HomeMy WebLinkAboutENFINEERING - TRUUS! / This document has beenekclro* +signed
0 ` 1 I 1 r ! wand sealed -kV a D qU Signahre. Pn d
`\\ PNpp 'I' /I�UskVthedii* ele trobne
�---F-N �c1/- ♦9j�/]�}'� ALPINE
• , i"" 1G AN ITW COMPANY
J
ti No 70773 * _
��. 7
STATE OFORI
W�
SIO N A►-
���IlilII111��
COA#0-27s
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:
Pa a 1:
Customer: Central Florida Truss, Inc.
I Job Number: 21-0845
Job Descri tion: /GROZA BUILDERS, INC. / /ROE RESIDENCE
Address: Port St Lucie, FL
Job Engineering Criteria:
Design Code: FBC 7th Ed. 2020 Res.
IntelliVIEW Version: 20.02.01A
JRef#: lXc47610013
Wind Standard: ASCE 7-16 Wind Speed (mph): 160
Design Loading (pso: 37.00, 65.00
Building Type: Closed
This package contains general notes pages, 113 truss drawing(s) and 9 detail(s).
Item
Drawing Number
Truss
1
011.22.1416.36477
FG1
3
011.22.1354.01586
FG3
5
011.22.1417.49690
FG5
7
011.22.1416.38260
FT2
9
011.22.1354.03394
FT6
11
011.22.1354.02464
FT8
13
011.22.1354.01125
FT10
15
011.22.1354.02103
FT13
17
011.22.1353.59954
FT15
19
011.22.1353.59943
FT17
21
011.22.1354.01878
FT19
23
011.22.1354.01748
FT21
25
011.22.1354.03342
T1
27
011.22.1354.01475
T3
29
011.22.1354.01287
T5
31
011.22.1416.20330
T7
33
011.22.1416.26897
T9
35
011.22.1354.01733
T11
37
011.22.1354.01694
T13
39
011.22.1354.02365
T15
41
011.22.1354.02769
T17
43
011.22.1354.02188
T19
45
011.22.1354.02524
T21
47
011.22.1354.03180
T23
49
011.22.1354.01828
T25
51
011.22.1354.02071
T27
Item
Drawing Number
Truss
2
011.22.1353.59984
FG2
4
011.22.1416.12793
FG4
6
011.22.1354.00311
FT1
8
011.22.1354.03223
FT5
10
011.22.1354.02006
FT7
12
011.22.1354.02414
FT9
14
011.22.1354.00891
FT11
16
011.22.1354.02401
FT14
18
011.22.1354.00460
FT16
20
011.22.1354.02538
FT18
22
011.22.1354.00793
FT20
24
011.22.1354.02729
FT22
26
011.22.1354.00941
T2
28
011.22.1354.00420
T4
30
011.22.1416.47423
T6
32
011.22.1416.55727
T8
34
011.22.1354.00364
T10
36
011.22.1354.01524
T12
38
011.22.1354.02857
T14
40
011.22.1354.02236
T16
42
011.22.1354.03004
T18
44
011.22.1354.03474
T20
46
011.22.1354.02782
T22
48
011.22.1354.02658
T24
50
011.22.1354.02266
T26
52
011.22.1354.00903
T28
Florida Certificate of Product Approval #FL1999 Printed 1/11/2022 2:23:21 PM
! / This document has beenekclro* +signed
0 ` 1 I 1 r ! wand sealed -kV a D qU Signahre. Pn d
`\\ PNpp 'I' /I�UskVthedii* ele trobne
�---F-N �c1/- ♦9j�/]�}'� ALPINE
• , i"" 1G AN ITW COMPANY
J
ti No 70773 * _
��. 7
STATE OFORI
W�
SIO N A►-
���IlilII111��
COA#0-27s
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:
Pa a 2:
Customer: Central Florida Truss, Inc.
I Job Number: 21-0845
Job Descri tion: /GROZA BUILDERS, INC. / /ROE RESIDENCE
Address: Port St Lucie, FL
Item
Drawing Number
Truss
53
011.22.1353.59919
T29
55
011.22.1353.59851
T31
57
011.22.1354.02918
T33
59
011.22.1354.01079
T35
61
011.22.1415.43247
T37
63
011.22.1416.28850
T39
65
011.22.1354.02880
T41
67
011.22.1354.00336
T43
69
011.22.1354.01067
T45
71
011.22.1354.00702
T47
73
011.22.1354.00731
T49
75
011.22.1354.03406
T50A
77
011.22.1354.01773
T51
79
011.22.1354.02032
T53
81
011.22.1415.46023
T55
83
011.22.1353.59877
T57
85
011.22.1354.02802
T59
87
011.22.1354.03056
T61
89
011.22.1354.01938
T63
91
011.22.1354.01190
T65
93
011.22.1354.01919
T83
95
011.22.1354.00786
V2
97
011.22.1354.01598
V4
99
011.22.1354.01962
J1
101
011.22.1354.02155
J3
103
011.22.1354.00681
J36
105
011.22.1354.01898
J5
107
011.22.1354.01495
K1
109
011.22.1354.01135
K4
111
011.22.1354.00430
C2
113
011.22.1354.01046
C4
115
CNSY42PL0118
117
GBLLETIN0118
119
S16030ENC160118
Item
Drawing Number
Truss
54
011.22.1354.01289
T30
56
011.22.1354.01426
T32
58
011.22.1354.01339
T34
60
011.22.1354.00785
T36
62
011.22.1415.44490
T38
64
011.22.1354.03015
T40
66
011.22.1354.03111
T42
68
011.22.1354.03225
T44
70
011.22.1354.01692
T46
72
011.22.1354.02770
T48
74
011.22.1354.02363
T50
76
011.22.1354.00088
T50B
78
011.22.1354.00998
T52
80
011.22.1354.00096
T54
82
011.22.1354.01425
T56
84
011.22.1354.01311
T58
86
011.22.1354.02592
T60
88
011.22.1354.01047
T62
90
011.22.1354.00419
T64
92
011.22.1354.02241
T82
94
011.22.1354.00431
V1
96
011.22.1354.00658
V3
98
011.22.1354.01796
V5
100
011.22.1354.02143
J2
102
011.22.1354.03539
J3A
104
011.22.1354.03110
J4
106
011.22.1354.02427
J5A
108
011.22.1354.01227
K2
110
j 011.22.1354.02494
C1
112
011.22.1354.01380
C3
114
BRCLBSUB0119
116
DEFLCAMB1014
118
LSCSYX2A1014
120
STRBRIBR1014
Florida Certificate of Product Approval #FL1999 Printed 1/11/2022 2:23:21 PM
// This document has teen electronically signed
' and sealed using a ❑igital Signature. Pn d
copies without an anginal signature
`\\� �PND0 V40L,
h i fled using the anginal electroni
�,�,�;�NaF•.,���2 ALPINE
AN ITW COMPANY
-z-
,
No 70773
STATE OF ,% W
` " 11 i 1111" \
COA#0-278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:
Pa a 3:
Customer: Central Florida Truss, Inc.
I Job Number: 21-0845
Job Descri tion: /GROZA BUILDERS, INC. / /ROE RESIDENCE
Address: Port St Lucie, FL
Item Drawing Number Truss Item Drawing Number Truss
121 VAL180160118 122 VALTN160118
Florida Certificate of Product Approval #FL1999 Printed 1/11/2022 2:23:21 PM
General Notes
Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities:
The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1,
Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate
Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design
Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and
dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to
independently verify the accuracy or completeness of the information provided by others and may rely on that information
without liability. The responsibility for verification of that information remains with others neither employed nor controlled
by the Truss Design Engineer. The Truss Design Engineer's seal and signature on the attached drawings, or cover page
listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component
designs and not for the technical information furnished by others which technical information and consequences thereof
remain their sole responsibility.
The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in
accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and
loads for each truss component match those required by the plans and by the actual use of the individual component, and
for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any
additional factors required in the particular application. Truss components using metal connector plates with integral teeth
shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to
exceed 19% and/or cause corrosion of connector plates and other metal fasteners.
The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set
forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss
component design loads, inspection of the truss components before or after installation, the design of temporary or
permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear
walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the
foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports,
installation of the truss components, observation of the truss component installation process, review of truss assembly
procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in
the installation of the truss components and/or its connections.
This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic
file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request.
Temporary Lateral Restraint and Bracing:
Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2,
B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or
other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these
drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to
and may not be relied upon for the temporary stability of the truss components during their installation.
Permanent Lateral Restraint and Bracing:
The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of
the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of
BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional.
These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building
stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building
Designer.
Connector Plate Information:
Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations,
gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60.
Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at
www.icc-es.org.
Fire Retardant Treated Lumber:
Fire retardant treated lumber must be properly re -dried and maintained below 19% or less moisture level through all
stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special
handling care must be taken to prevent breakage during all handling activities.
Page 1 of 3
General Notes (continued)
Key to Terms:
Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed
information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be
found in calculation sheets available upon written request.
BCDL = Bottom Chord standard design Dead Load in pounds per square foot.
BCLL = Bottom Chord standard design Live Load in pounds per square foot.
CL = Certified lumber.
Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot.
FRT = Fire Retardant Treated lumber.
FRT-DB = D-Blaze Fire Retardant Treated lumber.
FRT-DC = Dricon Fire Retardant Treated lumber.
FRT-FP = FirePRO Fire Retardant Treated lumber.
FRT-FL = FlamePRO Fire Retardant Treated lumber.
FRT-FT = FlameTech Fire Retardant Treated lumber.
FRT-PG = PYRO-GUARD Fire Retardant Treated lumber.
g = green lumber.
HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches.
HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep
adjustment.
HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds.
Ic = Incised lumber.
FJ = Finger Jointed lumber.
L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value.
L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the
referenced panel point. Reported as 999 if greater than or equal to 999.
Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection.
Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases.
Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases.
Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases.
NCBCLL = Non -Concurrent Bottom Chord design Live Load in pounds per square foot.
PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds.
PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds
PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds.
PP = Panel Point.
R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc).
-R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc).
Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the
indicated location (Loc).
RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non -gravity (wind or seismic)
load cases, at the indicated location (Loc).
Rw = maximum downward design Reaction, in pounds, from all specified non -gravity (wind or seismic) load cases, at the
identified location (Loc).
TCDL = Top Chord standard design Dead Load in pounds per square foot.
TCLL = Top Chord standard design Live Load in pounds per square foot.
U = maximum Upward design reaction, in pounds, from all specified non -gravity (wind or seismic) load cases, at the
indicated location (Loc).
VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in
inches.
VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and
maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment.
VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load.
VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment.
W = Width of non -hanger bearing, in inches.
Refer to ASCE-7 for Wind and Seismic abbreviations.
Uppercase Acronyms not explained above are as defined in TPI 1
Page 2 of 3
References:
1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org.
2. ICC: International Code Council; www.iccsafe.org.
3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO
63045; www.alpineitw.com.
4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org.
5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www. sbcacomponents.com.
Page 3 of 3
SEQN: 212189 FLAT
Ply: 4
Job Number: 21-0845
Cust: R761 JWAXW610013 T71
FROM:
Qty: 1
/GROZA
BUILDERS, INC. / /ROE RESIDENCE
Dnallo: 011.22.1416.36477
Truss Label: FG1
SSB / FV 01/11/2022
4 Complete
Trusses Required
2i_4'i5"2
6�
3'5"2 6'5"3
9'5"13 12'5" 15'4"4 185"5
21-4"105 23'10"14
3'5"2 3'0"2
3'0"10 2-11"4 2'11"4 3'1"2
2'11"10 2'6"
=5X6 =3X8
A B C
=3X10 -1-10510 =3X10 =4X4
D E F G H =4X7 I J
9
0D
W1
W17
T S R
Q B2 P9 O
N M LK
12X6 =3X10
=5X8 -8X16 =5X6
=4X7 III1.5X6
127'6
11'9"12
3'0"2 3'1"2 2'11"10 3W4 34"4 2'11"10
2'11"10 2'5"4
r 3'0"2 6'1"3 9'013 12'5" 15'9"4 18'8"13
21'8"7 24'1"10,
uT-8
24'5"2
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.067 C 999 480
Loc R+ / R- / Rh / Rw / U / RL
T 5296 /- /- /- /1948 /-
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.132 C 999 360
BCDL: 5.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.023 L - -
P 15335 /- /2 /- /5958 /1
Des Ld: 65.00
EXP: B Kzt: NA
HORZ(TL): 0.045 L
K 5056 /- /0 /- /1914 /0
Building Code:
NCBCLL: 0.00
Mean Height: 15.00 It
Creep Factor: 2.0
Wind reactions based on MWFRS
Soffit: 0.00
TCDL: 4.0 psf
BCDL: 3.0 psf
p
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.668
T Br Wid = 3.5 Min Re 1.6
g q =
Load Duration: 1.00
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
.
Max BC CSI: 0829
P Brg Wid = 3.5 Min Req = 2.8
K Brg Wid = -
Spacing: 24.0 "
C&C Dist a: 3.00 It
Rep Fac: Yes
Max Web CSI: 0.678
Bearings T & P are a rigid surface.
Loc. from endwall: Any
FT/RT:20(0)/5(0)
Members not listed have forces less than 375#
GCpi: 0.18
Plate Type(s):
Maximum Top Chord Forces Per Ply (Ibs)
Wind Duration: 1.60
WAVE, HS
VIEW Ver: 20.02.01A.1209.10
Chords Tens.Comp. Chords Tens. Comp.
Lumber
A-B 780-2098 E-F 2468 -920
Top chord: 2x4 SP 2250f-1.9E;
Wind
B - C 878 -2275 F - G 254 -623
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Wind loads and reactions based on MWFRS.
C - D 110 -412 G - H 793 -2083
Webs: 2x4 SP #2; W1,W1 7 2x6 SP #2;
W9 2x10 SP #1;
End verticals not exposed to wind pressure.
D-E 2468 -920 H-I 667 -1761
Nailnote
It is the responsibility of the Building Designer and
Maximum Bot Chord Forces Per Ply (Ibs)
Truss Fabricator to review this drawing prior to
Nail Schedule:0.128"x3", min. nails
cutting lumber to verify that all data,including
Chords Tens.Comp. Chords Tens. Comp.
Top Chord: 1 Row @ 1.25" o.c.
dimensions and loads, conform to the architectural
S - R 2288 -851 O - N 2074 -791
Bot Chord: 1 Row @12.00" o.c.
plans/specifications and fabricators truss layout.
R - Q 2278 -884 N - M 1941 737
Webs : il Row 4" o.c.
Repeat nailing as each layer is applied. Use equal
a
WARNING! This truss is not s
symmetric, but its
y
P - O 1008 -425
spacing between rows and stagger nails in each row
exterior geometry makes erection error more
to avoid splitting.
probable. It is imperative that this truss be
Maximum Web Forces Per Ply (Ibs)
In addition, apply (1) 0.22"-0.25" min/max dia. X 6.0"
installed properly.
Webs Tens.Comp. Webs Tens. Comp.
length wood screw at each joint location.
A - T 480 -1301 P - F 1241 - 3258
Special Loads
A - S 2206 -821 F - O 577 -202
---(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
S - B 343 -917 O - G 604 -1631
TC: From 1055 plf at 0.00 to 1055 plf at 6.83
C - Q 870 - 2098 H - M 337 - 870
TC: From 250 plf at 6.83 to 250 pif at 12.64
/�
Q - D 1087 -448 M - 1 1920 -727
TC: From if at 13.23���pNDO
TC: From 1985 055 plf at 13.23 to lf at 12.64 to 1985 plf at 24 43
���{{
��� ii�//
D I - L 465 -1223
-13 1501
BC: From 10 plf at 0.00 to 10 plf at 24.43
\\��055
E - P -11027 31
\\ 4��GENdF
TC: 1810 lb Conc. Load at 6.83
TC: 2450 lb Conc. Load at 12.64
No 70773
BC: 144 lb Conc. Load at 13.23,15.23,17.23,19.23
_ -
21.23,23.23
W
Plating Notes
,• STATE OF % Z
All plates are 3X4 except as noted.
0LOW..t�P,-' \2
3'SIONAL
Hangers / Ties
(J) Hanger Support Required, by others
COA#0-2 8/// 1111110\\
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety
bracing per BCSI. Unless noted otherwise, top chord shall
practices prior to performing these functions. Installers shall provide
have proper) attached structural sheathing and bottom chord shall
temporary
have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise.
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
to ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW CGMPANY
truss in ANSI/TPI 1, for handling, installation bracin trusses. A this drawin
conformance with or shipping,, and of seal on or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
ructure -Designer
drawing for any s is the responsibility of the Building
per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204511 / FLAT Ply: 4 Job Number: 21-0845 Cust: R761 JRef:1Xc47610013 T113
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1353.59984
Truss Label: FG2 SSB / DF 01/11/2022
4 Complete Trusses Required
T
1
3,3„41�20'6�
1'11"8 1'9"12 1'3"12
1'3"12 5'z"12 T2"3 10'11"15 12'11"31 14'11"111 17T'4 1 192 4 i
11.3"l 1'11"8 Ti_1"8 r 2' 1.11"4 2'0"8 2.1"8 2'1"
=6X6 =4X5 =3X4 1111.5X4 1111.5X4 =3X4 =3X8 =6X6 =3X3
A B C D E F G T2 H I J K L
W
W1
2
( W
V
U T S
R
Q
P O
1114X4
M
9,4
3X8
III1.5X4
20'6"
2'2"12 2'
1'11"8 1'11"8 2,3„8 2'1" 2'1" 2'1"8
2,4"4
2'11"4 4.11"4
6'10"11 8'103 11'1"11 13'2"11 15'3"11 17'5"4 19'9"8
8"
20' „
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions
(Ibs)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity
Non -Gravity
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.299 F 793 480
Loc R+ / R- / Rh
/ Rw
/ U / RL
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.487 F 488 360
X 8156/-
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): 0.057 A - -
N 9723/-
Des Ld: 65.00
EXP: NA Kzt: NA
HORZ(TL): 0.093 A
X Brg Wid = - Min
Req = -
NCBCLL: 10.00
Mean Height: NA ItBuildin
TCDL: NA psf
g Code:
Creep Factor: 2.0
N Br Wid = 13.8
9
Soffit: 0.00
TCDL: NA psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.621
Bearing N is a rigid surface.
Load Duration: 1.00
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.632
Members not listed have
forces less
than 375#
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.712
Maximum Top Chord Forces
Chords Tens.Comp.
Per
Chords
Ply (Ibs)
Tens. Comp.
Loc. from endwall: NA
FT/RT:20(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
A - B 0 -1048
F - G
0 - 7352
Wind Duration: NA
WAVE, HS
VIEW Ver: 20.02.01A.1209.10
B - C 0 -3788
G - H
0 -7347
Lumber
It is the responsibility of the Building Designer and
C - D 0 -
D - E 0 - 6792
H - I
I - J
0 - 9
0 - 5196
Top chord: 2x4 SP #2; T2 2x4 SP 2700f-2.2E;
Truss Fabricator to review this drawing prior to
E - F 0 -7351351
J - K
0 -3196
Bot chord: 2x6 SP 2400f-2.0E;
cutting lumber to verify that all data,including
Webs: 2x4 SP #2; W3,W20 2x8 SP 2400f-2.0E;
dimensions and loads, conform to the architectural
W 19 2x4 SP 2250f-1.9E;
plans/specifications and fabricators truss layout.
Maximum Bot Chord Forces Per
Ply (Ibs)
Chords Tens.Comp.
Chords
Tens. Comp.
Nailnote
W- V 1796 0
R- Q
6786 0
Nail Schedule:0.128"x3", min. nails
V - U 4048 0
Q - P
5411 0
Top Chord: 1 Row @12.00" o.c.
U - T 5714 0
P - O
3479 0
Bot Chord: 2 Rows @ 3.00" o.c. (Each Row)
T - S 6882 0
O - N
924 0
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
S - R 7352 0
spacing between rows and stagger nails in each row
to avoid splitting.
Maximum Web Forces
Per Ply (Ibs)
In addition, apply (1) 0.22"-0.25" min/max dia. X 6.0"
Webs Tens.Comp.
Webs
Tens. Comp.
length wood screw at each joint location.
A-X 0 -1904
E-S
593 0
Special Loads
A- W 2164 0
R- H
692 0
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
W - B 0 -1765
H - Q
0 -434
TC: From 60 plf at 0.00 to 60 plf at 20.50
B - V 2522 0
Q - I
1576 0
From5plfat 0.005 plf at 20.60
V - C 0 -1180
I - P
0 - 975
BC: lb Coat2.30
U- 18 0
D
P_J
211
BC: 115lbConc. Laat 4.30, 6.30, 7.63, 8.99
�O
0 -1284
112.1
/
D - T 1365 0
O - K
2801 0
BC: 1282 lb Conc. Load at 17.63
BC: 2785 lb Conc. Load at 19.49
No 70773
T - E 0 -408
K - N
0 -1883
Plating Notes
J
All plates are 5X8 except as noted.
STATE OF 41
Additional Notes
�iN'• F
RP,• �_���
OtC9
Truss must be installed as shown with top chord up.
• \�
�j �iss ""�, e IN
coa#0-2 s ///ll►1i11\0
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Ifefer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW COMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin4 of trusses. A seal on this drawing or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional engiineering responsibility solely -for the design shown. The suitability and use of this Suite 305
drawing for any sfructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For,more information see these web sites: Alpine: al ineitw.com; TPI: t inst.or ; SBCA: sbcacom onents.com; ICC: iccsafe.or ; AWC: awc.orc Orlando FL, 32821
SEQN: 204473 / FLAT Ply: 2 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T117
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01586
Truss Label: FG3 SSB / DF 01/11/2022
2 Complete Trusses Required
io
2' 10"8
2' 10"8
=4X4 Ill1.5X4
5,9„
2' 10"8
A B =4X4C
9'4"
F E D
1112X4 =3X10
III1.5X4
5,9„
2' 10"8
2' 10"8
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
BCDL: 5.00
Category: NA
Snow Duration: NA
EXP: NA Kzt: NA
Des Ld: 65.00
Mean Height: NA It
NCBCLL: 10.00
TCDL: NA psf
Building Code:
Soffit: 0.00
BCDL: NA psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.00
MWFRS Parallel Dist: NA
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Varies by Ld Case
Loc. from endwall: NA
FT/RT:20(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
Wind Duration: NA
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 2.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 2 plf at 0.00 to 2 plf at 5.75
BC: From 10 plf at 0.00 to 10 plf at 5.75
TC: 1040 lb Conc. Load at 0.44, 2.44, 4.44
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Truss must be installed as shown with top chord up
It is the responsibility of the Building Designer and
Truss Fabricator to review this drawing prior to
cutting lumber to verify that all data,including
dimensions and loads, conform to the architectural
plans/specifications and fabricators truss layout.
