Loading...
HomeMy WebLinkAboutEngineering ' I M L�Engineering Inc. 2030 37"Avenue Vero Beach,FL 32960 'Phone: (772)569-1257 Fax:(772)569-4041 i March 23, 2022 Mr. William Durden, Chief Plans Examiner FIECENEo St. Lucie County Building Department MAR 2 Planning &Development Services 3 2022 2300 Virginia Avenue St.Lucie county Permitting Ft. Pierce, Florida 34982 i Re: Ocean Harbor North Condominiums—Building A—Units 511, 611, & 711 5151 North Hwy AIA Fort Pierce, Florida 34949 Engineer's Project N.: 17-180 S.L.C. Bldg. Permit# 1708-0100 Dear Mr. Durden, Please be advised that no work was completed in Unit 411. This unit 411 should not have been mentioned on Report 1 as no work was completed in that unit. All other information in the report remains the same. If you have any questions, please call our office. ��aG�xae�r a8 Respectfully, `; 475 o b� OF Mich el Lue, P.E. = q ��_"� '- = p� °°�. ,b Cons lting Engineer: .�,`�i `- ; C) R Threshold Inspector Encl: Copy: Report 1 dated 02/02/18 f Cc: Gene Ross—Elliott Merrill Community Management Bob Stark—Structure-con i I i i 4 i i M IL Engineering Inc. Project No. 17-180 Report No. 1 Consulting Engineers Building Official: Joe Cicio,Plans Examiner Threshold Inspector Contractor: Khris McConnell,Structure-Con 2030 371h Avenue Project Manager: ; Gene Ross,Elliott Merrill. Vero Beach,Florida 32960 File Phone: (772)569-1257 _Fax: (772)569-4041 www.mlengineeringinc.com j THRESHOLD INSPECTION REPORT OCEAN HARBOR NORTH BUILDING A 5151 NORTH HWY AlA,FT. PIERCE,FLORIDA 34949 SLC BUILDING PERMIT NUMBER: 170�8-0100 PROJECT NAME: Ocean Harbor North—Bldg A DATE: February 2,2018 CLIENT: Elliott Merrill Community Management LOCATION: Vero Beach,Florida CONTRACTOR: Structure-Con PROJECT MGR: Mr.Khris McConnell INSPECTED BY: Michael Lue WEATHER: Su m), cool I WORK IN PECTED: Units Ojj 11, 611,&711 Concrete slab in this building are reinforced concrete and not a post tensioned slab. I i OBSERVATIONS: All repairs were mostly along the slab edges as indicated in the repair plan. The full depth or surface spalls originally assessed at Unit 511 were not required! The damages were found to hairline cracks in the slab with no corroded reinforcing bars. The cracks in the slab caused failure of the tile bond to the slab which was thought to be spalling concrete. The cracks were epoxied. i I The damages at the slab corners were due to no reinforcing bars along the edge in the existing construction and compounded by the handrail post being in a cored pocket right at the comer of the slab. A#4 reinforcing bar was added along the slab edge at the corner to minimize or alleviate future cracking. RECOMMENDATIONS: All structural repairs have been completed in compliance with the design documents i II ' ,ffflflfll���, ��• NJ NONvp y •, F r < � * • r i i �r� :�,�'Q.• F G ,o�111i11111f4 f i I I I Page 1 of I