HomeMy WebLinkAboutEngineer Letter BREITENBACH ENGINEERING, INC johnbach442@gmail.com
4853 SE Pilot Way, Stuart, Florida 34997 Cell: (772)834-4743
April 12, 2021
To: Building Official; St. Lucie County, Building Division
2300 Virginia Avenue, Fort Pierce, Florida 34982
- I
Re: Specialty Building Inspections for Threshold Building Permit#SLC 2101-0212
Project: Exterior Concrete Restoration tgrassijr561@gmail.com
Oceana 1 North Condo Association Attn:Ted Grassi 772-229-3010
9940 Ocean Drive, Jensen Beach, FL 34957
General Contractor:
Conquer Restoration by Golden Esvin Vazquez
i
'I
Building Official:
This letter is to inform you as threshold building special inspector, John Breitenbach PE 59770, SI
#2072 that the Contractor, to the best of my knowledge, has successfully completed the Concrete
Restoration Project as outlined'in the Plans and Specifications of CSM Engineers, dated October
2020.
The inspection report is attached.
Should you have any questions, please contract me.
Respectfully,
i
It
NB'
�• SEi
:CC
�O FLOR\O
FSS f 0 10": RECEIVED
�e,rvv��!!►! AUG 2 0 1011
it
Permitting Department
St. Lucie County
John D. Breitenbach, PE
FL PE#59770, FL SI #2072, Firm Reg. #26001
(2)-copies to Contractor, (1)-copy to CSM, (1)-copy to Condo Assoc, file= 21033-1-Oceana 1 North
I
4-12-21 Completion Letter.doc
l II
21033-1-Oceana One N
Breitenbach Engineering, Inc Tel: 772-834-4743 johnbach442a_g mail.com
4853 SE Pilot Way, Stuart, FL 34997
Permit Number: SLC 2101-0212
Attention: Ted Grassi Job Number: 21033-1
e-mail: tqrassiir561@gmail.com esvin.goldencons!@gmail.com
Condo Assoc: Oceana I North Contact: Esvin Vazquez,Mario
9940 S. Ocean Drive Contractor: Conquer Restoration by Golden
Jensen Beach, FL 34857 Address: 5877 Las Colinas Cr, Lake Worth, FL
By: John D. Breitenbach, PE Tel:772-834-4743 Gate Code: 1#7272
PE#69770 SI#2072 johnbach442@ mail.com Billing Method: I hourly
I
Date Hours Description Day Time Comments Pass/Fail
1 Administrative Review specs,dwgs,set-up spreadsheets n.a.
2 Letter of Intent progress
3 3/26/21 1st inspection Unit 209, pre-demo ;' progress
4 3/30/21 2nd inspection Unit 209, pre-pour passed
5 4112/21 Close-out letter n.a.
6
7
8
9
end of April lAdministrative,reports&mailing
1
2
3
4
end of May lAdministrative,reports&mailing n.a.
1 I
i
2
3 j
4
5
6
7
8
9
end of June lAdministrative,reports&mailing
'I
i
I�
REPORTS WILL BE HELD UNTIL PAY REQUESTS jRECEIVED
Inspections are performed by the special inspector per the permitted plans and specifications according to the International Concrete
Repair Institute(ICRI).The FBC and ACI-318 do not address concrete restoration.City and County forms are not legal iper law.
Total Hrs: 0.00 See Letter of Intent and the Engineer's Plans&Specifications for additional information.
Send via: ( ]e-mail [x] U.S. Mail
[x]Contractor [x]CSM Engineers [x]Condo Association
file=c:112019-ProjectslCSM Note:Contractor responsible for filing with building department]
I
21033-1-Oceana One N
i
I