Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PROJECT INFORMATION
9 @ Load Short Form Job: 1618 wri htsoft Date: 9/14/2021 Zone 1 By: Chris Bateman Air CaICs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyrrie@aircalcs.com Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Information Htg Clg Infiltration Outside db(°F) 41 90 Method Blower door Inside db(°F) 70 75 Shielding/stories 4(substantial)/2 Design TD(°F) 29 15 Pressure/AVF 50 Pa/2264 cfm Daily range - L Inside humidity(%) 30 50 Moisture difference(gr/Ib) 2 57 HEATING EQUIPMENT COOLING EQUIPMENT Make Generic Make Generic Trade Trade Model SEER 18.0,HSPF 9.1 Cond SEER 18.0,HSPF 9.1 AHRI ref Coil AHRI ref Efficiency 9.1 HSPF Efficiency 14.7 EER, 18 SEER Heating input Sensible cooling 8667 Btuh Heating output 12320 Btuh @ 47°F Latent cooling 3715 Btuh Temperature rise 27 °F Total cooling 12382 Btuh Actual airflow 413 cfm Actual airflow 413 cfm Air flow factor 0.041 cfm/Btuh Air flow factor 0.054 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 0.71 Capacity balance point=36°F ROOM NAME Area Htg load Clg load Htg AVF CIg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Game Room 1 321 2829 3364 115 180 Game Room2 528 6129 3209 250 172 Stairs 1B 96 0 0 0 0 Study 152 1164 1035 47 56 AHU 1 20 0 0 0 0 Bath 47 0 92 0 5 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft, 2022-Jan-17 11:15:35 II.--Iae„n„e1.-..,C—,�, Right-Sute®Universal 202121.0.11 RSU29066 Page 1 ..cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Zone 1164 10122 7699 413 413 Other equip loads 610 324 Equip.@ 1.00 RSM 8023 Latent cooling 3233 TOTALS 1164 10732 11256 413 413 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft, 2022-Jar07 11:15:35 AI.--Iae„n„e1,nawa.—,, Right-Sute®Urrversal202121.0.11 RSU29066 Page 2 ..cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N 9 @ Load Short Form Job: 1618 wri htsoft Date: 9/14/2021 Zone 2 By: Chris Bateman Air CaICs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyrrie@aircalcs.com Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Information Htg Clg Infiltration Outside db(°F) 41 90 Method Blower door Inside db(°F) 70 75 Shielding/stories 4(substantial)/2 Design TD(°F) 29 15 Pressure/AVF 50 Pa/2264 cfm Daily range - L Inside humidity(%) 30 50 Moisture difference(gr/Ib) 2 57 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Lennox Trade Trade LENNOX Model Cond ML14XC1S024-230A** AHRI ref Coil CBA27UHE-024-230*++TDR AHRI ref 10259435 Efficiency 100 EFF Efficiency 13.0 EER, 16 SEER Heating input 4.8 kW Sensible cooling 17280 Btuh Heating output 16354 Btuh Latent cooling 6720 Btuh Temperature rise 19 °F Total cooling 24000 Btuh Actual airflow 800 cfm Actual airflow 800 cfm Air flow factor 0.046 cfm/Btuh Air flow factor 0.060 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 0.68 ROOM NAME Area Htg load Clg load Htg AVF CIg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Cabana 74 2105 626 97 38 Family 440 5893 5359 273 324 Kitchen 427 2860 3038 132 184 Stairs 1A 128 0 0 0 0 Office 100 3235 1974 150 119 Dining 180 3202 2187 148 132 Pantry 33 0 50 0 3 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft, 2022-Jan-17 11:15:35 11.1-1ae„n„e1.-..,C—,�, Right-Sute®Universal 202121.0.11 RSU29066 Page 3 ..cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Zone 2 1381 17295 13234 800 800 Other equip loads 1874 995 Equip.@ 1.00 RSM 14230 Latent cooling 6843 TOTALS 1381 19169 21072 800 800 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft, 2022-Jar07 11:15:35 AI.--Iae„n„e1,nawa.—,, Right-Sute®Urrversal202121.0.11 RSU29066 Page 4 cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N 9 @ Load Short Form Job: 1618 wri htsoft Date: 9/14/2021 Zone 3 By: Chris Bateman Air CaICs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyrrie@aircalcs.com Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Information Htg Clg Infiltration Outside db(°F) 41 90 Method Blower door Inside db(°F) 70 75 Shielding/stories 4(substantial)/2 Design TD(°F) 29 15 Pressure/AVF 50 Pa/2264 cfm Daily range - L Inside humidity(%) 30 50 Moisture difference(gr/Ib) 2 57 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Lennox Trade Trade LENNOX Model Cond ML14XC1S030-230A** AHRI ref Coil CBA27UHE-030-230*++TDR AHRI ref 10259437 Efficiency 100 EFF Efficiency 13.0 EER, 16 SEER Heating input 7.1 kW Sensible cooling 20590 Btuh Heating output 24071 Btuh Latent cooling 8410 Btuh Temperature rise 23 °F Total cooling 29000 Btuh Actual airflow 967 cfm Actual airflow 967 cfm Air flow factor 0.047 cfm/Btuh Air flow factor 0.059 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 0.67 ROOM NAME Area Htg load Clg load Htg AVF CIg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Master Hall 124 0 0 0 0 Bath 3 40 393 231 18 14 Clst 28 58 42 3 2 Hers 71 161 116 7 7 Master Bed 310 2882 2211 134 131 His 67 1101 482 51 28 Laundry 1 92 909 1388 42 82 Stairs 2A 122 1342 837 62 49 Stairs 2B 94 1826 1079 85 64 Clst 2 42 609 363 28 21 Hall 2 84 0 0 0 0 Laundry 2 55 626 917 29 54 Bed 4 188 867 1277 40 75 Bed 5 226 1445 1808 67 107 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft, 2022-Jan-17 11:15:35 M.ew•I--- ,nawa.=omP Right-Sute®Universal 2021 21.0.11 RSU29066 Page 5 ..cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Lin 11 0 0 0 0 Bath 4 50 893 652 42 39 Master Bath 154 1013 552 47 33 Bed 3 162 1262 1474 59 87 Bath 2 55 1053 479 49 28 Bed 2 289 2453 1562 114 92 Clst 3 60 1069 469 50 28 Wtr Clst 28 718 351 33 21 Pwdr Room 52 113 81 5 5 Zone 3 2402 20794 16371 967 967 Other equip loads 2200 1168 Equip.@ 1.00 RSM 17539 Latent cooling 8520 TOTALS 2402 22994 26058 967 967 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft, 2022-Jar07 11:15:35 AI.--Iae„n„e1,nawa.—,, Right-Sute®Urrversal202121.0.11 RSU29066 Page 6 ..cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Building Analysis Job: 1618 +� wrightsoft° gna Date: 9/14/2021 Zone 1 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Conditions Location: Indoor: Heating Cooling St Lucie Co Intl,FL,US Indoor temperature(T) 70 75 Elevation: 26 ft Design TD(T) 29 15 Latitude: 28°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 2.4 56.9 Dry bulb(T) 41 90 Infiltration: Daily range(T) - 15 ( L ) Method Blower door Wet bulb(T) - 77 Shielding/stories 4(substantial)/2 Wind speed(mph) 15.0 7.5 Pressure/AVF 50 Pa/2264 cfm amme Component Btuh/ft2 Btuh %of load Walls 2.6 1935 18.0 Ventilation Glazing 9.0 1645 15.3 walls Ducts Doors 3.7 89 0.8 Ceilings 1.6 127 1.2 Floors 2.5 2954 27.5 Infiltration Infiltration 3.0 2839 26.5 Glazing Ducts 533 5.0 Piping 0 0 Humidification 0 0 Other Ventilation 610 5.7 Adjustments 0 Total 1 1107321 100.01 Floors • • • Component Btuh/ftz Btuh %of load Walls 1.1 809 10.1 Walls Ventilation Glazing 13.6 2486 31.0 Doors 3.7 89 1.1 Ceilings 1.2 98 1.2 Floors 0 0 0 Internal Gains Infiltration 1.0 918 11.4 Glazing Ducts 618 7.7 Ventilation 324 4.0 Internal gains 2680 33.4 Blower 0 0 Adjustments 0 Other Ducts Total 1 180231 100.01 Infiltration Latent Cooling Load=3233 Btuh Overall U-value=0.118 Btuh/ft2-°F Data entries checked. wrightsoft- 2022-Jan-17 11:15:35 �� ^.-k-I-1. .111-,1. ° Right-SuiteO Universal 202121.0.11RSU29066 Pagel cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Building Analysis Job: 1618 +� wrightsoft° gna Date: 9/14/2021 Zone 2 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Conditions Location: Indoor: Heating Cooling St Lucie Co Intl,FL,US Indoor temperature(°F) 70 75 Elevation: 26 ft Design TD(°F) 29 15 Latitude: 28°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 2.4 56.9 Dry bulb(°F) 41 90 Infiltration: Daily range(°F) - 15 ( L ) Method Blower door Wet bulb(°F) - 77 Shielding/stories 4(substantial)/2 Wind speed(mph) 15.0 7.5 Pressure/AVF 50 Pa/2264 cfm amme Component Btuh/ft2 Btuh %of load Walls 2.7 3302 17.2 Walls Ventilation Glazing 8.9 1982 10.3 Doors 3.7 162 0.8 Ceilings 1.6 459 2.4 Ducts Floors 3.4 4646 24.2 Glazing Infiltration 3.0 3584 18.7 Ducts 3161 16.5 Other Piping 0 0 Ceilings Humidification 0 0 Ventilation 1874 9.8 Infiltration Adjustments 0 Floors Total 19169 100.0 • • • Component Btuh/ft2 Btuh %of load Walls 1.2 1449 10.2 Walls Ventilation Glazing 14.7 3276 23.0 Doors 3.7 164 1.2 Ceilings 1.2 353 2.5 Floors 0 0 0 Glazing / Internal Gains Infiltration 1.0 1159 8.1 Ducts 2053 14.4 Ventilation 995 7.0 Internal gains 4780 33.6 Other Blower 0 0 Ceilings Adjustments 0 Infiltration Total 1 1142301 100.01 Ducts Latent Cooling Load=6843 Btuh Overall U-value=0.145 Btuh/ft2-°F Data entries checked. wrightsoft- 2022-Jan-17 11:15:35 �� ^.