 -374 F - E 824 -374 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 240 -90 Webs Tens. Comp. F - D 238 -84 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.028 H 999 360 VERT(CL): 0.072 H 999 240 HORZ(LL): 0.017 B - - HORZ(TL): 0.041 B - - Creep Factor: 2.0 Max TC CSI: 0.729 Max BC CSI: 0.987 Max Web CSI: 0.091 Weight: 75.6 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C02 Truss Type HIPS Qty 1 Ply 1 Seal #: 2501 01/27/2022 T2 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 9'1'4"8'8"4" 1'4" 4"34'10"35'5"2A B C D E FGH 6 12 2X4(A1) 5X6(R) 1.5X4 4X4 1.5X4 5X6(R) 3X4(B1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 103 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 809 /- /- /461 /353 /149 F 721 /- /- /377 /303 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 8.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 597 -1176 C - D 470 -869 Chords Tens. Comp. D - E 475 -866 E - F 594 -1157 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 997 -474 Chords Tens. Comp. G - F 971 -451 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 294 -326 D - G 485 -202 Webs Tens. Comp. G - E 288 -295 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.037 G 999 360 VERT(CL): 0.071 G 999 240 HORZ(LL): 0.017 F - - HORZ(TL): 0.032 F - - Creep Factor: 2.0 Max TC CSI: 0.275 Max BC CSI: 0.994 Max Web CSI: 0.185 Weight: 85.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C03 Truss Type SPEC Qty 1 Ply 1 Seal #: 2504 01/27/2022 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 9'8"9'4"4" 1'4" 4"35'2"35'9"2A B C D E F G 6 12 2X4(A1) 1.5X4 4X4 5X6 1.5X4 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 103 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 809 /- /- /461 /353 /149 F 721 /- /- /377 /303 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 8.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 597 -1176 C - D 470 -869 Chords Tens. Comp. D - E 475 -866 E - F 594 -1157 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 997 -474 Chords Tens. Comp. G - F 971 -451 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 294 -326 D - G 485 -202 Webs Tens. Comp. G - E 288 -295 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.037 G 999 360 VERT(CL): 0.071 G 999 240 HORZ(LL): 0.017 F - - HORZ(TL): 0.032 F - - Creep Factor: 2.0 Max TC CSI: 0.275 Max BC CSI: 0.994 Max Web CSI: 0.185 Weight: 85.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C03 Truss Type SPEC Qty 1 Ply 1 Seal #: 2504 01/27/2022 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 9'8"9'4"4" 1'4" 4"35'2"35'9"2A B C D E F G 6 12 2X4(A1) 1.5X4 4X4 5X6 1.5X4 3X4(B1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.00 19.00 BC 115 0.15 19.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 813 /- /- /512 /156 /240 F 717 /- /- /389 /262 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 8.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 532 -1152 Chords Tens. Comp. C - D 408 -682 D - E 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 955 -689 I - H 953 -690 Chords Tens. Comp. H - G 953 -690 G - F 529 -405 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - C 197 0 C - G 349 -519 D - G 442 -139 Webs Tens. Comp. D - F 536 -700 E - F 312 -218 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030 I 999 360 VERT(CL): 0.056 I 999 240 HORZ(LL): 0.012 F - - HORZ(TL): 0.023 F - - Creep Factor: 2.0 Max TC CSI: 0.588 Max BC CSI: 0.972 Max Web CSI: 0.390 Weight: 105.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C04 Truss Type HIPM Qty 1 Ply 1 Seal #: 2511 01/27/2022 T2 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 12'7'4" 1'4" 4"3 6'4"36'11"2(a) A B C D E FGHI 6 12 2X4(A1) 1.5X4 3X4 3X4 5X6 3X4 1.5X4 3X6(R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.00 19.00 BC 115 0.15 19.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 813 /- /- /512 /156 /240 F 717 /- /- /389 /262 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 8.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 532 -1152 Chords Tens. Comp. C - D 408 -682 D - E 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 955 -689 I - H 953 -690 Chords Tens. Comp. H - G 953 -690 G - F 529 -405 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - C 197 0 C - G 349 -519 D - G 442 -139 Webs Tens. Comp. D - F 536 -700 E - F 312 -218 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030 I 999 360 VERT(CL): 0.056 I 999 240 HORZ(LL): 0.012 F - - HORZ(TL): 0.023 F - - Creep Factor: 2.0 Max TC CSI: 0.588 Max BC CSI: 0.972 Max Web CSI: 0.390 Weight: 105.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss C04 Truss Type HIPM Qty 1 Ply 1 Seal #: 2511 01/27/2022 T2 19'4" SEAT PLATE REQ.SEAT PLATE REQ. 12'7'4" 1'4" 4"3 6'4"36'11"2(a) A B C D E FGHI 6 12 2X4(A1) 1.5X4 3X4 3X4 5X6 3X4 1.5X4 3X6(R) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 64 plf at -1.46 to 64 plf at 5.00 TC: From 32 plf at 5.00 to 32 plf at 10.00 TC: From 64 plf at 10.00 to 64 plf at 16.46 BC: From 14 plf at 0.00 to 14 plf at 5.03 BC: From 7 plf at 5.03 to 7 plf at 9.97 BC: From 14 plf at 9.97 to 14 plf at 15.00 TC: 207 lb Conc. Load at 5.03, 9.97 TC: 129 lb Conc. Load at 7.06, 7.94 BC: 186 lb Conc. Load at 5.03, 9.97 BC: 78 lb Conc. Load at 7.06, 7.94 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.27 5.00 TC 24 5.00 10.00 TC 24 10.00 16.27 BC 62 0.15 14.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1174 /- /- /- /703 /- E 1174 /- /- /- /703 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 36 -23 B - C 1271 -2001 C - D 1112 -1762 Chords Tens. Comp. D - E 1270 -1996 E - F 36 -23 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 1731 -1099 H - G 1748 -1106 Chords Tens. Comp. G - E 1728 -1098 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 297 -123 C - G 16 -8 Webs Tens. Comp. G - D 303 -127 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.62 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.055 G 999 360 VERT(CL): 0.098 G 999 240 HORZ(LL): -0.025 E - - HORZ(TL): 0.042 E - - Creep Factor: 2.0 Max TC CSI: 0.837 Max BC CSI: 0.986 Max Web CSI: 0.115 Weight: 67.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss D01G Truss Type HIPS Qty 1 Ply 1 Seal #: 2626 01/27/2022 15' SEAT PLATE REQ.SEAT PLATE REQ. 5'5'5' 1'4"1'4" 4"32'10"33'5"2A B C D E F GH 6 12 4X4(A2) 5X6 1.5X4 3X4 5X6 4X4(A2) 5'0"6 186# 207# 2'0"6 78# 129# 10"8 78# 129# 2'0"6 186# 207# 5'0"6 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 64 plf at -1.46 to 64 plf at 5.00 TC: From 32 plf at 5.00 to 32 plf at 10.00 TC: From 64 plf at 10.00 to 64 plf at 16.46 BC: From 14 plf at 0.00 to 14 plf at 5.03 BC: From 7 plf at 5.03 to 7 plf at 9.97 BC: From 14 plf at 9.97 to 14 plf at 15.00 TC: 207 lb Conc. Load at 5.03, 9.97 TC: 129 lb Conc. Load at 7.06, 7.94 BC: 186 lb Conc. Load at 5.03, 9.97 BC: 78 lb Conc. Load at 7.06, 7.94 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.27 5.00 TC 24 5.00 10.00 TC 24 10.00 16.27 BC 62 0.15 14.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1174 /- /- /- /703 /- E 1174 /- /- /- /703 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 36 -23 B - C 1271 -2001 C - D 1112 -1762 Chords Tens. Comp. D - E 1270 -1996 E - F 36 -23 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 1731 -1099 H - G 1748 -1106 Chords Tens. Comp. G - E 1728 -1098 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 297 -123 C - G 16 -8 Webs Tens. Comp. G - D 303 -127 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.62 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.055 G 999 360 VERT(CL): 0.098 G 999 240 HORZ(LL): -0.025 E - - HORZ(TL): 0.042 E - - Creep Factor: 2.0 Max TC CSI: 0.837 Max BC CSI: 0.986 Max Web CSI: 0.115 Weight: 67.