HomeMy WebLinkAboutReport 1st Floor JoistsBolsecascade Single 16" BCI® 4500s-1.8 P�OSSiEti
1st Floor\Floor Joists\J1(i762) (Floor Joist)
BC CALC® Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Reviewed for Code Description: 1st Floor\Floor Joists\J1(i762)
City, State, Zip: Compliance Specifier: CREEKS IDE
Customer: Universal Engineering Designer:
Code reports: ESR_1W Sciences Company: LOT 60
r
i7-09-00
B1 B2
Total Horizontal Product Length = 17-09-00
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
703/0
176/0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
3774 ft-Ibs
92.3%
100%
1
09-00-02
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole #1 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 Ibs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
U768 (0.271 ")
62.5%
n\a
6
09-00-02
Max Defl.
0.339"
33.9%
n\a
1
09-00-02
Span / Depth 13.0
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 05-00-00 8" L 12" Circular Horizontal
H02 13-09-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified
B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 1 of 82
i
Boise Cascade
Single 16" BCI® 4500s-1.8
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
1st Floor\Floor JoistsUl(i762) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J 1(i762)
Specifier:
Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTOO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUSO ,
Page 2 of 82
aBoise"Cascade Single 16" BCIO 4500s-1.8 PASSED
1st Floor\Floor J6ists\J1(i762) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
z-
n-09-00
Total Horizontal Product Length = 17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
703/0
176/0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
3774 ft-Ibs
92.3%
100%
1
09-00-02
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole 41 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 Ibs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
1_/768 (0.271 ")
62.5%
n\a
6
09-00-02
Max Defl.
0.339"
33.9%
n\a
1
09-00-02
Span / Depth 13.0
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 05-00-00 8" L 12" Circular Horizontal
H02 13-09-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified
B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16
Cautions
Headerfor the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 3 of 82
*Boise cascade Single 16" BCI® 4500s-1.8 PASSE®
1st FloorTloor J6ists\J1(i762) - 01 (Floor Joist)
BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J 1 (i762)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 4 of 82
Boise Cascade Single 16" BCI® 45005-1.8 IP�SSE�
1st Flooffloor JoistslJI(i762) - 02 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
1
17-09-00
Total Horizontal Product Length = 17-09-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind_ _ Roof Live
B1,4"
703/0
176/0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
3774 ft-Ibs
92.3%
100%
1
09-00-02
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole #1 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 Ibs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
U768 (0.271 ")
62.5%
n\a
6
09-00-02
Max Defl.
0.339"
33.96/6
n\a
1
09-00-02
Span / Depth 13.0
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 05-00-00 8" L 12" Circular Horizontal
H02 13-09-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxM Value Support Member Material
B1 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified
132 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 5 of 82
Boise Cascade Single 16" BCI® 4500s-1.8
1st Floor%Floor J661sts\JI(i762) - 02 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (I") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC), BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM), VERSA -RIM PLUS@ ,
Page 6 of 82
Boise cascade Single 16" BCI® 4500s-1.8 RSSE®
1st FloorTloor JoistsW1(1762) - 03 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive J Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J 1(i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
i
f
2
17-09-00
Total Horizontal Product Length = 17-09-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 4"
703/0
176/0
B2, 2"
703 / 0
176 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
_ _ Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
3774 ft-Ibs
92.3%
100%
1
09-00-02
End Reaction
879 Ibs
81.3%
100%
1
17-09-00
End Shear
863 Ibs
43.7%
100%
1
00-04-00
Hole #1 Shear
447 Ibs
81.5%
100%
3
05-00-00
Hole #2 Shear
514 lbs
93.7%
100%
4
13-09-00
Total Load Deflection
U615 (0.339")
58.6%
n\a
1
09-00-02
Live Load Deflection
U768 (0.271 ")
62.5%
n\a
6
09-00-02
Max Defl.
0.339"
33.9%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
879 Ibs
14.4%
59.6%
Unspecified
B2 Hanger
2" x 1-3/4"
879 Ibs
76.5%
81.3%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 7 of 82
*Boise cascade Single 16" BCI® 4500s-1.8 6�ASSEia
1st Flooffloor J6ists1J1(1762) - 03 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J 1 (i762)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (1-/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 8 of 82
A
Boise Cascade -
Single 16" BCI® 4500s-1.8
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
B1
1st Flooffloor JoistslJ1(U64) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J 1(i764)
Specifier:
Designer:
Company:
17-09-00
Total Horizontal Product Length=17-09-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow_
Wind Roof Live
B 1, 4"
646 / 0 161 / 0
B2, 2"
701 / 0 175 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (Ib/ft) L
00-02-00 17-09-00
Top
40 10 n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft) L
01-07-15 17-09-00
Top
40 10 n\a
Controls Summary
Value %Allowable Duration
Case
Location
Pos. Moment
3749 ft-Ibs 91.7%
100%
1
09-00-02
End Reaction
876 Ibs 81.1 %
100%
1
17-09-00
End Shear
860 Ibs 43.5%
100%
1
17-07-00
Hole #1 Shear
448 Ibs 81.6%
100%
3
05-00-00
Hole #2 Shear
511 Ibs 93.2%
100%
4
13-09-00
Total Load Deflection
U619 (0.337") 58.1%
n\a
1
09-00-02
Live Load Deflection
U774 (0.269") 62.0%
n\a
6
09-00-02
Max Defl.
0.337" 33.7%
n\a
1
09-00-02
Span / Depth 13.0
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 05-00-00 8" L 12" Circular Horizontal
H02 13-09-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Wall/Plate 4" x 1-3/4" 807 Ibs 13.2% 54.7% Unspecified
B2 Hanger 2" x 1-3/4" 876 Ibs 76.2% 81.1% ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 9 of 82
I
Boise Cascade
Single 16" BCI® 4500s-1.8
BC CALC@ Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
Notes
1st FlooAFloor Joists\J1(i764) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J 1(i764)
Specifier:
Designer:
Company:
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC@ analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@) ,
Page 10 of 82
*Boise'Cascade Single 16" BCI® 4500s-1.8 P�SSE�
1st FloorlFloor JoistSW1(i766) (Floor Joist)
BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J1(i766)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
1 2
17-09-00
Total Horizontal Product Length = 17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
586/0
147/0
B2, 2"
586 / 0
147 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-02-00 17-09-00
Top
67 17 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
3145 ft-Ibs
76.9%
100%
1
09-00-02
End Reaction
733 Ibs
67.8%
100%
1
17-09-00
End Shear
719 Ibs
36.4%
100%
1
00-04-00
Hole #1 Shear
373 Ibs
67.9%
100%
3
05-00-00
Hole #2 Shear
428 Ibs
78.1 %
100%
4
13-09-00
Total Load Deflection
U738 (0.283")
48.8%
n\a
1
09-00-02
Live Load Deflection
U922 (0.226")
52.1 %
n\a
6
09-00-02
Max Defl.
0.283"
28.3%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
733 Ibs
12.0%
49.7%
Unspecified
B2 Hanger
2" x 1-3/4"
733 Ibs
63.7%
67.8%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 11 of 82
613olse Cascade Single 16" BCI® 4500s-1.8 EeAS E®
1st Floor\Floor Joists;W1(i766) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i766)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@), VERSA -RIM PLUS@ ,
Page 12 of 82
Boise Cascade
Single 16" BCI® 4500s-1.8
PASSED
BC CALC® Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
B1
1st FloorTloor JoistslJ1(i766) - 01 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J 1(i766)
Specifier:
Designer:
Company:
hY r _ x x 1 �' v •Eze�''h rr v a ti +e 2 _ _ v J f,
17-09-00
Total Horizontal Product Length = 17-09-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 4"
586 / 0
147 / 0
B2, 2"
586 / 0
147 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
67 17 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
3145 ft-Ibs
76.9%
100%
1
09-00-02
End Reaction
733 Ibs
67.8%
100%
1
17-09-00
End Shear
719 Ibs
36.4%
100%
1
00-04-00
Hole #1 Shear
373 Ibs
67.9%
100%
3
05-00-00
Hole #2 Shear
428 Ibs
78.1 %
100%
4
13-09-00
Total Load Deflection
U738 (0.283")
48.8%
n\a
1
09-00-02
Live Load Deflection
U922 (0.226")
52.1 %
n\a
6
09-00-02
Max Defl.
0.283"
28.3%
n\a
1
09-00-02
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW►
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
733 lbs
12.0%
49.7%
Unspecified
B2 Hanger
2" x 1-3/4"
733 Ibs
63.7%
67.8%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 13 of 82
SBolse'Cascade Single 16" BCI® 4500s-1.8 IPAS�ED
1st Floor%Floor Joists\J1(i766) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i766)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAMTm, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 14 of 82
Boise Cascade Single 16" BCIO 4500s-1.8 PASSE®
1st Flooffloor JoistslJ1(U69) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1(i769)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
1
2
n
17-09-00
Total Horizontal Product Length = 17-09-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
817/0
204/0
B2, 2"
662 / 0
165 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
01-07-15
17-09-00
Top
73 18 n\a
2 J6(i771)
Conc. Pt.