-k-I-1. .111-,1. ° Right-SuiteO Universal 202121.0.11 RSU29066 Page cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Building Analysis Job: 1618 +� wrightsoft° gna Date: 9/14/2021 Zone 3 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Conditions Location: Indoor: Heating Cooling St Lucie Co Intl,FL,US Indoor temperature(°F) 70 75 Elevation: 26 ft Design TD(°F) 29 15 Latitude: 28°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 2.4 56.9 Dry bulb(°F) 41 90 Infiltration: Daily range(°F) - 15 ( L ) Method Blower door Wet bulb(°F) - 77 Shielding/stories 4(substantial)/2 Wind speed(mph) 15.0 7.5 Pressure/AVF 50 Pa/2264 cfm amme Component Btuh/ft2 Btuh %of load Walls 2.6 5239 22.8 Ventilation Glazing 8.9 2082 9.1 Walls Doors 0 0 0 Ducts Ceilings 1.6 3786 16.5 Floors 0.5 113 0.5 Infiltration 3.0 6723 29.2 Ducts 2852 12.4 Glazin Piping 0 0 Humidification 0 0 Ventilation 2200 9.6 Infiltration Adjustments O 'Ceilings Total 22994 100.0 Other • • • Component Btuh/ftz Btuh %of load Walls 1.4 2771 15.8 Walls Ventilation Glazing 16.7 3907 22.3 Doors 0 0 0 Internal Gains Ceilings 1.2 2917 16.6 Floors 0.4 100 0.6 Infiltration 1.0 2174 12.4 Ducts 2002 11.4 Glazing Ducts Ventilation 1168 6.7 Internal gains 2500 14.3 Blower 0 0 Adjustments O Infiltration Total 1 1175391 100.01 Ceilings Other Latent Cooling Load=8520 Btuh Overall U-value=0.243 Btuh/ftz--°F Data entries checked. wrightsoft- 2022-Jan-17 11:15:35 �� ^.-k-I-1. .111-,1. ° Right-SuteO Universal 202121.0.11 RSU29066 Page cunents\Wrightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Constructions Job: 1618 +� wrightsoft° Component Date: 9/14/2021 Zone 2 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Conditions Location: Indoor: Heating Cooling St Lucie Co Intl,FL,US Indoor temperature(T) 70 75 Elevation: 26 ft Design TD(T) 29 15 Latitude: 28°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 2.4 56.9 Dry bulb(T) 41 90 Infiltration: Daily range(T) - 15 ( L ) Method Blower door Wet bulb(T) - 77 Shielding/stories 4(substantial)/2 Wind speed(mph) 15.0 7.5 Pressure/AVF 50 Pa/2264 cfm Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ftUF W-T/Btuh Btuh/ft' Btuh Btuh/ft' Btuh Walls Block R-9 Wall:Blk Wall,Stuc Ext,8"Thk,R-9 Foam Fill, 1/2"Gyp Bd n 121 0.089 9.0 2.58 313 1.08 131 e 293 0.089 9.0 2.58 756 1.08 316 s 228 0.089 9.0 2.58 588 1.08 246 w 299 0.089 9.0 2.58 771 1.08 322 all 942 0.089 9.0 2.58 2428 1.08 1015 Partitions Fnn Wall, 1/2"Gyp Bd Ext,R-11 Cav Ins, 1/2"Gyp Bd Int Fnsh,2"A", 16" 298 0.101 11.0 2.94 874 1.46 434 OC Stud Windows Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% w 16 0.310 0 8.99 139 18.3 284 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (5.17 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.24);50%blinds 45°,light;50% n 4 0.260 0 7.54 31 6.83 28 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (4.17 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.20);50%blinds 45°,light;50% a 96 0.310 0 8.99 863 6.89 661 outdoor insect screen;foreground=green grass(0.23); 12 ft overhang(8 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% e 18 0.310 0 8.99 165 8.85 163 outdoor insect screen;foreground=green grass(0.23);9 ft overhang (4.17 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.24);50%blinds 45°,light;50% s 4 0.260 0 7.54 31 8.83 37 outdoor insect screen;foreground=green grass(0.23); 12 ft overhang (4.17 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.17);50%blinds 45°,light;50% w 10 0.280 0 8.12 80 16.3 161 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (4.08 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% w 37 0.310 0 8.99 329 8.85 324 outdoor insect screen;foreground=green grass(0.23);9.3 ft overhang (6.1 ft window ht, 1 ft sep.);8 ft head ht wright90ft- 2022-Jan-17 11:15:36 Right-Sutee Universal 2021 21.0.11 RSU29066 Page 1 �'CA .ents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% w 38 0.310 0 8.99 342 18.6 707 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (6.25 ft window ht, 1 ft sep.);8 ft head ht Doors Fbrgls Door e 20 0.127 7.0 3.69 74 3.73 75 w 24 0.127 7.0 3.69 89 3.73 89 all 44 0.127 7.0 3.69 162 3.73 164 Ceilings Attic,Metal Roof,R-20 Roof Deck Ins,5/8"Gyp Bd Int Fnsh 291 0.386 21.0 1.58 459 1.21 353 Floors On Grade Depth,Tile Flr Fnsh 162 0.989 0 28.7 4646 0 0 w rig ht90ft- 2022-Jar0 7 11:15:36 Right-Sutee Urrversal 2021 21.0.11 RSU29066 Page 2 �'CA curnents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Frord Door faces:N Constructions Job: 1618 +� wrightsoft° Component Date: 9/14/2021 Zone 1 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Conditions Location: Indoor: Heating Cooling St Lucie Co Intl,FL,US Indoor temperature(T) 70 75 Elevation: 26 ft Design TD(T) 29 15 Latitude: 28°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 2.4 56.9 Dry bulb(T) 41 90 Infiltration: Daily range(T) - 15 ( L ) Method Blower door Wet bulb(T) - 77 Shielding/stories 4(substantial)/2 Wind speed(mph) 15.0 7.5 Pressure/AVF 50 Pa/2264 cfm Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ftUF W-T/Btuh Btuh/ft' Btuh Btuh/ft' Btuh Walls Block R-9 Wall:Blk Wall,Stuc Ext,8"Thk,R-9 Foam Fill, 1/2"Gyp Bd n 306 0.089 9.0 2.58 788 1.08 330 e 181 0.089 9.0 2.58 466 1.08 195 s 47 0.089 9.0 2.58 120 1.08 50 w 218 0.089 9.0 2.58 561 1.08 234 all 751 0.089 9.0 2.58 1935 1.08 809 Partitions (none) Windows Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% e 31 0.310 0 8.99 283 18.3 577 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (5.17 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% n 47 0.310 0 8.99 421 6.85 321 outdoor insect screen;foreground=green grass(0.23);2 ft overhang(5.2 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.20);50%blinds 45°,light;50% e 48 0.310 0 8.99 432 9.99 479 outdoor insect screen;foreground=green grass(0.23); 10 ft overhang(8 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% w 57 0,310 0 8.99 510 18.6 1055 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (6.25 ft window ht, 1 ft sep.);8 ft head ht Doors Fbrgls Door n 24 0.127 7.0 3.69 89 3.73 89 Ceilings Attic,Metal Roof,R-20 Roof Deck Ins,5/8"Gyp Bd Int Fnsh 81 0.386 21.0 1.58 127 1.21 98 Floors On Grade Depth,Tile Flr Fnsh 103 0.989 0 28.7 2954 0 0 wright90ft- 2022-Jan-17 11:15:36 Right-Sutee Universal 2021 21.0.11 RSU29066 Page 3 �'CA .ents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Constructions Job: 1618 +� wrightsoft° Component Date: 9/14/2021 Zone 3 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Design Conditions Location: Indoor: Heating Cooling St Lucie Co Intl,FL,US Indoor temperature(T) 70 75 Elevation: 26 ft Design TD(T) 29 15 Latitude: 28°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 2.4 56.9 Dry bulb(T) 41 90 Infiltration: Daily range(T) - 15 ( L ) Method Blower door Wet bulb(T) - 77 Shielding/stories 4(substantial)/2 Wind speed(mph) 15.0 7.5 Pressure/AVF 50 Pa/2264 cfm Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ftUF W-T/Btuh Btuh/ft' Btuh Btuh/W Btuh Walls Block R-9 Wall:Blk Wall,Stuc Ext,8"Thk,R-9 Foam Fill, 1/2"Gyp Bd n 508 0.089 9.0 2.58 1310 1.36 693 e 527 0.089 9.0 2.58 1357 1.36 718 s 521 0.089 9.0 2.58 1343 1.36 710 w 477 0.089 9.0 2.58 1229 1.36 650 all 2033 0.089 9.0 2.58 5239 1.36 2771 Partitions (none) Windows Impact: Impact;NFRC rated(SHGC=0.17);50%blinds 45°,light;50% n 10 0.280 0 8.12 78 6.16 60 outdoor insect screen;foreground=green grass(0.23);2 ft overhang(4 ft w 10 0.280 0 8.12 81 16.3 163 window ht, 1 ft sep.);8 ft head ht all 20 0.280 0 8.12 160 11.3 