March 23, 2022
Mr. William Durden, Chief Plans Examiner FIECENEo
St. Lucie County Building Department
MAR 2
Planning &Development Services
3 2022
2300 Virginia Avenue St.Lucie county
Permitting
Ft. Pierce, Florida 34982
i
Re: Ocean Harbor North Condominiums—Building A—Units 511, 611, & 711
5151 North Hwy AIA
Fort Pierce, Florida 34949
Engineer's Project N.: 17-180
S.L.C. Bldg. Permit# 1708-0100
Dear Mr. Durden,
Please be advised that no work was completed in Unit 411. This unit 411 should not have been
mentioned on Report 1 as no work was completed in that unit. All other information in the report
remains the same.
If you have any questions, please call our office.
��aG�xae�r
a8
Respectfully, `;
475
o b�
OF
Mich el Lue, P.E. = q ��_"� '- = p� °°�. ,b
Cons lting Engineer: .�,`�i `- ; C) R
Threshold Inspector
Encl: Copy: Report 1 dated 02/02/18
f
Cc: Gene Ross—Elliott Merrill Community Management
Bob Stark—Structure-con
i
I
i
i
4 i
i
M IL Engineering Inc. Project No. 17-180 Report No. 1
Consulting Engineers Building Official: Joe Cicio,Plans Examiner
Threshold Inspector Contractor: Khris McConnell,Structure-Con
2030 371h Avenue Project Manager: ; Gene Ross,Elliott Merrill.
Vero Beach,Florida 32960 File
Phone: (772)569-1257
_Fax: (772)569-4041
www.mlengineeringinc.com j
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH BUILDING A
5151 NORTH HWY AlA,FT. PIERCE,FLORIDA 34949
SLC BUILDING PERMIT NUMBER: 170�8-0100
PROJECT NAME: Ocean Harbor North—Bldg A DATE: February 2,2018
CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach,Florida
CONTRACTOR: Structure-Con PROJECT MGR: Mr.Khris McConnell
INSPECTED BY: Michael Lue WEATHER: Su m), cool
I
WORK IN PECTED:
Units Ojj 11, 611,&711
Concrete slab in this building are reinforced concrete and not a post tensioned slab.
I i
OBSERVATIONS:
All repairs were mostly along the slab edges as indicated in the repair plan.
The full depth or surface spalls originally assessed at Unit 511 were not required! The damages were found to hairline
cracks in the slab with no corroded reinforcing bars. The cracks in the slab caused failure of the tile bond to the slab
which was thought to be spalling concrete. The cracks were epoxied. i
I
The damages at the slab corners were due to no reinforcing bars along the edge in the existing construction and
compounded by the handrail post being in a cored pocket right at the comer of the slab. A#4 reinforcing bar was added
along the slab edge at the corner to minimize or alleviate future cracking.
RECOMMENDATIONS:
All structural repairs have been completed in compliance with the design documents