Loading...
HomeMy WebLinkAbout30 Day Temporary Power ReleaseJ, Building 7r raeg Cad s as ,.=k 6 s sis i 7 ;b; q s'i: a13 w} r r c m Ave F oP . t., ,., ,� g� ., Rt.•«t$}„ec°! for 1®,��. t ;•,.fSa�,i'` t 4.r °t->e Yw.`a�.i. s-s s 1 €•.. t' ,ts b + 0" Project c THE UNDERSIGNED [HEREBY REQUEST RELEASE OF I_LE t UCAL. POWER, T€'2 THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED 7 I IRTY (3a) DAYS, FOR THE PURFOSE.OF TESL ING SYSTEM AND EQUIPMENT IN PREPARATIOR FOR A FINAL INSPECi'ION. IN C{ONSIDERA!TO 1! OF APPROVAL:OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS K}LLQlNS: 1. This temporary Power release is requested. for the above stated purpose only, and there wilt be no occupancy of any type, other than that permitted by construction, during this tine period; 2. As Witness by our sionatures,, we hereby agree to abide by alhteims and conditions .of this.,agreement, including Building Division Policy, which 'is 'ncorporated.herein;by reference. 3. All conditions and requirements, listed in the attached docciment :entitledRequiremerits for 30. tray Power fur Testing" have been fulfilled:antl the premise is ready for compliance insfion . 4. All requests for an extension beyorid.30 days must be made +n. writing to the Building:(lfFicia( stating: the reason.for the request. P, ower maybe remwed.from,the,site andjor a Stop, Work,Order issued it the Final Inspection has not been approved° within 30. days. A fee of $1©6.00 will tie required to lift the'Stop Work'Order. WE HEREBY RELEASE AND AGREE TO -HOLD HARMLESS, ST..LUCIE COUfIfTYr AN' 1`H6=II,-EMPLOYEES FROM ALL, LM BILITIES A111L? CLAIMS OF ANY TYPE OF MATURE WHICH. MAY ARISE NOW'OR IN T kt- FUTURE OUT OF THIS TRANSACij0N,.INCLUDING ANY DAM4.AGE` MAY 8E INCURRED DUE TO THE DISCONNECTION OF ELfiCTfiICAL FC3!>7iE -IN THE` EVENT OF VIOLATION OF tHIS AGREFAENT. �))oIIs