223 Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% n 31 0.310 0 8.99 279 6.85 212 outdoor insect screen;foreground=green grass(0.23);2 ft overhang e 31 0.310 0 8.99 283 18.3 577 (5.17 ft window ht, 1 ft sep.);8 ft head ht w 31 0.310 0 8.99 279 18.3 569 w 10 0.320 0 9.28 96 18.5 191 all 104 0.310 0 9.02 936 14.9 1548 Impact: Impact;NFRC rated(SHGC=0.22);50%blinds 45°,light;50% e 3 0.260 0 7.54 21 18.7 52 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (3.33 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% e 16 0.310 0 8.99 143 17.0 270 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (2.58 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% e 8 0.320 0 9.28 74 16.3 130 outdoor insect screen;foreground=green grass(0.23);2 ft overhang(2 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.24);50%blinds 45°,light;50% s 8 0.260 0 7.54 60 8.83 71 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (1.33 ft window ht, 1 ft sep.);8 ft head ht Impact: Impact;NFRC rated(SHGC=0.18);50%blinds 45°,light;50% s 4 0.270 0 7.83 33 8.16 34 outdoor insect screen;foreground=green grass(0.23);2 ft overhang(1.4 ft window ht, 1 ft sep.);8 ft head ht wright90ft- 2022-Jan-17 11:15:36 Right-Sutee Universal 2021 21.0.11 RSU29066 Page 4 �'CA .ents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Impact: Impact;NFRC rated(SHGC=0.19);50%blinds 45°,medium; s 16 0.310 0 8.99 140 9.02 141 50%outdoor insect screen;foreground=green grass(0.23);2 ft overhang (5.2 ft Wndow ht, 1 ft sep.);8 ft head ht Impact:Impact;NFRC rated(SHGC=0.17);50%blinds 45°,light;50% w 10 0.280 0 8.12 80 16.3 161 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (4.08 ft window ht, 1 ft sep.);8 ft head ht Impact:Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% w 16 0.320 0 9.28 148 17.6 282 outdoor insect screen;foreground=green grass(0.23);2 ft overhang(3.2 ft Window ht, 1 ft sep.);8 ft head ht Impact:Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% w 10 0.320 0 9.28 93 18.1 181 outdoor insect screen;foreground=green grass(0.23);2 ft overhang(4 ft window ht, 1 ft sep.);8 ft head ht Impact:Impact;NFRC rated(SHGC=0.19);50%blinds 45°,light;50% w 21 0.320 0 9.28 193 18.1 378 outdoor insect screen;foreground=green grass(0.23);2 ft overhang (4.17 ft window ht, 1 ft sep.);8 ft head ht Doors (none) Ceilings Attic,Metal Roof, R-20 Roof Deck Ins,5/8"Gyp Bd Int Fnsh 2402 0.386 21.0 1.58 3786 1.21 2917 Floors FlrTuss, 18"Thkns,Tile Flr Fnsh,R-30 Ins,Over Uncon Space 229 0.034 30.0 0.49 113 0.44 100 _ Aj- wrightsoft- 2022-Jan-1711:15:36 .�Cp. A..—ae. ,.e ==-„=om Right-Sute®Urrversal2021 21.0.11 RSU29066 Pages cuments\WrightsoftHVAaTBDUlrichRoadGBl.np Calc=MJ8 Front Door faces:N Pro S Job: 1618 +� wrightsoft° Project Date: 9/14/2021 Zone 1 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Notes: Design Information Weather: St Lucie Co Intl,FL,US Winter Design Conditions Summer Design Conditions Outside db 41 °F Outside db 90 °F Inside db 70 °F Inside db 75 °F Design TD 29 °F Design TD 15 °F Daily range L Relative humidity 50 % Moisture difference 57 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 9589 Btuh Structure 7081 Btuh Ducts 533 Btuh Ducts 618 Btuh Central vent(19 cfm) 610 Btuh Central vent(19 cfm) 324 Btuh Outside air Outside air Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 10732 Btuh Use manufacturer's data y Rate/swin multiplier 1.00 Infiltration Equipmen�sensible load 8023 Btuh Method Blower door Latent Cooling Equipment Load Sizing Shielding/stories 4 substantial)/2 Pressure/AVF 5 Pa/2264 dim Structure 2297 Btuh Ducts 196 Btuh Central vent(19 cfm) 740 Btuh Heatingg Cooling Outside air Area(ft�) 1164 1164 Equipment latent load 3233 Btuh Volume(ft3) 10823 10823 Air changes/hour 0.49 0.30 Equipment Total Load(Sen+Lat) 11256 Btuh Equiv.AVF(cfm) 89 54 Req.total capacity at 0.70 SHR 1.0 ton Heating Equipment Summary Cooling Equipment Summary Make Generic Make Generic Trade Trade Model SEER 18.0,HSPF 9.1 Cond SEER 18.0,HSPF 9.1 AHRI ref Coil AHRI ref Efficiency 9.1 HSPF Efficiency 14.7 EER, 18 SEER Heating input Sensible cooling 8667 Btuh Heating output 12320 Btuh @ 47°F Latent cooling 3715 Btuh Temperature rise 27 °F Total cooling 12382 Btuh Actual airflow 413 cfm Actual airflow 413 cfm Air flow factor 0.041 cfm/Btuh Air flow factor 0.054 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 0.71 Capacity balance point=36°F Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft- 2022-Jan-1711:15:36 ^.,.I•I ",1,,...,-°..-,1..,,�r,, Right-Sute®Universal 2021 21.0.11 RSU29066 Page 1 ACCA cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Pro S Job: 1618 +� wrightsoft° Project Date: 9/14/2021 Zone 2 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Notes: Design Information Weather: St Lucie Co Intl,FL,US Winter Design Conditions Summer Design Conditions Outside db 41 °F Outside db 90 °F Inside db 70 °F Inside db 75 °F Design TD 29 °F Design TD 15 °F Daily range L Relative humidity 50 % Moisture difference 57 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 14134 Btuh Structure 11182 Btuh Ducts 3161 Btuh Ducts 2053 Btuh Central vent(59 cfm) 1874 Btuh Central vent(59 cfm) 995 Btuh Outside air Outside air Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 19169 Btuh Use manufacturer's data y Rate/swin multiplier 1.00 Infiltration Equipmen�sensible load 14230 Btuh Method Blower door Latent Cooling Equipment Load Sizing Shielding/stories 4 substantial)/2 Pressure/AVF 5 Pa/2264 dim Structure 3846 Btuh Ducts 723 Btuh Central vent(59 cfm) 2273 Btuh Heating Coolingg Outside air Area(ft�) 1381 1381 Equipment latent load 6843 Btuh Volume(ft3) 12846 12846 Air changes/hour 0.53 0.32 Equipment Total Load(Sen+Lat) 21072 Btuh Equiv.AVF(cfm) 112 68 Req.total capacity at 0.72 SHR 1.6 ton Heating Equipment Summary Cooling Equipment Summary Make Make Lennox Trade Trade LENNOX Model Cond ML14XC1S024-230A** AHRI ref Coil CBA27UHE-024-230*++TDR AHRI ref 10259435 Efficiency 100 EFF Efficiency 13.0 EER, 16 SEER Heating input 4.8 kW Sensible cooling 17280 Btuh Heating output 16354 Btuh Latent cooling 6720 Btuh Temperature rise 19 °F Total cooling 24000 Btuh Actual airflow 800 cfm Actual airflow 800 cfm Air flow factor 0.046 cfm/Btuh Air flow factor 0.060 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 0.68 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft- 2022-Jan-1711:15:36 M,a Right-Site®Universal 2021 21.0.11 RSU29066 Page 2 ACCA cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Pro S Job: 1618 +� wrightsoft° Project Date: 9/14/2021 Zone 3 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project • • For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Notes: Design Information Weather: St Lucie Co Intl,FL,US Winter Design Conditions Summer Design Conditions Outside db 41 °F Outside db 90 °F Inside db 70 °F Inside db 75 °F Design TD 29 °F Design TD 15 °F Daily range L Relative humidity 50 % Moisture difference 57 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 17942 Btuh Structure 14369 Btuh Ducts 2852 Btuh Ducts 2002 Btuh Central vent(69 cfm) 2200 Btuh Central vent(69 cfm) 1168 Btuh Outside air Outside air Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 22994 Btuh Use manufacturer's data y Rate/swin multiplier 1.00 Infiltration Equipmen�sensible load 17539 Btuh Method Blower door Latent Cooling Equipment Load Sizing Shielding/stories 4 substantial)/2 Pressure/AVF 5 Pa/2264 dim Structure 4965 Btuh Ducts 888 Btuh Central vent(69 cfm) 2667 Btuh Heating Cooling Outside air Area(ft�) 2402 2402 Equipment latent load 8520 Btuh Volume(ft3) 21616 21616 Air changes/hour 0.59 0.36 Equipment Total Load(Sen+Lat) 26058 Btuh Equiv.AVF(cfm) 211 128 Req.total capacity at 0.71 SHR 2.1 ton Heating Equipment Summary Cooling Equipment Summary Make Make Lennox Trade Trade LENNOX Model Cond ML14XC1S030-230A** AHRI ref Coil CBA27UHE-030-230*++TDR AHRI ref 10259437 Efficiency 100 EFF Efficiency 13.0 EER, 16 SEER Heating input 7.1 kW Sensible cooling 20590 Btuh Heating output 24071 Btuh Latent cooling 8410 