HomeMy WebLinkAboutEngineering Inspection Results 4-5-22[PUNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: V__�X.)� Permit No.
Project:
Address: li T`l,� ;,�
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall/Ceiling
Wall Rough -In
Ceiling Rough -In
Stack Piping & Test
Water Piping & Test
HW Pi ing & Test
CHW Piping &Test
Framing
Panel/Feeder
Gas Piping P. Test
Cond. Piping &Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
i
Area Inspected/Code:
Inspection Results'�MP-Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1
2.
3.
4.
5.
6.
7.
Inspector's Name: Lic.#:
OFFICES THROUGHOUT FLORIDA
El DA-Disallowed
itC®ve, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com