Loading...
HomeMy WebLinkAboutBuilding Permit ChecklistBOARD OF ':d �" PLANNING & DEVELOPMENT COUNTY SERVICES DEPARTMENT t COMMISSIONERS a"= - e Building &Code Regulation CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT ,7S2&- 7532 lkl H FL 3 Permit Number: Required Documents: Date: :2 / ldl 2 S2 _ Technician• Application completely filled out with Notarized Signatures ............................ Yes X No N/A Sub Agreements with Notarized Signatures (prior to issuance) .......................... Yes X No N/A Owner / Builder Affidavit (signed in office) ................................................. Yes No N/A X Filled Land Affidavit (prior to issuance) ................................................... Yes No N/A X t' Recorded Warranty Deed, if applicable ......................................................Yes No N/A X Recorded Notice of Commencement (prior to issuance or inspection) ................. Yes X No N/A Utility Agreement or Payment Receipt (prior to issuance).................................Yes No N/A X Vegetation Removal Application with copy of survey.....................................Yes No N/A_k Plans, Calculations & Attachments (3 copies commercial, 2 copies residential) Complete set of plans with Engineer / Architect Raised Seal ........................... Yes X No N/A Truss Plans reviewed and approved by Engineer / Architect ............................ Yes No N/A X Landscaping and Parking plan (under 6,000 sgft)......................................... Yes No N/A X Approved Site Plans........................................................................... Yes No N/AX Sealed Survey with Dimensions, Finished floor ........................................... Yes No N/A X Elevations and Setbacks.............................................................. Yes No N/A X Plot plan with Setbacks.........................................:...................... Yes No N/A X Health Department approval stamped on survey and floor plan ........................ Yes No N/A X Health Department Food Establishment Permit stamped on floor plan ................ Yes No N/A X Manual ' J" or Manual "N Calculations.................................................... Yes X No N/A Signed Energy Calculations (1 set original signatures & signed in 2 spots) ........... .YesX No N/A Sealed Wind Load Compliance Certification ............................................... Yes No N/AX Product Review Affidavit..................................................................... Yes No N/A X Excavatine a pond for fill: Site plan showing 25-foot(minimum) set back from all property boundaries, size, Yes_ No_ N/A X shape, location and quantities of proposed excavation and fill areas Side slopes not to exceed 4 to 1 to a minimum of 3 feet below water level......... Yes No N/A X Depth of excavation does not exceed 12 feet in depth .................................... Yes No N/A X If Hauling fill off site (excess of 100 cubic yards) you must have a mining permit Yes_ No_ N/A X Other: Health Department Permit Paperwork....................................................... Yes No N/A X CD for Fire Department if commercial or multi -family ................................... Yes X No N/A DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............ Yes No N/AX Pool Barrier Affidavit.......................................................................... Yes No N/A X Ground Sign Landscape Affidavit (signs) ................................................... Yes No N/AX Burn Rate for Sign Cabinets.................................................................. Yes No N/AX � � l RV and Mobile Home Tie -Down Only_(2 copies) Permit Worksheet (Tie -Down Diagram) ................................................... Yes No N/AX Manufacture Set -Up and Installation Manual .............................................. Yes No N/A X Manufacture Blocking Documents.......................................................... Yes No N/AX Signed Penetrometer Test (1 copy)......................................................... Yes No N/AX StairDetails.................................................................................... Yes No N/A x Mobile Home Inspection Report for Relocation (used only) ......... 4 ................. Yes —No —N/A X Copy of Title for Relocation (used only) ................................................... Yes_No N/A X Private Property not in a mobile home park Class "A" Approval from Planning or file # ................................................ Yes No N/A X COMMENTS Revised 1015118 PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATIONS DIVISION COMMERCIAL BUILDING PERMIT CHECKLIST When you submit your building permit application for a commercial project, you should use the following checklist to determine if your application submittal is complete. Only complete applications will be accepted for processing. Also, see the "Starting a Business in St. Lucie County" checklist. Zoning Compliance 1 Before you purchase or lease a proposed business or property, obtain a zoning compliance/use permit to ensure that your intended use or building is consistent with the current zoning designation on the property. Approved Site Plan 3 Sets If the proposed construction entails a drive -through or if the proposed building will exceed 6,000 square feet, it will be necessary to obtain site plan approval prior to submitting a building permit application. All such site plans must bear the Planning Dev Services stamp of approval. Please contact Planning Dev Services at 772-462-2822. Health Department Septic 1 If you are planning to use or expand an existing or construct a new Permit septic system, you must first obtain Health Department approval for the system. All floor plans and all surveys must bear the original Health Department approval stamp. Please contact the Health Department at 772-873-4931. Health Department Food 1 Floor plans for all new, renovated and remodeled Department of Establishment Permit Health regulated food facilities must bear the original Health Department approval stamp. Please contact the health Department at 772-873-4931. Fire Department Permit 1 All commercial buildings or projects that in any way serve the public require approval from the Fire Department. Specific requirements may apply to your project that may all impact the cost of your construction. Please contact the Fire Department at 772-621-3322. ADA Handicap If you are starting a new business or renovating an existing business Requirements that in any way serves the public, you are required by Federal Law to comply with the American Disabilities Act, which requires removal of all barriers that would restrict access to a person with disabilities. This includes restroom facilities and providing handicap -parking facilities.