Loading...
HomeMy WebLinkAboutProject Information a U C I E W 0R i Section A(General Information) Master Permit No. 2 Process No. Contractors Name'jV�'iUr� 1y°�`1�Y1 License# �c� Job Address r ,o (D sakeo,0 '"'u�Fn •�'• �e►r('�1—� �L �7-15� i ROOF CATEGORY (DIw Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles ❑Asphaltic Shingles ❑Metal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS . 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair ❑ Maintenance C>6 Reroofing ❑Recovering .ROOF SYSTEM INFORMATION Low Slope Roof Area(SF) _ Steep Sloped Roof Area (SF) I Total(SF) — Section B(Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppersi and overflow drains. Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets. 1 I . i I I - J I I 9 I Y FILE Copy I A I , ST LUCIE WORKS a Surfacing: Section C(Low Slope Roof) Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment: manufacturer Zone 1'•2-" o6@ Lap,#Rowsa (If a component is not used,identify as"NA") Zone 1:Z"oc @Lap f#Rows, w �_ I System Manufacturer: C'�,� Zone 2:�11 oc @ Lap,#Row —°s-3 ® oc 's _ r\q I� �� Zone 3;.�._."oc;@ Lap,#Rows3 Product Approval No.: y t 1_:1 Number of Fasteners Per Insulation Board: Design Wind Pressures,From RAS 128 Or Calculations: Zone 1'-OftZol he 1:�_Z ne AE Zone Zone 1':�J[ Zone 1: Zone 26L� Zone 3: Illustrate Components Noted an d Details as Applicable: Max. Design Pressure,from the specific product approval Woodblocking, (Gutter, Edge Termination, Stripping, system: Flashing, Continuous Cleat, Kant Strip, Base Flashing, Counterflashing, Coping,Etc., Deck: Indicate: Mean Roof Height, Pal rapet Height, Height of Base Type: Flashing,Component Material,Material'Thickness,Fastener Type,Fastener Spacing or Submit Manufacturers Details that Gauge Thickness:_ \� Comply with RAS1111 and Chapter 16.. Slope: I D ��- Anchor/Base Sheet&No.df Ply(s): Anchor/.Base Sheet Fastener/Bonding Material. FT. l I Insulation Base Layer: Base Insultation Size and Thickness: N-r" Parapet Base Insulation Fastener/Bonding Material: Height Top Insulation Layer: Top Insulation Size and Thickness: �'-� FT. Top Insulation Fastener/Bonding Material: Mean Base Sheet(s)&No.of Ply(s): N-i'An" Roof Base Sheet Fastener/Bonding Material: Height PIy.Sheet(s)'&No.of Ply(s),: `1 Ply SheetFastener/Bonding Material: I Top Ply: C1V\X- P(\\r(1X'0.N 51yY�.ct.. I Top Ply Fastener/Bonding Material: I FILE COPY I� i I I