2' 10"8
5,9„
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.020 B 999 480
VERT(CL): 0.033 B 999 360
HORZ(LL): 0.003 A - -
HORZ(TL): 0.005 A
Creep Factor: 2.0
Max TC CSI: 0.875
Max BC CSI: 0.130
Max Web CSI: 0.337
EW Ver: 20.02.01A.1209.10
N
<G ,
No 70773
Ir
STATE OF ;,4
/
COA#0-2 8 N A1.
��l/!
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 1832/-
D 1357/-
F Brg Wid = - Min Req = -
D Brg Wid = 3.5
Bearing D is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A-B 0-1137 B-C 0 -1137
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
A-F 0 -891 E-C 1195 0
A-E 1195 0 C -D 0 -654
B - E 0 - 892
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212203 FLAT Ply: 3 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T31
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1416.12793
Truss Label: FG4 SSB / FV 01/11/2022
3 Complete Trusses Required
T
Co
2'9"12 5'0"3 7'3"11 9'6"3 11'11"3 13'10"5� 16'1"14
2'9"1 2 2'2"8 2'3"8 2'2"8 2'5" 1,11"1 2'3"1 0
--3X8 =4X7 III1.5X4 1111.5X4 =4X5 =3X6 =5X8
A B C D E F G =4X12H
W1
1
Ll
O N M L K J
P
1112X4
,. �,.. �,. ... B2
8X8
L 2'5"12 2'4"12
2'5"12 1 4'107
Loading Criteria (psf) Wind Criteria
TCLL: 40.00 Wind Std: ASCE 7-16
TCDL: 20.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 5.00 Risk Category: II
Des Ld: 65.00 EXP: B Kzt: NA
Mean Height: 15.00 It
NCBCLL: 0.00 TCDL: 4.0 psf
Soffit: 0.00 BCDL: 3.0 psf
Load Duration: 1.00 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 It
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
B2 2x8 SP SS Dense;
Webs: 2x4 SP #2; W 1, W 10, W 14 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 16.16
BC: From 10 plf at 0.00 to 10 plf at 16.16
BC: 6317 lb Conc. Load at 12.16 +
irifiME!
W14
I
1113X8
�9,4.,
27"
2'4"4 27"
1110"1 1 1'11"2
7'57
9'9"11 12'4"11
14'2"13' 16'1"14�
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.213 M 911 480
Loc R+ / R- / Rh / Rw / U / RL
Lu: NA Cs: NA
VERT(CL): 0.346 M 561 360
P 2612 /- /- /- /430 /-
Snow Duration: NA
HORZ(LL): 0.023 1 - -
I 5805 /- /- /- /941 /-
HORZ(TL): 0.037 1
Wind reactions based on MWFRS
Building Code:
Creep Factor: 2.0
P Brg Wid = 3.5 Min Req = 1.5
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.576
I Brg Wid = 3.5 Min Req = 2.0
TPI Std: 2014
Max BC CSI: 0.968
Bearings P & I are a rigid surface.
Rep Fac: Yes
Max Web CSI: 0.901
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
WAVE, HS I VIEW Ver: 20.02.01A.1209.10
It is the responsibility of the Building Designer and
Truss Fabricator to review this drawing prior to
cutting lumber to verify that all data,including
dimensions and loads, conform to the architectural
plans/specifications and fabricators truss layout.
A - B 228 -1389 E - F 808 -4976
B - C 520 - 3180 F - G 848 - 5248
C - D 531 - 3247 G - H 445 - 2751
D - E 538 - 3295
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
O - N 1588 - 261 L - K 5262 - 853
N - M 3247 - 531 K - J 3171 - 514
M - L 4828 - 786
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp
A - P
138 - 828
M - E
296 -1910
A - O
1549 - 254
E - L
740 -110
O - B
161 - 957
K - G
2670 - 430
B - N
1915 - 310
G - J
295 -1804
N - C
107 - 636
J - H
3192 - 516
D - M
484 - 69
H - 1
285 -1752
Wind \NENaF•,
Wind loads and reactions based on MWFRS.
No 70773
End verticals not exposed to wind pressure. * ,�
Additional Notes
STATE OF
Truss must be installed as shown with top chord up. � [t/
4
The maximum concentrated load is 6317# %0,p�, FLOR,pP,•
+14-(0.131"x3.0") nails opposite hangerss'/
after third is attached. //////�A
ply COA#0-2 8
1 \\
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
bracing BCSI. Unless noted otherwise, top chord shall have attached structural sheathing and bottom chord shall have a
per proper) properly
attached ri id ceilin Locations shown for ermanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, 67 or B10,
App�y face Defer
as applicabgla. plates to each of truss and position as shown above and on the Join tails, unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in ANSI/TPI 1, for handling, installation bracin trusses. A this drawin
AN,TW CGMPANY
conformance with or shipping,, and of seal on or cover page
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is
-Designer
6750 Forum Drive
Suite 305
drawing for any soructur is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL, 32821
SEQN: 212197 FLAT Ply: 3 Job Number: 21-0845 Cust: R761 JRef:1Xc47610013 T81
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1417.49690
Truss Label: FG5 SSB / FV 01/11/2022
3 Complete Trusses Required
1'8"6 3'0"5 42"1 5 5'5"9 6'9"7 8'5"14
1'8"6 + 1'3"14 1'2"10 1'2"10 1 1'3"14 + 1'8"6
A6 5X8 =5X8 -4Cp 4 1111.5X4 -4E4 -5 F8 -5X8
G
1113X1O -6X8 -5X8 -3X1O -5X8 -6X8 1113X10
8'S"14
1'3"14 1 1'4"6 1 1'6" 10 1'6" 10 1'4"6 1'3"14
1'3"14 1 2'8"5 1 47"15 5'9"9 7'1"15 8'5"14
Loading Criteria (psf) Wind Criteria
TCLL: 40.00 Wind Std: ASCE 7-16
TCDL: 20.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 5.00 Risk Category: II
EXP: B Kzt: NA
Des Ld: 65.00 Mean Height: 15.00 ft
NCBCLL: 0.00 TCDL: 4.0 psf
Soffit: 0.00 BCDL: 3.0 psf
Load Duration: 1.00 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x8 SP SS Dense;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 1.50" o.c.
Bot Chord: 2 Rows @ 3.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 60 pit at 0.00 to 60 pit at 5.60
TC: From 480 pit at 5.60 to 480 plf at 8.49
BC: From 5 plf at 0.00 to 5 plf at 5.60
BC: From 10 plf at 5.60 to 10 plf at 8.49
TC: 777 lb Conc. Load at 1.06, 2.06, 4.06
TC: 2250 lb Conc. Load at 5.60
BC: 777 lb Conc. Load at 1.06, 2.06, 4.06
BC: 5056 lb Conc. Load at 5.60 +
Hangers / Ties
(J) Hanger Support Required, by others
(H2) _ (J) Special hanger required Unavailable
supporting member.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.055 D 999 480
VERT(CL): 0.098 D 999 360
HORZ(LL): 0.016 A - -
HORZ(TL): 0.028 A
Creep Factor: 2.0
Max TC CSI: 0.570
Max BC CSI: 0.506
Max Web CSI: 0.874
EW Ver: 20.02.01A.1209.10
+ 840.131"x3.0") nails opposite hanger
after third ply is attached.
It is the responsibility of the Building Designer and
Truss Fabricator to review this drawing prior to
cutting lumber to verify that all data,including
dimensions and loads, conform to the architectural
plans/specifications and fabricators truss layout.
ow111101o"
No 70773 *
ILO
STATE OF ;
AL
77 �llllllll`
01/11/2022
g,4„
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
N 6317 /- /- /- /1011 /-
H 7432 /- /- /- /1456 /-
Wind reactions based on MWFRS
N BrgWid=
-
H BrgWid=
-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 323 -1934 D - E 850 - 4289
B - C 605 - 3330 E - F 964 - 4430
C - D 850 - 4289 F - G 480 - 2324
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
M - L 2311 - 384 K - J 4554 - 948
L - K 3545 - 654 J - 1 2838 - 583
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp.
Webs
Tens. Comp.
A-N
293-1813
K-E
171
-376
A - M
2578 - 431
E - J
0
- 534
M - B
261 -1616
J - F
2407
- 575
B - L
1541 - 334
F - 1
445
- 2211
L - C
212 - 924
1 - G
3099
- 640
C - K
1051 - 277
G - H
431
- 2191
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204515 / SY42 Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T119
FROM: Qty: 7 /GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.00311
Truss Label: FT1 SSB / DF 01/11/2022
9'0"1 1110"1 197'15
9'0"1 2' 87'14 1
2'6"
(TYP)
=3X3 Ill1.5X4 =W=3X4
=6X6 =4X4 =3X3 =3X3 1111X4 =4X4 =3X3 =4X4 =5X6
AB C D E F G H I J K L M
10'9"
zo
9,4„
111X4 =5X6 =4X4 =3X3 =3X3 =4X4 =3X3 =4X4 =5X6 -3X3
W =HO310
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: NA
TCDL: 20.00
Speed: NA mph
BCLL: 0.00
Enclosure: NA
BCDL: 5.00
Category: NA
EXP: NA Kzt: NA
Des Ld: 65.00
Mean Height: NA ft
NCBCLL: 10.00
TCDL: NA psf
Soffit: 0.00
BCDL: NA psf
Load Duration: 1.00
MWFRS Parallel Dist: NA
Spacing: 24.0 "
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Lumber
Top chord: 4x2 SP #2; T1 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Deflection
Max JT VERT DEFL: LL: 0.24" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
197'15
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.241 G 958 480
Loc R+ / R- / Rh / Rw / U / RL
A 1267/-
Lu: NA Cs: NA
VERT(CL): 0.369 G 626 360
Snow Duration: NA
HORZ(LL): -0.040 M - -
N 1286/-
HORZ(TL): 0.066 M
Creep Factor: 2.0
A Brg Wid = 3.0 Min Req = 1.5
N Brg Wid = 3.6 Min Req = 1.5
Building Code:
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.967
Bearings A & N are a rigid surface.
TPI Std: 2014
Max BC CSI: 0.535
Members not listed have forces less than 375#
Rep Fac: Yes
Max Web CSI: 0.455
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
FT/RT:12(0)/5(0)
Plate Type(s):
B- C 0 -1079 H- 1 0- 3872
Ver: 20.02.01A.1209.10
WAVE, HIS
C - D 0 -1039 I - J 0 -3398
D- E 0- 2601 J- K 0- 3398
E- F 0- 3485 K- L 0- 2435
F- G 0- 3875 L- M 0 - 905
G - H 0 - 3880
No 70773 ;
*rJ STATE OF /W
/11 11111`
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
W- V 2036 0 S- R 3880 0
V- U 3147 0 R- Q 3748 0
U- T 3796 0 Q- P 3037 0
T- S 3796 0 P- O 1807 0
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp
B-W
1612 0
R-I
612 -105
W-D
0-1519
I-Q
0 -573
D-V
898 0
Q-K
573 0
V- E
0- 867
K- P
0 - 956
E- U
536 0
P- L
997 0
U -F
0 -510
L-O
0 -1431
F-S
507 -178
O-M
1441 0
H- R
27 - 409
M- N
0 -1255
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
,ient Safety Information, by TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
tl rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
cable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
1is drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of s
I for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212176 SY42 Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T72
FROM: Qty: 3 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1416.38260
Truss Label: FT2 SSB / FV 01/11/2022
5'1"15 7'1"15 1 11'11"8
61"15 2' 14'9"9
F3 2,6„ �1� 2'37 1'11"1
(TYP)
- 4X5 - 3X3 - 3X3 3X3 - 3X3 - 4X5
A B C D E F
T
20
I
-3X3 - -- III IAA III In
3X3
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: NA
TCDL: 20.00
Speed: NA mph
BCLL: 0.00
Enclosure: NA
BCDL: 5.00
Category: NA
EXP: NA Kzt: NA
Des Ld: 65.00
Mean Height: NA ft
NCBCLL: 10.00
TCDL: NA psf
Soffit: 0.00
BCDL: NA psf
Load Duration: 1.00
MWFRS Parallel Dist: NA
Spacing: 24.0 "
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
11'11"8
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.061 K 999 480
VERT(CL): 0.124 C 999 360
HORZ(LL): 0.015 B - -
HORZ(TL): 0.031 B
Creep Factor: 2.0
Max TIC CSI: 0.516
Max BC CSI: 0.716
Max Web CSI: 0.224
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF ; %�
? z
c�OR1Oq'• O� �
COA#0-2 8 s/ANAL
01/11/2022
9,4„
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
N 777/-
G 777/-
N Brg Wid = 3.5 Min Req = 1.5
G Brg Wid= -
Bearing N is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A-B 0 -496 D-E 0 -1218
B-C 0-1201 E-F 0 -493
C-D 0 -1352
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
M-L 984 0 J-1 1350 0
L- K 1353 0 I- H 976 0
K - J 1352 0
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp
A-N 0 -769 1 - E 416 0
A- M 792 0 E- H 0 - 767
M-B 0 -774 H-F 787 0
D-I 0 -436 F-G 0 -752
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
its drawino indicates acceptance of professional engpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204470 / SY42 Ply: 1 Job Number: 21-0845
FROM: Qty: 3 /GROZA BUILDERS, INC. / /ROE RESIDENCE
Truss Label: FT5
L 5'1"15 7'1"15 16'1"14
5'1"15 2' 8'11"15
1 2,6" �{� 2'37
(TYP)
=4X6 =4X4 =3X3 III1X4 =3X3 =3X3
A B C D E F
20
I
Cust: R761 JWAXW610013 T116
Dnallo: 011.22.1354.03223
SSB / DF 01/11/2022
F"
3X3
3X4 = 6X6
G H I J
ZS
VQ
R
P
O
N
M
L
K
3X3 ="='F^'4 H I .U^-+ = 0^0 = 0^0
16'1"14
Loading Criteria (psf) Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00 Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00 Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.209 O 904 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00 Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.352 O 537 360
S 1057/-
BCDL: 5.00 Category: NA
Snow Duration: NA
HORZ(LL): 0.020 L - -
I 1040
EXP: NA Kzt: NA
Des Ld: 65.00
HORZ(TL): 0.033 L - -
S Brg Wid = 3.5 Min Req = 1.5
Mean Height: NA ft
NCBCLL: 10.00
Building Code:
Creep Factor: 2.0
1 Brg Wid = 3.2 Min Req = 1.5
TCDL: NA psf
Soffit: 0.00
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.547
Bearings S & I are a rigid surface.
g g
BCDL: NA psf
Load Duration: 1.00 MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.727
Members not listed have forces less than 375#
Spacing: 24.0 " C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.360
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Loc. from endwall: NA
FT/RT:12(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
A - B 0 -714 E - F 0 -2531
Wind Duration: NA
WAVE
VIEW Ver: 20.02.01A.1209.10
B - C 0 -1908 F - G 0 -1989
C-D 0 -2419 G-H 0 -819
Lumber
D- E 0- 2425 H- 1 0 - 855
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Additional Notes
R- Q 1412 0 O- N 2608 0
+ 2x6 continuous strongback. See detail
Q - P 2408 0 N - M 2366 0
STRBRIBR1014 for bracing and bridging
P - O 2419 0 M - L 1605 0
recommendations.
Truss must be installed as shown with top chord up.
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
A- S 0 -1050 O- E 77 - 501
A-R 1138 0 F-M 0 -599
R-B 0-1108 M-G 609 0
B-Q 788 0 G-L 0 -1192
Q- C 0- 938 L- I 1277 0
No 70773
STATE OF
?
cLOR1Oq'• O� ��
COA#0-2 8 s/ANAL
/llllllll�
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d ngid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204479 / SY42 Ply: 2 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T111
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03394
Truss Label: FT6 SSB / DF 01/11/2022
2 Complete Trusses Required
5'1"15 T1"15
5'1"15 2'
2,6„ 2,3„ 7
(TYP)
- W =3X4
=4X5 =4X4 =3X3 1111.5X4=3X3 =3X3
A B C D E F G
16'0"4 19'8" 12
8110"5 3'8"8
J'� �i
2,8„4 —ftr 1,6„ --�
1111 X4
=3X3 =4X10 =5X5 =5X6
H I J K L
+
Y X W V U T S R Q P O N M
-3X3 =4J14 =4J14 IIIZA4 —JAIJ —JAIJ
H0310W=(I)
Loading Criteria (psf) Wind Criteria
TCLL: 40.00 Wind Std: NA
TCDL: 20.00 Speed: NA mph
BCLL: 0.00 Enclosure: NA
BCDL: 5.00 Category: NA
EXP: NA Kzt: NA
Des Ld: 65.00 Mean Height: NA ft
NCBCLL: 10.00 TCDL: NA psf
Soffit: 0.00 BCDL: NA psf
Load Duration: 1.00 MWFRS Parallel Dist: NA
Spacing: 24.0 " C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 19.73
BC: From 10 plf at 0.00 to 10 plf at 19.73
TC: 1832 lb Conic. Load at 16.02
Plating Notes
(1) - plates so marked were sized using 0% Fabrication
Tolerance, 0 degrees Rotational Tolerance, and/or
zero Positioning Tolerance.
Hangers / Ties
(J) Hanger Support Required, by others
Deflection
Max JT VERT DEFL: LL: 0.32" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
See DWG CNSY42PL0118 for connection details of 2
ply trusses.
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
19'8"12
5X5
1'4„
Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA VERT(LL): 0.321 E 719 480
Loc R+ / R- / Rh / Rw / U / RL
Lu: NA Cs: NA VERT(CL): 0.521 E 442 360
Y 1612/-
Snow Duration: NA HORZ(LL): 0.030 N - -
M 2785/-
HORZ(TL): 0.049 N
Y Brg Wid = 3.5 Min Req = 1.5
Building Code: Creep Factor: 2.0
M Brg Wid = -
FBC 7th Ed. 2020 Res. Max TC CSI: 0.829
Bearing Y is a rigid surface.
TPI Std: 2014 Max BC CSI: 0.980
Members not listed have forces less than 375#
Rep Fac: Varies by Ld Case Max Web CSI: 0.487
Maximum Top Chord Forces Per Ply (Ibs)Chords
Tens.Comp. Chords Tens. Comp.
FT/RT:12(0)/5(0)
Plate Type(s):
A - B 0 - 575 G - H 0 - 3085
WAVE, HS VIEW Ver: 20.02.01A.1209.10
B - C 0 -1656 H - 1 0 -2991
It is the responsibility of the Building Designer and
C - D 0 - 22I - J 0 -1652
D - E 0 - 2286 J - K 0 -1652
Truss Fabricator to review this drawing prior to
E - F 0 - 2961 K - L 0 -1085
cutting lumber to verify that all data,including
dimensions and loads, conform to the architectural
F - G 0 -2961
plans/specifications and fabricators truss layout.
<G ,
No 70773
Ir
J STATE OFZZ
�O',
/ O N AL �?\��
COA#0-2 a ////! ) 111I )1��0\
01/11/2022
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
X-W
1131
0
S-R
3077
0
W- V
2254
0
R- Q
3107
0
V- U
2272
0
Q- P
2826
0
U- T
2729
0
P- O
2826
0
T- S
2729
0
O- N
1189
0
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
A- Y
0- 806
U- E
0 - 787
A-X
914 0
1-0
0 -1684
X- B
0- 884
O- K
1304 0
B- W
834 0
K- N
0 -1289
W- C
0 -1072
N- L
1725 0
C- V
448 0
L- M
0 -1388
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Ifefer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN ITW COMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin4 of trusses. A seal on this drawing or cover page 6750 Forum Drive
listing this drawing indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of this Suite 305
drawing for any sucture is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For,more information see these web sites: Alpine: al ineitw.com; TPI: t inst.or ; SBCA: sbcacom onents.com; ICC: iccsafe.or ; AWC: awc.orc Orlando FL, 32821
SEQN: 204491 / SY42
Ply: 1
Job Number: 21-0845
Cust: R761
JRef:1Xc47610013 T106
FROM:
Qty: 1
/GROZA BUILDERS, INC. / /ROE RESIDENCE
DrwNo: 011.22.1354.02006
Truss Label: FT7
SSB / DF 01/11/2022
7'011 i 9'0.11 19'8"12
�
7'0"11 2' 10'8" 1
2,6„ 1'8"3 1,51 i�3 12
(TYP)
W =3X4
=5X6 =4X4 =4X4 =3X3 =3X3 11X4 =3X3 =3X3
=4X4
=4X7
A B C D E F G H I
J
K
T
Eo
W V U T S R Q P O
N M
L
= 3X3 = 5X6 = 4X4 4X3X3 l l 1 X4 = 3X4 = 3X3
= 4X4 = 5X6
= 3X3
W=H0310
19'8"12
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00 Wind Std: NA Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/#
Gravity
Non -Gravity
TCDL: 20.00 Speed: NA mph Pf: NA Ce: NA VERT(LL): 0.308 E 749 480
Loc R+ / R- / Rh
/ Rw / U / RL
BCLL: 0.00 Enclosure: NA Lu: NA Cs: NA VERT(CL): 0.487 E 473 360
W 1282/-
BCDL: 5.00 Category: NA Snow Duration: NA HORZ(LL): 0.039 M - -
L 1282/-
EXP: NA Kzt: NA
Des Ld: 65.00 HORZ(TL): 0.063 M
W Brg Wid = 3.5 Min
Req = 1.5
Mean Height: NA ft
NCBCLL: 10.00 TCDL: NA psf Building Code: Creep Factor: 2.0
L Br Wid = -
9
Soffit: 0.00 BCDL: NA psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.698
Bearing W li rigid surface.
Load Duration: 1.00 MWFRS Parallel Dist: NA TPI Std: 2014 Max BC CSI: 0.915
Members not listed have forces
less than 375#
Spacing: 24.0 " C&C Dist a: NA ft Rep Fac: Yes Max Web CSI: 0.408
Maximum Top Chord Forces
Chords Tens.Comp.
Per Ply (Ibs)
Chords Tens. Comp.
Loc. from endwall: NA FT/RT:12(0)/5(0)
I: NA GCpi: NA Plate Type(s):
A - B 0 - 907
F - G 0 - 3890
Wind Duration: NA WAVE, HS VIEW Ver: 20.02.01A.1209.10
B - C 0 -2414
G - H 0 -3890
Lumber
C- D 0 -3477
D- E 0- 3727
H- 1 0 -3382
1-1 0- 2427
Top chord: 4x2 SP 2250f-1.9E; T2 4x2 SP #2;
E - F 0 - 3890
J - K 0 - 902
Bot chord: 4x2 SP #2; B2 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Maximum Bot Chord Forces Per Ply (Ibs)
Hangers / Ties
Chords Tens.Comp.
Chords Tens. Comp.
(J) Hanger Support Required, by others
V - U 1806 0
Q - P 3735 0
U- T 3004 0
P- O 3728 0
Deflection
T- S 3004 0
O- N 3026 0
Max JT VERT DEFL: LL: 0.31" DL: 0.24". See detail
S - R 3710 0
N - M 1800 0
DEFLCAMB1014 for camber recommendations.
