Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 3-11-22 I , i _ k Planning &Development Services ' 5 - 17J! Building &Code Regulation Division 0 2300 Virginia Ave o Fort Pierce, FL 34982 - - = 62-2172 Fax 772-462- 443 772 4 6 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT JOB ADD ESS: bIPUL1 e-AA- 406 BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: EVI T-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #:JB175775 'I We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: vZ — Chemicals used: DOMINION 2L. 'I Percentage of solution: .05 Total gallons used: .off SO Date of Treatment: Time of Treatment: . D k Footing Slab !L 1st Treatment X_1st Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other xxxxx Perimeter for Final Inspection 1st Treatment Re-Treat `g �- Signatu a of Exte minator Date Note: There must be a completed form for each required treatment or re-treatment and th/s form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection ill fail and a re-inspection fee charged. FBC104.2.6 Certificate of Protective Treatment For prevention of termites A weather reslstantjobsite posting board shall be provided to rece/ve dupl/cate Treatment Certificates as each requlred protecdve treatment/s completed, provid/ng a copy for the person the permit/s Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used,percent concentration and number of gallons used, to establ/sh a ver/liable record of protective treatment: If the soil chemical barrier method for termite prevention.is used, final exterior treatment shall be completed pnor to final bu/lding approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of apply i ations. Revised 7/24/2014