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss D01G Truss Type HIPS Qty 1 Ply 1 Seal #: 2626 01/27/2022 15' SEAT PLATE REQ.SEAT PLATE REQ. 5'5'5' 1'4"1'4" 4"32'10"33'5"2A B C D E F GH 6 12 4X4(A2) 5X6 1.5X4 3X4 5X6 4X4(A2) 5'0"6 186# 207# 2'0"6 78# 129# 10"8 78# 129# 2'0"6 186# 207# 5'0"6 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W3 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL O 472 /- /- /386 /192 /102 K 471 /- /- /283 /101 /- Wind reactions based on MWFRS O Brg Width = 3.5 Min Req = 1.5 K Brg Width = 3.5 Min Req = 1.5 Bearings O & K are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 100 -32 C - D 91 -14 D - E 156 -15 Chords Tens. Comp. E - F 161 -21 F - G 95 -28 G - H 99 -41 H - I 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - O 3 -2 O - N 108 -56 N - M 108 -56 Chords Tens. Comp. M - L 108 -56 L - K 108 -56 K - J 3 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 31 -13 B - O 214 -131 C - O 125 -102 O - Q 234 -232 Q - N 125 -55 D - R 147 -73 R - E 217 -220 E - M 142 -191 Webs Tens. Comp. E - S 135 -219 S - F 130 -73 L - T 101 -55 T - K 143 -231 K - G 142 -102 K - H 234 -135 H - J 39 -20 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.004 F 999 360 VERT(CL): 0.008 F 999 240 HORZ(LL): 0.002 F - - HORZ(TL): 0.004 D - - Creep Factor: 2.0 Max TC CSI: 0.156 Max BC CSI: 0.111 Max Web CSI: 0.139 Weight: 93.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E01 Truss Type COMN Qty 1 Ply 1 Seal #: 2526 01/27/2022 W3 W3 1'4"8 6'11"1'4"8 4'10"4'10" 9'8"1'4"1'4"2'4"34'9"3A B C D E F G H I JKLMNOP Q R S T 6 12 3X4 1.5X4 1.5X4 3X10 1.5X4 1.5X4 1.5X4 1.5X4 4X8(R1) 1.5X4 1.5X4 1.5X4 1.5X4 1.5X4 3X10 1.5X4 3X4 1.5X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W3 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL O 472 /- /- /386 /192 /102 K 471 /- /- /283 /101 /- Wind reactions based on MWFRS O Brg Width = 3.5 Min Req = 1.5 K Brg Width = 3.5 Min Req = 1.5 Bearings O & K are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 100 -32 C - D 91 -14 D - E 156 -15 Chords Tens. Comp. E - F 161 -21 F - G 95 -28 G - H 99 -41 H - I 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - O 3 -2 O - N 108 -56 N - M 108 -56 Chords Tens. Comp. M - L 108 -56 L - K 108 -56 K - J 3 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 31 -13 B - O 214 -131 C - O 125 -102 O - Q 234 -232 Q - N 125 -55 D - R 147 -73 R - E 217 -220 E - M 142 -191 Webs Tens. Comp. E - S 135 -219 S - F 130 -73 L - T 101 -55 T - K 143 -231 K - G 142 -102 K - H 234 -135 H - J 39 -20 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.004 F 999 360 VERT(CL): 0.008 F 999 240 HORZ(LL): 0.002 F - - HORZ(TL): 0.004 D - - Creep Factor: 2.0 Max TC CSI: 0.156 Max BC CSI: 0.111 Max Web CSI: 0.139 Weight: 93.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E01 Truss Type COMN Qty 1 Ply 1 Seal #: 2526 01/27/2022 W3 W3 1'4"8 6'11"1'4"8 4'10"4'10" 9'8"1'4"1'4"2'4"34'9"3A B C D E F G H I JKLMNOP Q R S T 6 12 3X4 1.5X4 1.5X4 3X10 1.5X4 1.5X4 1.5X4 1.5X4 4X8(R1) 1.5X4 1.5X4 1.5X4 1.5X4 1.5X4 3X10 1.5X4 3X4 1.5X4 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL J 472 /- /- /386 /192 /102 I 471 /- /- /283 /101 /- Wind reactions based on MWFRS J Brg Width = 3.5 Min Req = 1.5 I Brg Width = 3.5 Min Req = 1.5 Bearings J & I are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 61 -37 C - D 202 -111 Chords Tens. Comp. D - E 190 -111 E - F 67 -66 F - G 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. K - J 48 -41 J - I 62 -58 Chords Tens. Comp. I - H 60 -55 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - K 150 -73 C - J 385 -367 Webs Tens. Comp. I - E 371 -367 F - H 84 -69 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.088 D 901 360 VERT(CL): 0.179 D 444 240 HORZ(LL): 0.195 F - - HORZ(TL): 0.232 F - - Creep Factor: 2.0 Max TC CSI: 0.467 Max BC CSI: 0.356 Max Web CSI: 0.195 Weight: 51.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E02 Truss Type COMN Qty 3 Ply 1 Seal #: 2529 01/27/2022 W2 W2 1'4"8 6'11"1'4"8 4'10"4'10" 9'8"1'4"1'4"2'4"34'9"3A B C D E F G HIJK 6 12 1.5X4 1.5X4 1.5X4 1.5X4 3X4 1.5X4 1.5X4 1.5X4 1.5X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL J 472 /- /- /386 /192 /102 I 471 /- /- /283 /101 /- Wind reactions based on MWFRS J Brg Width = 3.5 Min Req = 1.5 I Brg Width = 3.5 Min Req = 1.5 Bearings J & I are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 B - C 61 -37 C - D 202 -111 Chords Tens. Comp. D - E 190 -111 E - F 67 -66 F - G 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. K - J 48 -41 J - I 62 -58 Chords Tens. Comp. I - H 60 -55 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - K 150 -73 C - J 385 -367 Webs Tens. Comp. I - E 371 -367 F - H 84 -69 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.088 D 901 360 VERT(CL): 0.179 D 444 240 HORZ(LL): 0.195 F - - HORZ(TL): 0.232 F - - Creep Factor: 2.0 Max TC CSI: 0.467 Max BC CSI: 0.356 Max Web CSI: 0.195 Weight: 51.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E02 Truss Type COMN Qty 3 Ply 1 Seal #: 2529 01/27/2022 W2 W2 1'4"8 6'11"1'4"8 4'10"4'10" 9'8"1'4"1'4"2'4"34'9"3A B C D E F G HIJK 6 12 1.5X4 1.5X4 1.5X4 1.5X4 3X4 1.5X4 1.5X4 1.5X4 1.5X4 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL I 367 /- /- /294 /140 /87 H 481 /- /- /286 /108 /- Wind reactions based on MWFRS I Brg Width = 3.5 Min Req = 1.5 H Brg Width = 3.5 Min Req = 1.5 Bearings I & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 57 -41 B - C 195 -118 C - D 190 -117 Chords Tens. Comp. D - E 61 -70 E - F 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 36 -47 I - H 66 -56 Chords Tens. Comp. H - G 65 -53 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - J 48 -49 B - I 360 -328 Webs Tens. Comp. H - D 381 -368 E - G 82 -72 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.096 C 827 360 VERT(CL): 0.197 C 404 240 HORZ(LL): 0.192 E - - HORZ(TL): 0.231 E - - Creep Factor: 2.0 Max TC CSI: 0.467 Max BC CSI: 0.326 Max Web CSI: 0.211 Weight: 50.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E03 Truss Type SPEC Qty 1 Ply 1 Seal #: 2629 01/27/2022 W2 W2 1'4"8 6'11"1'4"8 4'10"4'10" 9'8"1'4"2'4"34'9"3A B C D E F GHIJ 6 12 1.5X4 1.5X4 1.5X4 1.5X4 3X4 1.5X4 1.5X4 2X4 1.5X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL I 367 /- /- /294 /140 /87 H 481 /- /- /286 /108 /- Wind reactions based on MWFRS I Brg Width = 3.5 Min Req = 1.5 H Brg Width = 3.5 Min Req = 1.5 Bearings I & H are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 57 -41 B - C 195 -118 C - D 190 -117 Chords Tens. Comp. D - E 61 -70 E - F 35 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 36 -47 I - H 66 -56 Chords Tens. Comp. H - G 65 -53 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - J 48 -49 B - I 360 -328 Webs Tens. Comp. H - D 381 -368 E - G 82 -72 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.096 C 827 360 VERT(CL): 0.197 C 404 240 HORZ(LL): 0.192 E - - HORZ(TL): 0.231 E - - Creep Factor: 2.0 Max TC CSI: 0.467 Max BC CSI: 0.326 Max Web CSI: 0.211 Weight: 50.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E03 Truss Type SPEC Qty 1 Ply 1 Seal #: 2629 01/27/2022 W2 W2 1'4"8 6'11"1'4"8 4'10"4'10" 9'8"1'4"2'4"34'9"3A B C D E F GHIJ 6 12 1.5X4 1.5X4 1.5X4 1.5X4 3X4 1.5X4 1.5X4 2X4 1.5X4 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 83 0.00 6.93 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL E 269 /- /- /198 /101 /46 D 269 /- /- /193 /92 /- Wind reactions based on MWFRS E Brg Width = 3.5 Min Req = 1.5 D Brg Width = 3.5 Min Req = 1.5 Bearings E & D are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 199 -137 Chords Tens. Comp. B - C 190 -137 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. E - D 48 -63 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - E 270 -216 Webs Tens. Comp. C - D 270 -216 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.178 B 467 360 VERT(CL): 0.339 B 244 240 HORZ(LL): 0.180 A - - HORZ(TL): 0.212 A - - Creep Factor: 2.0 Max TC CSI: 0.582 Max BC CSI: 0.509 Max Web CSI: 0.489 Weight: 32.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E04 Truss Type SPEC Qty 2 Ply 1 Seal #: 2632 01/27/2022 6'11" 3'5"8 3'5"10 6'11"23'0"74'9"3A B C DE 6 12 4X4 3X6 3X4 4X4 3X6 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 83 0.00 6.93 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL E 269 /- /- /198 /101 /46 D 269 /- /- /193 /92 /- Wind reactions based on MWFRS E Brg Width = 3.5 Min Req = 1.5 D Brg Width = 3.5 Min Req = 1.5 Bearings E & D are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 199 -137 Chords Tens. Comp. B - C 190 -137 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. E - D 48 -63 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - E 270 -216 Webs Tens. Comp. C - D 270 -216 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.178 B 467 360 VERT(CL): 0.339 B 244 240 HORZ(LL): 0.180 A - - HORZ(TL): 0.212 A - - Creep Factor: 2.0 Max TC CSI: 0.582 Max BC CSI: 0.509 Max Web CSI: 0.489 Weight: 32.