R - Q 3727 0
Additional Notes
+ 2x6 continuous strongback. See detail
Maximum Web Forces Per Ply (Ibs)
STRBRIBR1014 for bracing and bridging
Webs Tens.Comp.
Webs Tens. Comp.
recommendations.
A- W 0 -1272
E- P 465 -250
Truss must be installed as shown with top chord up.
A - V 1444 0
H - O 0 - 549
V-B 0-1427
0-1 565 0
B-U 965 0
1 - N 0 -952
93
C S 8411 0
�
J M 0
-
- -1426
�� �Q�•���eM8R••'9iP
S-D 0-1052
M-K 1436 0
D-R 584 0
K-L 0 -1251
No 70773
STATE OF ;
jOic� FLOR��ix
SRO
N A` \\\
COA#0-2 8 ///011111 \0
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition
of BCSI (Building
Component Safety Information, by TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a
attached rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections
properly
B3, B7 or B10,
as applicable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Ifefer to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in with ANSI/TPI 1, for handling, installation bracin4 trusses. A this drawing
AN,TW COMPANY
conformance or shipping,and of seal on or cover page
listing this drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of this
-Designer
6750 Forum Drive
Suite 305
drawing for any sfructure is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For,more information see these web sites: Alpine: al ineitw.com; TPI: t inst.or ; SBCA: sbcacom onents.com; ICC: iccsafe.or
AWC: awc.orcl
Orlando FL, 32821
SEQN: 204487 / SY42
Ply: 1
Job Number: 21-0845
Cust: R761
JWAXW610013 T99 /
FROM:
Qty: 2
/GROZA BUILDERS, INC. / /ROE RESIDENCE
Dnallo: 011.22.1354.02464
Truss Label: FT8
SSB / DF 01/11/2022
8'4"3 10'4"3
18'8"6
8'4"3 2'
8'4"3
(TYP)
3X3 3X3
4X6 = 4X4 = 3X3 III 1.5X4 1111.5X4 — W=3X4 —_3X3
= 4X4
= 4X6
A B C D E F G H I
J
K
T
bo
9,4„
�
V U T S R Q P O
N M
L
_ _
=3X3 =5X5—4w=H0310 —3X3 =3X3 =3X3 —_3X3=4X4
=5X5
=3X3
18'8"6
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00 Wind Std: NA Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/#
Gravity
Non -Gravity
TCDL: 20.00 Speed: NA mph Pf: NA Ce: NA VERT(LL): 0.201 E 999 480
Loc R+ / R- / Rh
/ Rw / U / RL
BCLL: 0.00 Enclosure: NA Lu: NA Cs: NA VERT(CL): 0.314 Q 694 360
V 1215/-
BCDL: 5.00 Category: NA Snow Duration: NA HORZ(LL): 0.036 B - -
L 1215/-
EXP: NA Kzt: NA
Des Ld: 65.00 HORZ(TL): 0.059 B
V Brg Wid = 3.5 Min
Req = 1.5
Mean Height: NAft Building
NCBCLL: 10.00 g Code: Creep Factor: 2.0
TCDL: NA psf
L Br Wid =-
9
Soffit: 0.00 gCDL: NA psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.887
Bearing V is a rigid surface.
g g
Load Duration: 1.00 MWFRS Parallel Dist: NA TPI Std: 2014 Max BC CSI: 0.768
Members not listed have forces
less than 375#
Spacing: 24.0 " C&C Dist a: NA ft Rep Fac: Yes Max Web CSI: 0.382
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Loc. from endwall: NA FT/RT:12(0)/5(0)
I: NA GCpi: NA Plate Type(s):
A - B 0 - 850
F - G 0 -3449
Wind Duration: NA WAVE, HS VIEW Ver: 20.02.01A.1209.10
B - C 0 -2263
G - H 0 -3115
Lumber
C -D 0-3114
H - 1 0 -3115
D- E 0- 3449
I- J 0- 2263
Top chord: 4x2 SP #2;
E - F 0 - 3454
J - K 0 - 848
Bot chord: 4x2 SP #2; B2 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Maximum Bot Chord Forces
Per Ply (Ibs)
Hangers / Ties
Chords Tens.Comp.
Chords Tens. Comp.
(J) Hanger Support Required, by others
U - T 1693 0
Q - P 3454 0
T- S 2810 0
P- 0 3404 0
Additional Notes
S- R 2810 0
O- N 2810 0
+ 2x6 continuous strongback. See detail
R - Q 3404 0
N - M 1692 0
STRBRIBR1014 for bracing and bridging
recommendations.
Maximum Web Forces Per Ply (Ibs)
Truss must be installed as shown with top chord up.
Webs Tens.Comp.
Webs Tens. Comp.
A-V 0-1205
F-P 91 -379
A-U 1353 0
P-G 541 -201
U -B 0-1338
G-O 0 -527
B- T 906 0
0-1 484 0
T- C 0- 867
1- N 0 - 868
C-R 484 0
N -J 907 0
����
'!yq�►��%
1340
D - Q 5411 - 201
M K 1351
\\`\����PND
Q-E 91 -379
K -L 0 -1185
No 70773
STATE OF
0'. F40RIOP',CO
/0NAI
�?\X
COA#0-2 8 //rrr111i��\
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall
temporary
have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise.
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
to
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in ANSI/TPI 1, for handling, installation bracin trusses. A this drawin
AN,TW CGMPANY
conformance with or shipping,, and of seal on or cover page
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is
ructure -Designer
6750 Forum Drive
Suite 305
drawing for any s is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or
AWC: awc.org
Orlando FL, 32821
SEQN: 204483 /
SY42
Ply: 1
Job Number: 21-0845
Cust: R 761 JRef:1Xc47610013 T110
FROM:
Qty: 6
/GROZA BUILDERS, INC. / /ROE RESIDENCE
DwNo: 011.22.1354.02414
Truss Label: FT9
SSB / DF 01/11/2022
8'4" 3
i
10'4" 3
18'8"6
8'4"3
2'
8'4"3
(TYP)
�1
14'
i
47-6 �{
3X3(**)
=3X3
=3X4 =5X5
=W=3X4
6X8 = 5X5(**)
- 3X3
III 1.5X4
III 1.5X6
= 5X5
- 5X5 = 6X6
A BC
D
E F
G
H I
J K
L M
T
00
9,4„
�
X W
V U T
S
R
Q P
O N
=3X3
-5X6
-4X4 -3X3
-3X3
-4X4
-3X3 -4X4
-4X7 -3X3
W=H0310
18'8"6
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.213 F 999 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.324 S 674 360
X 1215/-
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): 0.035 C - -
N 1215/-
Des Ld: 65.00
EXP: NA Kzt: NA
HORZ(TL): 0.058 C
X Brg Wid = 3.5 Min Req = 1.5
NCBCLL: 10.00
Mean Height: NA ft
Building Code:
Creep Factor: 2.0
N Br 9 Wid = -
Soffit: 0.00
TCDL: NA psf
TCDL: NA psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.634
Bearing X is a rigid surface.
Load Duration: 1.00
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.828
Members not listed have forces less than 375#
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.392
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Loc. from endwall: NA
FT/RT:12(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
A - B 0 -905 G - H 0 -3712
Wind Duration: NA
WAVE, HS
VIEW Ver: 20.02.01A.1209.10
B - C 0 -901 H - 1 0 -3710
Lumber
C-D 0-2455 I-J 0 -3245
D- E 0- 3393 J- K 0- 2356
Top chord: 4x2 SP #2; T2 4x2 SP 2250f-1.9E;
E - F 0 - 3720 K - L 0 - 2356
Bot chord: 4x2 SP #2; B2 4x2 SP 2250f-1.9E;
F - G 0 - 3726 L - M 0 - 884
Webs: 4x2 SP #2;
Plating Notes
Maximum Bot Chord Forces Per Ply (Ibs)
(**) 2 plate(s) require special positioning. Refer to
Chords Tens.Comp. Chords Tens. Comp.
scaled plate plot details for special positioning
W - V 1825 0 S - R 3726 0
requirements.
V- U 3061 0 R- Q 3567 0
Hangers / Ties
U- T 3061 0 Q- P 2924 0
T-S 3685 0 P-O 1761 0
(J) Hanger Support Required, by others
Additional Notes
Maximum Web Forces Per Ply (Ibs)
+ 2x6 continuous strongback. See detail
Webs Tens.Comp. Webs Tens. Comp.
STRBRIBR1014 for bracing and bridging
A - X 38 -1244 H - R 0 - 614
recommendations.
A- W 1389 0 R- 1 794 0
Truss must be installed as shown with top chord up.
W - C 0 -1397 1 - Q 0 - 550
C-V 951 0
Q-J 501 0
`'
\aPpDO D D - T502 9100
P _ P 922 8700
ENg�c,�tS��ii T-E 0 -507
L-O 0 -1360
E - S 506 - 235
O - M 1371 0
I No 70773 S-F 113 -409
M-N 0 -1196
J
STATE OF ;
rCORt��'
AIL
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing BCSI. Unless otherwise, top have bottom have
per noted chord shall properly attached structural sheathing and chord shall a properly
attached rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
Refer
as applicable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in with ANSI/TPI 1, for handling, installation bracin4 trusses. A this drawing
AN,TW COMPANY
conformance or shipping,and of seal on or cover page
listing this drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of this
-Designer
6750 Forum Drive
Suite 305
drawing for any sfructure is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For,more information see these web sites: Alpine: al ineitw.com; TPI: t inst.or ; SBCA: sbcacom onents.com; ICC: iccsafe.or ; AWC: awc.orc
Orlando FL, 32821
SEQN: 204498 / SY42
Ply: 1
Job Number: 21-0845
Cust: R 761 JRef:1Xc47610013 T103
FROM:
Qty: 2
/GROZA BUILDERS, INC. / /ROE RESIDENCE
DrwNo:
011.22.1354.01125
Truss Label: FT10
SSB / DF 01/11/2022
1010"3 12-10"3
21'2"6
1010"3 2,
8'4"3
2'6"
(TYP)
W =3X4
=3X3 1112X4
=5X6 =4X5 =3X5 =3X3 III1.5X4 =4X4 =3X4 =4X5
=5X6
A B C D E F G H I J
K
L
—4�9,4„
X W V U T S R Q P
O N
M
3X3 — 5X6 = 4X5 = 3X5 = 3X3 = 3X3 = 4X4 = 3X4
= 4X5 = 5X6 = 3X3
=W=H0310
21'2"6
Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria
♦ Maximum Reactions
(Ibs)
TCLL: 40.00 Wind Std: NA Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/#
Gravity
Non -Gravity
TCDL: 20.00 Speed: NA mph Pf: NA Ce: NA VERT(LL): 0.329 R 754 480
Loc R+ / R- / Rh
/ Rw / U / RL
BCLL: 0.00 Enclosure: NA Lu: NA Cs: NA VERT(CL): 0.501 E 495 360
X 1378/-
BCDL: 5.00 Category: NA Snow Duration: NA HORZ(LL): 0.052 B - -
M 1378/-
EXP: NA Kzt: NA
Des Ld: 65.00 HORZ(TL): 0.085 B
X Brg Wid = 3.5 Min
Req = 1.5
Mean Height: NA It
NCBCLL: 10.00 TCDL: NA psf Building Code: Creep Factor: 2.0
M Br Wid = -
9
Soffit: 0.00 BCDL: NA psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.655
Bearing X is a rigid surface.
Load Duration: 1.00 MWFRS Parallel Dist: NA TPI Std: 2014 Max BC CSI: 0.754
Members not listed have forces less than 375#
Spacing: 24.0 " C&C Dist a: NA ft Rep Fac: Yes Max Web CSI: 0.440
Maximum Top Chord Forces
Chords Tens.Comp.
Per Ply (Ibs)
Chords Tens. Comp.
Loc. from endwall: NA FT/RT:12(0)/5(0)
I: NA GCpi: NA Plate Type(s):
A - B 0 -979
G - H 0 -4395
Wind Duration: NA WAVE, HS VIEW Ver: 20.02.01A.1209.10
B - C 0 -2657
H - 1 0 -3766
Lumber
C- D 0- 3774
D- E 0- 4380
I- J 0- 3766
J- K 0- 2659
Top chord: 4x2 SP 2250f-1.9E; T2 4x2 SP #2;
E - F 0 -4417
K - L 0 -978
Bot chord: 4x2 SP 2250f-1.9E;
F - G 0 -4411
Webs: 4x2 SP #2;
Hangers / Ties
Maximum Bot Chord Forces Per Ply (Ibs)
(J) Hanger Support Required, by others
Chords Tens.Comp.
Chords Tens. Comp.
W- V 1955 0
R- Q 4411 0
Deflection
V- U 3332 0
Q- P 4233 0
Max JT VERT DEFL: LL: 0.33" DL: 0.25". See detail
U - T 4204 0
P - O 3331 0
DEFLCAMB1014 for camber recommendations.
T - S 4204 0
O - N 1956 0
S - R 4491 0
Additional Notes
See detail STRBRIBR1014 for bracing and bridging
Maximum Web Forces
Per Ply (Ibs)
recommendations.
Webs Tens.Comp.
Webs Tens. Comp.
Truss must be installed as shown with top chord up.
A- X 0 -1364
Q- H 908 0
A- W 1558 0
H- P 0 - 768
W-B 0-1550
P-J 692 0
C 111
B-VV
0
O-106
O 1117 0
_ -10722
-K
C-U 702 0
K-N 0 -1552
U-D 0 -683
N -L 1557 0
No 70773 *
E - R 320 - 572
L - M 0 -1346
G-Q 0 -641
STATE OF ;
jOic� FLORk 'Dix
SRO
N A` \\\
COA#0-2 8 ///011111 \0
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition
of BCSI (Building
Component Safety Information, by TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a
attached rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections
properly
B3, B7 or B10,
as applicable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Ifefer to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in with ANSI/TPI 1, for handling, installation bracin4 trusses. A this drawing
AN,TW COMPANY
conformance or shipping,and of seal on or cover page
listing this drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of this
-Designer
6750 Forum Drive
Suite 305
drawing for any sfructure is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For,more information see these web sites: Alpine: al ineitw.com; TPI: t inst.or ; SBCA: sbcacom onents.com; ICC: iccsafe.or
; AWC: awc.orc
Orlando FL, 32821
SEQN: 204524 / SY42 Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T108
FROM: Qty: 2 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.00891
Truss Label: FT11 SSB / DF 01/11/2022
T
LO
6,1"
6,1"
5" 4
i , 2'6"
(TYP)
8-1" 142"
2' 6,1"
- 3X3 - 3X3 - 3X3 - 3X3
6X6 = 3X3 III 1 X4 III 1 X4 3X3 = 6X6
AB C D E F G H I J KL
T S R Q P O N M
III 1 X4 = 4X5 = 3X3 = 3X3 = 3X3 = 3X3 = 4X5 III 1 X4
147'
10'9"
20
Loading Criteria (psf) Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00 Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00 Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.104 G 999 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00 Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.173 F 963 360
A 918
BCDL: 5.00 Category: NA
Snow Duration: NA
HORZ(LL): -0.017 S - -
K 918
EXP: NA Kzt: NA
Des Ld: 65.00
HORZ(TL): 0.033 S
A Brg Wid = 3.0 Min Req = 1.5
Mean Height: NA ft
NCBCLL: 10.00
Building Code:
g
Cree Factor: 2.0
p
K Brg Wid = 3.0 Min Req = 1.5
TCDL: NA psf
Soffit: 0.00
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.786
Bearings A & K are a rigid surface.
BCDL: NA psf
Load Duration: 1.00 MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.645
Members not listed have forces less than 375#
Spacing: 24.0 " C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.312
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Loc. from endwall: NA
FT/RT:12(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
B - C 0 -740 G - H 0 -2002
Wind Duration: NA
WAVE
VIEW Ver: 20.02.01A.1209.10
C - D 0 -707 H - 1 0 -1673
D-E 0-1673 I-J 0 -707
Lumber
E- F 0- 2002 J- K 0 - 740
Top chord: 4x2 SP #2; T1 4x2 SP 2250f-1.9E;
F - G 0 -2009
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Maximum Bot Chord Forces Per Ply (Ibs)
Additional Notes
Chords Tens.Comp. Chords Tens. Comp.
+ 2x6 continuous strongback. See detail
S - R 1391 0 P - O 1938 0
STRBRIBR1014 for bracing and bridging
R - Q 1938 0 O - N 1391 0
recommendations.
Q - P 2009 0
Truss must be installed as shown with top chord up.
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
B-S 1106 0 P-H 467 -62
S-D 0-1033 H-O 0 -419
D- R 449 0 0-1 449 0
R-E 0 -419 1 - N 0 -1033
E- Q 467 - 62 N- K 1106 0
\\
-N Al
No 70773
STATE OF Ir
Fss/O N AL �?\\��
COA#0-2 8 1///11)11111����
01 / 11 /2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW CGMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204530 /
FROM:
SY42
Ply: 1
Qty: 2
J ob Number: 21-0845
GROZA BUILDERS, INC. / /ROE RESIDENCE
Truss Label: FT13
Cust: R761 JWAXW610013 T112
Dnallo: 011.22.1354.02103
SSB / DF 01/11/2022
4'5"10
6'5"10 11'
4'5"1 0
2' 4'6"6
5"41, 2'6" 1 - 1-5"1 0
1'5"1 0
6
�
(TYP)
3X3
= 3X3
5X5 —3
E2F6
G11H4 =3X3
=4X8
A C D
I
J
10'9"
1,0'1,12
K
�
90 9'11 "4
1111 X4 = 4X4 = 3X3 = 3X3 = 4X4 =1 5X6
1111 X4
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: NA
TCDL: 20.00
Speed: NA mph
BCLL: 0.00
Enclosure: NA
BCDL: 5.00
Category: NA
EXP: NA Kzt: NA
Des Ld: 65.00
Mean Height: NA ft
NCBCLL: 10.00
TCDL: NA psf
Soffit: 0.00
BCDL: NA psf
Load Duration: 1.00
MWFRS Parallel Dist: NA
Spacing: 24.0 "
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Lumber
Top chord: 4x2 SP #2; T3 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Rt Bearing Leg: 4x2 SP #2;
Additional Notes
See detail STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.096 H 999 480
VERT(CL): 0.174 H 737 360
HORZ(LL): -0.014 J - -
HORZ(TL): 0.024 J
Creep Factor: 2.0
Max TC CSI: 0.776
Max BC CSI: 0.680
Max Web CSI: 0.436
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF %Al
COA#0-2 8 sS,O N AL1111\0?\\\\
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 710/-
K 713/-
A Brg Wid = 3.0 Min Req = 1.5
K Brg Wid = 3.0 Min Req = 1.5
Bearings A & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B-C 0 -523 G-H 0 -1224
C-D 0 -495 H-1 0 -1216
D-F 0-1218 I-J 0 -632
F-G 0 -1229
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
P-O 999 0 N-M 1071 0
O - N 1224 0
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
B-P 781 0 1-M 0 -664
P- D 0- 757 M- J 766 0
D- O 430 0 J- K 8 - 685
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rgid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional engpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204527 / SY42 Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T107
FROM: Qty: 4 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.02401
Truss Label: FT14 SSB / DF 01/11/2022
4'5"10 6'5"10 11'
4'5"1 0 2' 4'6"6
5"41, 6
2'6" 1 1'5"10 1'5"10
(TYP)
3X3
=5X5 =3X3 1111X4 1111X4 =3X3 =4X8
AB C D E F G H
10'9"
LIDI
1,0'1,12
�
°r—V'11 "4
11110X4 = 4X4 = 3X3 = 3X3 = 3X5 =1 5X6
1111 X4
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: NA
TCDL: 20.00
Speed: NA mph
BCLL: 0.00
Enclosure: NA
BCDL: 5.00
Category: NA
EXP: NA Kzt: NA
Des Ld: 65.00
Mean Height: NA ft
NCBCLL: 10.00
TCDL: NA psf
Soffit: 0.00
BCDL: NA psf
Load Duration: 1.00
MWFRS Parallel Dist: NA
Spacing: 24.0 "
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Rt Bearing Leg: 4x2 SP #2;
Additional Notes
See detail STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.057 F 999 480
VERT(CL): 0.114 E 999 360
HORZ(LL): -0.012 O - -
HORZ(TL): 0.024 O
Creep Factor: 2.0
Max TC CSI: 0.804
Max BC CSI: 0.456
Max Web CSI: 0.466
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF %Al
COA#0-2 8 sS,O N AL1111\0?\\\\
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 710/-
1 713/-
A Brg Wid = 3.0 Min Req = 1.5
1 Brg Wid = 3.0 Min Req = 1.5
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B-C 0 -532 E-F 0 -1181
C-D 0 -504 F-G 0 -1173
D-E 0 -1174 G-H 0 -575
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
N-M 995 0 L-K 985 0
M - L 1181 0
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp
B-N 795 0 G-K 0 -651
N-D 0 -736 K-H 710 0
D-M 393 0 H-1 13 -725
L - G 401 0
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rgid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional engpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204534 / SY42 Ply: 1
FROM: Qty: 2
6'8" 12
r 6'8"12
�2'6"�
(TYP)
I11712
3X3
=6X6 =3X3
AB C D
n 1.31
Job Number: 21-0845
/GROZA BUILDERS, INC. / /ROE RESIDENCE
Truss Label: FT15
12 I 15'1"12
2' 6'5"
11712 I
W =3X4
=3X3 1111X4 1111.5X4=3X4 =4X4 =4X8
E IF H I J K
Cust: R761 JWAXW610013 T105
Dnallo: 011.22.1353.59954
SSB / DF 01/11/2022
20'0"14 22'0"14 27'1"8
4' 11 "2 2' 5'0" 10
2,2"2 2,2"2 -- ?,I
=3X3 =3X3 =3X3 =3X3 =3X5
L M N O P
II,�---
i-I
�--_-'lMA
-
I -II'---
109
zo
y 1 9W
111X4 =4X5 =3X3 =3X3 =3X4 =4X4 =4X5 1113X3 =4X4 11X4 111X4 =4X4 =3X3 �}
=W=3X4 =3X3 =3X3
-��
15'1"12
27' 1 "8
11'11"12
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.135 F 999 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.230 F 783 360
A 941/-
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): -0.024 AE - -
X 1924/-
Des Ld: 65.00
EXP: NA Kzt: NA
HORZ (TL ): 0.045 AE
Q 734/-
NCBCLL: 10.00
Mean Height: NA ft
Building Code:
Creep Factor: 2.0
A Brg Wid = 3.0 Min Req = 1.5
Soffit: 0.00
TCDL: NA psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.803
X Br Wid = 3.5 Min Re 1.5
g q =
Load Duration: 1.00
BCDL: NA psf
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.854
Q Brg Wid = 3.5 Min Req = 1.5
Bearings A, X, & Q are a rigid surface.