(Ibs) L
01-08-13
01-08-13
Top
308 77 n\a
Controls Summary.
Value
%Allowable
Duration
Case
Location
Pos. Moment
3674 ft-Ibs
89.8%
100%
1
08-07-13
End Reaction
827 Ibs
76.5%
100%
1
17-09-00
End Shear
1021 Ibs
51.7%
100%
1
00-04-00
Hole #1 Shear
401 Ibs
73.2%
100%
3
05-00-00
Hole #2 Shear
495 Ibs
90.2%
100%
4
13-09-00
Total Load Deflection
L/625 (0.334")
57.6%
n\a
1
08-10-11
Live Load Deflection
U781 (0.267")
61.4%
n\a
6
08-10-11
Max Defl.
0.334"
33.4%
n\a
1
08-10-11
Span / Depth
13.0
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
13-09-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
1021 Ibs
16.7%
69.2%
Unspecified
B2 Hanger
2" x 1-3/4"
827 Ibs
71.9%
76.5%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 15 of 82
Boise Cascade Single 16" BCI® 4500s-1.8 PASSED
1st Floor\Floor JoistsW1(i769) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J 1 (i769)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (U480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTOO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 16 of 82
Boise Cascade Single 16" BCI® 4500s-1.8 PASSED
1st Floor\Floor Joists\J1(i772) (Floor Joist)
BC CALL® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J 1 (i772)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
2
B1
17-09-00
Total Horizontal Product Length = 17-09-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow_
Wind Roof Live
B1,4"
514/0
129/0
B2, 2"
514/0
129/0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 17-09-00
Top
58 15 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
2759 ft-Ibs
67.5%
100%
1
09-00-02
End Reaction
643 Ibs
59.5%
100%
1
17-09-00
End Shear
631 Ibs
31.9%
100%
1
00-04-00
Hole #1 Shear
327 Ibs
59.6%
100%
3
05-00-00
Hole #2 Shear
376 Ibs
68.5%
100%
4
13-09-00
Total Load Deflection
U841 (0.248")
42.8%
n\a
1
09-00-02
Live Load Deflection
U1051 (0.198")
45.7%
n\a
6
09-00-02
Max Defl.
0.248"
24.8%
n\a
1
09-00-02
Span / Depth 13.0
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 05-00-00 8" L 12" Circular Horizontal
H02 13-09-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Wall/Plate 4" x 1-3/4" 643 Ibs 10.5% 43.6% Unspecified
B2 Hanger 2" x 1-3/4" 643 Ibs 55.9% 59.5% ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 17 of 82
aBoise'Cascade Single 16" BCI® 4500s-1.8
1st Floor\Floor JoistsWl (i772) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J 1 (i772)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC® analysis is based on IBC 2009.
Composite EI value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC®, BC FRAMER®, AJS-,
ALLJOIST®, BC RIM BOARD-, BCI® ,
BOISE GLULAM-, BC FloorValue® ,
VERSA -LAM®, VERSA -RIM PLUS®,
Page 18 of 82
Boise cascade
Single 16"
BCIO 4500s-1.8
P,�SSEd
1st Floor\Floor JoistslJ2(i745) (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 24 OCS I Non -Repetitive I Glued & nailed February
11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J2(i745)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
I
�
B1
15.04-14
82
Total Horizontal Product
Length=15-04-14
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow Wind Roof Live
B1,4"
611 /0
153/0
B2,2"
610/0
152/0
Load Summary
Live Dead Snow Wind
Roof OCs
Live
Tag Description
Load Type
Ref. Start
End Loc. 100% 90% 1156/6 160%
125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L 00-01-12 15-04-14 Top 80 20
n\a
Controls Summary
Value
% Allowable
Duration Case Location
Pos. Moment
2824 ft-Ibs
69.0%
•100% 1 07-09-08
End Reaction
762 Ibs
70.5%
100% 1 15-04-14
End Shear
745 Ibs
37.7%
100% 1 00-04-00
Hole #1 Shear
354 Ibs
64.5%
100% 3 04-09-08
Hole #2 Shear
361 Ibs
65.8%
100% 4 10-10-08
Total Load Deflection
U915 (0.197")
39.3%
n\a 1 07-09-08
Live Load Deflection
U1144 (0.158")
42.0%
n\a 6 07-09-08
Max Defl.
0.197"
19.7%
n\a 1 07-09-08
Span / Depth
11.3
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width Shape Orientation
H01
04-09-08
8" L 12"
Circular Horizontal
H02
10-10-08
8" L 12"
Circular Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value Support
Member Material
B1 Wall/Plate
4" x 1-3/4"
764 Ibs 12.5%
51.8% Unspecified
B2 Hanger
2" x 1-3/4"
762 Ibs 66.3%
70.5% ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 19 of 82
Boise Cascade
Single 16" BCI® 4500s-1.8
BC CALCO Member Report
Build 7493
Job name:
Address:
1st Floor\Floor JoistsW(U45) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J2(i745)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (U360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS—,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAMTm, BC FloorValue@ ,
VERSA -LAM@), VERSA -RIM PLUS@ ,
Page 20 of 82
ffk
Boise�Cascade --
Single 16" BCIO 4500s-1.8
BC CALC® Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
1st Floor\Floor Joists\J2(i755) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J2(i755)
Specifier:
Designer:
Company:
2
_1
w
1 a ✓ .r
w
131
15-04-14
Total Horizontal Product Length=15-04-14
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow
Wind Roof Live
B1,4"
534/0 133/0
B2, 2"
530 / 0 133 / 0
Load Summary
Live Dead Snow Wind Roof ocs
Live
Tag Description
Load Type Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-14 15-04-14
Top
30 7 n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-01-12 15-04-14
Top
40 10 n\a
Controls Summary
Value % Allowable
Duration
Case
Location
Pos. Moment
2456 ft-Ibs 60.1%
100%
1
07-09-08
End Reaction
663 Ibs 61.3%
100%
1
15-04-14
End Shear
648 Ibs 32.8%
100%
1
00-04-00
Hole #1 Shear
308 Ibs 56.1 %
100%
3
04-09-08
Hole #2 Shear
314 Ibs 57.2%
100%
4
10-10-08
Total Load Deflection
U1052 (0.171 ") 34.2°lo
n\a
1
07-09-08
Live Load Deflection
U1315 (0.137") 36.5%
n\a
6
07-09-08
Max Defl.
0.171" 17.1%
n\a
1
07-09-08
Span / Depth
11.3
Hole Location
Valid
Hole Summary
Center Elevation Ref. Height
Width
Shape
Orientation .
H01
04-09-08 8" L
12"
Circular
Horizontal
H02
10-10-08 8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW) Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4" 667 Ibs
10.9%
45.2%
Unspecified
B2 Hanger
2" x 1-3/4" 663 Ibs
57.6%
61.3%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 21 of 82
Boise Cascade
Single 16" BCI® 4500s-1.8
h lh _ -__`
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
1st Flooffloor Joists\J2(11755) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J2(i755)
Specifier:
Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 22 of 82
aBolse'Cascade Single 16" BCI® 4500s-1.8 PA5SEt9
1st FloorTloor JoistsU2(i759) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J2(i759)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
131
15-04-14
Total Horizontal Product Length = 15-04-14
X
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,4"
621 /0
155/0
B2,2"
610/0
152/0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-01-12
15-04-14
Top
80 20 n\a
Controls Summary
Value
%Allowable
Duration
Case
Location
Pos. Moment
2824 ft-Ibs
69.0%
100%
1
07-09-08
End Reaction
762 Ibs
70.5%
100%
1
15-04-14
End Shear
745 Ibs
37.7%
100%
1
00-04-00
Hole #1 Shear
354 Ibs
64.5%
100%
3
04-09-08
Hole #2 Shear
361 Ibs
65.8%
100%
4
10-10-08
Total Load Deflection
U915 (0.197")
39.3%
n\a
1
07-09-08
Live Load Deflection
L/1144 (0.158")
42.0%
n\a
6
07-09-08
Max Defl.