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss E04 Truss Type SPEC Qty 2 Ply 1 Seal #: 2632 01/27/2022 6'11" 3'5"8 3'5"10 6'11"23'0"74'9"3A B C DE 6 12 4X4 3X6 3X4 4X4 3X6 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.89 to 61 plf at 0.00 TC: From 2 plf at 0.00 to 2 plf at 7.01 BC: From 2 plf at 0.00 to 2 plf at 7.01 TC: -18 lb Conc. Load at 1.46 TC: 134 lb Conc. Load at 4.29 BC: 13 lb Conc. Load at 1.46 BC: 87 lb Conc. Load at 4.29 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.01 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 243 /- /- /- /182 /- D 109 /- /- /- /44 /- C 78 /- /- /- /68 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 Chords Tens. Comp. B - C 42 -23 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.017 B - - HORZ(TL): 0.020 B - - Creep Factor: 2.0 Max TC CSI: 0.595 Max BC CSI: 0.453 Max Web CSI: 0.000 Weight: 25.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss HJ5P Truss Type HIP_ Qty 2 Ply 1 Seal #: 2623 01/27/2022 SEAT PLATE REQ. 7'0"21'10"10 4"3 2'9"143'5"1A B C D 4.24 12 2X4(A1) 1'5"8 13# -18# 2'9"15 87# 134# 2'8"11 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.89 to 61 plf at 0.00 TC: From 2 plf at 0.00 to 2 plf at 7.01 BC: From 2 plf at 0.00 to 2 plf at 7.01 TC: -18 lb Conc. Load at 1.46 TC: 134 lb Conc. Load at 4.29 BC: 13 lb Conc. Load at 1.46 BC: 87 lb Conc. Load at 4.29 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.01 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 243 /- /- /- /182 /- D 109 /- /- /- /44 /- C 78 /- /- /- /68 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 Chords Tens. Comp. B - C 42 -23 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.017 B - - HORZ(TL): 0.020 B - - Creep Factor: 2.0 Max TC CSI: 0.595 Max BC CSI: 0.453 Max Web CSI: 0.000 Weight: 25.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss HJ5P Truss Type HIP_ Qty 2 Ply 1 Seal #: 2623 01/27/2022 SEAT PLATE REQ. 7'0"21'10"10 4"3 2'9"143'5"1A B C D 4.24 12 2X4(A1) 1'5"8 13# -18# 2'9"15 87# 134# 2'8"11 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.89 to 61 plf at 0.00 TC: From 2 plf at 0.00 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -18 lb Conc. Load at 1.46 TC: 134 lb Conc. Load at 4.29 TC: 258 lb Conc. Load at 7.12 BC: 13 lb Conc. Load at 1.46 BC: 87 lb Conc. Load at 4.29 BC: 156 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 114 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 321 /- /- /- /246 /- E 314 /- /- /- /132 /- D 92 /- /- /- /65 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 405 -729 Chords Tens. Comp. C - D 49 -59 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 690 -364 G - F 680 -365 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 196 0 Webs Tens. Comp. C - F 391 -728 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 G 999 360 VERT(CL): 0.040 G 999 240 HORZ(LL): 0.006 F - - HORZ(TL): 0.011 F - - Creep Factor: 2.0 Max TC CSI: 0.671 Max BC CSI: 0.969 Max Web CSI: 0.391 Weight: 43.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss HJ7 Truss Type HIP_ Qty 2 Ply 1 Seal #: 2486 01/27/2022 SEAT PLATE REQ. 9'10"11'10"10 4"3 3'9"144'5"1A B C D EFG 4.24 12 2X4(A1) 1.5X4 3X4 4X4 1'5"8 13# -18# 2'9"15 87# 134# 2'9"15 156# 258# 2'8"11 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.89 to 61 plf at 0.00 TC: From 2 plf at 0.00 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -18 lb Conc. Load at 1.46 TC: 134 lb Conc. Load at 4.29 TC: 258 lb Conc. Load at 7.12 BC: 13 lb Conc. Load at 1.46 BC: 87 lb Conc. Load at 4.29 BC: 156 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 114 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 321 /- /- /- /246 /- E 314 /- /- /- /132 /- D 92 /- /- /- /65 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 405 -729 Chords Tens. Comp. C - D 49 -59 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 690 -364 G - F 680 -365 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 196 0 Webs Tens. Comp. C - F 391 -728 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 G 999 360 VERT(CL): 0.040 G 999 240 HORZ(LL): 0.006 F - - HORZ(TL): 0.011 F - - Creep Factor: 2.0 Max TC CSI: 0.671 Max BC CSI: 0.969 Max Web CSI: 0.391 Weight: 43.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss HJ7 Truss Type HIP_ Qty 2 Ply 1 Seal #: 2486 01/27/2022 SEAT PLATE REQ. 9'10"11'10"10 4"3 3'9"144'5"1A B C D EFG 4.24 12 2X4(A1) 1.5X4 3X4 4X4 1'5"8 13# -18# 2'9"15 87# 134# 2'9"15 156# 258# 2'8"11 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 0 plf at -1.89 to 61 plf at 0.00 TC: From 2 plf at 0.00 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -18 lb Conc. Load at 1.46 TC: 143 lb Conc. Load at 4.29 TC: 262 lb Conc. Load at 7.12 BC: 13 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 BC: 154 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 112 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 326 /- /- /- /252 /- E 317 /- /- /- /137 /- D 94 /- /- /- /67 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 421 -743 Chords Tens. Comp. C - D 50 -59 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 702 -379 G - F 691 -379 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 197 0 Webs Tens. Comp. C - F 406 -740 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 G 999 360 VERT(CL): 0.039 G 999 240 HORZ(LL): 0.006 F - - HORZ(TL): 0.011 F - - Creep Factor: 2.0 Max TC CSI: 0.368 Max BC CSI: 0.976 Max Web CSI: 0.398 Weight: 43.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss HJ7A Truss Type HIP_ Qty 1 Ply 1 Seal #: 2489 01/27/2022 SEAT PLATE REQ. 9'10"11'10"10 4"3 3'9"144'5"1A B C D EFG 4.24 12 2X4(A1) 1.5X4 3X4 4X4 1'5"8 13# -18# 2'9"15 86# 143# 2'9"15 154# 262# 2'8"11 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 0 plf at -1.89 to 61 plf at 0.00 TC: From 2 plf at 0.00 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -18 lb Conc. Load at 1.46 TC: 143 lb Conc. Load at 4.29 TC: 262 lb Conc. Load at 7.12 BC: 13 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 BC: 154 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 112 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 326 /- /- /- /252 /- E 317 /- /- /- /137 /- D 94 /- /- /- /67 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 421 -743 Chords Tens. Comp. C - D 50 -59 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 702 -379 G - F 691 -379 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 197 0 Webs Tens. Comp. C - F 406 -740 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.021 G 999 360 VERT(CL): 0.039 G 999 240 HORZ(LL): 0.006 F - - HORZ(TL): 0.011 F - - Creep Factor: 2.0 Max TC CSI: 0.368 Max BC CSI: 0.976 Max Web CSI: 0.398 Weight: 43.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss HJ7A Truss Type HIP_ Qty 1 Ply 1 Seal #: 2489 01/27/2022 SEAT PLATE REQ. 9'10"11'10"10 4"3 3'9"144'5"1A B C D EFG 4.24 12 2X4(A1) 1.5X4 3X4 4X4 1'5"8 13# -18# 2'9"15 86# 143# 2'9"15 154# 262# 2'8"11 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 196 /- /- /174 /101 /54 D 6 /-10 /- /17 /13 /- C - /-30 /- /37 /41 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 49 -28 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 B - - HORZ(TL): 0.000 B - - Creep Factor: 2.0 Max TC CSI: 0.236 Max BC CSI: 0.032 Max Web CSI: 0.000 Weight: 5.6 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J1 Truss Type JACK Qty 6 Ply 1 Seal #: 2463 01/27/2022 SEAT PLATE REQ. 1'1'4" 4"3 10"31'5"2A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 196 /- /- /174 /101 /54 D 6 /-10 /- /17 /13 /- C - /-30 /- /37 /41 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 49 -28 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 B - - HORZ(TL): 0.000 B - - Creep Factor: 2.0 Max TC CSI: 0.236 Max BC CSI: 0.032 Max Web CSI: 0.000 Weight: 5.6 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J1 Truss Type JACK Qty 6 Ply 1 Seal #: 2463 01/27/2022 SEAT PLATE REQ. 1'1'4" 4"3 10"31'5"2A B C D 6 12 2X4(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 196 /- /- /184 /102 /54 D 6 /-10 /- /13 /4 /- C - /-30 /- /34 /44 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 48 -28 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 B - - HORZ(TL): 0.000 B - - Creep Factor: 2.0 Max TC CSI: 0.236 Max BC CSI: 0.030 Max Web CSI: 0.000 Weight: 5.6 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J1P Truss Type JACK Qty 4 Ply 1 Seal #: 2614 01/27/2022 SEAT PLATE REQ. 1'1'4" 4"3 10"31'5"2A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 196 /- /- /184 /102 /54 D 6 /-10 /- /13 /4 /- C - /-30 /- /34 /44 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 48 -28 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 B - - HORZ(TL): 0.000 B - - Creep Factor: 2.0 Max TC CSI: 0.236 Max BC CSI: 0.030 Max Web CSI: 0.000 Weight: 5.6 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J1P Truss Type JACK Qty 4 Ply 1 Seal #: 2614 01/27/2022 SEAT PLATE REQ. 1'1'4" 4"3 10"31'5"2A B C D 6 12 2X4(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 221 /- /- /167 /86 /106 D 44 /- /- /20 /- /- C 67 /- /- /36 /58 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 30 -77 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.001 B - - HORZ(TL): 0.001 B - - Creep Factor: 2.0 Max TC CSI: 0.242 Max BC CSI: 0.059 Max Web CSI: 0.000 Weight: 11.