Loading...
HomeMy WebLinkAboutEngineering Inspection Resuls 4-1-22@UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: I (� Permit No. Project: Address: I��� Check one: Regular Inspection: O Reinspection Date of Initial Inspection: �U2-C­)7z,6 L Y Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Tes[ HW Pi ing &Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping &Test Framing Panel/Feeder Gas Piping &Test Cond. Piping &Test Structural Service/Ground I I Storm Piping & Test I Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: � � ���� C 1 �'��;� t � Area Inspected/Code: Inspection ResultsAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Na e: , \ TC' T YT Lic.fl: [�jj�( 1 1. 6 l OFFICES THROUGHOUT FLORIDA / 07 N COmmo ity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com