0.197"
19.7%
n\a
1
07-09-08
Span / Depth
11.3
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-09-08
8" L
12"
Circular
Horizontal
H02
10-10-08
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
4" x 1-3/4"
776 lbs
12.7%
52.6%
Unspecified
132 Hanger
2" x 1-3/4"
762 lbs
66.3%
70.5%
ITS1.81/16
Cautions
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 23 of 82
Boise Cascade
Single 16" BCI® 4500s-1.8
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
Notes
1st Floor\Floor JoistsW2(1759) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J2(i759)
Specifier:
Designer:
Company:
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 24 of 82
Boise Cascade Single 16" BCI® 4500s-1.8
1st Floor\Floor JoistsW(i737) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i737)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
15-01-06
B1 132
Total Horizontal Product Length=1"1-06
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B1,2" 566/0 142/0
B2, 2" 572 / 0 143 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 15-01-06
Top
40 10 n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-02-00 15-01-06
Top
36 9 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
2629 ft-Ibs
64.3%
100%
1
07-06-08
End Reaction
715 Ibs
66.2%
100%
1
15-01-06
End Shear
700 Ibs
35.4%
100%
1
00-02-00
Hole #1 Shear
338 Ibs
61.7%
100%
3
04-06-00
Hole #2 Shear
336 Ibs
61.3%
100%
4
10-07-00
Total Load Deflection
U989 (0.181 ")
36.4%
n\a
1
07-06-08
Live Load Deflection
U1236 (0.145")
38.8%
n\a
6
07-06-08
Max Defl.
0.181"
18.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center Elevation Ref. Height Width
Shape
Orientation
H01
04-06-00 8"
L
12"
Circular
Horizontal
H02
10-07-00 8" L 12"
Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Hanger 2" x 1-3/4" 708 Ibs 42.5% 65.5% IUS1.81/16
B2 Hanger 2" x 1-3/4" 715 Ibs 62.2% 66.2% ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 25 of 82
aBolse Cascade Single 16" BCI® 4500s-1.8 IPAS�E�
1st Floor\Floor Joists\J3(i737) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i737)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC), BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM), VERSA -RIM PLUS@ ,
Page 26 of 82
613oise'Cascade Single 16" BCIO 4500s-1.8 PASSEt�
1st Flooffloor JoistsW(UQ) (Floor Joist)
BC CALC® Member Report Dry I 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
15-01-06
Total Horizontal Product Length = 15-01-06
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
605 / 0
15110
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 27 of 82
Boise cascade Single 16" BCI® 4500s-1.8 6�ASSE�
1st Floor\Floor Joists\J3(i742) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (1-/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@), VERSA -RIM PLUS@ ,
Page 28 of 82
Boise cascade Single 16" BCIO 4500s-1.8 PJ4SSE®
1st Flooffloor JoistsW(UQ) - 01 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-01-06
Total Horizontal Product Length=15-01-06
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow _ _
Wind Roof Live
B1, 2"
605/0
151 /0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 29 of 82
*Boise'Cascade Single 16" BCI® 4500s-1.8
1st Flooffloor Joists\J3(WQ) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 30 of 82
aBolse'Cascade Single 16" BCI® 4500s-1.8 RASSEID
1st FloorlFloor JoistslJ3(i742) - 02 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-01-06
Total Horizontal Product Length = 15-01-06
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live _
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof ocs
Live
Tag Description
Load Type
Ref.
Start
End
Loc. _
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 31 of 82
Boise Cascade
Single 16" BCI® 4500s-1.8
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
1 st Flooffloor JoistsW3(i742) - 02 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J3(i742)
Specifier:
Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAMTm, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 32 of 82
aBoise.'Cascade Single 16" BCI® 4500s-1.8 PASSE®
1 st FloorTloor JoistslJ3(i742) - 03 (Floor Joist)
BC CALC® Member. Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
15-01-05
Total Horizontal Product Length=15-01-06
132
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth 11.2
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 04-06-00 8" L 12" Circular Horizontal
H02 10-07-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LXW) Value Support Member Material
B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16
B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 33 of 82
Boise'cascade Single 16" BCI® 4500s-1.8 PASSES
1st FloorlFloor JoistslJ3(i742) - 03 (Floor Joist)
BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 34 of 82
110
@Bois"Cascade Single 16" BCIO 4500s-1.8 iPASSE®
1st Flooffloor Joists\J3(i742) - 04 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
B1
15-01-05
Total Horizontal Product Length=15-01-06
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115%" 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 lbs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191")
38.5%
n\a
1
07-06-08
Live Load Deflection
U1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 35 of 82
BolseCascade Single 16" BCI® 4500s-1.8 PASSE®
1st FloorlFloor Joists\J3(i742) - 04 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant., 24 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 36 of 82
OBolse'Cascade Single 16" BCI® 4500s-1.8 PASSES
1st Floor%Floor JoistslJ3(i742) - 05 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
1
131
15-01-06
Total Horizontal Product Length=15-01-06
132
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191")
38.5%
n\a
1
07-06-08
Live Load Deflection
L/1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth 11.2
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 04-06-00 8" L 12" Circular Horizontal
H02 10-07-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
131 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16
B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 37 of 82
zBoisetCascade Single 16" BCI® 4500s-1.8 PAS�Et�
1st Flooffloor JoistslJ3(i742) - 05 (Floor Joist)
BC CALC@ Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALC® analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC®, BC FRAMER®, AJS-,
ALLJOISTO , BC RIM BOARD-, BCI® ,
BOISE GLULAM-, BC FloorValue® ,
VERSA-LAMO, VERSA -RIM PLUS®,
Page 38 of 82
6Boise cascade Single 16" BCI® 4500s-1.8 PASSE®
1st Flooffloor JoistslJ3(i742) - 06 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-01-06
Total Horizontal Product Length = 15-01-06
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
L/1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 Ibs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 Ibs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 39 of 82
Boise Cascade Single 16" BCI® 4500s-1.8 P1�SSE®
1st Flooffloor Joists\J3(i742) - 06 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 40 of 82
613olse'Cascade Single 16" BCI® 4500s-1.8 PASSE®
1st FloorlFloor JoistsW(i742) - 07 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-01-06
Total Horizontal Product Length = 15-01-06
132
Reaction Summary (Down / Uplift) (lbs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2777 ft-lbs
67.9%
100%
1
07-06-08
End Reaction
756 lbs
69.9%
100%
1
00-00-00
End Shear
739 lbs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 lbs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 lbs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
L/1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth
11.2
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
04-06-00
8" L
12"
Circular
Horizontal
H02
10-07-00
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxA9
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
756 lbs
45.4%
69.9%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
756 lbs
65.7%
69.9%
ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 41 of 82
• Boise Cascade Single 16" BCI® 4500s-1.8 PSSI=D
1st FloorTloor Joists\J3(1742) - 07 (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 42 of 82
Boise Cascade Single 16" BCIO4500s-1.8 PASSEIa
1st Flooffloor JoistsW(i742) - 08 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
15-01-06
Total Horizontal Product Length = 15-01-06
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof_ Live_
B1,2"
605/0
151/0
B2, 2"
605 / 0
151 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-01-06
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
2777 ft-Ibs
67.9%
100%
1
07-06-08
End Reaction
756 Ibs
69.9%
100%
1
00-00-00
End Shear
739 Ibs
37.4%
100%
1
00-02-00
Hole #1 Shear
358 Ibs
65.2%
100%
3
04-06-00
Hole #2 Shear
355 Ibs
64.7%
100%
4
10-07-00
Total Load Deflection
U936 (0.191 ")
38.5%
n\a
1
07-06-08
Live Load Deflection
L/1170 (0.153")
41.0%
n\a
6
07-06-08
Max Defl.
0.191"
19.1%
n\a
1
07-06-08
Span / Depth 11.2
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 04-06-00 8" L 12" Circular Horizontal
H02 10-07-00 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16
B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16
Cautions
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 43 of 82
Boise cascade - Single 16" BCI® 4500s-1.8 Pi►SSE®
1st Flooffloor JoistSU3(1742) - 08 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J3(i742)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAW, VERSA -RIM PLUSO ,
Page 44 of 82
Boise cascade Single 16" BCI® 4500s-1.8 PASSED
1st FloorlFloor J6istsW4(i767) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J4(i767)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
15-11-05
Total Horizontal Product Length=15-11-05
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B 1, 2" 568 / 0 142 / 0
B2, 2"
568/0 142/0
B2
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-11-05
Top
71 18 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
2757 ft-Ibs
67.4%
100%
1
07-11-02
End Reaction
710 Ibs
65.7%
100%
1
00-00-00
End Shear
696 Ibs
35.2%
100%
1
00-02-00
Hole #1 Shear
448 Ibs
81.6%
100%
3
03-02-05
Hole #2 Shear
388 Ibs
70.8%
100%
4
11-11-05
Total Load Deflection
U907 (0.208")
39.7%
n\a
1
07-11-02
Live Load Deflection
U1134 (0.167")
42.3%
n\a
6
07-11-02
Max Defl.