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.328
Members not listed have forces less than 375#
Loc. from endwall: NA
FT/RT:12(0)/5(0)
Maximum Top Chord Forces Per Ply (Ibs)
I: NA GCpi: NA
Plate Type(s):
Chords Tens.Comp. Chords Tens. Comp.
Wind Duration: NA
WAVE
VIEW Ver: 20.02.01A.1209.10
B- C 0- 759 H -1 0 -1418
Lumber
C-D 0 -724 L-M 0 -964
Top chord: 4x2 SP #2; T1 4x2 SP 2250f-1.9E;
D - E 0 -1732 M - N 0 -1191
Bot chord: 4x2 SP #2;
E - F 0 - 2087 N - O 0 -1096
Webs: 4x2SP#2;
F-G 0-2092 O-P 0 -461
Additional Notes
G - H 0 - 2081
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
B Maximum oorForces Per
Maxy (Ibs)
PI P d F t Chord
recommendations.
Chords Tens.Comp. Chords Tens. Comp.
Truss must be installed as shown with top chord up.
AE-AD 1429 0 X - W 0 -871
AD -AC 2001 0
W - V 673
- 95
AC -AB 2092 0
V - U 1188
0
AB -AA 1829 0
U - T 1191
0
AA- Z 995 0
T- S 1193
0
Z-Y 995 0
S-R 914
0
Y-X 0 -871
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
Webs Tens. Comp.
11
11
AEAD 0 -1065
K - X 0
-1844
D -AD 480 0
f No 70773 ,'� AD- E 0 -427
K- W 888
W - L 0
0
-871
*
—_ - G -AB 0 -406
L- V 551
0
Of — AB- H 656 0
STATE OF
V - M 0
- 572
;'1` H-AA 0 -724
O-R 0
-719
FiORtOp',C9O AA- 730
730
-1135
P-Q
-708
coa#0-2 s " 0111110�\\�
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
in ANSI/TPI 1, for handling, installation A
AN,TW
COMPANY
truss conformance with or shipping,, and bracin of trusses. seal on this drawin or cover page
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is
ructure -Designer
6750 Forum Drive
Suite 305
drawing for any s is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL, 32821
SEQN: 204538 / SY42 Ply: 1 ob Number: 21-0845 Cust: R761 JXW610013 T104
FROM: Qty: 6 J
GRRef:1
OZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.00460
Truss Label: FT16 SSB / DF 01/11/2022
6'8"12
r 6'8"12
2,6"
(TYP)
r1
8'T12I 15'1"12 20'0"14 22'
26'5" 4'11"2 2'
1'2"12 1'2"12
4 1 F i �— 272 --{ �— 272 --{
29'7"8
7'6"10
=3X3 =3X4 =W=3X4
=6X6 =3X3=3X31111X4 1111.5X4 =4X4 =4X8 =4X4 =3X3 =3X3 =3X3 =3X3 =4X5
AB CD E F G H I J K L M N O P Q
•-�10,9„
I +20
+ 19,4„
AH AG AF AE AD AC AB AA Z Y X W V U T S R
1111X4 =4X5 =3X3 =3X3 =3X4 =4X4 =4X5 1113X3 =4X5 =4X4 1111.5X4 =3X3 =4X4 =3X3
=W=3X4 1111.5X4 =3X3
15'1"12 i 14'5"12
29'7"8
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Gravity Non -Gravity
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.147 N 999 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.251 N 681 360
A 939
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): -0.025 Q - -
AA 2059/-
Des Ld: 65.00
EXP: NA Kzt: NA
HORZ (TL ): 0.044 AG - -
R 920/-
NCBCLL: 10.00
Mean Height: NA ft
Building Code:
Creep Factor: 2.0
A Brg Wid = 3.0 Min Req = 1.5
Soffit: 0.00
TCDL: NA psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.801
AA Br Wid = 3.5 Min Re 1.5
g q =
Load Duration: 1.00
BCDL: NA psf
P
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.825
R Brg Wid = 3.5 Min Req = 1.5
Bearings A, AA, & R are a rigid surface.
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.325
Members not listed have forces less than 375#
Loc. from endwall: NA
FT/RT:12(0)/5(0)
Maximum Top Chord Forces Per Ply (Ibs)
I: NA GCpi: NA
Plate Type(s):
Chords Tens.Comp. Chords Tens. Comp.
Wind Duration: NA
WAVE
VIEW Ver: 20.02.01A.1209.10
B-C 0 -757 K-L 325 -399
Lumber
C-D 0 -723 L-M 0 -1448
Top chord: 4x2 SP 2250f-1.9E; T2 4x2 SP #2;
D - E 0 -1727 M - N 0 -1845
Bot chord: 4x2 SP #2; B2 4x2 SP 2250f-1.9E;
E - F 0 - 2077 N - O 0 -1913
Webs: 4x2 SP #2;
F - G 0 - 2082 O - P 0 -1546
Additional Notes
G - H 0 - 2071 P - Q 0 - 611
H - 1 0-1403
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Maximum Bot Chord Forces Per Ply (Ibs)
Truss must be installed as shown with top chord up.
Chords Tens.Comp. Chords Tens. Comp.
AG-AF 1426 0
Z - Y
0
-839
AF-AE 1994 0
Y - X
1019
- 62
AE-AD 2082 0
X - W
1835
0
AD -AC 1817 0
W - V
1845
0
AC -AB 977 0
V - U
1855
0
AB -AA 0 - 839
U - T
1862
0
AA- Z 0- 839
T- S
1213
0
Maximum Web Forces Per Ply (Ibs)
�PgDO ��� ii��i Webs Tens.Comp.
Webs
Tens. Comp.
�\ �Q',��GENdF , 9�► /� B-AG 1130 0
K-Y
1056
0
AG- D 0 -1063
No 70773 �', * D -AF 478 0
Y- L
L - X
0 -1033
774 0
AF-E 0 -424
X-M
0
-887
' Of = G -AD 0 - 392
M - W
397
0
" STATE OF W ` AD- H 632 0
V - N
0
375
0 ' , P ; \2�� H -AC 0 - 722
O - T
0
- 501
F'•,LORt�_• o AC-1 731 0
1127
T-P
530
0
SWIONAL �?\\`\ AB- K 1152
S
S
974
9 6
COA#0-2 8 �81IIIIII\1\
-
K-AA 0 -1971
Q-R
0
-893
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
in ANSI/TPI 1, for handling, installation A
AN,TW
CGMPANY
truss conformance with or shipping,, and bracin of trusses. seal on this drawin or cover page
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is
ructure -Designer
6750 Forum
Suite 305
Drive
drawing for any s is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL,
32821
SEQN: 204545 / SY42 Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T98 /
FROM: Qty: 2 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1353.59943
Truss Label: FT17 SSB / DF 01/11/2022
it 6'812 8'8"12I 15'r'12 20'0"14 22'0"14 29'7"8
6'812 2' 6'5" 411"2 2' 7'6"10
'q 1'2"12 1'2"12 1'4"8 3'
2,6„12 27„14 � I
14' i8'0"14 7'6"10
=3X3
=6X6 -3X3
AB CD
-3X4
-3X3 1111X4 1111.5X4
E F G H
=3X3
-4X4 =6X6 —4X4 =4X4
I J KL M N
=3X3
=3X3 =3X5 -3X3 -3X3 =4X5
OP Q. R S T 0191.
n94,
AK AJ
Al AH AG AF
AE AD MAC AB
AA Z Y X W V U
1111X4 =4X5
=3X3 =3X3 =3X4 =4X4
=4X5 =3X5 =4X4
=4X4 1111X4 =3X3 =4X4 =3X3
-W=3X4
III1.5X4
-3X3
15'1"12
29'7"8
14'5"12
Loading Criteria (psf)
Ch d C Ch d C
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.132 F 999 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.228 F 793 360
A 946/-
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): -0.024 AJ - -
AD 2069/-
Des Ld: 65.00
EXP: NA Kzt: NA
HORZ (TL ): 0.044 AJ
U 898/-
NCBCLL: 10.00
Mean Height: NA ft
Building Code:
Creep Factor: 2.0
A Brg Wid = 3.0 Min Req = 1.5
Soffit: 0.00
TCDL: NA psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.838
AD Br Wid = 3.5 Min Re 1.5
g q =
Load Duration: 1.00
BCDL: NA psf
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.837
U Brg Wid = 3.5 Min Req = 1.5
Bearings A, AD, & U are a rigid surface.
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.341
Members not listed have forces less than 375#
Loc. from endwall: NA
FT/RT:12(0)/5(0)
Maximum Top Chord Forces Per Ply (Ibs)
I: NA GCpi: NA
Plate Type(s):
Chords Tens.Comp. Chords Tens. Comp.
Wind Duration: NA
WAVE
VIEW Ver: 20.02.01A.1209.10
B- C 0- 763 K- M 982 0
Lumber
C- D 0- 729 N- O 0 -1398
Top chord: 4x2 SP #2; T1 4x2 SP 2250f-1.9E;
D - E 0 -1744 O - P 0 -1806
Bot chord: 4x2 SP #2; B2 4x2 SP 2250f-1.9E;
E - F 0 - 2110 P - Q 0 -1817
Webs: 4x2 SP #2;
F - G 0 - 2116 Q - R 0 -1833
Additional Notes
G- H 0- 2105 R- S 0 -1492
H - 1 0-1451 S-T 0 -593
+ 2x6 continuous strongback. See detail
J - K 155 - 375
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Bot Chord Forces Per Ply (Ibs)
T T
or s ens. omp.
or s ens. omp.
AJ-AI 1438 0
AB -AA 912
-2
AI-AH 2O17 0
AA- Z 1798
0
AH-AG 2116 0
Z - Y 1806
0
AG-AF 1860 0
Y - X 1806
0
AF-AE 1031 0
X - W 1785
0
AE-AD 0 -882
W-V 1179
0
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
V'�
Webs Tens. Comp.
\\\�\�PNpO
/ 11
Q',��GfNd�c•• ��► //�i
115
\\\k AJAD 0 -1072
MDAB 750
i D -Al 486 0
No 70773 * �_
AB- N 0
-1011
Al- E 0 -434
N -AA 795
0
* G -AG 0 - 411
AA- O 0
- 838
STATE OF WZ AG- H 664 0
R- W 0
-465
4 H -AF 0- 713
•••
W- S 498
0
j�� F�ORtpP,•'G\?�� AF- 1 718 0
S - V 0
-930
I -AE 0 -1145
`SbNA
V - T 946
0
AE- K 1208 0
��//`\��
T- U 0
-871
COA#0-2 8 K-AD 0-1147
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in ANSI/TPI 1, for handling, installation bracin trusses. A this drawin
AN,TW
CGMPANY
conformance with or shipping,, and of seal on or cover page
listing this drawin indicates acceptance of professional encLlneering responsibility solely -for the design shown. The suitability and use of g is
ructure -Designer
6750 Forum Drive
Suite 305
drawing for any s is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL, 32821
SEQN: 204549 / SY42 Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T102
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.02538
Truss Label: FT18 SSB / DF 01/11/2022
6'8"12
6'8"12
2,6"
5 4 (TYP)
Y1
3X3
-6X6 -3X3
AB C D
98"1
2'
42„ 4 P„ 4
- 3X3 III 1 X4 III 1.5X4 3X4
E F G H
AG AF AE AD AC AB
1111X4 =4X5 =3X3 =3X3 =3X4 =4X4
15'1"12
15'1"12 2_ '14 1 22'
6'5" 4' 11 "2 2'
P2„2
28'72
6'6"4
W=3X4
=4X4 -4X8
-3X4 -3X3
1111X4 =3X3 -3X3 -4X5
I J K
L M
N O P Q
10'9"
ro
!f!
RP
AA Z
X W V
U T S R
=4X5 1113X3
=4X4 1111.5X4
=3X3 =3X3 =4X4 =3X3
-W=3X4
-3X4
13'5"6
28'72
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.134 F 999 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.228 F 791 360
A 939
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): -0.024 AF - -
Y 2001
Des Ld: 65.00
EXP: NA Kzt: NA
HORZTL ): 0.044 AF
(
R 848 /-
NCBCLL: 10.00
Mean Height: NA ft
Building Code:
Creep Factor: 2.0
A Brg Wid = 3.0 Min Req = 1.5
Soffit: 0.00
TCDL: NA psf
BCDL: NA psf
P
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.802
Y Br Wid = 3.5 Min Re 1.5
g q =
Load Duration: 1.00
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.826
R Brg Wid = 3.5 Min Req = 1.5
Bearings A, Y, & R are a rigid surface.
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.323
Members not listed have forces less than 375#
Loc. from endwall: NA
FT/RT:12(0)/5(0)
Maximum Top Chord Forces Per Ply (Ibs)
I: NA GCpi: NA
Plate Type(s):
Chords Tens.Comp. Chords Tens. Comp.
Wind Duration: NA
WAVE
VIEW Ver: 20.02.01A.1209.10
B- C 0- 757 H- I 0 -1405
Lumber
C-D 0 -723 L-M 0 -1267
Top chord: 4x2 SP 2250f-1.9E; T2 4x2 SP #2;
D - E 0 -1728 M - N 0 -1585
Bot chord: 4x2 SP #2; B2 4x2 SP 2250f-1.9E;
E - F 0 - 2079 N - O 0 -1582
Webs: 4x2 SP #2;
F - G 0 - 2084 O - P 0 -1376
Additional Notes
G - H 0 - 2072 P - Q 0 - 550
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
B Maximum oorForces Per
Maxy (Ibs)
PI P d F t Chord
recommendations.
Chords Tens.Comp. Chords Tens. Comp.
Truss must be installed as shown with top chord up.
AF-AE 1426 0 Y - X 0 - 834
AE-AD 1995 0
X - W 893
- 91
AD -AC 2084 0
W - V 1578
0
AC -AB 1819 0
V - U 1585
0
AB -AA 979 0
U - T 1595
0
AA- Z 0- 834
T- S 1102
0
Z-Y 0 -834
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
Webs Tens. Comp.
AF 113
1898
AFD0 -1063
K-X 970
D -AE 478 0
X - L 0
- 964
AE- E 0 -425
No 70773 •; *
L- W 692
0
_ G -AC 0 -394
* "
W - M 0
-751
* AC- H 635 0
T - P 435
0
STATE OF 'AU. H -AB 0 -722
P - S 0
-877
k/ AB- 1 731 0
S- Q 877
0
j�.t�'• FLORtOP,•'G�?�� I -AA 0-1128
Q-R 0
-816
0 AL AA- K 1143 0
COA#0-2 8 ////►111111\0
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
in ANSI/TPI 1, for handling, installation A
AN,rw
CGMPANY
truss conformance with or shipping,, and bracin of trusses. seal on this drawin or cover page
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is
ructure -Designer
6750 Forum Drive
Suite 305
drawing for any s is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL, 32821
SEQN: 204553 / SY42 Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T101
FROM: Qty: 7 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.01878
Truss Label: FT19 SSB / DF 01/11/2022
6'8"12
6'8"12
2'6"
5 4 (TYP)
Y1
3X3
=6X6 =3X3
AB C D
8'8"121 14'1"12
2' 5'5"
=3X3 1111X4 =3X3 1111X4 =3X5
E F G H I
20'0"14 22'0"14 28'7"2
611"2 2' "Y" 6'6"4
�'1� 1�1
=W=3X4 =3X4
=4X8 =3X4 1111.5X4 III1X4 =3X3 =3X3 =4X5
J K L M N O P Q R
+
IR
9
AH AG AF AE AD AC AB AA
Z Y X W
V U T
S
1111X4 =4X5 =3X3 -3X3 1111X4 -4X5 -4X5 1113X3 =4X5 -3X4 -3X4 =3X3 =3X3 -4X4 =3X3
W=3X4
14'1"12 1 14'5"6
r
28'72
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity
Non -Gravity
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.127 F 999 480
Loc R+ / R- / Rh
/ Rw / U / RL
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.218 F 771 360
A 882
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): -0.023 AG - -
AA 2000/-
Des Ld: 65.00
EXP: NA Kzt: NA
HORZ (TL ): 0.042 AG
S 903/-
NCBCLL: 10.00
Mean Height: NA ft
Building Code:
Creep Factor: 2.0
A Brg Wid = 3.0 Min
Req = 1.5
Soffit: 0.00
TCDL: NA psf
BCDL: NA psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.757
AA Br Wid = 3.5 Min
g
Re 1.5
q =
Load Duration: 1.00
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.765
S Brg Wid = 3.5 Min Req = 1.5
Bearings A, AA, & S are a rigid surface.
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.302
Members not listed have
forces less than 375#
Loc. from endwall: NA
FT/RT:12(0)/5(0)
Maximum Top Chord Forces Per Ply (Ibs)
I: NA GCpi: NA
Plate Type(s):
Chords Tens.Comp.
Chords Tens. Comp.
Wind Duration: NA
WAVE
VIEW Ver: 20.02.01A.1209.10
Lumber
B- C 0- 698
L- M 0 -1305
C-D 0 -665
M-N 0 -1832
Top chord: 4x2 SP 2250f-1.9E; T2 4x2 SP #2;
D - E 0 -1581
N - O 0 -1844
Bot chord: 4x2 SP 2250f-1.9E; B2 4x2 SP #2;
E - F 0 -1799
O - P 0 -1840
Webs: 4x2 SP #2;
F - G 0 -1802
P - Q 0 -1504
Additional Notes
G- H 0 -1360
Q- R 0 - 598
H - 1 0-1360
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Maximum Bot Chord Forces Per Ply (Ibs)
Truss must be installed as shown with top chord up.
Chords Tens.Comp.
Chords Tens. Comp.
AG-AF 1320 0
Z - Y 0 - 791
AF-AE 1791 0
Y - X 920 0
AE-AD 1802 0
X - W 1682 0
AD -AC 1797 0
W - V 1844 0
AC -AB 945 0
V - U 1781 0
AB -AA 0 - 791
U - T 1191 0
AA- Z 0 - 791
Maximum Web Forces Per Ply (Ibs)
Webs T
Wes T Comp
\\\\����PpDO �i//
BAG 1043Comp
0
X669 O
No 70773 .*
AG- D 0- 987
D -AF 414 0
X- M 0 671
M- W 630 0
G -AC 0 - 845
W - N 0 - 460
*
AC- 1 711 0
P- U 0 -439
STATE OF ; �� `
I -AB 0 -1035
U - Q 498 0
Q� \
AB- J 1050 0
Q - T 0 - 942
FA,
•.•1OR10-, (� ��
J-AA 0-1899
T-R 953 0
y � 107
R - S 0 875
COA#0-2 8 �5/S10 N AL �?�\\\
_ 0 -1058
0vt vz022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall
provide temporary
have a properly
attached Iid ceilin Locations shown for ermanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, 67 or B10,
App�y face Defer
as applicabgla. plates to each of truss and position as shown above and on the Join tails, unless noted otherwise.
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
to
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
in ANSI/TPI 1, for handling, installation A
AN,TW COMPANY
truss conformance with or shipping,, and bracin of trusses. seal on this drawin
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability
-Designer
or cover page
and use of g is
6750 Forum Drive
Suite 305
drawing for any soructur is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL, 32821
SEQN: 204559 / SY42 Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T121
FROM: Qty: 2 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00793
Truss Label: FT20 SSB / DF 01/11/2022
3'0"12 3'8", 6'9"8
3'0"12 7'4 1 3'1"8
11,
2'6"
6
(TYP)
3X3
5X5
= 3X3 = 3X3
= 3X8
A B
C D E
F
04
0
10
\/G
III X4 =
3X3 1111 X4 1111 X4
= 3X3 =1 5X6
1111X4
6'9"8
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
VERT(LL): 0.023 D 999 480
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
VERT(CL): 0.038 D 999 360
BCDL: 5.00
Category: NA
Snow Duration: NA
HORZ(LL): -0.004 IF- -
Des Ld: 65.00
EXP: NA Kzt: NA
HORZ (TL ): 0.006 IF
Building Code:
NCBCLL: 10.00
Mean Height: NA ft
Creep Factor: 2.0
TCDL: NA psf
Soffit: 0.00
BCDL: NA psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.591
Load Duration: 1.00
MWFRS Parallel Dist: NA
TPI Std: 2014
Max BC CSI: 0.264
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fac: Yes
Max Web CSI: 0.295
Loc. from endwall: NA
FT/RT:12(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: NA
WAVE
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Rt Bearing Leg: 4x2 SP #2;
Additional Notes
Truss must be installed as shown with top chord up
No 70773
STATE OF %Al
COA#0-2 8 sS,O N AL \?\\\\
10'9"
009'11 "4
1
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 434/-
G 442/-
A Brg Wid = 3.0 Min Req = 1.5
G Brg Wid = 3.5 Min Req = 1.5
Bearings A & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
D - E 0 - 475
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
L- K 476 0 J- 1 474 0
K-J 475 0
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
B-L 389 0 F-G 19 -496
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204562 / SY42 Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T100
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01748
Truss Label: FT21 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 40.00
TCDL: 20.00
BCLL: 0.00
BCDL: 5.00
Des Ld: 65.00
NCBCLL: 10.00
Soffit: 0.00
Load Duration: 1.00
Spacing: 24.0 "
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
T
90
I
1'6" 9'0"8
1,6„ T 7'6„8
V6"12 �{ 1'4" � � 4 {
4
1112X4 1'1"4 s{ { 1'4" -3X4
A (TYP) I
=3X3 K =3X3
3X3
9'0"8
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Wind Std: NA
Pg: NA Ct: NA CAT: NA
Speed: NA mph
Pf: NA Ce: NA
Enclosure: NA
Lu: NA Cs: NA
Category: NA
Snow Duration: NA
EXP: NA Kzt: NA
Mean Height: NA ft
Building Code:
TCDL: NA psf
BCDL: NA psf
FBC 7th Ed. 2020 Res.
MWFRS Parallel Dist: NA
TPI Std: 2014
C&C Dist a: NA ft
Rep Fac: Yes
Loc. from endwall: NA
FT/RT:20(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
Wind Duration: NA
tninvr=
Bracing
Sheathing is required for any longitudinal(drag)
forces. All connections to be designed by the building
designer.
Plating Notes
All plates are 1 X4 except as noted.
Additional Notes
Truss must be installed as shown with top chord up.
