Loading...
HomeMy WebLinkAboutTruss DrawingI =LIFE SAFETY WARNING This symbol identifies Life Safety Warnings that should be read and given special attention to all persons installing trusses. SPACING NOTE All trusses are to be set 2'-0" on center except as noted. MULTIPLE PLY TRUSSES MUST BE FASTENED TOGETHER PER ENGINEERING BEFORE SETTING, REFER TO ENGINEERING DRAWING TO DETERMINE IF MULTIPLE PLY. A DON'T LIFT TRUSSES WITH SPANS LONGER THAN 30' BY THE PEAK. CONSULT BCSI 30' Sp4n or less A I Soredder Bar 60 degrees or less tl2 span Tag line �12 spaapprox—0 E—%lpprox 213 to �10 Tag line 1/2 of Spa. REFER TO BCSI Truss must be set this way 0 crane is used. REFER TO BCSI Truss must be set this way 6 crane is used. I Truss is an example, your truss may not match. Truss is an example, your truss may not match. Insist crane operator sets truss this way. Insist crane operator sets truss this way. All load bearing walls, headers, beams, & lintels must be in place at indicated height before trusses are installed. AIR HANDLER NOTE Unless noted elsewhere on this layout, these trusses are not designed for air handlers in the roof or for any other A/C requirements. This may be in conflict with building code and A/C Design requirements. Consult with Building Department and A/C Contractor. WARNING The size of these trusses makes it necessary that they a set by a profeesional builder familiar with and experienced in the problems and dangers of setting large span trusses. The builder and erector should consult with an engineer licensed in Florida specializing in wood roof trusses about the safe erection of these trusses. The engineer should be at the job site when trusses are erected to provide supervision and advice. REPRESENTS THE LEFT SIDE OF EACH TRUSS DRAWING SEAT PLATES BY CHAMBERS TRUSS Of REPRESENTS A HANGER HANGER SCHEDULE USE HUS26 FOR 2X4, SUH46 FOR 02 EXCEPT AS SHOWN CARRIED TRUSS CARRYING TRUSS HANGER ID FASTENER FOR CARRIED TRUSS FASTENER FOR CARRYING TRUSS *Please refer to Standard Lngmeenng pacKage Tar geneldl mmucu�u �iI "id ..o„a- 10d=0.148" x 3" 16d=0.162" x 3 1/2" I Hatch Legend IF I + + + 1 12" COFFER r� 1 9'-511 CEILING WALL HEIGHT 8'-1" 10'-9" CEILING WALL HEIGHT 9'-511 WALL HEIGHT 10'-911 `: Do not stand on trusses until they are braced per BCSI & properly nailed to straps and hangers !! ! ARRANGE WITH CRANE OPERATOR IN ADVANCE FOR A SPREADER BAR OF 30'- 38' IN LENGTH!! PLUMB CUT END 12 2X4 TOP CHORD 6 r WALL HEIGHT 8'-1" END DETAIL: B 1-00- 0 4-03 41-06-00 0 2-00-00 L PLUMB CUT END 2X4 TOP CHORD WALL HEIGHT VARIES END DETAIL: TYPICAL 4-03 Z WV7 6r 12 PLUMB CUT END —I 6 2X4 TOP CHORD WALL HEIGHT 10, END DETAIL: A 1-10-00 FABRICATION AGREEMENT TRUSSES CANNOT BE STARTED UNTIL THIS AGREEMENT IS SIGNED & RETURNEDI.. The undersigned acknowledges and agrees: 1. Trusses will be made in strict accordance with this truss placement diagram layout, which is the sole authority for''I determining successful fabrication of the trusses. 2. All dimensions in this layout have been verified by the undersigned. 3. Unless written notice is provided by certified mail to Chambers Truss within ten (10) days of delivery the ' undersigned agrees that no backcharges will be allowed. In the event such written notice is furnished Chambers Truss shall have three (3) business days in which to begin repairs required, or to substitute other trusses, at Chambers option. After 10 days of delivery remedy will be according to Florida statute 558, 4. The undersigned acknowledges receipt of "BCSI" summary sheet by TPI & WTCA. 5. Delivery is to job site, It is the buyer's responsibility to make the job site suitable for delivery. Chambers Truss has the sole authority to determine the suitability of the job site or a portion of the job site for delivery. Chambers Truss will be responsible for dump delivery only. The buyer is responsible for additional delivery expenses if Chambers Truss has to redeliver because job site is not prepared for delivery or buyer is not prepared for delivery of trusses. Buyer is responsible to Chambers Truss for towing costs due to site conditions. 