Your Project is Our Commitment
December 27, 2017
Mr. Tom Butler
Bodax Foundations, Inc.
1101 NW 55th Street
Ft. Lauderdale, Florida 33309
171D.-oq2 q
RECEIVED
JAN 5 20i8
ST. Luck county, P9rmitting
Subject: Report of Augercast Pile Installation Monitoring
Proposed Halbert Residence
Lot 52, 4884 Watersong Way
Hutchinson Island, Florida
Dear Mr. Butler:
J I V IYCF/LU I IC U1I VC
Boynton Beach, Florida 33426
561-736-4900
Toll Free: 877-NUTTING (688-8464)
Fax:561-737-9975
Broward 954-941-8700
St. Lucie 772-408-1050
Miami -Dade 305-557-3083
www.nuttingengineers.com
Nutting Engineers of Florida, Inc. (NE) has completed observation of augercast piling operations
for the proposed residence and pool at the subject site. Bodax Foundations, Inc. installed cast -in -
place augured piles for support of the proposed construction.
Bodax Foundations, Inc. installed a total of 56, 14-inch diameter augercast piles for the project.
The piles were installed from December 7 to December 14, 2017. Please refer to the pile plan
for the numbering provided to our office. The pile size and depth recommendations were based
upon our review of the Report of Geotechnical Exploration prepared by GFA International dated
August 12, 2015.
The pile installation characteristics of each pile are presented in the attached Pile Installation
Data. Identification of each pile location followed by the pile number is shown on the Pile
Location Plans attached. Each pile record in the attached summary tables shows the following
information:
OFFICES
Palm Beach
Miami -Dade
St. Lucie
■ RECORD NUMBER IN CHRONOLOGICAL ORDER
■ THE PILE NUMBER (AS FOUND ON ATTACHED PLANS)
■ THE DIAMETER OF THE PILE
■ THE LENGTH OF PILE FROM GROUND SURFACE TO TIP
■ THE THEORETICAL VOLUME OF GROUT FOR THE PILE
■ THE NUMBER OF PUMP STROKES FOR THE PILE
■ THE ACTUAL VOLUME OF GROUT FOR THE PILE,
■ THE GROUT FACTOR
■ THE DATE OF INSTALLATION
■ THE REINFORCEMENT TYPES nk
■ AND GENERAL COMMENTS AS NEEDED
The drilling operations were monitored in the field by our field engineer and inspector in order to
approximately determine the type of material being penetrated. This identification was done
based on the augering time, the materials received during the drilling operations and the relative
hardness of the soils/rocks as indicated by the vibration or "chattering" of the hydraulic lines.
The augercast piles were installed to depths of twenty-five feet below the existing ground surface
which was approximately three to four feet below adjacent crown of road elevations. The .piles
were designed for an allowable compressive capacity of 30 tons as required by the structural
specifications.
Generally, during the installation of the piles, easy drilling was observed from the ground level to
approximately twenty feet. Below this depth range hard drilling was encountered to the final tip
depth.
All piles received steel reinforcement consisting of an upper fifteen -foot cage with 4, 45
reinforcing bars with #3 ties spaced 10-inch on center, and a central 47 full length reinforcing bar
as stated in the structural documents.
Upon completion of this inspection process, and review of the recorded data, it is our opinion
that the augercast piles installed for the residence attained the required design compressive
capacity of 30 tons. The piles that were presently installed were constructed in substantial
compliance with the plans and specifications.
We note that it was monitored and ensured that the piles began installation at the survey locations
provided in the field. If during drilling operations it was discovered that gross deviations from
original locations have occurred, the deviation was attempted to be rectified. Nutting Engineers
is not responsible for minor deviations which have occurred during drilling operations, along
with incorrect surveyed pile locations during piling installation. We also note that some
deviations may be due to the augerdrill shifting when attempting to drill through the hard rock or
other encountered debris conditions. This condition is beyond the control of the site inspector
and undersigned engineer.
Our client for this project was:
Mr. Tom Butler
Bodax Foundations, Inc.