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.000 1 999 480
VERT(CL): 0.001 1 999 360
HORZ(LL): 0.000 1 - -
HORZ(TL): 0.001 1
Creep Factor: 2.0
Max TC CSI: 0.111
Max BC CSI: 0.021
Max Web CSI: 0.023
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF ;
P
�i F,,LORtO, •' G ��
COA#0-2 8 ��//r N AL
01/11/2022
g,4„
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
J* 130 /-/-
J Brg Wid = 108 Min Req = -
Bearing R is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204556 / SY42 Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T94 /
FROM: Qty: 2 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02729
Truss Label: FT22 SSB / DF 01/11/2022
1'7"8 2'0" T'f
1'7"8 4"1 1'912
�— VY12
(TYP)
1111X4
=3X4 1111X4 =3X3 =5X5
A B C D E F
T , 0'9"
5
J =3X3 -3X3 1111X4
i 3-10" �
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 40.00
Wind Std: NA
Pg: NA Ct: NA CAT: NA
TCDL: 20.00
Speed: NA mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: NA
Lu: NA Cs: NA
BCDL: 5.00
Category: NA
Snow Duration: NA
EXP: NA Kzt: NA
Des Ld: 65.00
Mean Height: NA ft
NCBCLL: 10.00
TCDL: NA psf
Building Code:
Soffit: 0.00
BCDL: NA psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.00
MWFRS Parallel Dist: NA
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: NA ft
Rep Fee: Yes
Loc. from endwall: NA
FT/RT:12(0)/5(0)
I: NA GCpi: NA
Plate Type(s):
Wind Duration: NA
WAVE
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Truss must be installed as shown with top chord up
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.007 C 999 480
VERT(CL): 0.012 C 999 360
HORZ(LL): 0.001 B - -
HORZ(TL): 0.001 B
Creep Factor: 2.0
Max TIC CSI: 0.211
Max BC CSI: 0.084
Max Web CSI: 0.057
EW Ver: 20.02.01A.1209.10
\�oW 111111!!//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 �ON
SsAL
� 111111111� �
01/11/2022
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 258/-
E 237/-
J Brg Wid = 3.5 Min Req = 1.5
E Brg Wid = 3.0 Min Req = 1.5
Bearings J & E are a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204571 / GABL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T91 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03342
Truss Label: T1 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
6'4"
6'4"
2,4„ —g 1,4„ -� _4E4
12 (TYP)
12'10"
6'6"
5
0
q I in
J i„8 t—V
,4.
2X4(A1) =2X4(A1)
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S16030ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
12'10"
12'10"
12'10"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.002 1 999 360
VERT(CL): -0.002 1 999 240
HORZ(LL): 0.002 1 - -
HORZ(TL): 0.002 1
Creep Factor: 2.0
Max TC CSI: 0.384
Max BC CSI: 0.077
Max Web CSI: 0.024
EW Ver: 20.02.01A.1209.10
\�;PA
� W 111111!!//
`\\���P� NDo 1�///%
(C
No 70773
STATE OF
-0'n�••
COA#0-2 8 Ss�ONAL
111111111�
01/11/2022
2'1"6
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A* 86 /- /- /36 /42 /7
1 342 /- /- /212 /237 /-
Wind reactions based on MWFRS
A Brg Wid = 146 Min Req = -
I Brg Wid = 7.6 Min Req = 1.5
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204568 / SPEC Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T92 /
FROM: Qty: 2 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00941
Truss Label: T2 SSB / DF 01/11/2022
Cl)
3"8"8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
6'8"
6'8"
=4X4
12 B
13'2"
6'6"
5 �
u7
O
A C r)
e �9,4„
E D
4X4(D1) III 1.5X4=2X4(A1)
6'8"
6'8"
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
13'2"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
6'6"
13'2"
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): -0.021 A 999 360
VERT(CL): 0.037 A 999 240
HORZ(LL): -0.010 A - -
HORZ(TL): 0.017 A
Creep Factor: 2.0
Max TC CSI: 0.388
Max BC CSI: 0.505
Max Web CSI: 0.064
EW Ver: 20.02.01A.1209.10
���PNDO •V�ti
<G ;
No 70773
STATE OF 1
co
to
2'1 "6
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 483 /- /- /230 /248 /78
C 629 /- /- /325 /383 /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5
C Brg Wid = 7.6 Min Req = 1.5
Bearings A & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A-B 414 -740 B-C 419 -747
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - E 634 - 248 E - C 634 - 248
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204832 / SPEC Ply: 2 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T39 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.01475
Truss Label: T3 SSB / DF 01/11/2022
2 Complete Trusses Required
9"8 _
T10"14 6'8"
8'6"10 1 10'5"4 1 12'9"2
9"8
3'1"6 2'9,
1'10"10 1'10"10 2'3"14
12
5 1111.5X4
CD
T
=4X5
=5X5
A
B
1111.5X4 =3X4 =3X8
E F G
M
T
io
�9,4„
N M
L K
J I H
1111.5X4
=3X12 =5X8
111.5X4
=3X8 =3X8 1113X3
12'9"2
-
7"1
3'1"6 2'9"2
3'9"2 - - 6'6"4
2'0"6 _i_ 27'10 _i_ 1'11"14
8'6"10 10'9"4 12'9"2
Loading Criteria (psf) Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 40.00 Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 20.00 Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.063 D 999 480
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00 Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.141 D 999 360
N 1271 /- /- /323 /119 /41
BCDL: 5.00 Risk Category: II
Snow Duration: NA
HORZ(LL): 0.010 H - -
H 2196 /- /- /342 /148 /-
Des Ld: 65.00 EXP: B Kzt: NA
HORZ(TL): 0.022 H
Wind reactions based on MWFRS
Mean Height: 15.00 It
NCBCLL: 0.00
Buildin Code:
g
Cree Factor: 2.0
p
N Brg Wid = 3.5 Min Req = 1.5
TCDL: 4.0 psf
Soffit: 0.00 BCDL: 3.0 psf
P
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.371
H Brg Wid = 2.7 Min Req = 1.5
Load Duration: 1.00 MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.848
Bearings N & H are a rigid surface.
Members not listed have forces less than 375#
Spacing: 24.0 " C&C Dist a: 3.00 It
Rep Fac: No
Max Web CSI: 0.435
Maximum Top Chord Forces Per Ply (Ibs)
Loc. from endwall: Any
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
VIEW Ver:20.02.01A.1209.10
A-B 110 -1226 E-F 155 -2014
Lumber
It is the responsibility of the Building Designer and
C - E 156 -2032 F - G 90 -1288
Top chord: 2x4 SP #2;
Truss Fabricator to review
this drawing prior to
Bot chord: 2x4 SP #2;
cutting lumber to verify that all data,including
Maximum Bot Chord Forces Per Ply (Ibs)
Webs: 2x4 SP #2;
dimensions and loads, conform to the architectural
Chords Tens.Comp. Chords Tens. Comp.
plans/specifications and fabricators truss layout.
Nailnote
L - K 2136 -188 J - I 1473 -105
K-J 2188 -193
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 6.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Maximum Web Forces Per Ply (Ibs)
Webs : 1 Row @ 4" o.c.
Webs Tens.Comp. Webs Tens. Comp.
Use equal spacing between rows and stagger nails
A - M 75 -J - F 61
in each row to avoid splitting.
A-L 1341 -119 19 F-I 70 -891
Special Loads
L - C 61 - 988 I - G 1542 -108
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
B - C 130 -1203 G - H 75 -1079
TC: From 123 plf at 0.50 to 123 plf at 6.67
TC: From 413 plf at 6.67 to 413 plf at 12.76
BC: From 130 plf at 0.00 to 130 plf at 0.50
BC: From 10 plf at 0.50 to 10 plf at 12.76
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
`\\ Q- ---
�P ---
No 70773 `.
Wind
=
Wind loads based on MWFRS with additional C&C
member design.
STATE OF 1JJ
Right end vertical not exposed to wind pressure.
�,�; • 4 LOW,,•
FO"• 0 \�
Wind loading based on both gable and hip roof types.
COA#0-2 8 /,/pNA'0\�\\
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW CGMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLlneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204837 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T95 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00420
Truss Label: T4 SSB / DF 01/11/2022
5'1"1 6'8" 8'6"10 _ _ 10'514 _1 _ 12'9"2 _
r7"1 2'0"1 2'5"5 1'6'. 1'10"10 1'1,0 2' ,"
1111.5XE
D
1111A5X4
=4B5 =6X10(SRS)
T1 CC
1111.5X4
—3X6 —3X8
F
G H
T
N
ye�_Zn
0
N
49'4"
P O
N M L
K
J
I
=4X5
=3X5 =5X5 =7X8
1111.5X4
=3X12
=4X7 1112X5
12'9"2
it 2'1"13 2'1"13 1,5„3 1 2,0„6 1 2'2"2 + 208 i
2'11"5 5'1"1 6'6"4 8'610 10'8"12 12'9"2
��
9"8
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: ASCE 7-16
TCDL: 20.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 5.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 65.00
Mean Height: 15.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 0.00
BCDL: 3.0 psf
Load Duration: 1.00
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
-----(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 123 plf at 0.50 to 123 plf at 12.76
BC: From 130 pif at 0.00 to 130 plf at 0.50
BC: From 10 plf at 0.50 to 10 plf at 12.76
TC: 620 lb Conc. Load at 6.67
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.093 E 999 480
Loc R+ / R- / Rh / Rw / U / RL
p 1145 /- /- /315 /122 /23
Lu: NA Cs: NA
VERT(CL): 0.177 E 863 360
Snow Duration: NA
HORZ(LL): 0.021 E - -
I 1175 /- /- /335 /145 /-
HORZ(TL): 0.040 E
Creep Factor: 2.0
Wind reactions based on MWFRS
P Brg Wid = 3.5 Min Req = 1.5
Building Code:
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.418
1 Brg Wid = 3.5 Min Req = 1.5
TPI Std: 2014
Max BC CSI: 0.831
Bearings P & I are a rigid surface.
Rep Fac: Varies by Ld Case
Max Web CSI: 0.512
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
B - C 146 -1365 F - G 300 -2724
WAVE
D - F 303 - 2741 G - H 177 -1511
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
O - N 1241 -161 L - K 3795 - 380
N - M 1925 - 212 K - J 1725 - 205
M - L 3725 - 373
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp
O-B
191 -1721
D-E
20 -690
B-N
912 -62
D-K
94 -1259
N-C
61 -789
K-G
1236 -117
C-M
1453 -116
G-J
138 -1035
C - D
243 - 2230
J - H
1813 - 212
M - D
207 - 2319
H - 1
148 -1148
Wind
Wind loads based on MWFRS with additional C&C
member design. \`�\ �PNpp
Right end vertical not exposed to wind pressure. �N Q*
Wind loading based on both gable and hip roof types.�C�
It is the responsibility of the Building Designer and * ;! No 70773
Truss Fabricator to review this drawing prior to _
cutting lumber to verify that all data,including * -
dimensions and loads, conform to the architectural STATE OF W
plans/specifications and fabricators truss layout.
0�F' FLORtOP'�,C'�.r\�
�flllIII11
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached ri id ceilin Locations shown for ermanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, 67 or B10,
as applicabgla. App�y plates to each face of truss and position as shown above and on the Join tails, unless noted otherwise. Defer to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is
drawing for any soructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINE
AN ITW COMPANY
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204565 / SPEC Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T96 /
FROM: Qty: 6 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01287
Truss Label: T5 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
1111A5X4 12
a 5
B
� CV
9,4„
D III 1.5X4 C
2X4(A1)
i 3'3"8
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
3'3" 8
3'3"8 2'1"6
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.002 B 999 360
VERT(CL): 0.002 B 999 240
HORZ(LL): -0.001 B - -
HORZ(TL): 0.001 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.069
Max Web CSI: 0.014
EW Ver: 20.02.01A.1209.10
\\\\\%III I ///////
oCENS
No 70773 ;
*rJ STATE OF /W
111000
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
D 72 /- /- /49 /43 /134
B 298 /- /- /125 /206 /-
Wind reactions based on MWFRS
D Brg Wid = - Min Req = -
B Brg Wid = 7.6
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212125 SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T87
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1416.47423
Truss Label: T6 SSB / FV 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
T
1
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
1111.5X4 12
A a 5
C
1111
B
a s 9'4°
.5X4 2X4(A1)
i, 37' _
37"
3��"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.004 B 999 360
VERT(CL): 0.006 B 999 240
HORZ(LL): 0.002 B - -
HORZ(TL): 0.004 B
Creep Factor: 2.0
Max TC CSI: 0.140
Max BC CSI: 0.107
Max Web CSI: 0.031
EW Ver: 20.02.01A.1209.10
oW 111111!!//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �a0
111111111�
01/11/2022
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 75 /- /- /36 /43 /25
Wind reactions based on MWFRS
B Brg Wid = 43.0 Min Req = -
Bearing C is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212128 SPEC Ply: 2 Job Number: 21-0845 Cust: R761 JRef:1Xc47610013 T61
FROM: Qty: 2 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1416.20330
Truss Label: T7 SSB / FV 01/11/2022
2 Complete Trusses Required
T 1
T 1
6'6" 6
3'3" 5
97 9
3'1 "3
12
-4X5 -3X4 -4X5 5
A B C
TT2
w W5 D
FI
F E
III1.5X4 -4X5 =3X8=31(A1)
9'3"9
2'11"9 1 2'11"9
2'11"9 1511"2
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: ASCE 7-16
TCDL: 20.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 5.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 65.00
Mean Height: 15.00 ft
NCBCLL: 0.00
TCDL: 4.0 psf
Soffit: 0.00
BCDL: 3.0 psf
Load Duration: 1.00
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5 2x8 SP SS Dense;
Nailnote
Nail Schedule:0.128"xY, min. nails
Top Chord: 1 Row @ 4.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 123 plf at 0.00 to 123 plf at 9.63
BC: From 10 plf at 0.00 to 10 plf at 9.63
TC: 1865 lb Conc. Load at 6.05
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Right bottom chord exposed to wind.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
3'8" 7
97 9
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.034 E 999 480
VERT(CL): 0.065 E 999 360
HORZ(LL): 0.012 D - -
HORZ(TL): 0.023 D
Creep Factor: 2.0
Max TC CSI: 0.598
Max BC CSI: 0.896
Max Web CSI: 0.379
✓E MEW Ver: 20.02.01 A. 1209.10
It is the responsibility of the Building Designer and
Truss Fabricator to review this drawing prior to
cutting lumber to verify that all data,including
dimensions and loads, conform to the architectural
plans/specifications and fabricators truss layout.
\wl I I f 1/► ,
aPp00 1,1,N //
EN8i'•�tS���i
No 70773
J STATE OF ;
i Q'•, '
AIL
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
G 1271 /- /- /327 /182 /46
D 1878 /- /- /376 /181 /-
Wind reactions based on MWFRS
G Brg Wid = 3.6 Min Req = 1.5
D Brg Wid = 4.0 Min Req = 1.5
Bearings G & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 142 -1225 C - D 168 -1869
B-C 141 -1588
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
F - E 1336 -143 E - D 1682 -148
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
A - G 84 - 626 F - B 60 - 538
A - F 1344 -154
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
,ient Safety Information, by TPI an SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
tl rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
cable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
1is drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of s
I for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212131 SPEC Ply: 2 Job Number: 21-0845 Cust: R761 JRef:1Xc47610013 T90
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1416.55727
Truss Label: T8 SSB / FV 01/11/2022
2 Complete Trusses Required
2'9"11 6314 8'0"1 97"9
2'9"11 2'6"3 2'8"3 17"8
=3X4 =3X4 =3X4 III1.5X4 12
A B C DE a 5
W8
90 7�q
Li
J I H G
111.5X4 =3X4 =3X8 �SIS05X4(**) '91 -
2'6"3
2'6"3
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: ASCE 7-16
TCDL: 20.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 5.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 65.00
Mean Height: 15.00 ft
NCBCLL: 0.00
TCDL: 4.0 psf
Soffit: 0.00
BCDL: 3.0 psf
Load Duration: 1.00
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 4.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 123 pIf at 0.00 to
123 pIf at 5.32
TC: From 253 pit at 5.32 to
253 pIf at 7.88
TC: From 123 pit at 8.00 to
123 pIf at 9.63
BC: From 10 plf at 0.00 to
10 pIf at 9.63
TC: 1284 lb Conc. Load at 8.00
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
9'3"9
a
4'�
27'15 4'57
5'2"2 97"9
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Pf: NA Ce: NA
VERT(LL): 0.026 C 999 480
Lu: NA Cs: NA
VERT(CL): 0.040 C 999 360
Snow Duration: NA
HORZ(LL): 0.007 F - -
HORZ(TL): 0.011 F
Building Code:
Creep Factor: 2.0
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.368
TPI Std: 2014
Max BC CSI: 0.651
Rep Fac: No
Max Web CSI: 0.209
FT/RT:20(0)/5(0)
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
WAVF 1RCC
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Right bottom chord exposed to wind.
It is the responsibility of the Building Designer and
Truss Fabricator to review this drawing prior to
cutting lumber to verify that all data,including
dimensions and loads, conform to the architectural
plans/specifications and fabricators truss layout.
\\�\\\%li( i III//,/
<G ,
No 70773
Ir
J STATE OF
�0%
SS�
COA#0-2 8 O N A1. M 1111 \0
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 892 /- /- /322 /186 /24
F 1993 /- /- /363 /428 /-
Wind reactions based on MWFRS
J Brg Wid = 3.6 Min Req = 1.5
F Brg Wid = 4.0 Min Req = 1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 131 - 656 D - F 331 -1581
B - C 164 -1058
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
I - H 731 -137 G - F 1363 - 282
H - G 1217 - 248
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
A - J 88 - 434 B - H 378 - 45
A - 1 741 -148 C-D 139 -819
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
,ient Safety Information, by TPI an SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
tl rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
cable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
1is drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of s
I for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212134 SPEC Ply: 2 Job Number: 21-0845 Cust: R761 JRef:1Xc47610013 T68
FROM: Qty: 4 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1416.26897
Truss Label: T9 SSB / FV 01/11/2022
2 Complete Trusses Required
90
2'9"11 6314 8'0"1
2'9"11 2'6"3 2'8"3
9'7"9
1'7"8
=3X3 =3X4 =3X4 III1.5X4 12
A B C DE a 5
J fl
III 1.5X4
2'6"3
2'6"3
Loading Criteria (psf)
Wind Criteria
TCLL: 40.00
Wind Std: ASCE 7-16
TCDL: 20.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 5.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 65.00
Mean Height: 15.00 ft
NCBCLL: 0.00
TCDL: 4.0 psf
Soffit: 0.00
BCDL: 3.0 psf
Load Duration: 1.00
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 6.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 123 pIf at 0.00 to 123 pIf at 7.88
TC: From 123 pit at 8.00 to 123 pIf at 9.63
BC: From 10 plf at 0.00 to 10 pIf at 9.63
TC: 1284 lb Conc. Load at 8.00
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
It is the responsibility of the Building Designer and
Truss Fabricator to review this drawing prior to
cutting lumber to verify that all data,including
dimensions and loads, conform to the architectural
plans/specifications and fabricators truss layout.
1111.5X4
9'3"9
4'�
27'15 4'57
5'2"2 97"9
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Pf: NA Ce: NA
VERT(LL): 0.024 C 999 480
Lu: NA Cs: NA
VERT(CL): 0.033 C 999 360
Snow Duration: NA
HORZ(LL): 0.007 F - -
HORZ(TL): 0.010 F
Building Code:
Creep Factor: 2.0
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.314
TPI Std: 2014
Max BC CSI: 0.554
Rep Fac: No
Max Web CSI: 0.182
FT/RT:20(0)/5(0)
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
WAVF 1RCC
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Right bottom chord exposed to wind.
No 70773
STATE OF ;
COA#0-2 8 ////r 111111 \0
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 795 /- /- /322 /186 /24
F 1757 /- /- /363 /496 /-
Wind reactions based on MWFRS
J Brg Wid = 3.6 Min Req = 1.5
F Brg Wid = 4.0 Min Req = 1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 131 - 572 D - F 393 -1370
B - C 205 - 865
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
I - H 637 -137 G - F 1175 - 336
H - G 1044 - 298
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
A - J 88 - 386 C - D 147 - 659
A - 1 645 -148
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
,ient Safety Information, by TPI an SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
tl rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
cable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
1is drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of s
I for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204577 / GABL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T59 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00364
Truss Label: T10 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
4' 10"6
4' 10"6
1'4"
(TYP)
2,2„6 12 =4XD4
10'0"6
5'7'
5 �
_o
A G n
n
Ll t
ae _VW
H
3X4(B 1) = 2X4(A1)
fA
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S16030ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
9'0"12
7 1-i
10'0"6
10'0"6 2' 1 "6
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 G 999 360
VERT(CL): -0.002 G 999 240
HORZ(LL): 0.002 G - -
HORZ(TL): 0.002 G
Creep Factor: 2.0
Max TC CSI: 0.384
Max BC CSI: 0.078
Max Web CSI: 0.021
EW Ver: 20.02.01A.1209.10
`\�\\ �PpDO Vj�,/i�i
\\\ \rENsi
<G ;
No 70773
STATE OF LOR
i O.t� `.• R P �\2
COA#0-2 8 sSIO N AL
��rrr
01/11/2022
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 85 /- /- /43 /45 /75
A* 73 /- /- /32 /37 /-
G 340 /- /- /211 /307 /-
Wind reactions based on MWFRS
A Brg Wid = 4.0 Min Req = 1.5
A Brg Wid = 108 Min Req = -
G Brg Wid = 7.6 Min Req = 1.5
Bearings A, A, & G are a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204574 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T56 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01733
Truss Label: T11 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
4'10"6
4'10"6
4X4
12 B
10'0"6
57'
5 �
0
A C ih
ih
a a �9'4"
E D
3X4(B 1) 5X5 = 2X4(A1)
4'10"6
4'10"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
10'0"6
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
57'
10'0"6
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.009 E 999 360
VERT(CL): 0.017 E 999 240
HORZ(LL): 0.003 C - -
HORZ(TL): 0.006 C
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.221
Max Web CSI: 0.045
EW Ver: 20.02.01A.1209.10
���PNDO •V�ti
<G ;
No 70773
STATE OF I
co
to
COA#0-2 8 /ON0/11111 AI \\\���\
2'1 "6
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 362 /- /- /181 /202 /67
C 515 /- /- /277 /319 /-
Wind reactions based on MWFRS
A Brg Wid = 4.0 Min Req = 1.5
C Brg Wid = 7.6 Min Req = 1.5
Bearings A & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 280 - 504 B - C 284 - 507
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A-E 421 -140 E-C 421 -140
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204580 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T55 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01524
Truss Label: T12 SSB / DF 01/11/2022
2'11"3 J_ 4'6"2 9'8"2
2'5"11 5 T 57'
12
5
=4X4
C
T =4X7 =5X5
A B
T
� M
N -
1
I H G F
=3X8 =3X4 -3X4
1111.5X4
9'8"2
2'2"3 1'8"11 5'3"12
2'7"11 4'4"6 9'8"2
Loading Criteria (psf) Wind Criteria
TCLL: 20.00 Wind Std: ASCE 7-16
TCDL: 7.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
DEXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00 TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
O_
p ih 9'11"4
T 9,4„
E
I(A1)
2'1"6
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.008 F 999 360
Loc R+ / R- / Rh / Rw / U / RL
Lu: NA Cs: NA
VERT(CL): 0.014 F 999 240
1 339 /- /- /163 /200 /135
Snow Duration: NA
HORZ(LL): 0.004 A - -
D 501 /- /- /283 /311 /-
HORZ(TL): 0.007 A
Wind reactions based on MWFRS
Building Code:
Creep Factor: 2.0
1 Brg Wid = 3.0 Min Req = 1.5
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.272
D Brg Wid = 7.6 Min Req = 1.5
TPI Std: 2014
Max BC CSI: 0.215
Bearings I & D are a rigid surface.