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J3 Truss Type JACK Qty 5 Ply 1 Seal #: 2466 01/27/2022 SEAT PLATE REQ. 3'1'4" 4"3 1'10"32'5"2A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 221 /- /- /167 /86 /106 D 44 /- /- /20 /- /- C 67 /- /- /36 /58 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 30 -77 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.001 B - - HORZ(TL): 0.001 B - - Creep Factor: 2.0 Max TC CSI: 0.242 Max BC CSI: 0.059 Max Web CSI: 0.000 Weight: 11.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J3 Truss Type JACK Qty 5 Ply 1 Seal #: 2466 01/27/2022 SEAT PLATE REQ. 3'1'4" 4"3 1'10"32'5"2A B C D 6 12 2X4(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.21 2.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D 106 /- /- /62 /21 /68 C 43 /- /- /20 /- /- B 76 /- /- /47 /67 /- Wind reactions based on MWFRS D Brg Width = 8.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing D is a rigid surface. Bearing D requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 34 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 B - - HORZ(TL): 0.001 A - - Creep Factor: 2.0 Max TC CSI: 0.211 Max BC CSI: 0.067 Max Web CSI: 0.000 Weight: 9.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J3A Truss Type JACK Qty 1 Ply 1 Seal #: 2492 01/27/2022 SEAT PLATE REQ. 4"2'8" 3'1'10"3A B CD 6 12 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.21 2.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D 106 /- /- /62 /21 /68 C 43 /- /- /20 /- /- B 76 /- /- /47 /67 /- Wind reactions based on MWFRS D Brg Width = 8.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing D is a rigid surface. Bearing D requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 34 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 B - - HORZ(TL): 0.001 A - - Creep Factor: 2.0 Max TC CSI: 0.211 Max BC CSI: 0.067 Max Web CSI: 0.000 Weight: 9.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J3A Truss Type JACK Qty 1 Ply 1 Seal #: 2492 01/27/2022 SEAT PLATE REQ. 4"2'8" 3'1'10"3A B CD 6 12 3X4(B1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 221 /- /- /204 /91 /106 D 44 /- /- /60 /31 /- C 67 /- /- /40 /57 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 30 -84 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.000 B - - HORZ(TL): 0.001 B - - Creep Factor: 2.0 Max TC CSI: 0.241 Max BC CSI: 0.059 Max Web CSI: 0.000 Weight: 11.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J3P Truss Type JACK Qty 4 Ply 1 Seal #: 2617 01/27/2022 SEAT PLATE REQ. 3'1'4" 4"3 1'10"32'5"2A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 221 /- /- /204 /91 /106 D 44 /- /- /60 /31 /- C 67 /- /- /40 /57 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 30 -84 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.000 B - - HORZ(TL): 0.001 B - - Creep Factor: 2.0 Max TC CSI: 0.241 Max BC CSI: 0.059 Max Web CSI: 0.000 Weight: 11.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J3P Truss Type JACK Qty 4 Ply 1 Seal #: 2617 01/27/2022 SEAT PLATE REQ. 3'1'4" 4"3 1'10"32'5"2A B C D 6 12 2X4(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 288 /- /- /203 /100 /158 D 78 /- /- /36 /- /- C 129 /- /- /76 /108 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 58 -146 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.005 B - - HORZ(TL): 0.009 B - - Creep Factor: 2.0 Max TC CSI: 0.517 Max BC CSI: 0.246 Max Web CSI: 0.000 Weight: 18.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J5 Truss Type JACK Qty 5 Ply 1 Seal #: 2469 01/27/2022 SEAT PLATE REQ. 5'1'4" 4"3 2'10"33'5"2A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 288 /- /- /203 /100 /158 D 78 /- /- /36 /- /- C 129 /- /- /76 /108 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 58 -146 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.005 B - - HORZ(TL): 0.009 B - - Creep Factor: 2.0 Max TC CSI: 0.517 Max BC CSI: 0.246 Max Web CSI: 0.000 Weight: 18.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J5 Truss Type JACK Qty 5 Ply 1 Seal #: 2469 01/27/2022 SEAT PLATE REQ. 5'1'4" 4"3 2'10"33'5"2A B C D 6 12 2X4(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.19 4.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D 182 /- /- /107 /40 /120 C 76 /- /- /37 /- /- B 133 /- /- /82 /114 /- Wind reactions based on MWFRS D Brg Width = 8.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing D is a rigid surface. Bearing D requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 60 -124 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.005 B - - HORZ(TL): 0.008 A - - Creep Factor: 2.0 Max TC CSI: 0.433 Max BC CSI: 0.200 Max Web CSI: 0.000 Weight: 15.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J5A Truss Type JACK Qty 1 Ply 1 Seal #: 2495 01/27/2022 SEAT PLATE REQ. 4"4'8" 5'2'10"4A B CD 6 12 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.19 4.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D 182 /- /- /107 /40 /120 C 76 /- /- /37 /- /- B 133 /- /- /82 /114 /- Wind reactions based on MWFRS D Brg Width = 8.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing D is a rigid surface. Bearing D requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 60 -124 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.005 B - - HORZ(TL): 0.008 A - - Creep Factor: 2.0 Max TC CSI: 0.433 Max BC CSI: 0.200 Max Web CSI: 0.000 Weight: 15.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J5A Truss Type JACK Qty 1 Ply 1 Seal #: 2495 01/27/2022 SEAT PLATE REQ. 4"4'8" 5'2'10"4A B CD 6 12 3X4(B1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 288 /- /- /266 /108 /158 D 78 /- /- /111 /59 /- C 129 /- /- /83 /106 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 58 -130 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.005 B - - HORZ(TL): 0.009 B - - Creep Factor: 2.0 Max TC CSI: 0.385 Max BC CSI: 0.239 Max Web CSI: 0.000 Weight: 18.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J5P Truss Type EJAC Qty 4 Ply 1 Seal #: 2620 01/27/2022 SEAT PLATE REQ. 5'1'4" 4"3 2'10"33'5"2A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 288 /- /- /266 /108 /158 D 78 /- /- /111 /59 /- C 129 /- /- /83 /106 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 58 -130 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.005 B - - HORZ(TL): 0.009 B - - Creep Factor: 2.0 Max TC CSI: 0.385 Max BC CSI: 0.239 Max Web CSI: 0.000 Weight: 18.2 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J5P Truss Type EJAC Qty 4 Ply 1 Seal #: 2620 01/27/2022 SEAT PLATE REQ. 5'1'4" 4"3 2'10"33'5"2A B C D 6 12 2X4(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 361 /- /- /245 /117 /210 D 109 /- /- /53 /- /- C 190 /- /- /115 /157 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 85 -196 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.013 B - - HORZ(TL): 0.025 B - - Creep Factor: 2.0 Max TC CSI: 0.572 Max BC CSI: 0.523 Max Web CSI: 0.000 Weight: 23.