Btuh Temperature rise 23 °F Total cooling 29000 Btuh Actual airflow 967 cfm Actual airflow 967 cfm Air flow factor 0.047 cfm/Btuh Air flow factor 0.059 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 0.67 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft- 2022-Jan-1711:15:36 M,a Right-Site®Universal 2021 21.0.11 RSU29066 Page 3 ACCA cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 1 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Zone 1 Game Room1 2 E)posed wal I 103.0 It 17.5 ft 3 Room height 9.3 It 9.3 ft heat/cool 4 Room dimensions 1.0 x 321.3 ft 5 Room area 1163.8 fF 321.3 fF Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 2.58 1.08 377 306 788 330 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 47 0 421 321 0 0 0 0 D Fbrgls Door 0.127 n 3.69 3.73 24 24 89 89 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.08 260 181 466 195 0 0 0 0 Impact 0.310 a 8.99 18.34 31 4 283 577 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 9.99 48 44 432 479 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.270 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 47 47 120 50 47 47 120 50 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 274 218 561 234 116 59 153 64 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.58 57 6 510 1055 57 6 510 1055 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 81 81 127 98 81 81 127 98 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 1164 103 2954 0 321 18 502 0 6 c)AED excursion 55 335 Envelope loss/gain 6750 3483 1413 1602 12 a) Infiltration 2839 918 482 156 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 1 230 0 0 Appliances/other 2450 900 Subtotal(lines 6 to 13) 9589 7081 1895 2658 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 401 87 14 Subtotal 9589 7081 2296 2745 15 Duct loads 6% 9% 533 618 23% 23% 533 618 FFTotal room load T10122 7699 2829 3364 Airrequired(ctm) 413 413 115 180 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 1 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 1 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Game Room2 Stairs 1 B 2 E)posed wal I 52.5 It 12.0 It 3 Room height 9.3 It heat/000l 9.3 It heat/000l 4 Room dimensions 1.0 x 528.0 It 12.0 x 8.0 It 5 Room area 528.0 fF 96.0 ft Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 2.58 1.08 339 269 692 289 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 47 0 421 321 0 0 0 0 D Fbrgls Door 0.127 n 3.69 3.73 24 24 89 89 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.08 149 101 260 109 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 9.99 48 44 432 479 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.270 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 0 0 0 0 112 112 288 120 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.58 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 0 0 0 0 0 0 0 0 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 528 53 1506 0 96 12 344 0 6 c)AED excursion -256 -18 Envelope loss/gain 3398 1032 632 102 12 a) Infiltration 1447 468 331 107 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 1 230 0 0 Appliances/other 1200 0 Subtotal(lines 6 to 13) 4846 2930 962 209 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 1283 279 -962 -209 14 Subtotal 6129 3209 0 0 15 Duct loads -0% 0% 0 0 -0% 0% 0 0 FFTotal room load 6129 3209 0 0 Airrequired(dm) 250 172 0 0 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 2 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 1 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Study AHU 1 2 E)posed wal I 12.0 ft 9.0 It 3 Room height 9.3 ft heat/000l 9.3 ft heat/000l 4 Room dimensions 1.0 x 151.8 ft 5.0 x 4.0 ft 5 Room area 151.8 fF 20.0 ft2 Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 2.58 1.08 0 0 0 0 37 37 96 40 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 3.69 3.73 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.08 112 80 207 86 0 0 0 0 Impact 0.310 a 8.99 18.34 31 4 283 577 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 9.99 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.270 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 0 0 0 0 47 47 120 50 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.58 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 0 0 0 0 0 0 0 0 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 152 12 344 0 20 9 258 0 6 c)AED excursion 15 -14 Envelope loss/gain 833 678 474 77 12 a) Infiltration 331 107 248 80 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 250 0 Subtotal(lines 6 to 13) 1164 1035 722 157 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 -722 -157 14 Subtotal 1164 1035 0 0 15 Duct loads -0% 0% 0 0 -0% 0%1 0 0 Total room load 1164 1035 0 0 Air required(ctm) 47 56 0 0 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 3 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 1 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Bath 2 E)posed wal I 0 It 3 Room height 9.3 It heat/000l 4 Room dimensions 8.5 x 5.5 It 5 Room area 46.8 ft Ty Consh'ucton U-value Or HTM Area (ft2) Load Area Load number (BtuhV-°F) (Btuh/fF) or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 G Impact 0.280 n 0.00 0.00 0 0 0 0 G Impact 0.310 n 0.00 0.00 0 0 0 0 Block R-9 Wall 0.089 n 2.58 1.08 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 D Fbrgls Door 0.127 n 3.69 3.73 0 0 0 0 W Block R-9 Wall 0.089 e 0.00 0.00 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 G Impact 0.310 e 0.00 0.00 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 W Block R-9 Wall 0.089 e 2.58 1.08 0 0 0 0 Impact 0.310 e 8.99 18.34 0 0 0 0 G Impact 0.310 e 0.00 0.00 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 Impact 0.310 e 8.99 9.99 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 G Impact 0.260 s 0.00 0.00 0 0 0 0 G Impact 0.270 s 0.00 0.00 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 G Impact 0.280 w 0.00 0.00 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 G Impact 0.310 w 0.00 0.00 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 G Impact 0.310 w 0.00 0.00 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 G Impact 0.310 w 8.99 18.58 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 P Frm Wall,1/2"Gyp B 0.101 0.00 0.00 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 0 0 0 0 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 47 0 0 0 6 c)AED excursion -8 Envelope loss/gain 0 -8 12 a) Infiltration 0 0 b) Room ventilation 0 0 13 Internal gains: Occupants@ 230 0 0 Appliances/other 100 Subtotal(lines 6 to 13) 0 92 Less extemalload 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 0 92 15 Dud loads -0% 0% 0 0 FFTotal room load 0 92 Air required(dm) 0 5 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunertls\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 4 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 2 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Zone 2 Cabana 2 E)posed wal I 162.0 It 23.0 It 3 Room height 9.3 It 9.3 ft heat/000l 4 Room dimensions 1.0 x 73.5 It 5 Room area 1381.3 fF 73.5 ft' Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 2.58 1.08 126 121 313 131 0 0 0 0 11 Impact 0.260 n 7.54 6.83 4 0 31 28 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.08 428 293 756 316 84 64 164 69 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 8.99 6.89 96 96 863 661 0 0 0 0 Impact 0.310 a 8.99 8.85 18 18 165 163 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 3.69 3.73 20 20 74 75 20 20 74 75 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.270 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 233 228 588 246 0 0 0 0 L-G Impact 0.260 s 7.54 8.83 4 4 31 37 0 0 0 0 Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 423 299 771 322 0 0 0 0 Impact 0.280 w 8.12 16.33 10 2 80 161 0 0 0 0 Impact 0.310 w 8.99 18.34 16 2 139 284 0 0 0 0 Impact 0.310 w 8.99 8.85 37 37 329 324 0 0 0 0 Impact 0.310 w 8.99 18.58 38 4 342 707 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 3.69 3.73 24 24 89 89 0 0 0 0 P Frm Wall,12'Gyp B 0.101 2.94 1.46 