Loading...
HomeMy WebLinkAboutEngineering Inspection Results 4-5-22[PUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: V__�X.)� Permit No. Project: Address: li T`l,� ;,� Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall/Ceiling Wall Rough -In Ceiling Rough -In Stack Piping & Test Water Piping & Test HW Pi ing & Test CHW Piping &Test Framing Panel/Feeder Gas Piping P. Test Cond. Piping &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: i Area Inspected/Code: Inspection Results'�MP-Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: OFFICES THROUGHOUT FLORIDA El DA-Disallowed itC®ve, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com