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J7 Truss Type EJAC Qty 7 Ply 1 Seal #: 2472 01/27/2022 SEAT PLATE REQ. 7'1'4" 4"3 3'10"34'5"2A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 361 /- /- /245 /117 /210 D 109 /- /- /53 /- /- C 190 /- /- /115 /157 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 35 0 Chords Tens. Comp. B - C 85 -196 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.013 B - - HORZ(TL): 0.025 B - - Creep Factor: 2.0 Max TC CSI: 0.572 Max BC CSI: 0.523 Max Web CSI: 0.000 Weight: 23.8 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss J7 Truss Type EJAC Qty 7 Ply 1 Seal #: 2472 01/27/2022 SEAT PLATE REQ. 7'1'4" 4"3 3'10"34'5"2A B C D 6 12 2X4(A1) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.00 2.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /40 /10 /13 Wind reactions based on MWFRS D Brg Width = 29.5 Min Req = - Bearing D is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -37 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 106 -11 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025 B 999 360 VERT(CL): 0.047 B 584 240 HORZ(LL): 0.011 B - - HORZ(TL): 0.021 B - - Creep Factor: 2.0 Max TC CSI: 0.185 Max BC CSI: 0.257 Max Web CSI: 0.000 Weight: 8.4 lbs VIEW Ver: 20.01.01A.0724.12 Job: CRMSCMB1L15X10 Truss VM03 Truss Type VAL Qty 1 Ply 1 Seal #: 2895 01/27/2022 2'5"8 6"15 1'10"9 0"4 1'3"A B CD 6 12 2X4(D8R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.00 2.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /40 /10 /13 Wind reactions based on MWFRS D Brg Width = 29.5 Min Req = - Bearing D is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -37 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 106 -11 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025 B 999 360 VERT(CL): 0.047 B 584 240 HORZ(LL): 0.011 B - - HORZ(TL): 0.021 B - - Creep Factor: 2.0 Max TC CSI: 0.185 Max BC CSI: 0.257 Max Web CSI: 0.000 Weight: 8.4 lbs VIEW Ver: 20.01.01A.0724.12 Job: CRMSCMB1L15X10 Truss VM03 Truss Type VAL Qty 1 Ply 1 Seal #: 2895 01/27/2022 2'5"8 6"15 1'10"9 0"4 1'3"A B CD 6 12 2X4(D8R) Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.00 4.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL F* 76 /- /- /44 /13 /16 Wind reactions based on MWFRS F Brg Width = 53.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 47 -162 Chords Tens. Comp. B - C 0 -40 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 175 -23 Chords Tens. Comp. E - D 172 -23 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 319 -192 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.008 C 999 360 VERT(CL): 0.015 C 999 240 HORZ(LL): -0.004 C - - HORZ(TL): 0.007 C - - Creep Factor: 2.0 Max TC CSI: 0.174 Max BC CSI: 0.051 Max Web CSI: 0.108 Weight: 15.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss VM05 Truss Type VAL Qty 1 Ply 1 Seal #: 2475 01/27/2022 4'5"8 6"15 3'10"9 2'8"13 3"8 1'5"3 0"4 2'3"A B C D E F 6 12 2X4(D8R) 1.5X4 1.5X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.00 4.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL F* 76 /- /- /44 /13 /16 Wind reactions based on MWFRS F Brg Width = 53.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 47 -162 Chords Tens. Comp. B - C 0 -40 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 175 -23 Chords Tens. Comp. E - D 172 -23 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 319 -192 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.008 C 999 360 VERT(CL): 0.015 C 999 240 HORZ(LL): -0.004 C - - HORZ(TL): 0.007 C - - Creep Factor: 2.0 Max TC CSI: 0.174 Max BC CSI: 0.051 Max Web CSI: 0.108 Weight: 15.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss VM05 Truss Type VAL Qty 1 Ply 1 Seal #: 2475 01/27/2022 4'5"8 6"15 3'10"9 2'8"13 3"8 1'5"3 0"4 2'3"A B C D E F 6 12 2X4(D8R) 1.5X4 1.5X4 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 6.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL F* 76 /- /- /45 /15 /17 Wind reactions based on MWFRS F Brg Width = 77.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 59 -179 Chords Tens. Comp. B - C 0 -40 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 226 -32 Chords Tens. Comp. E - D 230 -35 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 349 -232 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.016 A 999 360 VERT(CL): 0.031 A 999 240 HORZ(LL): -0.010 C - - HORZ(TL): 0.019 C - - Creep Factor: 2.0 Max TC CSI: 0.237 Max BC CSI: 0.187 Max Web CSI: 0.127 Weight: 22.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss VM07 Truss Type VAL Qty 1 Ply 1 Seal #: 2478 01/27/2022 6'5"8 6"15 5'10"9 4'8"13 3"8 1'5"3 0"4 3'3"A B C D E F 6 12 2X4(D8R) 1.5X4 1.5X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 6.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL F* 76 /- /- /45 /15 /17 Wind reactions based on MWFRS F Brg Width = 77.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 59 -179 Chords Tens. Comp. B - C 0 -40 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 226 -32 Chords Tens. Comp. E - D 230 -35 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 349 -232 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.016 A 999 360 VERT(CL): 0.031 A 999 240 HORZ(LL): -0.010 C - - HORZ(TL): 0.019 C - - Creep Factor: 2.0 Max TC CSI: 0.237 Max BC CSI: 0.187 Max Web CSI: 0.127 Weight: 22.4 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss VM07 Truss Type VAL Qty 1 Ply 1 Seal #: 2478 01/27/2022 6'5"8 6"15 5'10"9 4'8"13 3"8 1'5"3 0"4 3'3"A B C D E F 6 12 2X4(D8R) 1.5X4 1.5X4 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 8.33 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H* 76 /- /- /46 /15 /17 Wind reactions based on MWFRS H Brg Width = 100.0 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 60 -230 B - C 25 -121 Chords Tens. Comp. C - D 0 -36 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - G 273 -44 G - F 281 -47 Chords Tens. Comp. F - E 279 -46 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - G 264 -231 Webs Tens. Comp. C - F 228 -133 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014 A 999 360 VERT(CL): 0.026 A 999 240 HORZ(LL): -0.005 D - - HORZ(TL): 0.007 A - - Creep Factor: 2.0 Max TC CSI: 0.207 Max BC CSI: 0.160 Max Web CSI: 0.082 Weight: 35.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss VM09 Truss Type VAL Qty 1 Ply 1 Seal #: 2481 01/27/2022 8'4" 6"15 7'9"1 4'8"13 2'3"8 1'3"11 0"4 4'2"4A B C D E FG H 6 12 2X4(D8R) 1.5X4 1.5X4 1.5X4 3X6 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 8.33 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H* 76 /- /- /46 /15 /17 Wind reactions based on MWFRS H Brg Width = 100.0 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 60 -230 B - C 25 -121 Chords Tens. Comp. C - D 0 -36 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - G 273 -44 G - F 281 -47 Chords Tens. Comp. F - E 279 -46 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - G 264 -231 Webs Tens. Comp. C - F 228 -133 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.014 A 999 360 VERT(CL): 0.026 A 999 240 HORZ(LL): -0.005 D - - HORZ(TL): 0.007 A - - Creep Factor: 2.0 Max TC CSI: 0.207 Max BC CSI: 0.160 Max Web CSI: 0.082 Weight: 35.0 lbs VIEW Ver: 21.01.03A.0805.14 Job: CRMSCMB1L15X10 Truss VM09 Truss Type VAL Qty 1 Ply 1 Seal #: 2481 01/27/2022 8'4" 6"15 7'9"1 4'8"13 2'3"8 1'3"11 0"4 4'2"4A B C D E FG H 6 12 2X4(D8R) 1.5X4 1.5X4 1.5X4 3X6 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 CORNERSET GENERAL SPECIFICATIONS: MAX LOAD: 55 PSF ROOF LOAD, 175 MPH, ASCE 7-16, EXP. B & C, UP TO 60' MEAN ROOF HEIGHT & EXPOSURE D UP TO 30' MEAN ROOF HEIGHT.7'-0" MAX.ATTACH KING JACK USING (3) 0.131" Ø TOE NAILS AT TOP CHORD & BOTTOM CHORD. ATTACH END JACKS USING (4) 0.131" Ø TOE NAILS AT TOP CHORD & (3) 0.131" Ø TOE NAILS AT BOTTOM CHORD. ATTACH CORNER JACKS USING (3) 0.131" Ø TOE NAILS AT TOP & BOTTOM CHORDS (TYP). NOTE: WHEN NAILING JACKS WITH 2X6 CHORDS, USE (4) NAILS IN LIEU OF 3. SEE STDTL 12 FOR FURTHER INFO. ·2X4: (3) 0.131" Ø TOE NAILS ·2X6: (4) 0.131" Ø TOE NAILS 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLHIP/ KING JACK (TYPICAL)01.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 Ryan Bays, P.E.# 912314451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 IN-LAID STUD SCAB VERTICAL STRUCTURAL GABLE TRUSS PROVIDE 2X4 BLOCKING BETWEEN TRUSSES SUPPORTING BRACE & 2 TRUSSES ON EITHER SIDE AS NOTED. TOE-NAIL BLOCKING TO TRUSSES WITH (2) 10d NAILS AT EACH END. ATTACH DIAGONAL BRACE TO BLOCKING WITH (5) 10d COMMON WIRE NAILS. 