Rep Fac: Yes
Max Web CSI: 0.093
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
WAVE
VIEW Ver:20.02.01A.1209.10
A-B 255 -376 C-D 251 -459
B - C 270 -418
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
G-F 413 -142
�NN�\Q'�P,cD
No 70773
STATE OF ; %�
'?
i�Ot." �,' cLOR1Oq
i ,'•
COA#0-2 8 s/ANAL
/llllllll�
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW CGMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204583 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T52 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01694
Truss Label: T13 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
IT
Lo v
to
N
5"Q 3,4"3 4 6„2 9,8"2
15" 2'10"11 12„ 57'
12
5 [---
=4X4
C
9'8"2
27"3 12 5'3"12
3'0"11 4 4"6 9,8"2 2'1 "6
5Q "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Lt Bearing Leg: 2x6 SIP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.008 F 999 360
VERT(CL): 0.014 F 999 240
HORZ(LL): 0.004 A - -
HORZ(TL): 0.007 A
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.215
Max Web CSI: 0.093
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF %40
i O.t� R P \2
COA#0-2 8 sLOR
SIO N AL
8011111
01/11/2022
0
9'11"4
T 9,4„
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
1 339 /- /- /163 /202 /146
D 501 /- /- /285 /310 /-
Wind reactions based on MWFRS
I Brg Wid = 3.0 Min Req = 1.5
D Brg Wid = 7.6 Min Req = 1.5
Bearings I & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 254 - 376 C - D 248 - 459
B - C 269 -412
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
G - F 407 -127
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
I- A 282 -392
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204586 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T89 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02857
Truss Label: T14 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
3'9"2 4'6'
3710 9
12
5 [,--
=4X4
=4X7 =5X5 C
9'3"4
4'9"2
9'3"4
_ 3'0"2 _i_ 10"1?�_ 4'10"14
3'5"10 4'4"6 9'3"4
5.
5"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Lt Bearing Leg: 2x6 SIP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.007 E 999 360
VERT(CL): 0.013 E 999 240
HORZ(LL): 0.004 A - -
HORZ(TL): 0.007 A
Creep Factor: 2.0
Max TC CSI: 0.217
Max BC CSI: 0.200
Max Web CSI: 0.093
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF %40
i O.t� R P \2
COA#0-2 8 sLOR
SIO N AL
8011111
01/11/2022
911 4
s a y,4„
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 342 /- /- /158 /212 /101
D 346 /- /- /173 /190 /-
Wind reactions based on MWFRS
H Brg Wid = 3.0 Min Req = 1.5
D Brg Wid = 3.5 Min Req = 1.5
Bearings H & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 250 - 377 C - D 251 - 466
B - C 268 - 408
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
F - E 403 -168 E - D 384 -166
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
H-A 301 -417
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204591 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T88 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02365
Truss Label: T15 SSB / DF 01/11/2022
4'6"2
4'0"10
=4X7
9'3"4
4'9"2
12
=4X4 _7 5
filX4 3X4(B2)
Loading Criteria (psf) Wind Criteria
TCLL: 20.00 Wind Std: ASCE 7-16
TCDL: 7.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
Des Ld: 37.00 EXP: B Kzt: NA
Mean Height: 30.00 ft
NCBCLL: 10.00 TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
9'3"4
4'0"10
4'6"2
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
472
9'3"4
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.008 B 999 360
VERT(CL): 0.014 B 999 240
HORZ(LL): 0.004 C - -
HORZ(TL): 0.007 C
Creep Factor: 2.0
Max TC CSI: 0.211
Max BC CSI: 0.207
Max Web CSI: 0.094
EW Ver: 20.02.01A.1209.10
\\
-N\\A'�?PNDo
No 70773
STATE OF Ir
Fss/O N AL �?\\��
COA#0-2 8 1///1()11111����
01 / 11 /2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 342 /- /- /162 /217 /117
C 346 /- /- /179 /188 /-
Wind reactions based on MWFRS
F Brg Wid = 3.0 Min Req = 1.5
C Brg Wid = 3.5 Min Req = 1.5
Bearings F & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 289 - 406 B - C 254 - 483
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
D - C 404 -170
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
F - A 321 - 445
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204671 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T57 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02236
Truss Label: T16 SSB / DF 01/11/2022
fi
5'11"4 12'
5'11 "4 60"12
18'0"12
6'0"12
_5X10 1112X4 =5X10
12 C D T2 E
24'
5' 11 "4
5 T
B F r
in
9 4"
A-4X7(B1) 1111.5X4 =H0510 1111.5X4=4X7(B1) G
24'
2'1"6 1 6'1" 5'11" 5'11" 61 2'1"6
6'1" 12' 17'11" 24'
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
-----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From
55 plf at -2.11 to 55 plf at
5.94
TC: From
28 plf at 5.94 to 28 pIf at
18.06
TC: From
55 plf at 18.06 to 55 plf at
26.12
BC: From
4 plf at -2.11 to 4 plf at
0.00
BC: From
20 pIf at 0.00 to 20 pIf at
5.97
BC: From
10 pIf at 5.97 to 10 plf at
18.03
BC: From
20 pIf at 18.03 to 20 pIf at
24.00
BC: From
4 pIf at 24.00 to 4 pIf at
26.12
TC: 305 lb
Conc. Load at 5.97,18.03
TC: 133 lb
Conc. Load at 8.00,10.00,12.00,14.00
16.00
BC: 296 lb
Conc. Load at 5.97,18.03
BC: 104 lb
Conc. Load at 8.00,10.00,12.00,14.00
16.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.247 D 999 360
VERT(CL): 0.452 D 629 240
HORZ(LL): 0.061 F - -
HORZ(TL): 0.112 IF
Creep Factor: 2.0
Max TC CSI: 0.780
Max BC CSI: 0.585
Max Web CSI: 0.575
EW Ver: 20.02.01A.1209.10
<G ;
No 70773
STATE OF % W
• Al
R P \2
NAL
ir) ij((0
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1990 /- /- /- /1180 /-
F 1990 /- /- /- /1180 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.6
F Brg Wid = 7.6 Min Req = 1.6
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 2329 -4072 D - E 2844 -4961
C - D 2844 -4961 E - F 2329 -4072
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - J 3692 - 2092 I - H 3715 - 2089
J -1 3715 - 2089 H - F 3692 - 2092
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
C-J 413 0 I-E 1351 -818
C-1 1351 -818 H-E 413 0
D - I 657 - 628
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204801 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R76, JRef:1Xc47610013 T77 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02769
Truss Label: T17 SSB / DF 01/11/2022
7' 11 "4
T11"4
12'
4'0"12
16'0"12
4'0"12
-4X8 1111.5X4 -4X8
C D E
24'
T11"4
,2 5 T
�
a0
in
7
B F
A=3X4(A1) 111.5X4 =5X8 III1.5X4=3X4(A1) G
2 1"6 -}- 8'1"
8'1"
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
24'
3'11" + 3'11"
12' 1611"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
I NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.078 D 999 360
VERT(CL): 0.143 D 999 240
HORZ(LL): 0.028 F - -
HORZ(TL): 0.051 IF
Creep Factor: 2.0
Max TC CSI: 0.625
Max BC CSI: 0.650
Max Web CSI: 0.067
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF
i O.t� `.• R P �\2
IONAL
//II1111\1\
24' 2' 1 "6
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1025 /- /- /528 /613 /113
F 1025 /- /- /528 /613 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
F Brg Wid = 7.6 Min Req = 1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B-C 915 -1608 D-E 972 -1516
C-D 972-1516 E-F 915 -1608
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B-J 1410 -681 I-H 1416 -680
J-1 1416 -680 H-F 1410 -681
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
its drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
I for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204820 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T78 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03004
Truss Label: T18 SSB / DF 01/11/2022
M
<O
V
1 4T
5'3" 9' 11 "4 . 1 . 14'0"12
5'3" 4'8"4 4-1"8
2'1 "6 9' 11 "4
9' 11 "4
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
D
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
=4X7 =4X4
D E
24'
3'11 "12
13'11"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
18'9"1
4'8"4
191"
24'
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.078 J 999 360
VERT(CL): 0.141 J 999 240
HORZ(LL): -0.030 G - -
HORZ(TL): 0.054 G
Creep Factor: 2.0
Max TC CSI: 0.453
Max BC CSI: 0.821
Max Web CSI: 0.165
EW Ver: 20.02.01A.1209.10
61 PNDO •V�ti /���i
<G ;
No 70773
* Jr
STATE OF ,Ul
co
COA#0-2 8 10IN �?���\
0/Oi»1\
01/11/2022
24'
5'3"
2'1"6
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1025 /- /- /520 /611 /130
G 1025 /- /- /520 /611 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
G Brg Wid = 7.6 Min Req = 1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1029 -1687 E - F 816 -1365
C - D 819 -1372 F - G 1030 -1686
D - E 808 -1991
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B-J 1510 -819 I-G 1509 -819
J -1 1219 - 515
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204812 / COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T79 /
FROM: Qty: 6 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02188
Truss Label: T19 SSB / DF 01/11/2022
43'3"8
1'3"8
10'8"8 12' i . 1.
10'8"8 1'3" 10'8"8
=3X4
F z,3X12
o 3X4 %3X12 G @3X4 .53X3
o3X3 E 1111.5X4(")
1111.5X4(") H
D T B3 �3X3
12 5 03X3 T4
v `v 01OX10 C 1�10X10
FD
FD
N O
V
t ,1, l
B 1 T J
i^e 94
.=H0P510B2 NH0M510 L KA=XA1Xr X53X
1111.5X4 =3X6(A1)
2,T,6 41"13
4'1"13
i 4'3"9
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP 2700f-2.2E; T2,
T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.OE; B3 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
-----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -2.11 to 55 plf at
26.12
BC: From 4 plf at -2.11 to 4 plf at
0.00
BC: From 20 plf at 0.00 to 20 plf at
7.96
BC: From 90 plf at 7.96 to 90 plf at
16.04
BC: From 20 pif at 16.04 to 20 plf at
24.00
BC: From 4 pif at 24.00 to 4 pif at
26.12
PLB: From 40 plf at 9.72 to 40 plf at
14.28
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
24'
2'10"3 10, 2'10"3 I 4'1"13
7' 17' 19'10"3 24'
15'4"14 -{- 4'3"9
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.240 H 999 360
Loc R+ / R- / Rh / Rw / U / RL
Lu: NA Cs: NA
VERT(CL): 0.381 H 747 240
B 1399 /- /- /508 /973 /148
Snow Duration: NA
HORZ(LL): 0.087 D - -
J 1399 /- /- /508 /973 /-
HORZ(TL): 0.138 D
Wind reactions based on MWFRS
Building Code:
Creep Factor: 2.0
B Brg Wid = 7.6 Min Req = 1.5
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.607
J Brg Wid = 7.6 Min Req = 1.5
TPI Std: 2014
Max BC CSI: 0.518
Bearings B & J are a rigid surface.
Rep Fac: Varies by Ld Case
Max Web CSI: 0.201
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
WAVE, HS
VIEW Ver: 20.02.01A.1209.10
C - D 2568 -1658 F - G 601 - 381
B - C 1784 - 2586 G - H 2322 - 2666
D - E 2586 -1611 H - 1 2568 -1658
E - F 601 - 381 1-1 1784 - 2586
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
B - Q 2336 -1600 N - M 2350 -1613
Q - P 2350 -1614 M - L 2350 -1614
P - O 2350 -1613 L - J 2336 -1600
O-N 1913-1369
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp. Webs Tens. Comp.
C - O
315 - 500 H - N 890 - 531
O - D
890 - 531 N - I 315 - 500
E - G
1782 - 2564
scaled plate plot details for special positioning `�1t♦�
requirements. `\\PNDO
Wind �\ �Q*�pENii 14P
Wind loads based on MWFRS with additional C&C
member design. No 70773
Wind loading based on both gable and hip roof types. W
Collar -Tie braced with continuous lateral bracing STATE OF ;, W
@24" OC, or rigid sheathing k/
LOR
/O N AL
COA#0-2 8 ��/ I
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW CGMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204816 / COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T86 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03474
Truss Label: T20 SSB / DF 01/11/2022
1018"8 + 12'
10'8"8 1'X
24'
10'8"8
=T ' 3XM2
3X12
3X3 I3X4E 3X4 .53X3
1111.5X4(") 1111.SX4("")
B3 H
� � 3X3
12 3X3 4
5
a "v �10X10 9 1 �10X10 ro
o
T
6'11 D
1 B 1 �7c T J
aTa9'4'
A P O N B2 M L K
=3X6(A1) 1111.5X4 =3X5 =3X4 1111.5X4=3X6(A7)
=H0510 =H0510
24'
4'1"13 2'10"3 10, 210"3 41"13
�21"6 4'1"13 T 17' 19'10"3 24'
i 479 -}- 15'4"14 -}- 479
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP 2700f-2.2E; T2,
T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.OE; B3 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
-----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From
55 plf at
-2.11 to
55 plf at
24.00
BC: From
4 plf at
-2.11 to
4 plf at
0.00
BC: From
20 plf at
0.00 to
20 plf at
7.96
BC: From
90 plf at
7.96 to
90 plf at
16.04
BC: From
20 pif at
16.04 to
20 plf at
24.00
PLB: From
40 plf at
9.72 to
40 plf at
14.28
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.244 H 999 360
Loc R+ / R- / Rh / Rw / U / RL
B 1405 /- /- /507 /979 /127
Lu: NA Cs: NA
VERT(CL): 0.387 H 735 240
Snow Duration: NA
HORZ(LL): 0.086 D - -
J 1270 /- /- /436 /863 /-
HORZ(TL): 0.138 D
Creep Factor: 2.0
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
Building Code:
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.621
J Brg Wid = 7.6 Min Req = 1.5
TPI Std: 2014
Max BC CSI: 0.520
Bearings B & J are a rigid surface.
Rep Fac: No
Max Web CSI: 0.207
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
C - D 2563 -1654 F - G 609 - 388
B - C 1796 - 2600 G - H 2391 - 2737
WAVE, HS
D - E 2576 -1603 H - 1 2608 -1692
E - F 606 - 385 1 - J 1857 - 2671
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
B - P 2349 -1611 M - L 2437 -1687
P - O 2363 -1625 L - K 2437 -1688
O - N 2363 -1624 K - J 2424 -1675
N - M 1930 -1384
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp. Webs Tens. Comp.
C - N
308 - 495 H - M 918 - 555
N - D
892 - 533 M -1 378 - 578
E - G
1802 - 2588
Wind
mWind
embeads based on MWFRS with additional C&C \\`\���P*NDO
Wind loading based on both gable and hip roof types. No 70773
Collar -Tie braced with continuous lateral bracing
@24" OC, or rigid sheathing
STATE OF
i O.t� `.• R P \2
IONA
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,rw CGMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204807 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T65 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02524
Truss Label: T21 SSB / DF 01/11/2022
3'11"8 7'6" 12' 16'6" 20'3"2
3'11"8 3'6"8 4'6" 4,6„ 3,9"2
2'1"6 -1 7'6"
7'6"
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
D
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types
20'3"2
4,6„
12'
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
=4X4
E
4,6„
16'6"
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.051 D 999 360
VERT(CL): 0.094 D 999 240
HORZ(LL): 0.014 H - -
HORZ(TL): 0.026 H
Creep Factor: 2.0
Max TC CSI: 0.351
Max BC CSI: 0.610
Max Web CSI: 0.289
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF
F�ORt�P'�
111110
01/11/2022
3'9"2
20
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 897 /- /- /460 /534 /141
H 749 /- /- /366 /432 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
H Brg Wid = 3.5 Min Req = 1.5
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 832 -1433 E - F 612 - 886
C - D 716 -1257 F - G 494 - 874
D - E 831 -1272
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - K 1274 - 788 J - 1 712 - 370
K-J 712 -370
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
K - E 629 - 364 G - H 435 - 741
I- G 842 -444
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204804 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T80 /
FROM: Qty: 3 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02782
Truss Label: T22 SSB / DF 01/11/2022
3'118 7'6" 12' 16'6" 20'32
3,11 "8 - 3'6"8 4,6" 46 3,9"2
90
v
in
88
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
7'6"
7'6"
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
20'3"2
4'6"
12'
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
=4X4
D
4'6"
16'6"
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.050 C 999 360
VERT(CL): 0.093 C 999 240
HORZ(LL): 0.014 G - -
HORZ(TL): 0.026 G
Creep Factor: 2.0
Max TC CSI: 0.280
Max BC CSI: 0.608
Max Web CSI: 0.306
EW Ver: 20.02.01A.1209.10
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
0 1111111� �a
01/11/2022
3'9"2
2
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 767 /- /- /372 /436 /120
G 756 /- /- /366 /438 /-
Wind reactions based on MWFRS
A Brg Wid = 7.6 Min Req = 1.5
G Brg Wid = 3.5 Min Req = 1.5
Bearings A & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 890 -1502 D - E 619 - 894
B - C 746 -1293 E - F 501 - 882
C - D 858 -1304
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - J 1349 - 852 1 - H 725 - 381
J - 1 725 - 381
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
J - D 655 - 386 F - G 440 - 747
H - F 850 -451
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204646 / HIPM Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T58 /
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03180
Truss Label: T23 SSB / DF 01/11/2022
as
3' 11 "4 8'37 127'10
3' 11 "4 4'4"3 4'4"3
5X8 III 1.5X4 = 4X4
19 C D E
127'10
2'1"6 4' 1 " 4'27
4'1" 8'3"7
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -2.11 to
55 plf at 3.94
TC: From 28 plf at 3.94 to
28 plf at 12.63
BC: From 4 plf at -2.11 to
4 plf at 0.00
BC: From 20 plf at 0.00 to
20 plf at 3.97
BC: From 10 plf at 3.97 to
10 pit at 12.63
TC: 153 lb Conc. Load at 3.97
TC: 74lb Conc. Load at 6.00, 8.00,10.00,12.00
BC: 86 lb Conc. Load at 3.97
BC: 65 lb Conc. Load at 6.00, 8.00,10.00,12.00
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
4'4"3
127'10
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.039 D 999 360
VERT(CL): 0.071 D 999 240
HORZ(LL): 0.009 C - -
HORZ(TL): 0.017 C
Creep Factor: 2.0
Max TC CSI: 0.349
Max BC CSI: 0.485
Max Web CSI: 0.300
EW Ver: 20.02.01A.1209.10
\\\\\%III I ///////
ljoo
oCENS
No 70773 ;
*rJ STATE OF /W
//rriii0
TT
o
20
CV
9,4„
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 828 /- /- /- /513 /-
1 712 /- /- /- /409 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
1 Brg Wid = 7.6 Min Req = 1.5
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 720 -1286 D - E 716 -1252
C-D 716-1253
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B-H 1142 -624 H-G 1154 -617
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
G - E 1328 - 759 E - F 416 - 621
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
,ient Safety Information, by TPI an SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
tl rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
cable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
1is drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of s
I for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204661 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T67 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.02658
Truss Label: T24 SSB / DF 01/11/2022
5' 11 "4
5' 11 "4
11'6"4 12
57' 5"
5X5
C =4X7D
12
5 �
_O
(V
g E
�•a
A G IF=2 4(A1) =3X4 1111 FYa
11'11"12
T
(V
(V W
Trni 9'11"4
74
t4914"
2-1-6
62"12
6712
5'3"8
11'6"4
5"
1' 1"12
Loading Criteria (psf) Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 20.00 Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Gravity Non -Gravity
TCDL: 7.00 Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): -0.016 G 999 360
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00 Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.025 C 999 240
B 585 /- /- /472 /374 /193
BCDL: 10.00 Risk Category: II
Snow Duration: NA
HORZ(LL): -0.004 IF- -
E 429 /- /- /330 /352 /-
EXP: B Kzt: NA
Des Ld: 37.00
HORZ (TL ): 0.006 IF -
Wind reactions based on MWFRS
Mean Height: 30.00 ft
NCBCLL: 10.00
Building Code:
Creep Factor: 2.0
B Brg Wid = 4.0 Min Req = 1.5
TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
P
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.275
E Br Wid = 3.0 Min Re 1.5
g q =
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.354
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Spacing: 24.0 " C&C Dist a: 3.00 ft
Rep Fee: Yes
Max Web CSI: 0.195
Maximum Top Chord Forces Per Ply (Ibs)
Loc. from endwall: Any
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
VIEW Ver: 20.02.01A.1209.10
B - C 399 -640 C - D 383 -529
Lumber
Maximum Bot Chord Forces Per Ply (Ibs)
Top chord: 2x4 SP #2;
Chords Tens.Comp.
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
B - G 538 -389
Rt Bearing Leg: 2x6 SP #2;
Purlins
Maximum Web Forces Per Ply (Ibs)
In lieu of structural panels use purlins to brace all flat
Webs Tens.Comp. Webs Tens. Comp.
TIC @ 24" oc.
G - D 477 - 336 D - E 735 - 743
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
\\
-N\\A'�?PNDo
No 70773
STATE OF Ir
Fss/O N AL �?\\��
COA#0-2 8 1///1()11111����
01 / 11 /2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW CGMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204664 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T75 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01828
Truss Label: T25 SSB / DF 01/11/2022
M
M
78
711"4 i 116"4 11' 1"12
7'11"4 3'7" 5"
21"6 82"12
8'2"12
11'11"12
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
C5 =4X7p
3'3"8
11'6"4
5"
1' 1"12
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.017 B 999 360
VERT(CL): 0.030 B 999 240
HORZ(LL): -0.011 B - -
HORZ(TL): 0.018 B
Creep Factor: 2.0
Max TC CSI: 0.574
Max BC CSI: 0.512
Max Web CSI: 0.125
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF %Al
COA#0-2 8 sS,O N AL �?\\\\
�8ir) ij((\��
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 585 /- /- /336 /331 /243
E 429 /- /- /207 /285 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
E Brg Wid = 3.0 Min Req = 1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 216 - 522 C - D 258 - 395
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
B - G 412 - 282
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
G - D 516 - 341 D - E 259 - 402
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204667 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T76 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02266
Truss Label: T26 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
2'1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
62"15
52"15
11'11"12
10'1"
10'1"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
tAr i"12
5"�
911"4 i 11'6"4
4'8"4 1'7"
-4Xp4 -4X7E
1'5"4
11'6
In,"12
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.017 C 999 360
VERT(CL): 0.032 B 999 240
HORZ(LL): -0.006 G - -
HORZ(TL): 0.016 B
Creep Factor: 2.0
Max TC CSI: 0.279
Max BC CSI: 0.731
Max Web CSI: 0.188
EW Ver: 20.02.01A.1209.10
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
0 1111111� �a
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 585 /- /- /337 /314 /293
F 429 /- /- /216 /300 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
F Brg Wid = 3.0 Min Req = 1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
B - C 298 - 622
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
B - H 535 - 443
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
H - E 509 - 250 E - F 276 - 597
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204658 / SPEC Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T74 /
FROM: Qty: 6 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02071
Truss Label: T27 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
6'1"8
6.1 "8
I V6"4
5'4"12
�4X7�
12 1111.5X4
5 c
V
V
g LL�E 9'11"4
4L 1 94.