6. Price as shown in paragraph 7 below is subject to change if any changes are made in this layout. A $50 per hour fee for revisions may be charged by Chambers Truss, 7. This is a PURCHASE ORDER to Chambers Truss of the sum agreed to, or if no agreement a reasonable price. I.. Invoice will be made on delivery and paid within terms of net on delivery. Invoice may be made at scheduled date of'. delivery if buyer cannot accept delivery of fabricated trusses. The undersigned agrees to pay Chambers Truss I. reasonable attorneys fee for collections in event of payment not timely made. 1-1/2 % per month service charge will be added for all sums not paid within terms. 8, Signature or initials anywhere on this sheet constitutes agreement to all terms herein. 9. In consideration of Chambers Truss extending credit for this material the undersigned unconditionally guarantees payment when due of any and all indebtedness owed to Chambers Truss by any entity receiving material and the undersigned agrees to pay such indebtedness including attorneys fees, if default in payment for material be made by the recipient. 10, In the event of any litigation concerning this agreement, the items furnished hereunder or payments referred to! herein, the parties agree that the sole venue for any such action will be Saint Lucie County, Florida. 11, Design responsibilities are per liNational Standard And Recommended Guidelines On Responsibilities For Construction Using Metal Plate Connected Wood Trusses ANSI/TPIWTCA 4 - 200211] 12. Warranty is per Chambers Truss Warranty attached.I, DATED SIGNED A spreader bar may be required per "BCSI" to prevent injury & damage. Multiple ply trusses must be fastened together per engineering before they are set, failure to do so can result in roof collapse. Temporary and permanent bracing are required and can save life and property and is the responsibility of the truss erector. Study the contents of the information packet included on delivery before setting trusses. Trusses must be set and braced per design to prevent injury & damage. e., Trusses must be set plumb and square Do not set bunks or stack of plywood, roofing material or any other concentrated loads on trusses, this can cause collapse. DO NOT INSTALL TRUSSES USING THIS USE PLAN DELIVERED WITH TRUSSES TO SET TRUSSES CHAMBERS TRUSS INC REVIEWED FOR FILE COPY CODE COMPLI NC Zz�l -�o EI ST. LUCIE COa N wC �_ s z�alzZ MITEK VERSION 7.4. 1431---- LOADINGIDESIGN CRITERIA REDUCIBLE PER CODE SUCH AS SBC 1604.6.1 DESIGN CRITERIA County ST. LUCIE Building Department ST. LUCIE CO. Wind Design Criteria ASCE 7-16 Wind Design Method MWFRS(Directional)/C-C hybrid Wind ASCE 7-16 Roofing Material Shingle or Shake Loading in PSF Roof R.D.L. Floor Top Chord Live 20 0 Top Chord Dead 7 4.2 0 Bottom Chord Live *10-Non Conccurent 0 Bottom Chord Dead 10 3 0 Total Load 47 7.2 0 Duration Factor 1.25 0 Wind Speed 160mph Top Chord C.B. Sheathing by builder Bottom Chord C.B. Sheathing by builder Highest Mean Height 15' Building Type Enclosed Building Category II: Non Restrictive Exposure Category B Miles from Ocean 5 Conforms to Florida Building Code 2020 R.D.L.=Restraining Dead Load C.B.=Continuous Bracing Verify DESIGN CRITERIA shown above with the building department and your engineer. Design Criteria is the responsibility of the Building Designer and/or Engineer of Record Chambers Truss Inc. Drawing Name: 77848 SCALE: 1 /4" = 1'-011 131 total trusses, 48 unique designs Designer: RAC Reviewed by: _ Date: 10/14/21 FOR SOUTHERN CITY DEVELOPMENT DESCRIPTION: 5606 MYRTLE ST. Page 1 of 1 CUSTOMER INITIALS EACH PAGE 77848