298 298 874 434 130 130 382 190 C Attic,Metal Roof,R 0.386 1.58 1.21 291 291 459 353 74 74 116 89 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 1381 162 4646 0 74 23 660 0 6 c)AED excursion 910 -3 Envelope loss/gain 10551 5243 1396 419 12 a) Infiltration 3584 1159 248 80 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 6 1380 0 0 Appliances/other 3400 0 Subtotal(lines 6 to 13) 14134 11182 1644 500 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 0 0 14 Subtotal 14134 11182 1644 500 15 Duct loads 22% 18% 3161 2053 28% 25% 461 127 FFTotal room load T17295 13234 2105 626 Airrequired(dm) 800 800 97 38 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 5 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 2 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Family Kitchen 2 E)posed wal I 46.5 ft 27.5 ft 3 Room height 9.3 ft heat/000l 9.3 ft heat/000l 4 Room dimensions 1.0 x 440.3 ft 1.0 x 427.0 ft 5 Room area 440.3 fF 427.0 fF Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 2.58 1.08 0 0 0 0 37 33 85 36 11 Impact 0.260 n 7.54 6.83 0 0 0 0 4 0 31 28 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.08 163 67 172 72 181 163 420 176 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 8.99 6.89 96 96 863 661 0 0 0 0 Impact 0.310 a 8.99 8.85 0 0 0 0 18 18 165 163 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 3.69 3.73 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.270 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 0 0 0 0 37 33 85 36 L-G Impact 0.260 s 7.54 8.83 0 0 0 0 4 4 31 37 Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 140 79 203 85 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 8.85 37 37 329 324 0 0 0 0 Impact 0.310 w 8.99 18.58 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 3.69 3.73 24 24 89 89 0 0 0 0 P Frm Wall,12'Gyp B 0.101 2.94 1.46 130 130 382 190 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 82 82 128 99 0 0 0 0 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 440 47 1334 0 427 28 789 0 6 c)AED excursion 322 -16 Envelope loss/gain 3500 1842 1607 458 12 a) Infiltration 896 290 758 245 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 4 920 2 460 Appliances/other 1150 1700 Subtotal(lines 6 to 13) 4396 4202 2365 2864 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redistribution 206 73 495 174 14 Subtotal 4603 4275 2860 3038 15 Duct loads 28% 25% 1290 1084 -0% 0%1 0 0 Total room load 5893 5359 2860 3038 Air required(ctm) 273 324 132 184 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 6 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 2 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Stairs 1A Office 2 E)posed wal I 23.5 It 29.5 It 3 Room height 9.3 It heat/000l 9.3 It heat/000l 4 Room dimensions 8.5 x 15.0 It 10.0 x 10.0 It 5 Room area 127.5 fF 100.0 fF Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 2.58 1.08 0 0 0 0 88 88 228 95 11 Impact 0.260 n 7.54 6.83 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.08 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 8.99 6.89 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 8.85 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 3.69 3.73 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.270 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 140 140 359 150 56 56 144 60 L-G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 79 69 178 75 93 78 200 84 Impact 0.280 w 8.12 16.33 10 2 80 161 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 16 2 139 284 Impact 0.310 w 8.99 8.85 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.58 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 3.69 3.73 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 2.94 1.46 0 0 0 0 37 37 109 54 C Attic,Metal Roof,R 0.386 1.58 1.21 0 0 0 0 100 100 158 121 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 128 24 674 0 100 30 846 0 6 c)AED excursion 88 149 Envelope loss/gain 1292 474 1823 847 12 a) Infiltration 648 210 703 227 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 500 Subtotal(lines 6 to 13) 1940 683 2526 1575 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution -1940 -683 0 0 14 Subtotal 0 0 2526 1575 15 Duct loads -0% 0% 0 0 28% 25% 708 399 Total room load 0 0 3235 1974 Air required(dm) 0 0 150 119 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 7 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 2 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Dining Pantry 2 E)posed wal I 12.0 It 0 It 3 Room height 9.3 It heat/000l 9.3 It heat/000l 4 Room dimensions 12.0 x 15.0 It 6.0 x 5.5 It 5 Room area 180.0 fF 33.0 ft Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 2.58 1.08 0 0 0 0 0 0 0 0 11 Impact 0.260 n 7.54 6.83 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.260 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 e 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.08 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 8.99 6.89 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 8.85 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 3.69 3.73 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.270 s 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 s 0.00 0.00 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 2.58 1.08 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.320 w 0.00 0.00 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 2.58 1.08 112 74 190 79 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 8.85 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.58 38 4 342 707 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 3.69 3.73 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 2.94 1.46 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 36 36 57 44 0 0 0 0 F RrTuss,18"Thkns, 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 28.68 0.00 180 12 344 0 33 0 0 0 6 c)AED excursion 372 0 Envelope loss/gain 932 1202 0 0 12 a) Infiltration 331 107 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 50 Subtotal(lines 6 to 13) 1263 1309 0 50 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 1238 436 0 0 14 Subtotal 2501 1745 0 50 15 Duct loads 28% 25% 701 443 -0% 0%1 0 0 Total room load 3202 2187 0 50 Air required(dm) 148 132 0 3 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 8 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Zone 3 Master Hall 2 E)q)osed wal I 252.0 It 0 ft 3 Room height 9.0 It 9.0 ft heat/cool 4 Room dimensions 31.0 x 4.0 It 5 Room area 2401.8 fF 124.0 fF Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 549 508 1310 693 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 10 0 78 60 0 0 0 0 Impact 0.310 n 8.99 6.85 31 0 279 212 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 585 527 1357 718 0 0 0 0 Impact 0.260 e 7.54 18.67 3 1 21 52 0 0 0 0 Impact 0.310 a 8.99 16.95 16 4 143 270 0 0 0 0 Impact 0.310 a 8.99 18.34 31 4 283 577 0 0 0 0 Impact 0.320 a 9.28 16.28 8 3 74 130 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 549 521 1343 710 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 8 8 60 71 0 0 0 0 Impact 0.270 s 7.83 8.16 4 4 33 34 0 0 0 0 Impact 0.310 s 8.99 9.02 16 16 140 141 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 585 477 1229 650 0 0 0 0 Impact 0.280 w 8.12 16.30 10 2 81 163 0 0 0 0 Impact 0.280 w 8.12 16.33 10 2 80 161 0 0 0 0 Impact 0.310 w 8.99 18.34 31 4 279 569 0 0 0 0 Impact 0.320 w 9.28 17.63 16 3 148 282 0 0 0 0 Impact 0.320 w 9.28 18.08 10 2 93 181 0 0 0 0 G Impact 0.320 w 9.28 18.15 21 3 193 378 0 0 0 0 Impact 0.320 w 9.28 18.48 10 1 96 191 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 2402 2402 3786 2917 124 124 195 151 F RrTuss,18"Thkns, 0.034 0.49 0.44 229 229 113 100 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 436 -8 Envelope loss/gain 11220 9694 195 143 12 a) Infiltration 6723 2174 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 2500 0 Subtotal(lines 6 to 13) 17942 14369 195 143 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 -195 -143 14 Subtotal 17942 14369 0 0 15 Duct loads 16% 14%1 2852 2002 16% 14% 