0.208"
20.8%
n\a
1
07-11-02
Span / Depth
11.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
03-02-05
8" L
12"
Circular
Horizontal
H02
11-11-05
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
710 Ibs
52.2%
65.7%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
710 Ibs
61.8%
65.7%
ITS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 45 of 82
WE
Boise Cascade Single 16" BCI® 4500s-1.8 PASSEEQ
1st Flooffloor JoistslJ4(i767) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J4(1767)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 46 of 82
Boise Cascade Single 16" BCI® 4500s-1.8 PASSED
1st Floor\FloorJoistsW5(i741) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J5(i741)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
61
15-03-02
Total Horizontal Product Length = 15-03-02
62
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
505/0
126/0
B2, 2"
505 / 0
126 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 15-03-02
Top
66 17 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
2343 ft-Ibs
57.3%
100%
1
07-07-12
End Reaction
631 Ibs
58.4%
100%
1
00-00-00
End Shear
618 Ibs
31.3%
100%
1
00-02-00
Hole #1 Shear
292 Ibs
53.3%
100%
3
04-07-12
Hole #2 Shear
300 Ibs
54.6%
100%
4
10-08-12
Total Load Deflection
U1102 (0.164")
32.7%
n\a
1
07-07-12
Live Load Deflection
L/1377 (0.131 ")
34.9%
n\a
6
07-07-12
Max Defl.
0.164"
16.4%
n\a
1
07-07-12
Span / Depth 11.3
Hole Location Valid
Hole Summary Center Elevation Ref. Height Width Shape Orientation
H01 04-07-12 8" L 12" Circular Horizontal
H02 10-08-12 8" L 12" Circular Horizontal
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member Material
B1 Hanger 2" x 1-3/4" 631 Ibs 46.4% 58.4% IUS1.81/16
B2 Hanger 2" x 1-3/4" 631 Ibs 54.9% 58.4% ITS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails.
Header for the hanger ITS1.81/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 47 of 82
Boise Cascade Single 16" BCl® 4500s-1.8 PASSED
1st FloorTloor JoistSW5(i741) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Flooffloor JoistslJ5(i741)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (1-/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@), VERSA -RIM PLUS@ ,
Page 48 of 82
Boise cascade Single 16" BCI® 4500s-1.8 EaASSE®
1st Floor\Floor JoistSW6(i746) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS J Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J6(i746)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
03-01-11
Total Horizontal Product Length = 03-01-11
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow
Wind Roof Live
B1,2"
171/0 42/0
B2, 9-3/4"
376 / 0 93 / 0
Load Summary
Live Dead Snow Wind Roof
OCs
Live
Tag Description
Load Type Ref.
Start End
Loc. 100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 03-01-11
Top 4 1
n\a
2 J6(i785)
Conc. Pt. (Ibs) L
00-07-02 00-07-02
Top 26 6
n\a
3 J5(i741)
Conc. Pt. (Ibs) L
01-08-13 01-08-13
Top 510 127
n\a
Controls Summary
Value % Allowable Duration
Case Location
Pos. Moment
305 ft-Ibs 7.5%
100%
1 01-08-13
End Reaction
469 Ibs 31.8%
100%
1 03-01-11
End Shear
466 Ibs 23.6%
100%
1 02-03-15
Total Load Deflection
U999 (0.003") n\a
n\a
1 01-08-13
Live Load Deflection
U999 (0.003") n\a
n\a
2 01-08-13
Max Defl.
0.003" n\a
n\a
1 01-08-13
Span / Depth
1.7
% Allow % Allow
Bearing Supports
Dim. (LxW) Value
Support Member
Material
B1 Hanger
2" x 1-3/4" 213 Ibs
12.8% 19.7%
IUS1.81/16
B2 Wall/Plate
9-3/4" x 1-3/4" 469 Ibs
3.1% 31.8%
Unspecified
Cautions
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@) ,
Page 49 of 82
Boise Cascade Single 16" BCl® 4500s-1.8 PASSEm
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
131
1st FloorTloor JoistslJ6(i771) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J6(i771)
Specifier:
Designer:
Company:
0❑
03-04-03
Total Horizontal Product Length = 03-04-03
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
310/0
78/0
B2, 2"
269 / 0
67 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc. 100% 90% 115% 160% 125%
1 J4(i767)
Conc. Pt. (Ibs) L
01-06-13 01-06-13
Top 579 145 n\a
Controls Summary
Value
% Allowable
Duration
Case Location
Pos. Moment
565 ft-Ibs
13.8%
100%
1 01-06-12
End Reaction
387 Ibs
35.8%
100%
1 00-00-00
End Shear
387 Ibs
19.6%
100%
1 00-02-00
Total Load Deflection
U999 (0.007")
n\a
n\a
1 01-06-12
Live Load Deflection
U999 (0.005")
n\a
n\a
2 01-06-12
Max Defl.
0.007"
n\a
n\a
1 01-06-12
Span / Depth
2.4
% Allow
% Allow
Bearing Supports
Dim. (Lx1N)
Value
Support
Member
Material
B1 Hanger
2" x 1-3/4"
387 Ibs
28.5%
35.8%
IUS1.81/16
B2 Hanger
2" x 1-3/4"
337 Ibs
20.2%
31.2%
IUS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails.
Header for the hanger IUS1.81/16 is a Double 1-3/4" x 16" LVL Beam.
Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails.
Notes
Design meets User specified (U360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75') Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 50 of 82
0Boise cascade Single 16" BCI® 4500s-1.8 ��SSED
1st Flooffloor JoistslM(U85) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J6(i785)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
S k�N
.. .,, .:wa , a ... ,,.
7
03-08-03
61 132
Total Horizontal Product Length = 03-08-03
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow
Wind
Roof Live
B1,4" 25/0 6/0
B2,2" 27/0 7/0
Load Summary
Live Dead
Snow Wind Roof OCs
Live
Tag Description Load Type Ref. Start End
Loc. 100% 90%
115% 160% 125%
1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-04-00 03-08-00
Top 15 4
n\a
2 FC1 Floor Material Conc. Pt. (Ibs) L 00-03-00 00-03-00
Top 1
n\a
Controls Summary Value % Allowable Duration
Case Location
Pos. Moment 26 ft-Ibs 0.6% 100%
1 01-11-01
End Reaction 33 Ibs 3.1 % 100%
1 03-08-03
End Shear 30 Ibs 1.5% 100%
1 00-04-00
Total Load Deflection U999 (0") n\a n\a
1 01-11-01
Live Load Deflection U999 (0") n\a n\a
2 01-11-01
Max Defl. 0" n\a n\a
1 01-11-01
Span / Depth 2.5
% Allow % Allow
Bearing Supports Dim. (LxW) Value Support Member
Material
B1 Wall/Plate 4" x 1-3/4" 31 Ibs 0.5% 2.1%
Unspecified
B2 Hanger 2" x 1-3/4" 33 Ibs 2.4% 3.1 %
IUS1.81/16
Cautions
Hanger IUS1.81/16 requires (14) 10dxl.5 face nails, (2) Strong -Grip joist nails.
Disclosure
Use of the Boise Cascade Software is
Notes
subject to the terms of the End User
Design meets User specified (L/360) Total load deflection criteria.
License Agreement (EULA).
Design meets User specified (L/480) Live load deflection criteria.
Completeness and accuracy of input
must be reviewed and verified by a
Design meets arbitrary (1") Maximum Total load deflection criteria.
qualified engineer or other appropriate
Design meets arbitrary (0.75") Maximum live load deflection criteria.
expert to assure its adequacy, prior to
Calculations assume member is fully braced.
anyone relying on such output as
evidence of suitability for a particular
HanHanger Manufacturer: Simpson Strong -Tie, Tie Inc.
9 P g-
application. The output here is based on
BC CALCO analysis is based on IBC 2009.
building code -accepted design
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
properties and analysis methods.
Design based on Dry Service Condition.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 51 of 82
Boise cascade Single 16" BCI® 6000s-1.8 MASSED
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
B1
1st Flooffloor JbistsW(i774) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J7(i774)
Specifier:
Designer:
Company:
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow
Wind Roof Live
B1,2"
677/0 169/0
B2, 4"
692 / 0 173 / 0
Load Summary
Live Dead Snow Wind Roof
ocs
Live
Tag Description
Load Type Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
40 10
n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 03-09-00
Top
26 6
n\a
3 FC1 Floor Material
Unf. Lin. (lb/ft) L
03-09-00 20-01-00
Top
29 7
n\a
Controls Summary
Value % Allowable
Duration
Case
Location
Pos. Moment
4180 ft-Ibs 76.1%
100%
1
09-11-06
End Reaction
846 Ibs 66.7%
100%
1
00-00-00
End Shear
844 Ibs 38.8%
100%
1
19-09-00
Hole #1 Shear
471 Ibs 77.9%
100%
3
05-00-00
Hole #2 Shear
172 Ibs 28.5%
100%
4
10-00-04
Hole #3 Shear
474 Ibs 78.4%
100%
6
14-11-14
Total Load Deflection
U608 (0.389") 59.2%
n\a
1
09-11-06
Live Load Deflection
U760 (0.311") 63.2%
n\a
8
09-11-06
Max Defl.