A G F �`lY1
4(A1) =3X4 3X8
`~ 2'1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
11'11"12
6'3"4
6'3"4
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
VT
11'6"4
in,"12
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.018 C 999 360
VERT(CL): 0.032 C 999 240
HORZ(LL): -0.007 D - -
HORZ(TL): 0.012 D
Creep Factor: 2.0
Max TC CSI: 0.303
Max BC CSI: 0.337
Max Web CSI: 0.372
EW Ver: 20.02.01A.1209.10
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
01111111� �a
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 585 /- /- /336 /294 /344
E 429 /- /- /227 /318 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
E Brg Wid = 3.0 Min Req = 1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 195 - 640 C - D 322 - 619
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
B - G 539 - 392
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
G - D 636 -441 D - E 623 -630
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
It Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204655 / SPEC Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T73 /
FROM: Qty: 4 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00903
Truss Label: T28 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
SO
OD
M
t T1.
2'1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
7'11"12
T6"4
7'6"4
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
04X4
C
5"
11"12
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.016 B 999 360
VERT(CL): 0.031 B 999 240
HORZ(LL): 0.009 B - -
HORZ(TL): 0.017 B
Creep Factor: 2.0
Max TC CSI: 0.494
Max BC CSI: 0.484
Max Web CSI: 0.148
EW Ver: 20.02.01A.1209.10
���PNDO •V�ti
<G ;
No 70773
STATE OF I
co
to
COA#0-2 8 /ON0/11111 AI \\\���\
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 441 /- /- /263 /233 /244
D 272 /- /- /140 /205 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
D Brg Wid = 3.0 Min Req = 1.5
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
C - D 874 - 803
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204652 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T64 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1353.59919
Truss Label: T29 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
�-- 2'V6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
T11"12
' S"8
611 "4 7'6'4
1'7"
=4X4
C =4X7 D
T11"12
6712
6'2"12
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
1'3"8
T6"4
P11"12
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.006 B 999 360
VERT(CL): 0.012 B 999 240
HORZ(LL): 0.004 B - -
HORZ(TL): 0.006 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.269
Max Web CSI: 0.077
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF ; %Ir
O'" ?
c�OR1Oq'•
COA#0-2 8 s/ANAL
/llllllll�
01/11/2022
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 441 /- /- /263 /253 /193
E 272 /- /- /132 /187 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
E Brg Wid = 3.0 Min Req = 1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204649 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T60 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01289
Truss Label: T30 SSB / DF 01/11/2022
T
2'1 "6
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
D
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Special Loads
-----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -2.11 to 55 plf at
3.94
TC: From 28 plf at 3.94 to 28 plf at
7.98
BC: From 4 plf at -2.11 to 4 plf at
0.00
BC: From 20 plf at 0.00 to 20 plf at
3.97
BC: From 10 plf at 3.97 to 10 plf at
7.52
TC: 153 lb Conc. Load at 3.97
TC: 74 lb Conc. Load at 6.00, 7.46
BC: 86 lb Conc. Load at 3.97
BC: 65 lb Conc. Load at 6.00, 7.46
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
3'11 "4
3'11 "4
4'2"12
4'2"12
7'6"4
3'7"
C 5 - 4X7 D
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
3'3"8
7'6"4
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.011 C 999 360
VERT(CL): 0.019 C 999 240
HORZ(LL): 0.003 F - -
HORZ(TL): 0.005 IF
Creep Factor: 2.0
Max TC CSI: 0.313
Max BC CSI: 0.244
Max Web CSI: 0.167
EW Ver: 20.02.01A.1209.10
�NQ'�p, oDa
4k
No 70773 `.
STATE OF
PL
rNAL
fllllll0
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 564 /- /- /- /364 /-
E 519 /- /- /- /295 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
E Brg Wid = 3.0 Min Req = 1.5
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 367 - 655 C - D 269 - 552
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp.
B - G 563 - 300
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
G - D 482 - 208 D - E 531 - 639
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204679 / GABL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T2 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1353.59851
Truss Label: T31 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
67'
67'
27' —4— 1,4„ -� =4F4
(TYP)
12'4"
67'
12
5 [---
_o
20
B J ih
�19'10"
A K
2X4(A1) O = 2X4(A1)
k
2'1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S16030ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
5X5
11'0"12
12'4"
12'4"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.002 B 999 360
VERT(CL): -0.002 B 999 240
HORZ(LL): 0.002 J - -
HORZ(TL): 0.002 J
Creep Factor: 2.0
Max TC CSI: 0.384
Max BC CSI: 0.074
Max Web CSI: 0.014
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF &U
PL
NAL
rfllllll0
01/11/2022
11
2'1"6
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 323 /- /- /199 /235 /110
B* 75 /- /- /34 /36 /-
J 323 /- /- /218 /235 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
B Brg Wid = 132 Min Req = -
J Brg Wid = 7.6 Min Req = 1.5
Bearings B, B, & J are a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204674 / SPEC Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T1 /
FROM: Qty: 4 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01426
Truss Label: T32 SSB / DF 01/11/2022
67'
67'
4X4
C
12'4"
6'2"
12
5
_o
90
B D Cl)
A F E
2X4(A1) 5X5 2X4(A1)
12'4"
2'1 "6 67'
67'
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types
67'
12W.
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.014 F 999 360
VERT(CL): 0.025 F 999 240
HORZ(LL): 0.005 D - -
HORZ(TL): 0.009 D
Creep Factor: 2.0
Max TC CSI: 0.287
Max BC CSI: 0.338
Max Web CSI: 0.057
EW Ver: 20.02.01A.1209.10
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
0 1111111� �a
01/11/2022
2'1"6
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 586 /- /- /314 /356 /98
D 586 /- /- /314 /356 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 7.6 Min Req = 1.5
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 347 - 638 C - D 347 - 638
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - F 534 -186 F - D 534 -186
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204797 / SPEC Ply: 2 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T33 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02918
Truss Label: T33 SSB / DF 01/11/2022
2 Complete Trusses Required
3'912
6'2" 8'6"4
3'9"12
2'4"4 2'4"4
5X5
D
T
12 03X5
5 C
iv
1 4y8
=4XB(A1)
A
J I
H
1113XI10
=10X10
2' 1 "6
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 It
NCBCLL: 0.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 It
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x8 SIP SS Dense;
Webs: 2x4 SIP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From
55 plf at
-2.11 to
55 plf at
6.17
TC: From
28 plf at
6.17 to
28 plf at
12.33
BC: From
4 plf at
-2.11 to
4 plf at
0.00
BC: From
20 plf at
0.00 to
20 plf at
6.17
BC: From
10 plf at
6.17 to
10 plf at
12.33
BC: 3358 lb
Conc. Load
at 6.84
BC: 1220 lb
Conc. Load
at 8.77,10.77
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
12'4"
3,8„ 2,6„ 2'6"
3'8" 6'2" 8'8"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
12'4"
3'9"12
3 E5
0
=4X7(A1) BO
FF �19'10"
G
13X10
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.077 H 999 360
VERT(CL): 0.126 H 999 240
HORZ(LL): -0.015 F - -
HORZ(TL): 0.025 IF
Creep Factor: 2.0
Max TC CSI: 0.536
Max BC CSI: 0.402
Max Web CSI: 0.473
EW Ver: 20.02.01A.1209.10
�N,�\Q'�P,cD
No 70773
Ir
STATE OF %Qi
i�i ,1�
cLOR1Oq.'•
COA#0-2 8 /S/s/ANAL
/llllllll�
01/11/2022
W-11i
12'4"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 2521 /- /- /- /1648 /-
F 4094 /- /- /- /2501 /-
Wind reactions based on MWFRS
J Brg Wid = 7.6 Min Req = 1.5
F Brg Wid = 7.6 Min Req = 2.1
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1694 - 2642 D - E 1838 - 2843
C - D 1846 -2852 E - F 2517 -4008
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - I 2424 -1550 H - G 3634 - 2283
I - H 2439 -1562 G - F 3697 - 2319
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
D - H 2O95 -1339 E - G 1046 - 600
H-E 688 -1181
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
its drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204685 / GABL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T8 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01339
Truss Label: T34 SSB / DF 01/11/2022
7,9„
7,9„
2'5" --+ 1,4" - {
(TYP)
=4X4
G
15'6"
TV'
12
5
rn
"v
B L
�19'10"
A M
2X4(A1) =5X5=2X4(A1)
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
2'1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S16030ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
15'6"
166"
15'6"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.002 B 999 360
VERT(CL): -0.002 B 999 240
HORZ(LL): -0.001 B - -
HORZ(TL): 0.002 B
Creep Factor: 2.0
Max TC CSI: 0.384
Max BC CSI: 0.078
Max Web CSI: 0.018
EW Ver: 20.02.01A.1209.10
6PNDO •V�ti /���i
<G ;
No 70773
* of
STATE OF
AL
4OR co
�irrr
01/11/2022
2'1"6 --{
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
L* 118 /- /- /41 /63 /8
Wind reactions based on MWFRS
L Brg Wid = 186 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204682 / COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T10 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01079
Truss Label: T35 SSB / DF 01/11/2022
7,9„
7,9„
5X5
C
15'6"
7,9„
12
5 �
rn
"v
B D
19'10"
A F E
= 9X4(A 1 l = 5X5 = 9X4(A1) t__0_
15'6"
2'1 „6 7,9„
7,9„
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fee: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types
7,9„
15'6"
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.021 F 999 360
VERT(CL): 0.037 F 999 240
HORZ(LL): 0.009 D - -
HORZ(TL): 0.016 D
Creep Factor: 2.0
Max TC CSI: 0.501
Max BC CSI: 0.544
Max Web CSI: 0.075
EW Ver: 20.02.01A.1209.10
61 PNDO •V�ti /���i
<G ;
No 70773
* Jr
STATE OF ,Ul
co
COA#0-2 8 10NAI �?���\
0/(ri»1\
01/11/2022
2'1"6 --{
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 705 /- /- /366 /425 /112
D 705 /- /- /366 /425 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 7.6 Min Req = 1.5
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 477 - 860 C - D 477 - 860
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - F 727 - 286 F - D 727 - 286
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204823 / COMN Ply: 2 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T35 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00785
Truss Label: T36 SSB / DF 01/11/2022
2 Complete Trusses Required
4'5"2 7'9" 11'0"14
4'5"2 3-3"14 3'3"14
4'3"6
436
Loading Criteria (psf) Wind Criteria
TCLL: 20.00 Wind Std: ASCE 7-16
TCDL: 7.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
Des Ld: 37.00 EXP: B Kzt: NA
Mean Height: 30.00 ft
NCBCLL: 0.00 TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP 2400f-2.OE;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 5.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
-----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 15.50
BC: From 10 plf at 0.00 to 10 plf at 15.50
BC: 1216 lb Conc. Load at 0.77, 2.77, 4.77, 6.77
8.77
BC: 1209 lb Conc. Load at 10.77,12.77
BC: 1221 lb Conc. Load at 14.77
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
3'5"10
7,9„
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
5X8
C
15'6"
3'5"10
11'2"10
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.115 G 999 360
VERT(CL): 0.211 G 866 240
HORZ(LL): 0.026 E - -
HORZ(TL): 0.047 E
Creep Factor: 2.0
Max TC CSI: 0.590
Max BC CSI: 0.501
Max Web CSI: 0.561
EW Ver: 20.02.01A.1209.10
<G ;
No 70773
STATE OF
i OLOR
.t� `.• R P \2
COA#0-2 8 sSIO N A801111
L
01/11/2022
15'6"
4'5"2
4'3"6
15'6"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
1 5353 /- /- /- /3006 /-
E 5377 /- /- /- /3038 /-
Wind reactions based on MWFRS
I Brg Wid = 7.6 Min Req = 2.2
E Brg Wid = 7.6 Min Req = 2.2
Bearings I & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 2686 -4765 C - D 1921 -3403
B - C 1921 -3403 D - E 2688 -4758
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - H 4387 - 2466 G - F 4327 - 2440
H - G 4333 - 2438 F - E 4380 - 2468
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
H - B 1076 - 565 G - D 771 -1357
B - G 769 -1365 D - F 1070 - 567
C - G 2485 -1363
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212140 GABL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T11
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1415.43247
Truss Label: T37 SSB / FV 01/11/2022
T
48
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
4'4"
4'4"
1,8„ __�_(TYP--� -4E4
8,8„
4'4"
12 5 T
�
00
B H _
fV
19,10"
A I
- 2X4(A1) - 2X4(A1)
8"
2'1 "6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S16030ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
7'4"6
8'8"
8'8"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.002 B 999 360
VERT(CL): -0.002 H 999 240
HORZ(LL): 0.002 B - -
HORZ(TL): 0.002 B
Creep Factor: 2.0
Max TC CSI: 0.384
Max BC CSI: 0.087
Max Web CSI: 0.020
EW Ver: 20.02.01A.1209.10
\,QPNDO •V�ti /���i
<G ;
No 70773
STATE OF
COA#0-2 8 10NAt. �?\X
2'1"6
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 323 /- /- /211 /339 /93
B* 61 /- /- /34 /26 /-
H 323 /- /- /227 /339 /-
Wind reactions based on MWFRS
B Brg Wid = 8.0 Min Req = 1.5
B Brg Wid = 88.4 Min Req = -
H Brg Wid = 7.6 Min Req = 1.5
Bearings B, B, & H are a rigid surface.
Members not listed have forces less than 375#
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212143 COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T13
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1415.44490
Truss Label: T38 SSB / FV 01/11/2022
CM
N
N
8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
4'4"
4'4"
4X4
C
8,8,E
4'4"
12 5 T
�
00
B D _
CV
19'10"
A IF E
2X4(A1) III 1.5X4 2X4(A1)
2'1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
8,8„
4'4"
4'4"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
4'4"
8'8"
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.007 F 999 360
VERT(CL): 0.012 F 999 240
HORZ(LL): 0.003 D - -
HORZ(TL): 0.005 D
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.159
Max Web CSI: 0.037
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF ; %Jr
O', ?
c�OR1Oq'•
COA#0-2 8 s/ANAL
/llllllll�
01/11/2022
2'1"6
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 448 /- /- /257 /276 /83
D 448 /- /- /257 /276 /-
Wind reactions based on MWFRS
B Brg Wid = 8.0 Min Req = 1.5
D Brg Wid = 7.6 Min Req = 1.5
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 212146 COMN Ply: 2 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T69
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1416.28850
Truss Label: T39 SSB / FV 01/11/2022
2 Complete Trusses Required
T
4'
4'
12 =4XX4
5 F_—
8,4"
4'4"
X4A (A1) �
C_
(V
�s 19'10"
E D
1113X8 = 3X4(A1)
4'
4'
Loading Criteria (psf) Wind Criteria
TCLL: 20.00 Wind Std: ASCE 7-16
TCDL: 7.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
Des Ld: 37.00 EXP: B Kzt: NA
Mean Height: 30.00 It
NCBCLL: 0.00 TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 It
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.50" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 10.45
BC: From 10 plf at 0.00 to 10 plf at 5.77
BC: From 20 plf at 5.77 to 20 plf at 8.33
BC: From 4 plf at 8.33 to 4 plf at 10.45
BC: 1208 lb Conc. Load at 1.77, 3.77
BC: 1191 lb Conc. Load at 5.77
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
8'4"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
4'4"
2'1„6
8,4„
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.025 E 999 360
VERT(CL): 0.046 E 999 240
HORZ(LL): 0.006 C - -
HORZ(TL): 0.011 C
Creep Factor: 2.0
Max TC CSI: 0.301
Max BC CSI: 0.695
Max Web CSI: 0.272
EW Ver: 20.02.01A.1209.10
No 70773 `.
Ir
STATE OF ; %A
COA#0-2 8 INAL
/llllllll�
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2243 /- /- /- /1280 /-
C 2055 /- /- /- /1224 /-
Wind reactions based on MWFRS
A Brg Wid = 4.0 Min Req = 1.5
C Brg Wid = 7.6 Min Req = 1.5
Bearings A & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 990 -1738 B - C 989 -1734
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - E 1590 - 900 E - C 1590 - 900
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
B - E 1206 - 645
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204704 / GABL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T66 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03015
Truss Label: T40 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; M1,M5 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/360.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S16030ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
5" 3'0"5 5'7"2 6'0"
"10
5" 2'6"13 2'6"13 5
1'8"5 1'5"9 —{
14=�
12 (TYP) D
=3X4 =3X4
i 6'0"10
1'6"9 2'11"8 1'6"9
2'1"14 1'6"9 4,611 6'0"10 2'1"14
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.001 F 999 360
VERT(CL): 0.001 D 999 240
HORZ(LL): -0.001 B - -
HORZ(TL): 0.002 B
Creep Factor: 2.0
Max TC CSI: 0.613
Max BC CSI: 0.036
Max Web CSI: 0.092
EW Ver: 20.02.01A.1209.10
<G ;
No 70773
STATE OFLOR
i O.t� `.• R P \2
COA#0-2 8 IO N AL
01/11/2022
_(�,19,101,
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
L* 160 /- /- /45 /153 /3E
Wind reactions based on MWFRS
L Brg Wid = 72.6 Min Req = -
Bearing L is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204700 / COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T5 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02880
Truss Label: T41 SSB / DF 01/11/2022
3'0"5
3'0"5
=4X4
12 C
6'0"10
2'1"14 -}- 3'0"5
3'0"5
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fee: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W 1,W 5 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/360.
Wind loading based on both gable and hip roof types
6'0"10
3'0"5
3'0"5
6'0"10 + 2'1"14
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 C 999 360
VERT(CL): 0.002 C 999 240
HORZ(LL): -0.001 D - -
HORZ(TL): 0.001 D
Creep Factor: 2.0
Max TC CSI: 0.284
Max BC CSI: 0.072
Max Web CSI: 0.052
EW Ver: 20.02.01A.1209.10
\\
-N\\A'�?PNDo
No 70773
STATE OF Ir
Fss/O N AL �?\\��
COA#0-2 8 1///11)11111����
01 / 11 /2022
—AV19,101,
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 352 /- /- /168 /221 /209
F 352 /- /- /168 /221 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5
F Brg Wid = 3.5 Min Req = 1.5
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204769 / COMN Ply: 2 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T3 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03111
Truss Label: T42 SSB / DF 01/11/2022
2 Complete Trusses Required
N
T
Loading Criteria (psf) Wind Criteria
TCLL: 20.00 Wind Std: ASCE 7-16
TCDL: 7.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
Des Ld: 37.00 EXP: B Kzt: NA
Mean Height: 30.00 It
NCBCLL: 0.00 TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 It
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W 1,W 5 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 5.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -2.16 to 55 plf at 8.21
BC: From 4 plf at -2.16 to 4 plf at 0.00
BC: From 10 plf at 0.00 to 10 plf at 6.05
BC: From 4 plf at 6.05 to 4 plf at 8.21
BC: 1203 lb Conc. Load at 1.56, 3.56, 5.56
Wind
Wind loads and reactions based on MWFRS.
End verticals exposed to wind pressure. Deflection
meets L/360.
Wind loading based on both gable and hip roof types.
3'0"5
3'0"5
=4X4
12 C
i- V0"10
2-1.14 1 3'0"5
3'0"5
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
6'0"10
3'0"5
T0.5 2-1.14
6'0"10
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.005 G 999 360
VERT(CL): 0.010 G 999 240
HORZ(LL): 0.001 B - -
HORZ(TL): 0.001 B
Creep Factor: 2.0
Max TC CSI: 0.163
Max BC CSI: 0.318
Max Web CSI: 0.141
EW Ver: 20.02.01A.1209.10
<G ;
No 70773
STATE OF
i O.t� `.• R P �\2
IONAL
//II1111\1\
�19'10"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 1807 /- /- /- /1068 /-
F 2447 /- /- /- /1418 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5
F Brg Wid = 3.5 Min Req = 1.5
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 335 - 596 C - D 335 - 596
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
B - H 422 - 687 G - D 621 - 343
B - G 623 - 344 D - F 421 - 686
C - G 394 -192
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204697 / GABL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T45 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00336
Truss Label: T43 SSB / DF 01/11/2022
I
rn
0
1
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
M
2-1"6
(TYP)
i-
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Plating Notes
All plates are 1.5X4 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S16030ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
8,5„
8,5„
=4X4
H
16'10"
16'10"
16'10"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
16'10"
8'5"
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 N 999 360
VERT(CL): -0.002 B 999 240
HORZ(LL): 0.003 N - -
HORZ(TL): 0.003 N
Creep Factor: 2.0
Max TC CSI: 0.384
Max BC CSI: 0.071
Max Web CSI: 0.020
EW Ver: 20.02.01A.1209.10
`\�\\ �PpDO Vj�,/i�i
4.
No 70773
STATE OF
i O.t� `.• R P \2
COA#0-2 8 ///sSIO N AL
2'1 "6
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 340 /- /- /202 /214 /132
N* 102 /- /- /38 /51 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
N Brg Wid = 194 Min Req = -
Bearings B & B are a rigid surface.