0 0 qT.0, tal room load 20794 16371 0 0 quired(dim) 967 967 0 0 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 9 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Bath 3 clst 2 E)posed wal I 5.0 It O ft 3 Room height 9.0 It heat/000l 9.0 ft heat/cool 4 Room dimensions 5.0 x 8.0 It 5.0 x 5.5 It 5 Room area 40.0 ft' 27.5 tt Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 45 41 106 56 0 0 0 0 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 4 1 37 65 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 40 40 63 49 28 28 43 33 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -10 -2 Envelope loss/gain 206 159 43 32 12 a) Infiltration 133 43 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 339 203 43 32 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 7 5 14 Subtotal 339 203 50 37 15 Duct loads 16% 14%1 54 28 16% 14% 8 5 qT.0, tal room load 393 231 58 42 quired(dim) 18 14 3 2 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 10 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Hers Master Bed 2 E)posed wal I O ft 35.0 It 3 Room height 9.0 It heat/000l 9.0 It heat/000l 4 Room dimensions 9.5 x 7.5 It 1.0 x 310.0 It 5 Room area 71.3 it' 310.0 fF Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 0 0 0 0 158 142 365 193 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 16 4 143 270 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 0 0 0 0 158 134 345 182 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 8 8 60 71 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 16 16 140 141 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 71 71 112 87 310 310 489 376 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -4 -103 Envelope loss/gain 112 82 1542 1131 12 a) Infiltration 0 0 934 302 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 500 Subtotal(lines 6 to 13) 112 82 2476 1933 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 27 19 11 8 14 Subtotal 139 102 2487 1941 15 Duct loads 16% 14% 22 14 16% 14%1 395 270 Total room load 161 116 2882 2211 Airrequired(dm) 7 7 134 131 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 11 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name His Laundry 1 2 E)posed wal I 16.5 It 10.0 It 3 Room height 9.0 It heat/000l 9.0 ft heat/000l 4 Room dimensions 7.0 x 9.5 It 8.0 x 11.5 It 5 Room area 66.5 ft' 92.0 ft Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 86 86 220 117 18 18 46 25 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 63 63 162 86 72 56 144 76 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 16 3 148 282 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 67 67 105 81 92 92 145 112 F RrTuss,18"Thkns, 0.034 0.49 0.44 46 46 22 20 68 68 34 30 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -22 108 Envelope loss/gain 510 281 518 632 12 a) Infiltration 440 142 267 86 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 500 Subtotal(lines 6 to 13) 950 423 785 1218 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 0 0 14 Subtotal 950 423 785 1218 15 Duct loads 16% 14%1 151 59 16% 14% 125 170 FFTotal room load 1101 482 909 1388 Airrequired(dm) 51 28 42 82 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 12 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Stairs2A Stairs2B 2 E)posed wal I 18.0 It 21.0 It 3 Room height 9.0 It heat/000l 9.0 ft heat/000l 4 Room dimensions 1.0 x 121.8 It 1.0 x 93.5 It 5 Room area 121.8 fF 93.5 ft' Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 27 27 70 37 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 59 59 151 80 72 72 185 98 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 77 67 172 91 117 107 276 146 Impact 0.280 w 8.12 16.30 0 0 0 0 10 2 81 163 Impact 0.280 w 8.12 16.33 10 2 80 161 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 122 122 192 148 94 94 147 114 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 53 53 Envelope loss/gain 664 569 690 573 12 a) Infiltration 480 155 560 181 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 1144 725 1250 755 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 14 10 325 192 14 Subtotal 1158 735 1575 947 15 Duct loads 16% 14%1 184 102 16% 14% 250 132 FFTotal room load 1342 837 1826 1079 Airrequired(ctm) 62 49 85 64 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 13 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name CIst2 Hall 2 E)posed wal I O ft 25.0 ft 3 Room height 9.0 It heat/000l 9.0 ft heat/cool 4 Room dimensions 6.5 x 6.5 It 4.0 x 21.0 ft 5 Room area 42.3 ft' 84.0 ft2 Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 189 179 462 244 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 10 0 78 60 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 0 0 0 0 36 26 67 35 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 10 2 93 181 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 42 42 67 51 84 84 132 102 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -3 42 Envelope loss/gain 67 49 833 664 12 a) Infiltration 0 0 667 216 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 67 49 1500 880 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 459 270 -1500 -880 14 Subtotal 525 319 0 0 15 Duct loads 16% 14% 83 44 16% 14%1 0 0 qT.0, tal room load 609 363 0 0 quired(ctm) 28 21 0 0 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 14 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Laundry2 Bed 2 E)q)osed wal I O ft 6.0 It 3 Room height 9.0 It heat/000l 9.0 It heat/000l 4 Room dimensions 6.5 x 8.5 It 12.5 x 15.0 It 5 Room area 55.3 it' 187.5 fF Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 0 0 0 0 54 33 85 45 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 21 3 193 378 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 55 55 87 67 188 188 296 228 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -29 158 Envelope loss/gain 87 39 574 809 12 a) Infiltration 0 0 160 52 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 500 250 Subtotal(lines 6 to 13) 87 539 734 1110 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 453 266 14 10 14 Subtotal 540 805 748 1121 15 Duct loads 16% 14% 86 112 16% 14%1 119 156 FFTotal room load 626 917 867 1277 Airrequired(dm) 29 54 40 75 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 15 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Bed 5 Lin 2 E)posed wal I 13.0 It 0 It 3 Room height 9.0 It heat/000l 9.0 It heat/000l 4 Room dimensions 1.0 x 226.3 It 3.0 x 3.5 It 5 Room area 226.3 fF 10.5 ft Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 117 86 222 117 0 0 0 0 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 31 4 279 569 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,IQ"Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 226 226 357 275 11 11 17 13 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 233 -1 Envelope loss/gain 857 1193 17 12 12 a) Infiltration 347 112 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 250 0 Subtotal(lines 6 to 13) 1204 1555 17 12 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 43 32 -17 -12 14 Subtotal 1247 1587 0 0 15 Duct loads 16% 14% 198 221 16% 14%1 0 0 qT.0, tal room load 1445 1808 0 0 quired(ctm) 67 107. 