0.389" 38.9%
n\a
1
09-11-06
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00 8" L
12"
Circular
Horizontal
H02
10-00-04 8" L
12"
Circular
Horizontal
H03
14-11-14 8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxV4 Value
Support
Member
Material
B1 Hanger
2" x 2-5/16" 846 Ibs
73.6%
66.7%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16" 865 Ibs
10.7%
55.8%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 52 of 82
Boise Cascade Single 16" BCI® 6000s-1.8 lP�SEED
1st Flooffloor JoistsW(i774) (Floor Joist)
BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i774)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 53 of 82
Boise cascade g� Single 16" BCIO 6000s-1.8 PASSED
1st Flooffloor JbistslR(U75) (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
797/0
199/0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
%Allowable Duration
case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth 14.8
Hole Location Valid
Hole Summary
Center
Elevation
Ref. Height
Width
Shape Orientation
H01
05-00-00
8"
L 12"
Circular Horizontal
H02
10-00-04
8"
L 12"
Circular Horizontal
H03
14-11-14
8"
L 12"
Circular Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 54 of 82
Boise Cascade Single 16" BCI® 6000s-1.8 PAS�E�
1st Flooffloor JoistsW7(i775) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 55 of 82
Boise Cascade �9 Single 16" BCI® 6000s-1.8 E�ASSEID
1st FloorlFloor J6ists\J7(U75) - 01 (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
61
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
—
B1, 2"
79710
199 / 0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable Duration
Case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 lbs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth 14.8
Hole Location Valid
Hole Summary
Center
Elevation
Ref. Height
Width
Shape Orientation
H01
05-00-00
8"
L 12"
Circular Horizontal
H02
10-00-04
8"
L 12"
Circular Horizontal
H03
14-11-14
8"
L 12"
Circular Horizontal
% Allow
% Allow
Bearing
Supports
Dim. (LxW)
Value
Support
Member
Material
B1
Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2
Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 56 of 82
Boise cascade EE= Single 16" BCI® 6000s-1.8 PAS�Eii
1st Flooffloor J6istslJ7(1775) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 57 of 82
Single 16" BCI® 6000s-1.8
f
613oise
Cascade
BC CALC® Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
131
1 st FlooAFloor JoistsW(U75) - 02 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J7(i775)
Specifier:
Designer:
Company:
20-01-00
Total Horizontal Product Length = 20-01-00
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
797/0
199/0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1 %
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.44%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 58 of 82
Boise Cascade l`` Single 16" BCI® 6000s-1.8 PASS��
1st Flooffloor Msts1J7(i775) - 02 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 59 of 82
Boise Cascade
Single 16" BCI® 6000s-1.8
�I
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
B1
1st Flooffloor JoistsXR(i775) - 03 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1 st Floor\Floor Joists\J7(i775)
Specifier:
Designer:
Company:
c c 1 n
'P,3 c�
20-01-00
Total Horizontal Product Length = 20-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
797/0
199/0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 60 of 82
0 Boise cascade Single 16" BCI® 6000s-1.8 PASSId®
1st FloorlFloor Joists1J7(i775) - 03 (Floor Joist)
BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i775)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM), VERSA -RIM PLUS@ ,
Page 61 of 82
Bolse Cascade •••••• Single 16" BCI® 6000s-1.8 PASSEt�
1st Floor\Floor JoistslJ7(i776) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J7(i776)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
L I,
20-02-08
131 62
Total Horizontal Product Length = 20-02-08
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
797/0
199/0
B2, 5-1/2"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (Lx"
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
5-1/2" x 2-5116"
996 Ibs
18.4%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 62 of 82
6Boise cascade ` — Single 16" BCI® 6000s-1.8 PASSEt9
BC CALCO Member Report
Build 7493
Job name:
Address:
1st Flooffloor JoistslJ7(i776) (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J7(i776)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@), VERSA -RIM PLUS@ ,
Page 63 of 82
0 Boise Cascade Single 16" BCI® 6000s-1.8 IP�SSEE�
1st Flooffloor JoistslJ7(i776) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 24 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i776)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
f
w. x 3 2 n c.�
B1
20-02-08
Total Horizontal Product Length = 20-02-08
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
797 / 0
199 / 0
B2, 5-1/2"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
5-1/2" x 2-5/16"
996 Ibs
18.4%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 64 of 82
Boise Cascade
Single 16" BCI® 6000s-1.8
3 t1
BC CALCO Member Report
Build 7493
Job name:
Address:
City, State, Zip:
Customer:
Code reports: ESR-1336
Notes
1st FlooAFloor JoistsW7(i776) - 01 (Floor Joist)
Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
File name: N362326L&R.mmdl
Description: 1st Floor\Floor Joists\J7(i776)
Specifier:
Designer:
Company:
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 65 of 82
Boise Cascade Single 16" BCI® 6000s-1.8 PASSED
1st Flooffloor JoistslJ7(1778) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i778)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
20-02-08
Total Horizontal Product Length = 20-02-08
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B 1, 2"
797 / 0
199 / 0
B2, 5-1/2"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1%
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
5-1/2" x 2-5/16"
996 Ibs
18.4%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 66 of 82
Boise cascade Single 16" BCI® 6000s-1.8 PtSSE
1st Floor\Floor JoistsW7(i778) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Floor Joists\J7(i778)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAMTm, BC FloorValue@ ,
VERSA -LAM), VERSA -RIM PLUSO ,
Page 67 of 82
Boise Cascade = Single 16" BCIO 6000s-1.8 PASSES
1st Floor\Floor JoistsW7(1781) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1 st Floor\Floor Joists\J7(i781)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
B1
t Y i
20-01-00
Total Horizontal Product Length = 20-01-00
62
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead _
Snow
Wind Roof Live
B1,2"
797/0
199/0
B2, 4"
797 / 0
199 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4854 ft-Ibs
88.3%
100%
1
09-11-08
End Reaction
996 Ibs
78.5%
100%
1
00-00-00
End Shear
979 Ibs
45.0%
100%
1
00-02-00
Hole #1 Shear
544 Ibs
90.1 %
100%
3
05-00-00
Hole #2 Shear
201 Ibs
33.2%
100%
4
10-00-04
Hole #3 Shear
550 Ibs
91.1%
100%
6
14-11-14
Total Load Deflection
U523 (0.452")
68.8%
n\a
1
09-11-08
Live Load Deflection
U654 (0.362")
73.4%
n\a
8
09-11-08
Max Defl.
0.452"
45.2%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
996 Ibs
86.6%
78.5%
ITS2.37/16
B2 Wall/Plate
4" x 2-5/16"
996 Ibs
12.3%
64.2%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 68 of 82
Boise cascade Single 16" BCI® 6000s-1.8 hASS�®
1st FloorlFloor JoistsW(U81) (Floor Joist)
BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i781)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA-LAMO, VERSA -RIM PLUS@ ,
Page 69 of 82
Boise cascade Single 16" BCIO 6000s-1.8 PA�SEti
1st Flooffloor JoistsW7(i783) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 24 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i783)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
f x-Ib .... 2
.a 3
71,17
131
20-00-08
Total Horizontal Product Length=.20-00-08
132
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1,2"
607/0
152/0
B2, 3-1/2"
607 / 0
152 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-00-00 19-11-00
Top
61 15 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
3697 ft-Ibs
67.3%
100%
1
09-11-08
End Reaction
758 Ibs
59.8%
100%
1
00-00-00
End Shear
746 Ibs
34.3%
100%
1
00-02-00
Hole #1 Shear
415 Ibs
68.6%
100%
3
05-00-00
Hole #2 Shear
153 Ibs
25.3%
100%
4
10-00-04
Hole #3 Shear
419 Ibs
69.3%
100%
6
14-11-14
Total Load Deflection
U687 (0.344")
52.4%
n\a
1
09-11-08
Live Load Deflection
U858 (0.275')
55.9%
n\a
8
09-11-08
Max Defl.
0.344"
34.4%
n\a
1
09-11-08
Span / Depth
14.8
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
05-00-00
8" L
12"
Circular
Horizontal
H02
10-00-04
8" L
12"
Circular
Horizontal
H03
14-11-14
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Hanger
2" x 2-5/16"
758 Ibs
65.9%
59.8%
ITS2.37/16
B2 Wall/Plate
3-1/2" x 2-5/16"
758 Ibs
10.7%
48.9%
Unspecified
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 70 of 82
Boise cascade Single 16" BCI® 6000s-1.8 PA�SEEi
1 st FloorTloor JoistsW(i783) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J7(i783)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 71 of 82
I Boise Cascade Single 16" BCI® 6000s-1.8 PASSIED
1st FlooffloorJoistskA(U51) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J8(i751)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
131
i
�, .