2X4 PURLIN FASTENED TO 4 TRUSSES WITH (2) 16d NAILS. FASTEN PURLIN TO BLOCKING WITH (2) 16d NAILS, MINIMUM. NAIL DIAGONAL BRACE TO PURLIN WITH (2) 16d NAILS. 2X6 DIAGONAL BRACE SPACED AT 4'-0" O.C. ATTCHED TO VERTICAL WITH (4) 16d NAILS & ATTACHED TO BLOCKING WITH (5) 10d COMMONS. (1/3 POINTS IF REQ'D). HORIZONTAL BRACE (SEE SECTION A-A). END WALL CEILING IT IS THE RESPONSIBILITY OF THE BUILDING DESIGNER, PROJECT ARCHITECT OR ENGINEER TO DESIGN THE CEILING DIAPHRAGM AND ITS ATTACHMENT TO THE TRUSSES TO RESIST ALL OUT OF PLANE LOADS THAT MAY RESULT FROM BRACING OF GABLE ENDS. NOTE: AN ADEQUATE DIAPHRAGM OR OTHER METHOD OF BRACING MUST BE PRESENT TO PROVIDE FULL LATERAL SUPPORT OF THE BOTTOM CHORD TO RESIST ALL OUT OF PLANE LOADS. THE BRACING SHOWN IN THIS DETAIL IS FOR VERTICAL/ STUDS ONLY. STRUCTURAL GABLE TRUSSES MAY BE BRACED AS NOTED: 1.ATTACH A MATCHING GABLE TRUSS TO THE INSIDE OF THE STRUCTURAL GABLE PER THE FOLLOWING NAIL SCHEDULE. 2.ATTACH 2X SCABS TO THE FACE OF EACH VERTICAL MEMBER ON THE STRUCTURAL GABLE PER THE FOLLOWING NAILING SCHEDULE. NAILING SCHEDULE: ·FOR WIND SPEEDS 150 MPH (ASCE 7-16) OR LESS, NAIL ALL MEMBERS WITH ONE ROW OF 10d (0.131" X 3") SPACED AT 6" O.C. ·FOR WIND SPEEDS >(GREATER THAN)150 MPH (ASCE 7-16), NAIL ALL MEMBERS WITH TWO ROWS OF 10d (0.131" X 3") SPACED AT 6" O.C. (2X4 STUDS MINIMUM). BRACING REQUIREMENTS FOR STRUCTURAL GABLE TRUSSES STRUCTURAL GABLE TRUSS STANDARD GABLE TRUSS IMPORTANT NOTE THIS DETAIL IS TO BE USED FOR STRUCTURAL GABLE TRUSSES WITH INLAID STUDS ONLY. TRUSSES WITHOUT INLAID STUDS ARE NOT ADDRESSED IN THE DETAIL. ADDITIONAL NOTE: MAXIMUM STUD LENGTHS ARE LISTED ON PAGE 1. ALL BRACING METHODS SHOWN ON PAGE 1 ARE VALID AND TO BE FASTENED TO SCABS OR VERTICAL STUDS OF STANDARD GABLE TRUSS AT THE INTERIOR SIDE OF THE STRUCTURE. 12" MAX. 2/3 POSITION 1/3 POSITION 1/2 POSITION 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLGABLE END BRACING 03.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 OPTION #2: APA RATED GUSSET. OPTION #3: 2X4 VERT. SCAB. PIGGY-BACK TRUSS. (REFER TO ACTUAL TRUSS DESIGN DRAWINGS FOR ADDITIONAL INFORMATION.) ** IMPORTANT NOTE ** THIS DETAIL IS VALID ONLY FOR SINGLE PLY BASE TRUSSES SPACED AT 24" O.C. OR LESS. PIGGY-BACK DETAIL (TYPICAL) 180 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-16, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE C, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. OR... 160 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-16, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE D, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. IMPORTANT NOTE: TOP CHORDS OF TRUSSES SUPPORTING PIGGY-BACK CAP TRUSSES MUST BE ADEQUATELY BRACED BY SHEATHING AND/ OR PURLINS. THE BUILDING ENGINEER OF RECORD SHALL PROVIDE DIAGONAL BRACING OR OTHER SUITABLE ANCHORAGE TO PERMANENTLY RESTRAIN PURLINS AND LATERAL BRACING FOR OUT OF PLANE LOADS OVER GABLE ENDS. MAXIMUM TRUSS SPACING IS NOT TO EXCEED 24" O.C. DETAIL IS NOT APPLICABLE IF CAP SUPPORTS ADDITIONAL LOADS SUCH AS CUPOLA, STEEPLE, CHIMNEY OR DRAG STRUT LOADS. **REFER TO ENGINEER'S SEALED TRUSS DESIGN DRAWINGS FOR PIGGY-BACK AND BASE TRUSS SPECIFICATIONS.** OPTION #1: TEE-LOK MULTI-USE CONNECTION PLATE. ATTACH EACH PURLIN TO TOP CHORD OF BASE TRUSS. PURLIN & CONNECTIONS BY OTHERS. BASE TRUSS. (REFER TO TRUSS DESIGN DRAWINGS FOR ADDITIONAL INFORMATION.) PURLINS SPACED ACCORDING TO MAX. SPACING OF TOP CHORD OF BASE TRUSS. SPACING IS NOT TO EXCEED 24" O.C. & PURLINS TO BE LOCATED AT JOINT OF EACH BASE TRUSS. OPTION #2: APA RATED GUSSET: 8" x 8" x 0-7/16" (MIN.) APA RATED SHEATHING GUSSETS EACH FACE. ATTACH AT 8'-0" O.C. WITH 8 (EA.) 6d COMMON (0.113" x 2") NAILS PER GUSSET: 4 (EA.) AT CAP BOTTOM CHORD & 4 (EACH) AT BASE TRUSS TOP CHORD. GUSSETS MAY BE STAGGERED AT 4'-0" O.C. FRONT TO BACK FACES. MINIMUM 2 (EA.) CONNECTIONS AT EACH TRUSS. OPTION #3: 2X4 VERTICAL WOOD SCAB: 2X4 SPF #2, FULL CHORD DEPTH SCABS AT EACH FACE. ATTACH AT 8'-0" O.C. WITH 6 (EA.) 10d BOX NAILS (0.128" x 3") PER SCAB: (3) AT CAP BOTTOM CHORD & (3) AT BASE TRUSS TOP CHORD. SCABS MAY BE STAGGERED 4'-0" O.C. FRONT TO BACK FACES. MINIMUM 2 (EA.) CONNECTIONS AT EACH TRUSS. OPTION #1: TEE-LOK 3" x 8" TEE-LOK MULTI-USE CONNECTION PLATES SPACED AT 4'-0" O.C. MAX. PLATES SHALL BE PRESSED INTO PIGGY-BACK TRUSS AT 4'-0" O.C. STAGGERED FROM EACH FACE AND NAILED TO BASE TRUSS WITH 4 (EA.) 6d (1.5" X 0.099") NAILS IN EACH PLATE TO ACHEIVE MAXIMUM UPLIFT CAPACITY OF 377 LBS AT EACH 3" X 8" TEE-LOK MULTI-USE CONNECTION PLATE (MINIMUM OF 2 PLATES). 2'-0" MAX 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLPIGGYBACK TRUSS 04.112/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 OPTION #2: APA RATED GUSSET. OPTION #3: 2X4 VERT. SCAB. PIGGY-BACK TRUSS. ATTACH 2X4 #2 SYP SCAB TO ONE SIDE OF THE PIGGY-BACK W/ (0.131" X 3") NAILS @ 4" O.C. ALONG BOTTOM CHORD. PIGGY-BACK DETAIL (TYPICAL) 180 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-16, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE C, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. OR... 160 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-16, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE D, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. IMPORTANT NOTE: TOP CHORDS OF TRUSSES SUPPORTING PIGGY-BACK CAP TRUSSES MUST BE ADEQUATELY BRACED BY SHEATHING AND/ OR PURLINS. THE BUILDING ENGINEER OF RECORD SHALL PROVIDE DIAGONAL BRACING OR OTHER SUITABLE ANCHORAGE TO PERMANENTLY RESTRAIN PURLINS AND LATERAL BRACING FOR OUT OF PLANE LOADS OVER GABLE ENDS. MAXIMUM TRUSS SPACING IS NOT TO EXCEED 24" O.C. DETAIL IS NOT APPLICABLE IF CAP SUPPORTS ADDITIONAL LOADS SUCH AS CUPOLA, STEEPLE, CHIMNEY OR DRAG STRUT LOADS. **REFER TO ENGINEER'S SEALED TRUSS DESIGN DRAWINGS FOR PIGGY-BACK AND BASE TRUSS SPECIFICATIONS.** OPTION #1: TEE-LOK MULTI-USE CONNECTION PLATE. ATTACH EACH PURLIN TO TOP CHORD OF BASE TRUSS. PURLIN & CONNECTIONS BY OTHERS. 2-PLY BASE TRUSS. (REFER TO TRUSS DESIGN DRAWINGS FOR ADDITIONAL INFORMATION.) PURLINS SPACED ACCORDING TO MAX. SPACING OF TOP CHORD OF BASE TRUSS. SPACING IS NOT TO EXCEED 24" O.C. & PURLINS TO BE LOCATED AT JOINT OF EACH BASE TRUSS. ** IMPORTANT NOTE ** THIS DETAIL IS VALID ONLY FOR 2-PLY BASE TRUSSES SPACED AT 24" O.C. OR LESS. 2'-0" MAX OPTION #2: APA RATED GUSSET: 8" x 8" x 0-7/16" (MIN.) APA RATED SHEATHING GUSSETS EACH FACE. ATTACH AT 8'-0" O.C. WITH 8 (EA.) 6d COMMON (0.113" x 2") NAILS PER GUSSET: 4 (EA.) AT CAP BOTTOM CHORD & 4 (EACH) AT BASE TRUSS TOP CHORD. GUSSETS MAY BE STAGGERED AT 4'-0" O.C. FRONT TO BACK FACES. MINIMUM 2 (EA.) CONNECTIONS AT EACH TRUSS. OPTION #3: 2X4 VERTICAL WOOD SCAB: 2X4 SPF #2, FULL CHORD DEPTH SCABS AT EACH FACE. ATTACH AT 8'-0" O.C. WITH 6 (EA.) 10d BOX NAILS (0.128" x 3") PER SCAB: (3) AT CAP BOTTOM CHORD & (3) AT BASE TRUSS TOP CHORD. SCABS MAY BE STAGGERED 4'-0" O.C. FRONT TO BACK FACES. MINIMUM 2 (EA.) CONNECTIONS AT EACH TRUSS. OPTION #1: TEE-LOK 3" x 8" TEE-LOK MULTI-USE CONNECTION PLATES SPACED AT 4'-0" O.C. MAX. PLATES SHALL BE PRESSED INTO PIGGY-BACK TRUSS AT 4'-0" O.C. STAGGERED FROM EACH FACE AND NAILED TO BASE TRUSS WITH 4 (EA.) 6d (1.5" X 0.099") NAILS IN EACH PLATE TO ACHEIVE MAXIMUM UPLIFT CAPACITY OF 377 LBS AT EACH 3" X 8" TEE-LOK MULTI-USE CONNECTION PLATE (MINIMUM OF 2 PLATES). 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLPIGGYBACK TRUSS (2-PLY BASE TRUSS)04.212/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 FIG. 05.0c SHEATHING SECURE VALLEY TRUSS W/ A SINGLE ROW OF 10d NAILS AT 6" O.C. ATTACH 2X4 CONT. #2 SYP TO ROOF WITH (2) SIMPSON NO. SDS25412 (0.25" X 4.5") OR EQUIVALENT WOOD SCREWS INTO EACH BASE TRUSS. BASE TRUSS TRUSS CRITERIA: WIND DESIGN PER ASCE 7-16: 170 MPH MAXIMUM MEAN ROOF HEIGHT: 30 FEET ROOF PITCH: 3/12 MIN. & 6/12 MAX. CATEGORY II BUILDING EXPOSURE C WIND DURATION OF LOAD INCREASE: 1.60 MAXIMUM TOP CHORD TOTAL LOAD: 50 PSF MAXIMUM SPACING: 24" O.C. (BASE & VALLEY) MINIMUM REDUCED DEAD LOAD OF 6 PSF ON TRUSSES GENERAL SPECIFICATIONS: 1.NAIL SIZE: 10d (3" X 0.131" ) 2.WOOD SCREW: 412" SIMPSON NO. SDS25412 OR EQUIVALENT. 3.INSTALL SHEATHING TO TOP CHORD OF BASE TRUSS. 