0 0 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 16 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Bath 4 Master Bath 2 E)posed wal I 12.5 It 12.0 ft 3 Room height 9.0 It heat/000l 9.0 ft heat/cool 4 Room dimensions 5.5 x 9.0 It 1.0 x 153.5 ft 5 Room area 49.5 ft' 153.5 fF Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 32 32 81 43 36 36 93 49 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 0 0 0 0 72 69 178 94 Impact 0.260 e 7.54 18.67 0 0 0 0 3 1 21 52 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 32 32 81 43 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 50 39 101 53 0 0 0 0 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 10 1 96 191 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 50 50 78 60 154 154 242 186 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 74 -15 Envelope loss/gain 437 465 534 366 12 a) Infiltration 333 108 320 104 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 771 573 854 470 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 20 14 14 Subtotal 771 573 874 484 15 Duct loads 16% 14%1 122 80 16% 14% 139 67 FFTotal room load 893 652 1013 552 Airrequired(dm) 42 39 47 33 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 17 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Bed 3 Bath 2 2 E)posed wal I 12.0 It 15.5 It 3 Room height 9.0 It heat/000l 9.0 It heat/000l 4 Room dimensions 12.0 x 13.5 It 5.5 x 10.0 It 5 Room area 162.0 fF 55.0 ft Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 108 77 197 104 50 50 128 67 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 31 4 283 577 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 0 0 0 0 90 86 221 117 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 4 4 33 34 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 162 162 255 197 55 55 87 67 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 55 55 27 24 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 38 -22 Envelope loss/gain 735 916 495 287 12 a) Infiltration 320 104 413 134 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 250 0 Subtotal(lines 6 to 13) 1055 1269 909 421 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 34 25 0 0 14 Subtotal 1089 1294 909 421 15 Duct loads 16% 14%1 173 180 16% 14%1 144 59 FFTotal room load 1262 1474 1053 479 Airrequired(dm) 59 87 49 28 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 18 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Bed 2 Clst 3 2 E)posed wal I 23.5 It 16.0 ft 3 Room height 9.0 It heat/000l 9.0 ft heat/cool 4 Room dimensions 1.0 x 289.3 It 6.0 x 10.0 ft 5 Room area 289.3 fF 60.0 ft' Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 176 145 372 197 90 90 232 123 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 31 0 279 212 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 36 36 93 49 54 54 139 74 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 0 0 0 0 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 289 289 456 351 60 60 95 73 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 60 60 30 26 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -64 -22 Envelope loss/gain 1200 746 495 273 12 a) Infiltration 627 203 427 138 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 250 0 Subtotal(lines 6 to 13) 1827 1199 922 411 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 290 172 0 0 14 Subtotal 2117 1371 922 411 15 Duct loads 16% 14% 336 191 16% 14%1 147 57 Total room load 2453 1562 1069 469 Airrequired(dm) 114 92 50 28 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Universal 2021 21.0.11 RSU29066 Page 19 Wrightsoft HVAC\TBD Ulrich Road GBI.r p Calc=MJ8 Front Door faces:N + wrightsoft°° Right-J®Worksheet Job: 1618 Zone 3 Date: 9/14/2021 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com 1 Room name Wtrclst PvwdrRoom 2 E)posed wal I 11.0 It 0 It 3 Room height 9.0 It heat/000l 9.0 It heat/000l 4 Room dimensions 7.0 x 4.0 It 5.5 x 9.5 It 5 Room area 28.0 it' 52.3 ft Ty Consh'ucton U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/R2--°F) (Btuh/fl) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V)/ Block R-9 Wall 0.089 n 2.58 1.36 0 0 0 0 0 0 0 0 I; CCI Impact 0.280 n 8.12 6.16 0 0 0 0 0 0 0 0 Impact 0.310 n 8.99 6.85 0 0 0 0 0 0 0 0 V[ Block R-9 Wall 0.089 n 0.00 0.00 0 0 0 0 0 0 0 0 11 Impact 0.260 n 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 n 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 n 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 a 2.58 1.36 63 59 152 80 0 0 0 0 Impact 0.260 e 7.54 18.67 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 16.95 0 0 0 0 0 0 0 0 Impact 0.310 a 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 a 9.28 16.28 4 1 37 65 0 0 0 0 Block R-9 Wall 0.089 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 G Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 a 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 e 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 s 2.58 1.36 36 36 93 49 0 0 0 0 J-�G Impact 0.260 s 7.54 8.83 0 0 0 0 0 0 0 0 Impact 0.270 s 7.83 8.16 0 0 0 0 0 0 0 0 Impact 0.310 s 8.99 9.02 0 0 0 0 0 0 0 0 WI Block R-9 Wall 0.089 s 0.00 0.00 0 0 0 0 0 0 0 0 L-G Impact 0.260 s 0.00 0.00 0 0 0 0 0 0 0 0 Block R-9 Wall 0.089 w 2.58 1.36 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.30 0 0 0 0 0 0 0 0 Impact 0.280 w 8.12 16.33 0 0 0 0 0 0 0 0 Impact 0.310 w 8.99 18.34 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 17.63 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.08 0 0 0 0 0 0 0 0 G Impact 0.320 w 9.28 18.15 0 0 0 0 0 0 0 0 Impact 0.320 w 9.28 18.48 0 0 0 0 0 0 0 0 W Block R-9 Wall 0.089 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.280 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 Impact 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 D Fbrgls Door 0.127 w 0.00 0.00 0 0 0 0 0 0 0 0 P Frm Wall,12'Gyp B 0.101 0.00 0.00 0 0 0 0 0 0 0 0 C Attic,Metal Roof,R 0.386 1.58 1.21 28 28 44 34 52 52 82 63 F RrTuss,18"Thkns, 0.034 0.49 0.44 0 0 0 0 0 0 0 0 F On Grade Depth,Tile 0.989 0.00 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -16 -3 Envelope loss/gain 326 213 82 60 12 a) Infiltration 293 95 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 619 308 82 60 Less extemalload 0 0 0 0 Less transfer 0 0 0 0 Redishibution 0 0 15 11 14 Subtotal 619 308 98 71 15 Duct loads 16% 14%1 98 43 16% 14% 16 10 qT.0, tal room load 718 351 113 81 quired(ctm) 33 21 5 5 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �� rigF�tsoft° 2022-Jan-1711:15:36 ACCP. ..cunerrts\ Right-Sute®Urrversal 2021 21.0.11 RSU29066 Page 20 Wrightsoft HVAC\TBD Ulrich Road GBI.rkp Calc=MJ8 Front Door faces:N Duct System Summary Job: 1618 +� wrightsoft D S S Date: 9/14/2021 Zone 1 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.mm Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Heating Cooling External static pressure 0.70 in H2O 0.70 in H2O Pressure losses 0.16 in H2O 0.16 in H2O Available static pressure 0.54 in H2O 0.54 in H2O Supply/return available pressure 0.442/0.098 in H2O 0.442/0.098 in H2O Lowest friction rate 0.256 in/100ft 0.256 in/100ft Actual airflow 413 cfm 413 cfm Total effective length(TEL) 211 ft SupplyDetail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Egv Name (Btuh) (cfm) (cfm) FIR (in) (in) Matl Ln(ft) Ln(ft) Trunk Bath c 92 0 6 0.289 4.0 Ox0 VIFx 33.2 120.0 st8 Game Room1 c 1682 69 108 0.361 6.0 Ox 0 VIFx 27.6 95.0 st4 Game Room1-A c 1682 69 108 0.359 6.0 Ox 0 VIFx 28.4 95.0 st4 Game Room2 h 3064 150 103 0.365 6.0 Ox 0 VI Fx 26.1 95.0 st4 Game Room2-A h 3064 150 103 0.277 7.0 Ox 0 VI Fx 39.6 120.0 st8 Study c 1035 57 67 0.256 5.0 Ox0 VIFx 47.8 125.0 st8 SupplyDetail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk st8 PeakAVF 207 176 0.256 593 8.0 0 x 0 VInIFIX st4 st4 PeakAVF 496 496 0.256 631 12.0 0 x 0 VInIFIX TableReturn Branch Detail Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size(in) (cfm) (cfm) (ft) FIR (fpm) (in) (in) Opening(in) Matl Trunk rsb2 Ox 0 300 212 38.1 0.256 550 10.0 Ox 0 VI Fx rb5 Ox0 139 217 0 0 0 0 Ox 0 VIFx rb1 Ox0 57 67 0 0 0 0 Ox 0 VIFx wrightsoft® 2022-Jan-1711:15:40 AM,.ek,I--.e—naw,—p,�, Right-Suite(g)Universal202121.0.11 RSU29066 Page 1 ..cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Duct System Summary Job: 1618 +� wrightsoft D S S Date: 9/14/2021 Zone 2 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.mm Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Heating Cooling External static pressure 0.70 in H2O 0.70 in H2O Pressure losses 0.18 in H2O 0.18 in H2O Available static pressure 0.52 in H2O 0.52 in H2O Supply/return available pressure 0.380/0.140 in H2O 0.380/0.140 in H2O Lowest friction rate 0.216 in/100ft 0.216 in/100ft Actual airflow 800 cfm 800 cfm Total effective length(TEL) 240 ft SupplyDetail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Egv Name (Btuh) (cfm) (cfm) FIR (in) (in) Matl Ln(ft) Ln(ft) Trunk Cabana h 2105 117 45 0.325 6.0 Ox0 VIFx 17.0 100.0 st5 