Loading...
HomeMy WebLinkAboutBlower Door Test 10-7-18FBC, Energy. The building:or dwelling unit shall be tested and:vedfied as having an air leakage: rate of not exceeding 7 air changes per hour in:Climate Zone 1;2 and 3 air changes per hour in Climate Zones 3;through 8: Testing shall be conducted .with a blower,door ata pressure of 0.2 inches w: g. ($0 Pascals). Testing shall be conducted by either.individuals'as defined in Section.553.993(5) or (7), Florida Statutes or individuals.licensed as set forth in:Section.489..105 (3)(f),Jg) or.(i);or an approved third party.. A:written_ report of the results of the test shall be signed by. the party:conducting the test and .provided to the code.officiol. Testing shali.be performed of any time After creation of all. penetrations. of, the building thermal envelope. FBC, Residential_ :. where the.air.infiltration rate of. a dwelling.unit.is lessthari.5 air..changes per hour when tested With a blower door at, a ; pressure of 0.2.inch w. c. (50:P8) in accordance with section R402.4.:1:2 of the Florida Building Code,:Energy Conservation the dwelling:unit shall be 'provided.with whole=house mechanical ventilation in accordance with Section :M1507.3. .Testing Company Company Name: _GFA-International,. Inc Address:. "607 NW.Commodity. Cove, Port St. Lucie, Florida I hereby certify that the above: Ho filtration results demonstrate compliance with FBC Energy Conservation requirements in Accordance wi Sectio . R402.4:1:2 Climate Zone 2. Signata re: Printed Name: Mictiaei-Anderson License/Certification #:. BPI 5059963