RITZ
1r
19-01-00
Total Horizontal Product Length=19-01-00
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B1, 3-1/2" 611 / 0 153 / 0
B2, 2" 614/0 154/0
132
Load Summary Live Dead Snow Wind Roof OCS
Live
Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125%
1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 65 16 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
3559 ft-Ibs
64.8%
100%
1
09-06-15
End Reaction
768 Ibs
60.5%
100%
1
19-01-00
End Shear
754 Ibs
34.7%
100%
1
00-03-08
Hole #1 Shear
209 Ibs
34.6%
100%
3
08-05-11
Total Load Deflection
U741 (0.304")
48.6%
n\a
1
09-06-15
Live Load Deflection
L/926 (0.243")
51.8%
n\a
4
09-06-15
Max Defl.
0.304"
30.4%
n\a
1
09-06-15
Span / Depth
14.1
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
08-05-11
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LW)
Value
Support
Member
Material
131 Wall/Plate
3-1/2" x 2-5/16"
764 Ibs
10.8%
49.3%
Unspecified
B2 Hanger
2" x 2-5/16"
768 Ibs
66.8%
60.5%
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 72 of 82
Boise Cascade Single 16" BCIO 6000s-1.8 PASSED
1st Flooffloor JoistSW9(i736) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J9(i736)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
2
imi-00
B1 132
Total Horizontal Product Length = 19-01-00
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
B1,4" 787/0 196/0 .
B2, 2" 748 / 0 187 / 0
Load Summary
Live Dead Snow Wind Roof
OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-02-00 19-01-00
Top
40 10
n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft)
L
00-04-00 03-08-00
Top
15 4
n\a
3 FC1 Floor Material
Unf. Lin. (lb/ft)
L
03-09-01 19-01-00
Top
37 9
n\a
4 J6(i746)
Conc. Pt. (Ibs)
L
03-09-01 03-09-01
Top
166 41
n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4472 ft-Ibs
81.4%
100%
1
09-03-08
End Reaction
935 Ibs
73.7%
100%
1
19-01-00
End Shear
975 Ibs
44.8%
100%
1
00-04-00
Hole #1 Shear
242 Ibs
40.1 %
100%
3
08-05-11
Hole #2 Shear
542 lbs
89.7%
100%
4
14-06-11
Total Load Deflection
U587 (0.382")
61.3%
n\a
1
09-06-05
Live Load Deflection
L/734 (0.306")
65.4%
n\a
6
09-06-05
Max Defl.
0.382"
38.2%
n\a
1
09-06-05
Span / Depth
14.0
Hole Location
Valid
Hole Summary
Center Elevation Ref. Height
Width
Shape
Orientation
H01
08-05-11 8"
L
12"
Circular
Horizontal
H02
14-06-11 8"
L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW) Value
Support
Member
Material
B1 Wall/Plate
4" x 2-5/16" 983
Ibs
12.1 %
63.4%
Unspecified
B2 Hanger
2" x 2-5/16" 935
Ibs
81.3%
73.7%
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 73 of 82
• Boise Cascade Single 16" BCI® 6000s-1.8 PAS�E�
1st FloorTloor JoistsW9(i736) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\FloorJoists\J9(i736)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 74 of 82
6 Boise Cascade Single 16" BCIO 6000s-1.8 Pi�SSE®
1st Flooffloor JoistslJ9(1749) (Floor Joist)
BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1 st Floor\Floor Joists\J9(i749)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
B1
19-01-00
Total Horizontal Product Length=19-01-00
2
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow
Wind Roof Live
B1, 5-1/2"
762 / 0
190 / 0
B2, 2"
752 / 0
188 / 0
Load Summary
Live Dead Snow Wind Roof ocs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 . FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 19-01-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4318 ft-Ibs
78.6%
100%
1
09-08-04
End Reaction
940 Ibs
74.1%
100%
1
19-01-00
End Shear
923 Ibs
42.4%
100%
1
00-05-08
Hole #1 Shear
262 Ibs
43.4%
100%
3
08-05-11
Hole #2 Shear
529 Ibs
87.5%
100%
4
14-06-11
Total Load Deflection
U615 (0.363")
58.5%
n\a
1
09-08-04
Live Load Deflection
U769 (0.29")
62.4%
n\a
6
09-08-04
Max Defl.
0.363"
36.3%
n\a
1
09-08-04
Span / Depth
13.9
Hole Location
Valid
Hole Summary
Center
Elevation .Ref. Height
Width
Shape
Orientation
H01
08-05-11
8" L
12"
Circular
Horizontal
H02
14-06-11
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
5-1/2" x 2-5/16"
952 Ibs
17.6%
61.4%
Unspecified
132 Hanger
2" x 2-5/16"
940 Ibs
81.7%
74.1 %
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 75 of 82
8Boise cascade Single 16" BCI® 6000s-1.8 PASSE®
1st FloorTloor JoistsU9(i749) (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1 st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUSO ,
Page 76 of 82
Boise cascade Single 16" BCI® 6000s-1.8 PASSED
1st FloorlFloor JoistsW(U49) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
>.
W
19-01-00
Total Horizontal Product Length=19-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow_
Wind Roof Live
B 1, 5-1/2"
762 / 0
190 / 0
B2, 2"
752 / 0
188 / 0
Load Summary
Live Dead Snow Wind Roof OCs
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 19-01-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4318 ft-Ibs
78.6%
100%
1
09-08-04
End Reaction
940 Ibs
74.1%
100%
1
19-01-00
End Shear
923 Ibs
42.4%
100%
1
00-05-08
Hole #1 Shear
262 Ibs
43.4%
100%
3
08-05-11
Hole #2 Shear
529 Ibs
87.5%
100%
4
14-06-11
Total Load Deflection
U615 (0.363")
58.5%
n\a
1
09-08-04
Live Load Deflection
U769 (0.29")
62.4%
n\a
6
09-08-04
Max Defl.
0.363"
36.3%
n\a
1
09-08-04
Span / Depth
13.9
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
08-05-11
8" L
12"
Circular
Horizontal
H02
14-06-11
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (LxW)
Value
Support
Member
Material
B1 Wall/Plate
5-1/2" x 2-5/16"
952 Ibs
17.6%
61.4%
Unspecified
B2 Hanger
2" x 2-5/16"
940 Ibs
81.7%
74.1 %
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 77 of 82
*Boise cascade Single 16" BCID 6000s-1.8
1st Flooffloor Joists\J9(i749) - 01 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1 st Floor\Floor Joists\J9(i749)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1336
Company:
Notes
Design meets User specified (L/360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@ ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 78 of 82
z Boise cascade Single 16" BCIO 6000s-1.8 PABSE�3
1st Flooffloor JoistslJ9(i749) - 02 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J9(i749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
B1
19-01-00
Total Horizontal Product Length = 19-01-00
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live
Dead
Snow_ _
Wind Roof Live
B1, 5-1/2"
762 / 0
190 / 0
B2, 2"
75210
188 / 0
Load Summary
Live Dead Snow Wind Roof OCS
Live
Tag Description
Load Type
Ref.
Start
End
Loc.
100% 90% 115% 160% 125%
1 FC1 Floor Material
Unf. Lin. (lb/ft) L
00-02-00 19-01-00
Top
80 20 n\a
Controls Summary
Value
% Allowable
Duration
Case
Location
Pos. Moment
4318 ft-Ibs
78.6%
100%
1
09-08-04
End Reaction
940lbs
74.1%
100%
1
19-01-00
End Shear
923 Ibs
42.4%
100%
1
00-05-08
Hole #1 Shear
262 Ibs
43.4%
100%
3
08-05-11
Hole #2 Shear
529 Ibs
87.5%
100%
4
14-06-11
Total Load Deflection
U615 (0.363")
58.5%
n\a
1
09-08-04
Live Load Deflection
U769 (0.29")
62.4%
n\a
6
09-08-04
Max Defl.
0.363"
36.3%
n\a
1
09-08-04
Span / Depth
13.9
Hole Location
Valid
Hole Summary
Center
Elevation Ref. Height
Width
Shape
Orientation
H01
08-05-11
8" L
12"
Circular
Horizontal
H02
14-06-11
8" L
12"
Circular
Horizontal
% Allow
% Allow
Bearing Supports
Dim. (Lxyll
Value
Support
Member
Material
B1 Wall/Plate
5-1/2" x 2-5/16"
952 Ibs
17.6%
61.4%
Unspecified
B2 Hanger
2" x 2-5/16"
940 Ibs
81.7%
74.1 %
ITS2.37/16
Cautions
Header for the hanger ITS2.37/16 is a Double 1-1/2" x 9-1/4" SPF Lumber.
Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails.