1101 NW 551h Street
Ft. Lauderdale, Florida 33309
Hutting
E Engineers
of Florida Inc. I Established 1967
2
The contents of this report are for the exclusive use of the client, the client's design &
construction team and governmental authorities for this specific project exclusively. Information
conveyed in this report shall not be used or relied upon by other parties or for other projects
without the expressed written consent of NE.
We appreciate this opportunity to work with you on this project and look forward to completing
this and future projects with you. Should you have any questions or if we can be of any further
assistance, please contact us at your convenience.
Respectfully Submitted,
NUTTING ENGINEERS OF FLORIDA, INC.
Richard C. Wohlfarth, P.E.
Director of Engineering
Attachments: Pile Location Plans
Pile Installation Data
LTR BODAX LOT 52-4884 WATERSONG HUTCHINSON 1SL ACP CEO
Hutting
E Engineers
of Florida Inc. I Established 1967
3
E. Gworek, P.E. #69947
Leer`- y
i
1 I 2 )3 I 41 I 15
(3) •6 TOP
N 4 .17' xd'-m' . U' O.C.
BEARING WA 6' CONCRETE 6LAB W DEGREE HOOK
(31 5 TOP
6• CCl1CRETE 5 ,. U' STIRFUUNO.
1 • nrtt COVER
m-m F aLaB
-- 1
I
ZZ g
0
—
a a `2Jt
N
h
0 §8
� UV U �S
N
i • 17° Ed I c (31 Y BOTTOM
13 • 01 UNO. ILE 'OlEL
-1 PILE DOML (3).5 BOnal �
IL' 4t' AUGERCAST PILMG
SO✓� Id" AWER.AST PILMG � I0.
L
L1 GRADE BEAM 4 jRADE BEAM 2
N.T.S. AT ELEVATOR PAD
I "
r jY �P K
K S' CONCF£TE 5
°FERlMETER) BLOCK WALL h
V •12• W-m" • 18. Ol . /w
TRANSFER STEEL '4 A-m' • 12" or -
OVER NTERICR •
HOOK GRADE BEAM [3) 5 TL+P � �E [31 � T TOP O W
MIDDLE W Z 1
5.,M, uNo. mw J ti
J - I t5• MPL COVER
°d . 0' I B
LAB 0
EA 1my
I - s RAGE)
6' CCNCfETE 6LAB i 12. U� •1 PILE DOlEL rW _
[ (3) 5 BOTTOM
F (3) -I 20TTCM Z b
Y y td° AUGEICAST (I� O
!1 PILE DOXI L S, 9' FILM � ' .0
9 9'�
14' AIAERC4*TFILMf1
fi FILM 18°
G1 GRADE BEAM 3 G jRADE BEAM 1 J v
N.T.S. N.T.e - 0
G U `
I 5,�, T•5, J II
i CL t,y
!li
F l+ F
� 1
ZMIL VAPOR u}
E IED FILL p W E
z,
v�
_ �f3 : ----- - -
io."°" by
—1., Nc
C I] 5'-1PC-3 e•da n° Nw C
' Y•6'
DATE
'r �.- 1 PflOL@SS kV. 7 10- 7-17
I �f
I
Sheet No:
AAPPK�A
1 ct --
1 2 I 3 4! I 15 I 16
BODAX FOUNDATIONS
Proposed Halbert Residence
4884 Watersong Way
Hutchinson Island, Florida
PILE LOG DATA OF AUGERCAST PILE INSTALLATION
NUTTING ENGINEERS OF FLORIDA, INC.
Record
No.
Pile;No.
Pile Dia.
(in)
Length
ft
( )
T.
Theoretic.