4.INSTALL VALLEY TRUSS (24" O.C. MAX.) AND SECURE TO BASE TRUSS PER FIG. 05.0b (BELOW). 5.BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIDUAL DESIGN DRAWINGS. 6.NAILING PER NDS. 7.VALLEY STUD SPACING NOT TO EXCEED 48" O.C. GABLE END, COMMON OR TRUSS GIRDER VALLEY TRUSS (TYP) BASE TRUSS GABLE END, COMMON OR TRUSS GIRDER VALLEY TRUSS (TYP) SEE FIG. 05.0c BASE TRUSS SHEATHING 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLTRUSS VALLEY SET (SHEATHING)05.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 FIG. 06.0c SECURE VALLEY TRUSS W/ A SINGLE ROW OF 10d NAILS AT 6" O.C. ATTACH 2X4 CONT. #2 SYP TO ROOF WITH (2) SIMPSON NO. SDS25412 (0.25" X 4.5") OR EQUIVALENT WOOD SCREWS INTO EACH BASE TRUSS. BASE TRUSS NO SHEATHING GENERAL SPECIFICATIONS: 1.NAIL SIZE: 10d (3" X 0.131" ) 2.WOOD SCREW: 412" SIMPSON NO. SDS25412 OR EQUIVALENT. 3.INSTALL VALLEY TRUSS (24" O.C. MAX.) AND SECURE TO BASE TRUSS PER FIG. 06.0b (BELOW). 4.BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIDUAL DESIGN DRAWINGS. 5.NAILING PER NDS. 6.VALLEY STUD SPACING NOT TO EXCEED 48" O.C. GABLE END, COMMON OR TRUSS GIRDER VALLEY TRUSS (TYP) BASE TRUSS GABLE END, COMMON OR TRUSS GIRDER VALLEY TRUSS (TYP) SEE FIG. 06.0c BASE TRUSS NO SHEATHING TRUSS CRITERIA: WIND DESIGN PER ASCE 7-16: 170 MPH MAXIMUM MEAN ROOF HEIGHT: 30 FEET ROOF PITCH: 3/12 MIN. & 6/12 MAX. CATEGORY II BUILDING EXPOSURE C WIND DURATION OF LOAD INCREASE: 1.60 MAXIMUM TOP CHORD TOTAL LOAD: 50 PSF MAXIMUM SPACING: 24" O.C. (BASE & VALLEY) MINIMUM REDUCED DEAD LOAD OF 6 PSF ON TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLTRUSS VALLEY SET 06.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 FIG. 07.0b FIG. 07.0c FIG. 07.0d CLIP MAY BE APPLIED TO THIS FACE UP TO A 6/12 PITCH MAXIMUM. CLIP MUST BE APPLIED TO THIS FACE WHEN PITCH IS GREATER THAN 6/12 (NOT TO EXCEED 12"/12" PITCH). CLIP MAY BE APPLIED TO EITHER FACE WHEN BOTTOM CHORD IS BEVELED. BOTTOM CHORD NOT BEVELED BOTTOM CHORD WITH BEVEL CUT BOTTOM CHORD NOT BEVELED TRUSS CRITERIA: WIND DESIGN PER ASCE 7-16: 170 MPH MAXIMUM MEAN ROOF HEIGHT: 30 FEET ROOF PITCH: 3/12 MIN. & 6/12 MAX. CATEGORY II BUILDING EXPOSURE C WIND DURATION OF LOAD INCREASE: 1.60 MAXIMUM TOP CHORD TOTAL LOAD: 50 PSF MAXIMUM SPACING: 24" O.C. (BASE & VALLEY) MINIMUM REDUCED DEAD LOAD OF 6 PSF ON TRUSSES SUPPORTING TRUSSES DIRECTLY BELOW VALLEY TRUSSES MUST BE DESIGNED WITH A MAXIMUM UNBRACED LENGTH OF 2'-10" ON AFFECTED TOP CHORDS. NOTES: 1.SHEATHING TO BE APPLIED AFTER INSTALLATION OF VALLEY TRUSSES. 2.THIS DETAIL IS NOT APPLICABLE FOR SPF-S SPECIES LUMBER. IMPORTANT NOTE: VALLEY TRUSS SPACING NOT TO EXCEED 48" O.C. ATTACH VALLEY TRUSS TO LOWER TRUSSES WITH USP RT7 OR EQUIVALENT 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLTRUSS VALLEY SET (HVHZ)07.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 MAXIMUM STUD LENGTH MIN. STUD STUD SPACING W/O BRACE 2X4 L-BRACE DIAGONAL BRACE DIAGONAL BRACES 2(EA.) AT 1/3 POINTS 2X4 SP#3/ STUD 12" O.C.3- 8- 10 5- 6- 11 6- 6- 11 11- 1- 13 2X4 SP#3/ STUD 16" O.C.3- 3- 10 4- 9- 12 6- 6- 11 9- 10- 15 2X4 SP#3/ STUD 24" O.C.2- 8- 6 3- 11- 3 5- 4- 12 8- 1- 2 2X4 SP#2 12" O.C.3- 10- 15 5- 6- 11 6- 6- 11 11- 8- 14 2X4 SP#2 16" O.C.3- 6- 11 4- 9- 12 6- 6- 11 10- 8- 0 2X4 SP#2 24" O.C.3- 1- 4 3- 11- 3 6- 2- 9 9- 3- 13 ·DIAGONAL BRACES GREATER THAN 6'-3" REQUIRE 2X4 T-BRACE ATTACHED TO A SINGLE EDGE. ·DIAGONAL BRACES GREATER THAN 12'-6" REQUIRE 2X4 I-BRACES ATTACHED TO BOTH EDGES. ·T-BRACE & I-BRACE SHALL BE 2X4 SPF #2 OR SP #2. ·FASTEN T-BRACE OR I-BRACE TO NARROW EDGE OF DIAGONAL BRACE WITH 10d NAILS @ 6" O.C. AND SHALL MAINTAIN EDGE DISTANCE NO LESS THAN 3". ·BRACING SHALL COVER 90% OF DIAGONAL LENGTH. NOTES: 1.TOP & BOTTOM CHORDS SHALL BE A MINIMUM GRADE OF #2 MATERIALS. 2.CONNECTION BETWEEN BOTTOM CHORD OF GABLE END TRUSS AND WALL SHALL BE PROVIDED BY PROJECT ENGINEER OF RECORD OR ARCHITECT. 3.BRACING SHOWN IS FOR INDIVIDUAL TRUSS ONLY. CONSULT BUILDING ARCHITECT OR ENGIEER OF RECORD FOR TEMPORARY AND PERMANENT BRACING OF ROOF SYSTEM. 4."L-BRACES" SPECIFIED SHALL BE FULL LENGTH, SPF OR SP #3, OR BETTER WITH A SINGLE ROW OF 10d NAILS AT 6" O.C. SPACING. 5.DIAGONAL BRACING SHALL BE APPROXIMATELY 45° TO ROOF DIAPHRAGM AT 4'-0" O.C. 6.CONSTRUCT HORIZONTAL BRACE CONNECTING 2X6 AND 2X4 AS SHOWN (REFER TO FIG. 08.0b) WITH 16d NAILS SPACED AT 6" O.C. HORIZONTAL BRACE SHALL BE LOCATED AT THE MIDSPAN OF THE LONGEST GABLE STUD. ATTACH TO VERTICAL GABLE STUDS WITH (3) 10d NAILS THROUGH 2X4 (REFER TO FIG. 08.0c). 7.GABLE STUD DEFLECTION SHALL MEET OR EXCEED L/240. 8.THE DETAILS SHOWN ON THIS PAGE DO NOT APPLY TO STRUCTURAL GABLES. 9.DO NOT USE FLAT BOTTOM CHORD GABLES NEXT TO SCISSOR TYPE TRUSSES. 10.10d & 16d NAILS ARE 0.131" X 3.0" & 0.131" X 3.5" COMMON WIRE NAILS RESPECTIVELY. 11.SOUTHERN PINE LUMBER DESIGN VALUES ARE THOSE EFFECTIVE 2018 BY SPIB/ALSC. MEAN ROOF HEIGHT: NO GREATER THAN 30 FEET. EXPOSURE B / C ASCE 7-16 190 MPH DURATION OF LOAD INCREASE: 1.60 STUD DESIGN IS BASED UPON COMPONENTS AND CLADDING. BRACING CONNECTION IS BASED ON MWFRS. DIAGONAL BRACING 4'-0" O.C. MAX. 12 VARIES TO COMMON TRUSS 2'-0" MAX. 2'-0" O.C. FIG 08.0a 1'-0" MAX. 2'-0" O.C. TRUSS DIST. FIG 08.0b ROOF SHEATHING HORIZONTAL BRACE (REFER TO SECTION A-A) 2X6 DIAGONAL BRACE SPACED AT 48" O.C. NAILED TO VERTICAL WITH (4) 16d NAILS & TO BLOCKING WITH (5) 10d NAILS (0.131" X 3"). DIAGONAL BRACING AT 1/3 POINTS AS REQ'D. (2) 10d NAILS A A B B REFER TO INDIVIDUAL ENGINEERED DRAWINGS FOR TRUSS DESIGN CRITERIA TRUSS GEOMETRY AND CONDITIONS SHOWN ARE FOR ILLUSTRATIVE PURPOSES ONLY. SECTION B-B VERTICAL STUD 2X4 L-BRACE NAILED W/ 10D NAILS AT 6" O.C. SECTION A-A END WALL PROVIDE 2X4 BLOCKING BETWEEN 1ST TWO TRUSSES AS NOTED. TOE NAIL TO BLOCKING WITH (2) 10d NAILS AT EACH END. NAIL DIAGONAL BRACE TO BLOCKING W/(5) 10d NAILS (0.131" X 3"). (4) 8d NAILS MINIMUM, PLYWOOD SHEATHING TO 2X4 STD. SPF BLOCKING. 2X6 SP OR SPF #2 HORIZONTAL BRACE NAILED TO 2X4 VERT. WITH (4) 10d NAILS 16d NAILS SPACED AT 6" O.C. 2X6 SP OR SPF #2 DIAGONAL BRACE 2X4 SP OR SPF #2 (2) 10d NAIL IN 2X6 (4) 16d NAILS VERTICAL STUD 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLSTANDARD GABLE ENDS 08.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 NOTES: ·T-BRACING / I-BRACING SHALL BE USED WHEN CONTINUOUS LATERAL BRACING IS IMPRACTICAL. ·T- & I-BRACING MUST COVER 90% OF WEB LENGTH. ·T-BRACING MAY BE LOCATED ATTACHED, EITHER ABOVE OR BELOW WEB MEMBER. ·THIS DETAIL IS NOT TO BE USED TO CONVERT T- / I-BRACE WEBS TO CONTINUOUS LATERAL BRACED WEBS. NAILING PATTERN T-BRACE SIZE NAIL SIZE NAIL SPACING 2X4 OR 2X6 OR 2X8 10d 6" O.C. NOTE: NAIL ALONG ENTIRE LENGTH OF T-BRACE / I-BRACE (ON 2-PLY TRUSSES, NAIL TO BOTH PLIES). SINGLE PLY TRUSS BRACE SIZE SPECIFIED CONT. ROWS OF LATERAL BRACING WEB SIZE 1 2 2X3 OR 2X4 2X4 T-BRACE 2X4 I-BRACE 2X6 2X6 T-BRACE 2X6 I-BRACE 2X8 2X8 T-BRACE 2X8 I-BRACE 2-PLY TRUSS BRACE SIZE SPECIFIED CONT. ROWS OF LATERAL BRACING WEB SIZE 1 2 2X3 OR 2X4 2X4 T-BRACE 2X4 I-BRACE 2X6 2X6 T-BRACE 2X6 I-BRACE 2X8 2X8 T-BRACE 2X8 I-BRACE T-BRACE / I-BRACE SHALL BE SAME SPECIES AND GRADE (OR BETTER) THAN WEB MEMBER. SPACING SPACING SPACING SPACING SPACING SPACING NAILS T-BRACE WEB WEB MEMBER WEB MEMBER BRACED ABOVE WEB MEMBER BRACE ATTACHED ABOVE WEB MEMBER BRACE ATTACHED BELOW WEB MEMBER T-BRACE I-BRACE WEB MEMBER BRACE BELOW WEB MEMBER 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLT-BRACE/ I-BRACE WITH 2X ONLY 09.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 NOTE: TO MINIMIZE VIBRATION COMMON TO ALL SHALLOW FRAMING SYSTEMS, 2X6 "STRONGBACK" IS RECOMMENDED. LOCATED EVERY 8'-0" TO 10'-0" ALONG A FLOOR TRUSS. THE STRONGBACKS SHALL BE SECURED AT THEIR ENDS TO AN ADEQUATE SUPPORT, DESIGNED BY OTHERS. IF SPLICING IS NECESSARY, USE 4'-0" LONG SCAB CENTERED AT THE SPLICE AND JOINED WITH 1(2) 10d NAILS (0.131" X 3") EQUALLY SPACED. ALTERNATE METHOD: (TO BE USED ONLY WHEN STRONGBACK DOES NOT ALIGN WITH VERTICAL MEMBERS). OVERLAP STRONGBACK MEMBERS AT MINIMUM OF 4'-0" AND FASTEN WITH 1(2) 10d NAILS (0.131" X 3") STAGGERED AND EQUALLY SPACED. 