Page 79 of 82
Boise cascade Single 16" BCI® 6000s-1.8 PA�SEH�
1st Flooffloor JoistslJ9(i749) - 02 (Floor Joist)
BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed February 11, 2021 12:28:44
Build 7493
Job name: File name: N362326L&R.mmdl
Address: Description: 1st Floor\Floor Joists\J9(1749)
City, State, Zip: Specifier:
Customer: Designer:
Code reports: ESR-1336 Company:
Notes
Design meets User specified (U360) Total load deflection criteria.
Design meets User specified (L/480) Live load deflection criteria.
Design meets arbitrary (1") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Simpson Strong -Tie, Inc.
BC CALCO analysis is based on IBC 2009.
Composite El value based on 3/4" thick OSB sheathing glued and nailed to member.
Design based on Dry Service Condition.
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALCO, BC FRAMER@ , AJS-,
ALLJOISTO , BC RIM BOARD-, BCI@),
BOISE GLULAM-, BC FloorValueO ,
VERSA -LAM), VERSA -RIM PLUS@ ,
Page 80 of 82
%Boise Cascade Double 1-3/4" x 16" VERSA -LAM® 2.0 3100 SP P�SSEII�
1st Floofflush BeamslBM1(i744) (Flush Beam)
BC CALCO Member Report Dry I 1 span I No cant. February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Flush Beams\BM1(i744)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1040
Company:
B1
20-01-02
Total Horizontal Product Length = 20-01-02
B2
Reaction Summary (Down / Uplift) (Ibs)
Bearing
Live Dead
Snow
Wind Roof Live
B1, 7"
3879 / 0 1136 / 0
B2, 2"
3187 / 0 957 / 0
Load Summary
Live Dead Snow Wind Roof
Tributary
Live
Tag Description
Load Type Ref.
Start End
Loc. 100% 90% 115% 160% 125%
0 Self -Weight
Unf. Lin. (Ib/ft) L
00-00-00 20-01-02
Top 16
00-00-00
1 Smoothed Load
Unf. Lin. (lb/ft) L
00-00-00 17-03-11
Top 320 80
n\a
2 FC1 Floor Material
Unf. Lin. (lb/ft) L
03-09-01 20-01-02
Top 39 10
n\a
3 J6(i771)
Cone. Pt. (Ibs) L
03-09-15 03-09-15
Top 271 68
n\a
4 J3(i737)
Cone. Pt. (Ibs) L
18-03-11 18-03-11
Top 575 144
n\a
Controls Summary
Value % Allowable Duration
Case Location
Pos. Moment
21796 ft-Ibs 58.3%
100%
1 10-03-11
End Shear
4199 Ibs 39.5%
100%
1 01-11-00
Total Load Deflection
U377 (0.62") 63.7%
n\a
1 10-03-10
Live Load Deflection
U488 (0.479") 73.7%
n\a
2 10-03-10
Max Defl.
0.62" 62.0%
n\a
1 10-03-10
Span / Depth
14.6
% Allow % Allow
Bearing Supports
Dim. (LxW) Value
Support Member
Material
B1 Wall/Plate
7" x 3-1/2" 5015 Ibs
23.4% 27.3%
Unspecified
B2 Hanger
2" x 3-1/2" 4144 Ibs
n\a 78.9%
Hanger
Cautions
Hanger model Hanger was not found. Hanger has not been analyzed for adequate capacity.
Notes
Design meets Code minimum (L/240) Total load deflection criteria.
Design meets Code minimum (L/360) Live load deflection criteria.
Design meets arbitrary (1 ") Maximum Total load deflection criteria.
Design meets arbitrary (0.75") Maximum live load deflection criteria.
Calculations assume member is fully braced.
Hanger Manufacturer: Unassigned
BC CALCO analysis is based on IBC 2009.
Design based on Dry Service Condition.
Page 81 of 82
IS
Boise Cascade Double 1-3/4" X 16" VERSA -LAM® 2.0 3100 SP IE*AS�EI
1st Floor\Flush BeamslBM1(i744) (Flush Beam)
BC CALCO Member Report Dry 11 span I No cant. February 11, 2021 12:28:44
Build 7493
Job name:
File name: N362326L&R.mmdl
Address:
Description: 1st Floor\Flush Beams\BM1(i744)
City, State, Zip:
Specifier:
Customer:
Designer:
Code reports: ESR-1040
Company:
Connection Diagram: Full Length of Member
a
w
c
• • w
a
4
a minimum = 2" c = 6"
b minimum = 3" d = 24"
Calculated Side Load = 385.0 Ib/ft
Connectors are: 16d Common Nails
Disclosure
Use of the Boise Cascade Software is
subject to the terms of the End User
License Agreement (EULA).
Completeness and accuracy of input
must be reviewed and verified by a
qualified engineer or other appropriate
expert to assure its adequacy, prior to
anyone relying on such output as
evidence of suitability for a particular
application. The output here is based on
building code -accepted design
properties and analysis methods.
Installation of Boise Cascade
engineered wood products must be in
accordance with current Installation
Guide and applicable building codes. To
obtain Installation Guide or ask
questions, please call (800)232-0788
before installation.
BC CALC@, BC FRAMERO , AJS-,
ALLJOISTO , BC RIM BOARD-, BCIO ,
BOISE GLULAM-, BC FloorValue@ ,
VERSA -LAM@, VERSA -RIM PLUS@ ,
Page 82 of 82
Boise
Engine
Cascade
ed Wood Products
7
n Nailin
Multiple Ply 1 3/4" Wide VERSA -LAM' Beams
When using multiple ply 1 3/a" VERSA -LAM® beams to create a wider member, the connection of the
plies is as critical as determining the beam size. When side loaded beams are not connected properly,
the inside plies do not support their share of the load and thus the load carrying capacity of the full
member decreases significantly.
BC CALL® reports show a connection detail for connecting multiple ply 1 3/a" VERSA -LAM® beams. BC
CALC® reports will either show the member having no side loads or the calculated side load. When the
nails shown on the connection detail are not readily available on the job site, the following table may be
used to substitute power driven nails or hand driven nails.
Example: Connection detail on the BC CALC® report shows 16d sinker nails at 12" o.c. As an
alternative, 3" x 0.131" power driven nails can be used at 8" o.c. or 16d common nails can be used at
14" o.c.
As Shown on BC
power Driven Nails
Hand Driven Nails
CALe Report
C)
N CD
co
Mr
NO
CD
Er
N a
`1T'
XM
CU
CL
r
�
rCO
oo
rCM
00
E6
�o
0Y7
mo
Nail
Cn
X
o
X
X
X
X
70 X
U
i�
�i�
�C0
(0
0=
(D�
Co-
O
co
CO
C'7
r @7
CO
Q7
24"
24"
20"
16"
12"
24"
20"
16"
16d Common
12"
12"
10"
8"
6"
12"
10"
8"
3 1/2" x 0.162"
6"
6"
N/A
N/A
N/A
6"
N/A
N/A
24„
24„
24„
18"
16"
24„
24„
20'3
16d Sinker
12
14
12
8
8
14
12
1011
3 1/4 " x 0.148"
6"
6"
6"
N/A
N/A
6"
6"
N/A
24"
24"
24"
22"
.18"
24"
24"
24"
16d Box
-12"
16"
12"
10"
8"
16"
12"
12"
3 1/z" x 0.135"
6"
8"
6"
N/A
N/A
8"
6"
6"
MIMR
Alternate On -Center Spacing
Notes:
• For multiple ply 1 3/V VERSA -LAM`' beams with only top load, beam may be fastened at 24" o.c.
for all nails shown above (top mounted hangers shall be analyzed as side loads).
• Use end distance, edge distance, row spacing and number of rows shown on connection detail
found on BC CALC® Report.
• Alternate nailing not available for all nail types.
• Contact professional of record for connection design of side -loaded point loads beyond what is
shown in Boise Cascade Tech Note LVL-4 and LVL-10.
• Table is not applicable for 1 W' wide VERSA -LAM® beams.
Tech Note LVL-17 Page 1 of 1 11/12
Boise Cascade®
ENGINEERED WOOD PRODUCTS
Soecific Aoolication Detail
Temporary Storage of Masonry Block
on BCI`O / AJS®R Joist Floors
In areas where concrete masonry block is used in the construction of walls, limited job site
space may require the short-term storage of blocks on a BCI®/ AJS® floor. Because of the
significate weight, caution should be used in the block stack placement location and size. The
following guidelines shall be followed.
General Notes
• Limits based upon a normal weight concrete masonry unit (8x8xl6) weight of 37 pounds
( Reinforced Masonry Engineering Handbook, Masonry Institute of America).
• No more than one masonry block stack shall be placed on any joist.
• Limits shown are valid for all series and depths if the specific floor joists are properly sized
for the occupancy design loads.