Dining h 3202 178 159 0.216 8.0 Ox0 VIFx 50.6 125.0 st9 Family c 2679 164 194 0.307 7.0 Ox0 VIFx 23.9 100.0 st5 Family-A c 2679 164 194 0.316 7.0 Ox0 VIFx 20.1 100.0 st5 Kitchen c 1519 79 110 0.218 6.0 Ox0 VIFx 49.3 125.0 st9 Kitchen-A c 1519 79 110 0.225 6.0 Ox0 VIFx 44.1 125.0 st9 Office h 3235 180 143 0.312 7.0 Ox0 VIFx 21.7 100.0 st5 Pantry c 50 0 4 0.219 4.0 Ox0 VIFx 48.2 125.0 st9 SupplyDetail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk st9 PeakAVF 337 383 0.216 702 10.0 0 x 0 VinlFlx st5 st5 PeakAVF 960 960 0.216 898 14.0 0 x 0 VinlFlx TableReturn Branch Detail Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size(in) (cfm) (cfm) (ft) FIR (fpm) (in) (in) Opening(in) Matl Trunk rb4 Ox0 180 143 64.7 0.216 514 8.0 Ox 0 VIFx rt2 rb2 Ox0 780 817 62.4 0.224 585 16.0 Ox 0 VIFx rt2 wrightsoft® 2022-Jan-1711:15:40 AM,.ek,Iae„-H.1h..., p,�, Right-Sute®Universal 202121.0.11 RSU29066 Page 2 ..cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N TableReturn Trunk Detail Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk rt2 PeakAVF 960 960 0.216 688 16.0 0 x 0 VinlFlx Bolditalic values have been manually overridden wrightsoft® 2022-Jarr1711:15:40 AI,--I--.e—nawa,—,, Right-Sute®Uriversal202121.0.11 RSU29066 Page 3 curnents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Duct System Summary Job: 1618 +� wrightsoft D S S Date: 9/14/2021 Zone 3 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.mm Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Heating Cooling External static pressure 0.70 in H2O 0.70 in H2O Pressure losses 0.18 in H2O 0.18 in H2O Available static pressure 0.52 in H2O 0.52 in H2O Supply/return available pressure 0.393/0.127 in H2O 0.393/0.127 in H2O Lowest friction rate 0.223 in/100ft 0.223 in/100ft Actual airflow 967 cfm 967 cfm Total effective length(TEL) 233 ft SupplyDetail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Egv Name (Btuh) (cfm) (cfm) FIR (in) (in) Matl Ln(ft) Ln(ft) Trunk Bath2 h 1053 59 34 0.271 5.0 Ox0 Wx 29.9 115.0 st7 Bath h 393 22 16 0.327 4.0 Ox0 Wx 20.2 100.0 st2 Bath4 h 893 50 46 0.310 4.0 Ox 0 Wx 26.6 100.0 st3 Bed 2 h 2453 137 111 0.329 6.0 Ox 0 Wx 19.4 100.0 st2 Bed 3 c 1474 70 104 0.346 6.0 Ox 0 Wx 18.5 95.0 st2 Bed 4 c 1277 48 91 0.312 6.0 Ox 0 Wx 26.0 100.0 st3 Bed 5 c 1808 81 128 0.290 6.0 Ox 0 VI Fx 30.4 105.0 st1 clst h 58 3 3 0.329 4.0 Ox0 VI Fx 19.6 100.0 st2 Clst 2 h 609 34 26 0.309 4.0 Ox 0 VI Fx 27.3 100.0 st3 Clst 3 h 1069 60 33 0.255 5.0 Ox 0 VI Fx 34.2 120.0 st7 Hers h 161 9 8 0.232 4.0 Ox 0 VI Fx 44.1 125.0 st6 His h 1101 61 34 0.279 5.0 Ox0 VI Fx 35.8 105.0 st1 Landry 1 c 1388 51 98 0.293 6.0 Ox 0 Wx 29.1 105.0 st1 Laundry c 917 35 65 0.295 5.0 Ox 0 Wx 33.3 100.0 st3 Master Bath h 1013 57 39 0.224 5.0 Ox 0 Wx 50.3 125.0 st6 Master Bed h 1441 80 78 0.227 6.0 Ox 0 Wx 48.2 125.0 st6 Master Bed-A h 1441 80 78 0.231 6.0 Ox 0 Wx 45.3 125.0 st6 Pwdr Room h 113 6 6 0.310 4.0 Ox 0 Wx 26.6 100.0 st3 Stairs 2A h 1342 75 59 0.279 5.0 Ox 0 VI Fx 36.1 105.0 st1 Stairs2B h 1826 102 76 0.306 6.0 Ox0 VI Fx 28.3 100.0 st3 Wtrclst h 718 40 25 0.223 4.0 Ox0 VI Fx 51.2 125.0 st6 wrightsoft® 2022-Jan-1711:15:40 AM,.ek,Iae„-H.1h..., p,�, Right-Suite(g)Universal202121.0.11 RSU29066 Page 4 cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N SupplyDetail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk st6 PeakAVF 266 229 0.223 603 9.0 0 x 0 VinlFlx st1 st1 PeakAVF 534 549 0.223 699 12.0 0 x 0 VinlFlx st7 PeakAVF 118 67 0.255 603 6.0 0 x 0 VinlFlx st2 st2 PeakAVF 351 302 0.255 794 9.0 0 x 0 VinlFlx st3 PeakAVF 275 310 0.295 701 9.0 0 x 0 VinIFIX TableReturn Branch Detail Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size(in) (cfm) (cfm) (ft) FIR (fpm) (in) (in) Opening(in) Matl Trunk rb7 Ox0 231 199 56.1 0.226 523 9.0 Ox 0 VIFx rt1 rb6 Ox 0 496 466 56.9 0.223 464 14.0 Ox 0 VIFx rt1 rsb6 Ox0 82 116 0 0 0 0 Ox 0 VIFx rsb3 Ox0 81 128 0 0 0 0 Ox 0 VIFx rsb5 Ox0 74 107 0 0 0 0 Ox 0 VIFx rsb4 Ox0 197 144 0 0 0 0 Ox 0 VIFx TableReturn Trunk Detail Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk rt1 PeakAVF 727 665 0.223 521 16.0 0 x 0 VInIFIX wrightsoft® 2022-Jar07 11:15:40 AI,--I--.e—naw,—p,, Right-Sute®Uriversal202121.0.11 RSU29066 Page 5 ..cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Frord Door faces:N Manual S Compliance Report Job: 1618 +� wrightsoft° p Date: 9/14/2021 Zone 1 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Cooling Equipment Design Conditions Outdoor design DB: 90.4°F Sensible gain: 8023 Btuh Entering coil DB: 75.9°F Outdoor design WB: 77.4°F Latent gain: 3233 Btuh Entering coil WB: 63.5°F Indoor design DB: 75.0°F Total gain: 11256 Btuh Indoor RH: 50% Estimated airflow: 413 cfm Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer: Generic Model: SEER 18.0,HSPF 9.1 Actual airflow: 413 cfm Sensible capacity: 8667 Btuh 108%of load Latent capacity: 3715 Btuh 115%of load Total capacity: 12382 Btuh 110%of load SHR: 70% Heating Equipment Design Conditions Outdoor design DB: 41.0°F Heat loss: 10732 Btuh Entering coil DB: 68.5°F Indoor design DB: 70.0°F Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer: Generic Model: SEER 18.0,HSPF 9.1 Actual airflow: 413 cfm Output capacity: 12320 Btuh 115%of load Capacity balance: 36 °F Supplemental heat required: 0 Btuh Economic balance: -99 °F Meets all requirements ofACCA Manual S. wrightsoft, 2022-Jarr17 11:15:40 M;.ek „n" _ -.=mP=". Right-Srite®Uriversal202l 2l.O.11 RSU29066 Page 1 ACCk cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Manual S Compliance Report Job: 1618 +� wrightsoft° p Date: 9/14/2021 Zone 2 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Cooling Equipment Design Conditions Outdoor design DB: 90.4°F Sensible gain: 14230 Btuh Entering coil DB: 76.5°F Outdoor design WB: 77.4°F Latent gain: 6843 Btuh Entering coil WB: 64.1°F Indoor design DB: 75.0°F Total gain: 21072 Btuh Indoor RH: 50% Estimated airflow: 800 cfm Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SplitAC Manufacturer: Lennox Model: ML14XC1S024-230A**+CBA27UHE-024-230*++TDR Actual airflow: 800 cfm Sensible capacity: 17280 Btuh 121%of load Latent capacity: 6720 Btuh 98%of load Total capacity: 24000 Btuh 114%of load SHR: 72% Heating Equipment Design Conditions Outdoor design DB: 41.0°F Heat loss: 19169 Btuh Entering coil DB: 67.4°F Indoor design DB: 70.0°F Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: Elecstrip Manufacturer: Model: Actual airflow: 800 cfm Output capacity: 4.8 kW 85%of load Temp.rise: 50 °F Meets all requirements ofACCA Manual S. wrightsoft, 2022-Jarr17 11:15:40 M;.ek „n" _ -.=mP=". Right-Srite®Uriversal202l 2l.O.11 RSU29066 Page 2 ACCk cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N Manual S Compliance Report Job: 1618 +� wrightsoft° p Date: 9/14/2021 Zone 3 By: Chris Bateman Air Calcs, LLC 7550 Hidden Hammock Ln,Vero Beach,FL32966 Phone:772.800.8413 Email:vickilyme@aircalcs.com Project Information For: Roe Residence,Groza Builders,Inc TBD Ulrich Road,Fort Pierce,FL 34982 Cooling Equipment Design Conditions Outdoor design DB: 90.4°F Sensible gain: 17539 Btuh Entering coil DB: 76.4°F Outdoor design WB: 77.4°F Latent gain: 8520 Btuh Entering coil WB: 64.1°F Indoor design DB: 75.0°F Total gain: 26058 Btuh Indoor RH: 50% Estimated airflow: 967 cfm Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SplitAC Manufacturer: Lennox Model: ML14XC1S030-230A**+CBA27UHE-030-230*++TDR Actual airflow: 967 cfm Sensible capacity: 20590 Btuh 117%of load Latent capacity: 8410 Btuh 99%of load Total capacity: 29000 Btuh 111%of load SHR: 71% Heating Equipment Design Conditions Outdoor design DB: 41.0°F Heat loss: 22994 Btuh Entering coil DB: 67.5°F Indoor design DB: 70.0°F Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: Elecstrip Manufacturer: Model: Actual airflow: 967 cfm Output capacity: 7.1 kW 105%of load Temp.rise: 50 °F Meets all requirements ofACCA Manual S. wrightsoft, 2022-Jarr17 11:15:40 M;.ek „n" _ -.=mP=". Right-Srite®Uriversal202l 2l.O.11 RSU29066 Page 3 ACCk cunents\W rightsoft HVAC\TBD Ulrich Road GBI.rup Calc=MJ8 Front Door faces:N