Loading...
HomeMy WebLinkAboutProject RequirementsPlanning & Developmental Services Department Building & Code Regu lations. Division. PROJECT REQUIREMENTS 2202-0390 . POST TENSIONED STRUCTURE NO MODIFICATION TO THE SLAB OR DECK ABOVE (INCLUDING DRILLING, NOTCHING, CUTTING) IS PERMITTED UNDER THIS PERMIT. All work shall comply with the Florida Building Code Sixth Edition (2020), Building, Existing Building, Fuel Gas, Mechanical, Plumbing, Accessibility. FLORIDA BUILDING CODE EXISTING 302.3 EXISTING MATERIALS. _Materials already in use in a building -in compliance with requirements or approvals in effect at. the time of their erection 'or installation shall be permitted to remain in use unless determined: by the building official to be unsafe. 702.6 MATERIALS AND. METHODS. All new work shall comply with the materials and methods requirements in the Florida building code, building; Florida building code, energy conservation; Florida building code, mechanical; and Florida building code, plumbing, as applicable, that specify, material standards, detail of installation and connection, joints, penetrations, and continuity of any element, component, or system in the building. 703.1 GENERAL. Alterations shall be done in a manner that maintains the level of fire protection provided. FLORIDA BUILDING CODE GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER 2506.2 STANDARDS. Gypsum board and gypsum panel products shall conform to the appropriate standards listed in Table 2506:2 and Chapter 35 and; where required for fire protection, shall conform to the provisions of Chapter 7. 2508.1 GENERAL. Gypsum board, gypsum panel products and gypsum plaster construction shall be of the materials listed in Tables 2506.2 and 2507.2. These materials shall be assembled and installed in compliance with the appropriate standards listed in Tables 2508.1 and 2511.1.1 and Chapter 35. r Revised 12113119