• BCI® / AJS® joist shall not be spaced greater than 24" on -center. Floor sheathing shall be
designed by the structure's design professional of record and installed properly prior to
block storage.
o The floor shall not be loaded with concrete masonry block for a period longer than three
days.
• Avoid allowing the joists or floor sheathing to get wet before or during loading. Wet wood
may take a permanent set under load in the deflected shape.
No Shoring Required
8" tall masonry block stack
maximum 48" x 48" footprint,
maximum 2 courses tall
BCl/AJS Joists,
max 24" o.c.s.
Temporary Storage of Masonry Block Page 1 of 2 ro5/2019
Boise Cascade®
ENGINEERED WOOD PRODUCTS
• Masonry block stack may be placed anywhere along span length with the exception of no
closer than 4'-0" from any intermediate bearing.
• Concrete masonry units (8x8x16) shall be stacked no higher than two courses tall by 48
inches wide.
• Deviation of preceding provisions voids BCIO/ AJS® product warranty.
Shoring Required
D%A/MJJ JUIbLb,
max 24" o.c.s.
mry block stack
1.8" x 48" footprint,
i courses tall
:sign by others
L)
-'tp ...y others
• The design of the shoring members and transfer of load from the shoring is the
responsibility of the design professional of record. Inadequate shoring design voids
the BCI° / AJS® product warranty.
• Concrete masonry units (8x8x16) shall be stacked no higher than six courses tall by 48
inches wide.
Temporary Storage of Masonry Block Page 2 of 2 r05/2019
1�
Cascade
ed Wood Products
Temoora
Technical Note
Storaae of Gvosum Wallboard on
The practice of stacking gypsum wallboard on wood floors prior to the installation is common
and necessary to the successful completion of any residential project. Because of the
enormous weight, caution should be used in the placement location and size. The following
guidelines are recommended by Boise Cascade EWP Engineering.
• Gypsum wallboard shall be stacked no higher than 11 inches (22 sheet limit for 1/2"
gypsum board, 17 sheet limit for 5/8" gypsum board).
• Placement of wallboard stacks in the middle of a room is not allowed. Loading in the
middle of the joist span induces greater deflections compared to loads placed near the
joist's supports.
• No more than one gypsum stack shall be placed on a single joist.
• Wallboard stacks shall be oriented with their long dimension perpendicular to the joist
layout direction. In this orientation, more joists are supporting the wallboard.
• The floor shall not be loaded with wallboard for a period longer than 4 weeks.
• Avoid allowing the joists or floor sheathing to get wet while loaded. Wet wood will take a
permanent set, which may be unsightly.
Tech Note W-7 Page 1 of 1 r4/10
ITS/MIT/HIT
Engineered Wood Product Top -Flange Hangers
This product Is preferable to almilar connectors because
W of emler Installation, ib) higher Ica*, W lowerinatalled
�3 coat, or comb/nation of these features.
-
Simpson Strong -Tie offers a dedicated range of top -flange I -joist
hangers that meet the unique needs of 1-joists while offering superior
performance and ease of installation..
ITS
The innovative ITS sets the standard for engineered wood top -
tango hangers. The ITS installs faster and uses fewer riails than
any other EWP top -flange hanger. The Strong -Grip' seat.and
Funnel Flange' features allow standard joist installation without
requiring joist nails, resulting in the lowest installed cost. The
Strong -Grip seat firmly secures I joists with flange thicknesses
from 11h" to 1 W.
MIT/HIT — Posittve-Angle Nailing (PAN)
PAN is specifically designed for I joists when used with the MIT or
HIT. With PAN, the nail hole material Is not removed, but is formed
to channel and confine the path of the nail at approximately 45•.
PAN minimizes splitting of the flanges while permitting time -saving
nailing from a better angle. See top flange tables on pp. 173-182.
Refer to joist manufacturer's literature or appropriate Simpson
Strong -Tie Connector Selection Guide for actual joist sizes.
Material: ITS — 18 gauge; MR, HIT — 16 gauge
Finish: Galvanized
Installation:
• Use all specified fasteners. Verify that the header
can take the required fasteners specified in the table.
• See pp. 95-96 for more Installation Information.
• ITS — no. joist nailing required for standard I joist installation
without web stiffeners. When supporting I -joists with web
stiffenera or rectangular SOL member_(2) 0.148" x 1 W nails
must be Installed into optional triangle joist nall holes. for
standard installation values.
• ITS — optional triangle nail holes may be used for additional
load. See allowable load tables.
• MIT — optional triangle nail holes may be. used for Increased
uplift capacity. See Optional Nailing For Increased Uplift table.
• HIT — dosed PAN nail holes may be used for increased
uplift capacity. See Optional Nailing For Increased Uplift table.
• For sloped joists up to 1/412 there is. no reduction, between
1/:12 and up to 1A,12, tests show.a 100A reduction -In ultimate
hanger strength. Local crushing of the bottom flange or excessive
deflection may be limiting; check with joist manufacturer for
specific limitations on bearing of this type.
Allowable Loads:
• The ffS, MR and HIT hangers have locations for optional nails
If additional uplift is needed. Optional uplift nailing requires the
addition of properly -secured web stiffeners. See the load tables
for minimum required fasteners and allowable uplift loads,
• For attaching to multl-ply headers, refer to technical bulletin
T-C-MPLYHEADR at strongtie.coni.
Options:
• Because these hangers are fully die -formed, they cannot be
modified. However these models will normally accommodate
a skew of up to 5•.
Codes: Sea p.12 for Code Reference Key Chart
optimal
klstnau
ioration -
1or:lrplltt
e(MIT
OrHIT
Funnel flange
Supports 1Ye'to IV
thickfiangos
The Strong -Grip"' seat
secures I joists in position
without joist nails.
Typical MiT Installed
on a Double WL
HIT Installation
on a 3x Nailer mounted
on a Steel Beam
(ITS, Mir similar)
JriC/-TIC C:,,,,. 'Pl;: I:nn c, or` SIMPSON
Sti-ongTie
ir
I -Joist Hangers
A�
This product is preferable to simpler connectors because
W of (a) safer Installation, (b) higher loads, (a) lower Installed
cost, or combination of these features.
The IUS is a hybrid hanger that incorporates the advantages of
�p the face -mount and top -mount hanger. Installation is fast with the
Strong -Grip' seat, easy -to -reach face nails and self jigging locator tabs.
m The MIU series hangers are designed for commercial and high -load
v = I -joist applications without requiring web stiffeners. The MIU features
O Positive Angle Nailing (PAN), -which minimizes splitting of the flanges
Vwhile permitting time -saving nailing from abetter angle.
'o
Material: IUS — 18 gauge;. MIU —16 gauge
E Finish: Galvanized
�3
_S d Uplift Loads:
�O. • Models have optional triangle joist nail holes for additional uplift.
H is Properly attached web stiffeners are required.
p • MIU — add four additional 0.148" x 11h" Joist nails far a total
V uplift load of 975 lb.
• IUS — add web stiffeners.and two 0.148" x 11/2'joist nails In the triangle
holes for a total uplift of 365 lb.
Installation:
• Use all specified fasteners. Verify that the header can
take the required fasteners spedfled in the table.
See pp. 95-96 for more installation information.
• IUS — fasten hanger to header. Position I joist into
hanger and snap into place. No joist nailing required.
Some IUS models have triangle and round header
nail holes. To achieve max. download, All both round
and triangle holes.
• IUS — Locator tabs are not structural. They may
be bent back to. adjust for hanger placement..
• IUS — for rimboard applications see technical
bulletin T RIMBDHGR at strongtie.com.
• IUS — I -joists with web stiffeners or rectangular
sections can be used with the installation of
(2) 0.148" x 11/:' nails into the optional triangle
joist nails.
• IUS — web stiffeners are not required with I joists
when the top flange is laterally supported by the
sides of the hanger unless required by 1-joist
manufacturer.
Options.
• These hangers cannot be modified. However, these
models will normally accommodate a skew of up to 5`.
For sloped joists up to 1/4:12 there is no reduction;
between 1/4:12 and up to 1h;12, tests show a 10%
reduction in ultimate hanger strength. Local crushing
of the bottom flange or excessive deflection may be
limiting; check with joist manufacturer for specific
limitations on bearing of this type.
Codes: See p.12 for Code Reference Key Chart
Funnel 11AN
flat
6IUS
(some IVS models
aeatnr
tab
have. triangle holes.
in header flanges
for min./max. nailing)
U.S. Patent 6,523;321
IUS Installation Sequence
Step 1
Attach the IUS to
the header.
The Strong -Grip" seat
secures I joists in position
without joist nails.
Avoid a
Misinstallation
Do not make your own holes.
Do not.nail the bottom flange.
Step 2
Slide the I -joist downward
into the IUS until it rests
above the large teardrop.
MIU
Step 3
Firmly push or snap
I -joist fully into the
seat of the IUS.
.MIU-with Correct