4'-0" SPLICE (TYP)FLOOR TRUSS 2X6 STRONGBACK WALL B.O. BLOCKING B.O. INSTALLATION NOTES: A.USE METAL FRAMING ANCHOR TO ATTACH TO TOP CHORD. B.ATTACH TO VERTICAL WEB WITH (3) 10d NAILS (0.131" X 3"). BLOCKING IS RECOMMENDED BEHIND VERTICAL WEB WHILE NAILING TO STRONGBACK. C.ATTACH TO VERTICAL SCAB WITH (3) 10d NAILS (0.131" X 3"). D.ATTACH THROUGH OUTSIDE FACE OF CHORD TO EDGE OF STRONGBACK WITH (2) #12 X 3" WOOD SCREWS (Ø0.216"). DO NOT USE DRYWALL TYPE SCREWS. E.ATTACH 2X4 VERTICAL SCAB TO FACE OF TRUSS. FASTEN TOP & BOTTOM CHORD WITH (2) 10d NAILS (0.131" X 3") IN EACH CHORD. DABC E A B B C E D 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLLATERAL BRACING RECOMMENDATIONS 10.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 TOE-NAIL SINGLE SHEAR VALUES PER NDS 2018 (LBS/NAIL) LENGTH Ø DIA.SP DF HF SPF SPF-S 312" 0.131 88.1 80.6 69.9 68.4 59.7 0.135 93.5 85.6 74.2 72.6 63.4 0.162 118.3 108.3 93.9 91.9 80.2 314" 0.128 84.1 76.9 66.7 65.3 57.0 0.131 88.1 80.6 69.9 68.4 59.7 0.148 106.6 97.6 84.7 82.8 72.3 3" 0.120 73.9 67.6 58.7 57.4 50.1 0.128 84.1 76.9 66.7 65.3 57.0 0.131 88.1 80.6 69.9 68.4 59.7 0.148 106.6 97.6 84.7 82.8 72.3 MAY VARY 30-60 ° 45° MAY VARY 30-60 ° 45°MAY VARY 30-60 ° 45° SIDE VIEW (2X4) 3 NAILS SIDE VIEW (2X6) 4 NAILS SIDE VIEW (2X3) 2 NAILS VALUES SHOWN ARE CAPACITY PER TOE-NAIL. APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED. EXAMPLE: (3) 16d NAILS (0.162" X 3.5") WITH SPF SPECIES BOTTOM CHORD FOR LOAD DURATION INCREASE OF 1.15: 3 (NAILS) X 84.5 (LB/NAIL) X 1.15 (DOL) = 291.5 LB MAX. CAPACITY. NOTES: 1.TOE-NAILS SHALL BE DRIVEN AT AN ANGLE OF 45° WITH THE MEMBER AND MUST HAVE FULL WOOD SUPPORT (NAIL MUST BE DRIVEN THROUGH AND EXIT AT THE BACK CORNER OF THE MEMBER END AS SHOWN). 2.THE END DISTANCE, EDGE DISTANCE AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3.ALLOWABLE VALUE SHALL BE THE LESSER VALUE OF THE TWO SPECIES FOR MEMBERS OF DIFFERENT SPECIES. THESE DETAILS ARE ONLY APPLICABLE TO THE THREE END DETAILS SHOWN BELOW. VIEWS SHOWN ARE FOR ILLUSTRATIVE PURPOSES ONLY. NEAR SIDE NEAR SIDE NEAR SIDE NEAR SIDE NEAR SIDE NEAR SIDENEAR SIDE NEAR SIDE NEAR SIDE 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLLATERAL TOE-NAILING 11.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 TOE-NAIL WITHDRAWAL VALUES PER NDS 2018 (LBS/NAIL) LENGTH Ø DIA.SP DF HF SPF SPF-S 312" 0.131 59 46 32 30 20 0.135 60 48 33 30 20 0.162 72 58 39 37 25 314" 0.128 54 42 28 27 19 0.131 55 43 29 28 19 0.148 62 48 34 31 21 3" 0.120 46 36 25 24 16 0.128 49 38 26 25 17 0.131 51 39 27 26 17 0.148 57 44 31 28 20 NOTES: 1.TOE-NAILS SHALL BE DRIVEN AT AN ANGLE OF 30° WITH THE MEMBER AND STARTED 1/3RD THE LENGTH OF THE NAIL FROM THE MEMBER END AS SHOWN. 2.THE END DISTANCE, EDGE DISTANCE AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3.ALLOWABLE VALUE SHALL BE BASED ON THE SPECIES WITH LOWER NAIL CAPACITY BETWEEN THE TWO MEMBERS IN THE CONNECTION. VALUES SHOWN ARE CAPACITY PER TOE-NAIL. APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED. EXAMPLE: (3) 16d NAILS (0.162" X 312") WITH SPF SPECIES TOP PLATE. FOR WIND DOL OF 1.33: 3 (NAILS) X 37 (LBS/NAIL) X 1.60 (DOL FOR WIND) = 148 LBS MAX. ALLOWABLE UPLIFT REACTION DUE TO WIND. FOR WIND DOL OF 1.60: 3 (NAILS) X 37 (LBS/NAIL) X 1.60 (DOL FOR WIND) = 177 LBS ALLOWABLE UPLIFT REACTION DUE TO WIND. IF THE UPLIFT REACTION SPECIFIED ON THE TRUSS DESIGN DRAWING EXCEEDS 147 LBS (177 LBS) BUILDING DESIGNER IS RESPONSIBLE TO SPECIFY A DIFFERENT CONNECTION. *USE (3) TOE-NAILS ON 2X4 LBW. **USE (4) TOE-NAILS ON 2X6 LBW. NEAR SIDE FAR SIDE SIDE VIEW 1"3"30° END VIEW (3" NAIL) 1316"312"30° 1116"314"30° END VIEW (314" NAIL) END VIEW (312" NAIL) T.O.P.T.O.P.T.O.P. VIEWS SHOWN ARE FOR ILLUSTRATIVE PURPOSES ONLY. 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLUPLIFT TOE-NAILING 12.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 1.5X4 PLATES IN LIEU OF (2) 1.5X4 PLATES, NAILER CAN BE ATTACHED AS FOLLOWS: NEW 2X2 SP #3 ATTACHED TO OVERHANG USING, AT MINIMUM, (3) 10d NAILS (0.131" X 3"). NOTES: 1.THE END DISTANCE, EDGE DISTANCE AND SPACING OF NAILS SHOULD BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD AND PER NDS RECOMMENDATIONS.4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDL2X2 NAILER ATTACHMENT 13.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 NOTES: 1.THE END DISTANCE, EDGE DISTANCE AND SPACING OF NAILS SHOULD BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD AND PER NDS RECOMMENDATIONS. 2X6 SP#2 BOTH FACES 24" O.C. SIMPSON H5 UPLIFT CONNECTION (SEE ROOF TRUSS) EXTERIOR FLAT GIRDER ROOF TRUSS @ 24" O.C. (PITCH MAY VARY) (4) 12d NAILS 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLALTERNATE BRACING FOR EXTERIOR FLAT GIRDER TRUSS 14.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 TOTAL NAILS EACH SIDE OF BREAK* MAXIMUM FORCE (LBS) 15% LOAD DURATION X SP DF SPF HF 2X4 2X6 (INCH)2X4 2X6 2X4 2X6 2X4 2X6 2X4 2X6 20 30 24"1706 2559 1561 2342 1320 1980 1352 2028 26 39 30"2194 3291 2007 3011 1697 2546 1738 2608 32 48 36"2681 4022 2454 3681 2074 3111 2125 3187 38 57 42"3169 4754 2900 4350 2451 3677 2511 3767 44 66 48"3657 5485 3346 5019 2829 4243 2898 4347 *DIVIDE EQUALLY FRONT AND BACK. ATTACH 2X__ SCAB OF THE SAME SIZE AND GRADE AS THE BROKEN MEMBER TO EACH FACE OF THE TRUSS (CENTER ON BREAK OR SPLICE) WITH 10d NAILS, 2 ROWS FOR 2X4 & 3 ROWS FOR 2X6, SPACED AT 4" O.C. AS SHOWN (0.131" X 3"). STAGGER NAIL SPACING FROM FRONT FACE AND BACK FACE FOR NET 2" O.C. SPACING IN THE MAIN MEMBER. USE A MINIMUM 3" MEMBER END DISANCE. THE LENGTH OF THE BREAK (C) SHALL NOT EXCEED 12". (C= PLATE LENGTH FOR SPLICE REPAIRS). THE MINIMUM OVERALL SCAB LENGTH REQUIRED (L) IS CALCULATED AS FOLLOWS: L= (2)X +C.DO NOT USE REPAIR FOR JOINT SPLICES. NOTES: 1.THIS REPAIR DETAIL IS TO BE USED ONLY FOR THE APPLICATION SHOWN. THIS REPAIR DOES NOT IMPLY THAT THE REMAINING PORTION OF THE TRUSS IS UNDAMAGED. THE ENTIRE TRUSS SHALL BE INSPECTED TO VERIFY THAT NO FURTHER REPAIRS ARE REQUIRED. WHEN THE REQUIRED REPAIRS ARE PROPERLY APPLIED, THE TRUSS WILL BE CAPABLE OF SUPPORTING THE LOADS INDICATED. 2.ALL MEMBERS MUST BE RETURNED TO THEIR ORIGINAL POSITIONS BEFORE APPLYING REPAIR AND HELD IN PLACE DURING APPLICATION OF REPAIR. 3.THE END DISTANCE, EDGE DISTANCE AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 4.WHEN NAILING THE SCABS, THE USE OF BACKUP WEIGHT IS RECOMMENDED TO AVOID LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS AND/ OR SPLICES. 5.THIS REPAIR IS TO BE USED FOR SINGLE PLY TRUSSES IN THE 2X__ ORIENTATION ONLY. 6.THIS REPAIR IS LIMITED TO TRUSSES WITH NO MORE THAN 3 BROKEN MEMBERS. THE LOCATION OF THE BREAK MUST BE GREATER THAN OR EQUAL TO THE REQUIRED 'X' DIMENSION FROM ANY PERIMETER BREAK OR HEEL JOINT AND A MINIMUM OF 6" FROM ANY INTERIOR JOINT (SEE ABOVE SKETCH). X C X 3" TYP. 3" TYP. A A A A A A A A A A B B B B B B B B A A A A A A A A A A B B B B B B B B L A B 10d NAIL NEAR SIDE. 10d NAIL FAR SIDE. X (MI N ) X (MIN)6" (MIN) X (MI N )X (MIN)BREAK BREAK BREAK TRUSS CONFIGURATION & BREAK LOCATIONS FOR ILLUSTRATION ONLY. 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLBROKEN CHORD, WEB REPAIR & DAMAGED/ MISSING SPLICE PLTS 15.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 24" MAX. 2 X L (24" MIN.) TRUSS CRITERIA: LOADING:40-10-00-10 DURATION FACTOR:1.15 SPACING:24" O.C. TOP CHORD:2X4 OR 2X6 ROOF PITCH:4:12 TO 12:12 HEEL HEIGHT:STD. HEEL, UP TO 12" ENERGY HEEL END BEARING CONDITION NOTES: 1.ATTACH 2X__ SCAB (SPF, HF, SP, DF #2 GRADE MIN.)TO SINGLE FACE OF TRUSS WITH 2 ROWS OF 10d COMMON WIRE NAILS (0.148" X 3") AT 6" O.C. 2.END DISTANCE, EDGE DISTANCE AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3.WHEN NAILING SCABS, USE BACKUP WEIGHT AS RECOMMENDED TO AVOID LOOSENING OF CONNECTOR PLATES AT JOINTS AND/ OR SPLICES. 2X__ SCAB NOTE: TRUSS BUILT WITHOUT AN OVERHANG. THIS DETAIL IS NOT TO BE USED WHEN OVERHANG HAS BEEN BROKEN OR DAMAGED. REFER TO INDIVIDUAL TRUSS DESIGN DRAWINGS FOR PLATE SIZES AND LUMBER GRADES.IMPORTANT NOTE: DETAIL TO BE USED ONLY WITH TRUSSES MEETING THE FOLLOWING CRITERIA: ·SPAN IS LESS THAN 40'-0" &... ·24" O.C. SPACING MAX. &... ·PITCH AT 4:12 TO 12:12 &... ·TOP CHORD TOTAL LOAD NOT EXCEEDING 50 PSF. TRUSSES NOT MEETING THESE CRITERIA SHOULD BE EXAMINED INDIVIDUALLY. 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLSCAB APPLIED OVERHANG 16.012/2/2021 Ryan Bays, P.E. # 91231 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946