Pile
Volume
(ft3�
Pump
Strokes
.Total
Volume of
Grout
pumped
ft3
Grout
Factor
Date
Installed
Remarks
2
2
14.0
25
26.7
32
33.6
3
8
14.0
25
26.7
35
36.8
��u
07/17
movedas
6
15
14.0
25
26.7
32
33.6
1.26
12/12/17
7
17
14.0
25
26.7
35
36.8
1.38
12/12/17
8
30
14.0
25
26.7
33
34.7
1.30
12/12/17
9
31
14.0
25
26.7
37
38.9
1.45
12/12/17
10
18
14.0
25
26.7
37
38.9
1.45
12/12/17
11
42
14.0
25
26.7
35
36.8
1.38
12/12/17
12
7
14.0
25
26.7
38
39.9
1.49
12/12/17
13
14
14.0
25
26.7
36
37.8
1.41
12/12/17
14
16
14.0
25
26.7
34
35.7
1.34
12/12/17
15
28
14.0
25
26.7
38
1 39.9
1.49
12/12/17
16
27
14.0
25
26.7
35
36.8
1.38
12/12/17
17
41
14.0
25
26.7
38
39.9
1.49
12/12/17
18
54
14.0
25
26.7
70
73.5
2.75
12/12/17
redrill
19
1
14.0
25
26.7
37
38.9
1.45
12/12/17
20
3
14.0
25
26.7
35
36.8
1.38
12/12/17
21
6
14.0
25
26.7
34
35.7
1.34
12/12/17
22
55
14.0
25
26.7
38
39.9
1.49
12/12/17
23
29
14.0
25
26.7
42
44.1
1.65
12/12/17
24
40
14.0
25
26.7
46
48.3
1.81
12/12/17
25
12
14.0
25
26.7
33
34.7
1.30
12/12/17
26
11
14.0
25
26.7
36
37.8
1.41
12/12/17
27
10
14.0
25
26.7
42
44.1
1.65
12/12/17
28
9
14.0
25 1
26.7
36
37.8
1.41
12/12/17
29
22
14.0
25
26.7
34
35.7
1.34
12/12/17
30
4
14.0
25
26.7
36
37.8
1.41
12/12/17
31
53
14.0
25
26.7
38
39.9
1.49
12/12/17
32
52
14.0
25
26.7
42
44.1
1.65
12/12/17
redrill
35
20
14.0
25
26.7
44
46.2
1.73
12/13/17
36
44
14.0
25
26.7
34
35.7
1.34
12/13/17
37
32
14.0
25
26.7
35
36.8
1.38
12/13/17
38
33
14.0
25
26.7
42
44.1
1.65
12/13/17
39
19
14.0
25
26.7
35
36.8
1.38
12/13/17
40
56
14.0
25
26.7
42
44.1
1.65
12/13/17
41
23
14.0
25
26.7
56
58.8
2.20
12/13/17
redrill
42
48
14.0
25
26.7
42
44.1
1.65
12/13/17
43
34
14.0
25
26.7
44
46.2
1.73
12/13/17
44
24
14.0
25
26.7
36
37.8
1.41
12/13/17
Hutting
E Engineers
of Florida Inc. I Established 1967
BODAX FOUNDATIONS
Proposed Halbert Residence
4884 Watersong Way
Hutchinson Island, Florida
PILE LOG DATA OF AUGERCAST PILE INSTALLATION
NUTTING ENGINEERS OF FLORIDA, INC.
Record
'No.
Pile,No.
-Pile Dias'
(in)
Pile
Length
(ft)
Theoretic.'
Pile
Volume
Pump
Strokes
Total
Volume of
Grout'
pumped
Grout
Factor
Date
Installed .
Remarks
45
35
14.0
25
26.7
40
42.0
1.57
12/13/17
46
49
14.0
25
26.7
41
43.1
1.61
12/13/17
47
50
14.0
25
26.7
45
47.3
1.77
12/13/17
48
25
14.0
25
26.7
34
35.7
1.34
12/13/17
49
36
14.0
25
26.7
39
41.0
1.53
12/13/17
50
26
14.0
25
26.7
37
38.9
1.45
12/13/17
51
37
14.0
25
26.7
35
36.8
1.38
12/13/17
52
38
14.0
25
26.7
42
44.1
1.65
12/13/17
53
51
14.0
25
26.7
36
37.8
1.41
12/13/17
54
21
14.0
25
26.7
32
33.6
1.26
12/13/17
55
45
14.0
25
26.7
31
32.6
1.22
12/14/17
56
43
14.0
25
26.7
36
37.8
1.41
12/14/17
Total linear feet drilled
1400
Total Grout VoL. (yd3) 85
PILE LOG BODAX 4884 WATERSONG WY HUTCHINSON ISL ACP CEG
Minimum depth drilled
25
Maximum depth drilled
25
Hutting
E Engineers
of Florida Inc. I Established 1967
��§s0