Members not listed have forces less than 375#
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204694 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T4 /
FROM: Qty: 3 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03225
Truss Label: T44 SSB / DF 01/11/2022
4'5"14 'i' 8'5" "i 12'4"2
4'5"14 3'11 "2 3'11 "2
2' 1 "6
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
4X4
D
16'10"
8'5"
8'5"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
8'5"
16'10"
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.037 H 999 360
VERT(CL): 0.066 H 999 240
HORZ(LL): -0.014 F - -
HORZ(TL): 0.025 IF
Creep Factor: 2.0
Max TC CSI: 0.308
Max BC CSI: 0.613
Max Web CSI: 0.098
EW Ver: 20.02.01A.1209.10
61 PNDO •V�ti /���i
<G ;
No 70773
* Jr
STATE OF ,Ul
co
COA#0-2 8 10NAI �?���\
0/(ri»1\
01/11/2022
16'10"
4'5"14
2'1"6
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 755 /- /- /388 /454 /117
F 755 /- /- /388 /454 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
F Brg Wid = 4.0 Min Req = 1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 647 -1072 D - E 482 - 824
C - D 482 - 824 E - F 647 -1072
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - H 946 - 477 H - F 946 - 477
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
D - H 435 -150
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
its drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204789 / HIPS Ply: 2 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T49 /
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01067
Page 1 of 2 Truss Label: T45 SSB / DF 01/11/2022
2 Complete Trusses Required
11
5'4"4 6'81 13'4"6 197'
4'11'A + 1'4"� 67'14 1 6'2"10
12
5 F---
4X8 = 3X4
=3X10 .5X5 C D T3
269"10 32'1 "8
62"10 6'314
=5X5 =4X4 =5X8
E F GH
P O N M B2 L K F1IJ
1112X6 =4X8 =3X4 =5X6 =3X10 =7X6 1112X6
32'5"8
5'04 1'8"4 _ 6'4"6 6'6"2
5'0"4 8 13'0"14 197"
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 0.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 28 plf at 0.00 to 28 plf at 32.50
BC: From 10 plf at 0.00 to 10 pit at 32.46
TC: 104 lb Conc. Load at 0.39, 2.39, 4.39
TC: 165 lb Conc. Load at 6.39
TC: 154lb Conc. Load at 8.39,10.39,12.39,14.39
16.39,18.39, 20.39, 22.39, 24.39, 26.39, 28.39, 30.39
32.39
BC: 244 lb Conc. Load at 0.39, 2.39, 4.39
BC: 412 lb Conc. Load at 6.39
BC: 119 lb Conc. Load at 8.39,10.39,12.39,14.39
16.39,18.39, 20.39, 22.39, 24.39, 26.39, 28.39, 30.39
32.39
Hangers / Ties
(J) Hanger Support Required, by others
6'6"2 6'210
26'1"2 32'3"12
32'6"
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): -0.348 D 999 360
Loc R+ / R- / Rh / Rw / U / RL
P 3358 /- /- /- /2312 /-
Lu: NA Cs: NA
VERT(CL): 0.583 D 667 240
Snow Duration: NA
HORZ(LL): -0.073 A - -
J 3029 /- /- /- /1818 /-
HORZ(TL): 0.120 A
Creep Factor: 2.0
Wind reactions based on MWFRS
P Brg Wid = - Min Req = -
Building Code:
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.880
J Brg Wid = 3.5
TPI Std: 2014
Max BC CSI: 0.939
Bearing J is a rigid surface.
Rep Fac: No
Max Web CSI: 0.742
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
A - B 2057 -3014 D - E 2474 -4045
B - C 2158 -3263 E - F 2474 -4045
C - D 2611 - 4161 F - G 1614 - 2680
WAVE
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
End verticals exposed to wind pressure. Deflection
meets L/360.
Wind loading based on both gable and hip roof types.
No 70773
STATE OF ;
G % �tORk
tr \�
COA#0-2 8 ////01111
01/11/2022
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
O - N 3154 - 2133 M - L 4190 - 2640
N - M 3024 - 2021 L - K 2778 -1690
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp.
Webs
Tens. Comp.
A - P
968 -1486
L - F
1397 - 865
A - O
3285 - 2242
F - K
755 - 966
O - B
604 -1123
K - G
2916 -1755
C - N
470 - 324
G - J
916 -1389
C - M
1248 - 647
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
,ient Safety Information, by TPI an SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
cable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
1is drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of s
1 for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINEAN ITW COMPANY
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204789 / HIPS Ply: 2 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T49 /
FROM: Cty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.01067
Page 2 of 2 Truss Label: T45 SSB / DF 01/11/2022
Deflection
Max JT VERT DEFL: LL: -0.34" DL: 0.27". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
00
No 70773
STATE OF ;
j0A FLORtOP',
G jFS,- \ \�
SRO N AL \\\
COA#0-2 8
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_gComponents Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s r'ucture is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
N iTW COMPANY
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204785 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T44 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01692
Truss Label: T46 SSB / DF 01/11/2022
3'6" 8'8"8 13'11"3 18'8"9 23'9"8 24i6" 28'4" 32'2 3�'6"
3'6" 5'2"8 5'2"11 4'9"7 5'0"15 8" 3'10" 3'10" 4
12 == 4X8 =3X4 III 5X5
5 C D E F 1111.5X4 =4X5
G H IJ
-5X5
A B co
in
f-I 3 z 1 _19'10"
S R Q P O N M KL
1.5X6 =3X4 =5X5 =5X8 =3X4 =5X8 1111.5X6
32'5"8
3'2"8 5'6" 4'11' 60"15
3'2"8 8'8"8 13'7"11 18'8"9
Loading Criteria (psf) Wind Criteria
TCLL: 20.00 Wind Std: ASCE 7-16
TCDL: 7.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
Des Ld: 37.00 EXP: B Kzt: NA
Mean Height: 30.00 ft
NCBCLL: 10.00 TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.25 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 4X7 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.19" DL: 0.17". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
5'0"15 3'11"12
23'9"8 28'4" 32'3"12
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.192 D 999 360
VERT(CL): 0.360 D 999 240
HORZ(LL): 0.051 L - -
HORZ(TL): 0.096 L
Creep Factor: 2.0
Max TC CSI: 0.424
Max BC CSI: 0.662
Max Web CSI: 0.572
EW Ver: 20.02.01A.1209.10
`\4.
�\\ �PpDO Vj�,/i�i
<G ;
No 70773
STATE OF
i O.t� `.• R P �\2
IONA
6"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
S 1220 /- /- /593
/662 /108
L 1222 /- /- /574
/682 /-
Wind reactions based on MWFRS
S Brg Wid = - Min Req = -
L Brg Wid = 3.5
Bearing L is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
A - B 1239 - 2298 E - F
1504 - 2641
B - C 1293 - 2373 F - G
1265 - 2267
C - D 1501 - 2622 G - H
737 -1318
D - E 1504 - 2641 H - 1
737 -1318
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
R - Q 2494 -1470 O - N 2120 -1184
Q - P 2144 -1236 N - M 2152 -1206
P - O 2643 -1503
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp
A - S 659 -1181 O - F 644 - 376
A - R 2535 -1366 G - M 628 -1116
R - B 660 -1048 M - 1 1704 - 953
C - P 597 - 312 1 - L 692 -1184
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted oyherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracing installed per BCSI sections B3, B7 or B10,
aid
AppTy plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s r'ucture is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204781 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T42 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.00702
Truss Label: T47 SSB / DF 01/11/2022
6'3"
4'9"
10'8"8 . ! 16'3"
4'5"8 5'6"8
21'9"8 266" 32'2"
4.8"8 5'8"
5X8
12
5F----_
1111.5X4 = 5X8
D E
F
��\
'-
3
T
_5G —4X7
C4
I
5X5z
v =3X8
°D
A B
o
R Q P O N M L X
=3X8 -3X4 =3X4 =5X8 -3X4 —4X7 1111.5X6
1111.5X6
32'5"8
5'11"8 4'9" 5'6"8 5'6"8 5' 5'6"4
f• 5'11"8 108 16'3" 21'9"8 26'9"8 32'3"12
32 6"
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.174 E 999 360
Loc R+ / R- / Rh / Rw
/ U / RL
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.326 E 999 240
R 1220 /- /- /594
/662 /108
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.049 K - -
K 1222 /- /- /578
/676 /-
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.092 K - -
Wind reactions based on MWFRS
NCBCLL: 10.00
Mean Height: 30.00 ft
Building Code:
Creep Factor: 2.0
R Brg Wid = - Min Req = -
Soffit: 2.00
TCDL: 4.0 psf
BCDL: 4.0 psf
P
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.706
K Br Wid = 3.5
g
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.686
Bearing K is a rigid surface.
Members not listed have forces less
than 375#
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Rep Fee: Yes
Max Web CSI: 0.881
Maximum Top Chord Forces Per
Ply (Ibs)
Loc. from endwall: Any
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords
Tens. Comp.
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
VIEW Ver: 20.02.01A.1209.10
A- B 1028 -1928 E - F
1329 -2220
B - C 1411 - 2599 F - G
1222 - 2169
Lumber
C - D 1240 - 2170 G - H
1238 - 2248
Top chord: 2x4 SP #2;
D - E 1329 -2220
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Maximum Bot Chord Forces Per
Ply (Ibs)
Hangers / Ties
Chords Tens.Comp. Chords
Tens. Comp.
(J) Hanger Support Required, by others
Q - P 2397 -1419 N - M
1955 -1063
P - O 2352 -1357 M - L
2350 -1308
Purlins
O - N 1957 -1077
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Maximum Web Forces Per Ply (Ibs)
Wind
Webs Tens.Comp. Webs
Tens. Comp.
Wind loads based on MWFRS with additional C&C
A - R 615 -1159 M - G
279 -451
member design.
A - Q 2220 -1184 G - L
619 - 917
End verticals not exposed to wind pressure.
Q - B 739 -1223 L - H
2446 -1347
C - O 325 -457 H - K
690 -1167
W Ind loading based on both gable and hip roof types.
Deflection
Ddetail
DEFLCAMB 0114 for camber recommendations.
Provide for adequate drainage of roof. \�� ��.��cENa�c•. �S i�i
No 70773 `.
STATE OF &U
NAL
�f 01II I1�
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint o webs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,TW COMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLlneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204777 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T37 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.02770
Truss Label: T48 SSB / DF 01/11/2022
6'9"6 12'8"8 19'9"8 25'8"10 28'6" 32'2"
5'112 TV 5'11"2 2'9"6 3'8"
=5X5
12
=5X8
D
E
�3 5 X4
�3
C
(a)
F
90
=5XC5 =4XH
I in
0
B
o
V
a^a^a A
�19'10"
=4X4(A1) III1.5X4 =5X8 =5X5 =3 4 =4X7 1111.5X6
32'5"8
�- 2'1"6 6'710
6'2"10 6'11"4 6'2"10
29"6 3'6"4
6'710
12'104 19'9"8 26'0"2
28'9"8 37312
H2
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Gravity Non -Gravity
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.155 N 999 360
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.288 N 999 240
B 1352 /- /- /691 1756 /153
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.054 K - -
K 1212 /- /- /580 /664 /-
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.100 K - -
Wind reactions based on MWFRS
NCBCLL: 10.00
Mean Height: 30.00 ft
Building Code:
Creep Factor: 2.0
B Brg Wid = 7.6 Min Req = 1.6
Soffit: 2.00
TCDL: 4.0 psf
BCDL: 4.0 psf
P
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.544
K Br Wid = 3.5 Min Re 1.5
g q =
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.683
Bearings B & K are a rigid surface.
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Rep Fee: Yes
Max Web CSI: 0.552
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Loc. from endwall: Any
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
VIEW Ver: 20.02.01A.1209.10
B - C 1336 -2482 E - F 1141 -1986
C - D 1136 -1967 F - G 1376 - 2489
Lumber
D - E 1114 -1770 G - H 1212 - 2224
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Bracing
B - P 2224 -1233 N - M 2270 -1247
(a) 1x4 "T" reinforcement. 80% length of web
P - O 2221 -1235 M - L 2395 -1315
member. Same species & grade or better, attached
O - N 1779 - 911
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
Purlins
C - O 366 - 509 G - L 620 -1035
In lieu of structural panels use purlins to brace all flat
D - O 437 -112 L - H 2447 -1333
TC @ 24" oc.
E - N 446 -106 H - K 669 -1165
W d
N - F 373 -544
m
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
\�\�\(�Q���GENdF•�'9�/�ji
(C
No 70773 `
STATE OF
-0'n�,• ��ORt,DV-
Ss�ONAL
COA#0-2 8 111111111�
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing BCSI. Unless noted oyherwise, top chord shall have attached structural sheathing and bottom chord shall have a
per proper) properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracing installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in ANSI/TPI 1, for handling, installation bracin trusses. A this drawin
AN,TW CGMPANY
conformance with or shipping,, and of seal on or cover page
listing this drawin indicates acceptance of professional encLlneering responsibility solely -for the design shown. The suitability and use of g is
Iucture -Designer
6750 Forum Drive
Suite 305
drawing for any s is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL, 32821
SEQN: 204773 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T40 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00731
Truss Label: T49 SSB / DF 01/11/2022
7'8"15 _ _ 14'8"8 _ _ 17'9"8 _ _ 248"10
7'8"15 6'11"9 3.1" 6'11"2
f-2,1"6 I T'77"1"100
7
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
=5X5 =5X8
D E
32'5"8
77' 0 2'11"4 7710
14'10"4 17'9"8 25'0"2
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.153 N 999 360
VERT(CL): 0.283 N 999 240
HORZ(LL): 0.058 K - -
HORZ(TL): 0.108 K
Creep Factor: 2.0
Max TC CSI: 0.607
Max BC CSI: 0.708
Max Web CSI: 0.785
EW Ver: 20.02.01A.1209.10
\\
-N Al
No 70773
STATE OF Ir
Fss/O N AL �?\\��
COA#0-2 8 1///1()11111����
01 / 11 /2022
32'6"
48
30'6" + 32'1
5'9"6 1'7"
L
�19'10"
TY10
32712
4
2"',
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1352 /- /- /678 1756 /162
K 1212 /- /- /584 /660 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.6
K Brg Wid = 3.5 Min Req = 1.5
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1324 - 2456 E - F 1058 -1798
C - D 1053 -1788 F - G 1359 - 2487
D - E 1042 -1586 G - H 1115 - 2059
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
B - P 2196 -1164 N - M 2240 -1193
P-0 2192 -1165 M-L 2411 -1331
O - N 1586 - 740
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp.
Webs Tens. Comp.
C - O
475 - 678
G - L 709 -1154
D - O
409 -170
L - H 2337 -1265
E-N
415 -171
H-K 633 -1169
N - F
501 - 723
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204757 / COMN Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T32 /
FROM: Qty: 4 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02363
Truss Label: T50 SSB / DF 01/11/2022
5'9"7 10'Z'14 _i_ 16'3"
5'9"7 5'2"6 5'3"2
=5X5
E
32'6"
21'6"2 26'8"8 32V'
5'3"2 T 5'2"6 5'9"7
2'V6 84"14 7'10"2 i 7'10"2 84"14 2'1"6
8'4"14 16'3" 24'1"2 32'6"
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Rep Fee: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.159 K 999 360
VERT(CL): 0.292 K 999 240
HORZ(LL): 0.058 H - -
HORZ(TL): 0.107 H
Creep Factor: 2.0
Max TC CSI: 0.504
Max BC CSI: 0.753
Max Web CSI: 0.483
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF %Al
COA#0-2 8 sS,O N AL �?\\\\
�8ir) ij((\��
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1344 /- /- /667 1750 /193
H 1344 /- /- /667 /750 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.6
H Brg Wid = 4.0 Min Req = 1.6
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1367 - 2474 E - F 994 -1613
C - D 1264 - 2255 F - G 1264 - 2255
D - E 994 -1613 G - H 1367 - 2474
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - L 2224 -1130 K - J 1859 - 855
L - K 1859 - 855 J - H 2224 -1130
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
L - D 426 -131 K - F 421 - 563
D - K 421 - 563 F - J 426 -131
E - K 911 - 505
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204766 / COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T41 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03406
Truss Label: T50A SSB / DF 01/11/2022
5'9"7
5'9"7
�- 2,1"6 8'4"14
8'4"14
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
10'11"14 16'3"
57"6 5'3"2
7'10"2
16'3"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
5X5
E
32'6"
21'6"2 26'8"8 32'6"
5'3"2 T 5'2"6 5'9"7
T10"2
24'1"2
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.157 J 999 360
VERT(CL): 0.291 J 999 240
HORZ(LL): 0.058 H - -
HORZ(TL): 0.107 H
Creep Factor: 2.0
Max TC CSI: 0.508
Max BC CSI: 0.768
Max Web CSI: 0.496
EW Ver: 20.02.01A.1209.10
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
01111111� �a
8'4"14
32'6"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1348 /- /- /666 1753 /172
H 1217 /- /- /591 /660 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.6
H Brg Wid = 4.0 Min Req = 1.5
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1375 - 2485 E - F 1002 -1623
C - D 1272 - 2267 F - G 1296 - 2297
D - E 1002 -1624 G - H 1408 - 2526
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - K 2234 -1181 J - 1 1880 - 915
K - J 1869 - 906 1 - H 2279 -1217
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
K - D 426 -131 J - F 433 - 578
D - J 421 - 563 F - I 436 -156
E - J 917 - 510
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
lent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204760 / COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T6 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00088
Truss Label: T50B SSB / DF 01/11/2022
5'9"7
5'9"7
=4.
8'4"14
8'4"14
10'11"14 + 16'3"
5'2"6 5'3"2
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 It
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.25 It
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
5X5
D
32'6"
T10"2
16'3"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
21'6"2 26'8"8 32'6"
5'3"2 5'2"6 5'9"7
T10"2
24-1"2
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.157 J 999 360
VERT(CL): 0.291 J 999 240
HORZ(LL): 0.058 G - -
HORZ(TL): 0.107 G
Creep Factor: 2.0
Max TC CSI: 0.507
Max BC CSI: 0.775
Max Web CSI: 0.498
EW Ver: 20.02.01A.1209.10
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
01111111� �a
84"14 2'1"6-
32'6"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1216 /- /- /591
/659 /172
G 1349 /- /- /667
/754 /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
G Brg Wid=4.0
Bearing G is a rigid surface.
Members not listed have forces less
than 375#
Maximum Top Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
A - B 1414 - 2536 D - E
1003 -1626
B - C 1301 - 2304 E - F
1274 - 2268
C - D 1003 -1625 F - G
1377 - 2487
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - K 2289 -1180 J - 1 1871 - 864
K - J 1884 - 874 I - G 2236 -1140
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
K - C 440 -159 J - E 421 - 563
C - J 434 - 580 E - I 426 -132
D-J 919 -511
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
lent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204763 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T38 /
FROM: Qty: 3 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01773
Truss Label: T51 SSB / DF 01/11/2022
5'9"7
5'9"7
1 "1"14 16'3"
5'2"6 5'3"2
5X5
E
32'2"
21'6"2 i 26'8"8 32'2"
5'3"2 5'2"6 657
�- 2'1"6 8'4"14 T10"2 T10"2
8'4"14 163" 24'1"2
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.163 J 999 360
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.303 J 999 240
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.065 H - -
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.121 H
Building Code:
NCBCLL: 10.00
Mean Height: 30.00 ft
Creep Factor: 2.0
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.623
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.896
Spacing: 24.0 "
C&C Dist a: 3.22 ft
Rep Fac: Yes
Max Web CSI: 0.483
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types
���PNDO •V�ti
<G ;
No 70773
STATE OF I
co
to
COA#0-2 8 /ON0/11111 AI \\\���\
8'0"14
32'2"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1337 /- /- /661 1753 /169
H 1203 /- /- /585 /657 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.6
H Brg Wid= -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1369 - 2457 E - F 994 -1597
C - D 1266 - 2238 F - G 1247 - 2191
D - E 994 -1597 G - H 1347 - 2396
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - K 2209 -1183 J - 1 1826 - 900
K - J 1844 - 907 1 - H 2143 -1161
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
K - D 425 -131 J - F 414 - 539
D - J 424 - 563 F - I 377 -113
E - J 900 - 504
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204754 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T34 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00998
Truss Label: T52 SSB / DF 01/11/2022
=4.
7'8"2 14'6" 18' 24'9"14
7'8"2 6.9"15 3'5"15 6'9"15
7'6"6
7'6"6
=5X8 =5X5
C D
32'6"
7'8"2
III 1.0- -0- -,AB III I.0A
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
32'6"
1 477,6"6 I 2'1 "6
0 32'6"146"4 4'1"10 —
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.150 J 999 360
Loc R+ / R- / Rh / Rw / U / RL
A 1216 /- /- /589 /661 /156
Lu: NA Cs: NA
VERT(CL): 0.278 J 999 240
Snow Duration: NA
HORZ(LL): 0.059 F - -
F 1349 /- /- /677 /755 /-
HORZ(TL): 0.110 F
Creep Factor: 2.0
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
Building Code:
FBC 7th Ed. 2020 Res.
Max TICCSI: 0.641
F Brg Wid = 4.0
TPI Std: 2014
Max BC CSI: 0.688
Bearing F is a rigid surface.
Rep Fac: Yes
Max Web CSI: 0.746
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
A - B 1358 -2494 D - E 1059 -1796
B - C 1065 -1807 E - F 1326 - 2454
WAVE
C - D 1047 -1595
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
A - K 2238 -1109 1 - H 2191 -1078
K - J 2233 -1111 H - F 2195 -1076
J-1 1593 -656
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
B - J 502 - 708 1 - D 409 -163
C - J 412 -173 1 - E 469 - 667
No 70773
STATE OF ; %Jr
O'" ?
c�OR1Oq'•
COA#0-2 8 s/ANAL
/llllllll�
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
lent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of TIN Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
AN ITW COMPANY
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204750 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T36 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02032
Truss Label: T53 SSB / DF 01/11/2022
=4:
7'0"6
7'0"6
6'10"10
6'101,10
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
13'2"8 1 13'11" 20'
6'2"2 8" 6'1"
5X5
=5X5 _5X5
C n F
32'6"
6'3"14 + 6'7"12
13'2"8 19'10"4
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
25'9"14
5'9"15
6'1 "7
25'11"10
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.164 D 999 360
VERT(CL): 0.304 D 999 240
HORZ(LL): 0.060 G - -
HORZ(TL): 0.111 G
Creep Factor: 2.0
Max TC CSI: 0.544
Max BC CSI: 0.687
Max Web CSI: 0.500
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF
F�ORt�P'�
111110
01/11/2022
32'6"
6'8"2
32'6"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1216 /- /- /588
/659 /145
G 1349 /- /- /682
/755 /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
G Brg Wid=4.0
Bearing G is a rigid surface.
Members not listed have forces less
than 375#
Maximum Top Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
A - B 1369 - 2516 D - E
1118 -1776
B-C 11 18 -1928 E-F
1142 -1973
C - D 1141 -1821 F - G
1340 - 2478
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
A - L 2261 -1127 J - 1 2219 -1100
L - K 2257 -1129 I - G 2222 -1098
K - J 1815 - 800
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp. Webs Tens. Comp.
B - K
436 - 598 J - E 439 -130
C - K
1121 - 623 J - F 363 - 501
K - D
492 - 738
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204746 / SPEC Ply: 1
FROM: Qty: 1
To"6
7'0"6
T 12
5 �
3X4
rn B
0
in
1 48 A
=4X4(A1) M 1111.5X4
Job Number: 21-0845
/GROZA BUILDERS, INC. / /ROE RESIDENCE
Truss Label: T54
13'2"8 15'11" 22' 26'9"14 32'6"
6,2"2 2,8"8 6'1" 4,9"15 5'8"2
5X5
C
J__
=5X8
E
a 3X4
F
6'1010 + 6'3"14
6'1010 132"8
L K
=3X8 =5X5
32'6"
'3' + 59"8
162"8 22,
=3X4 1111.S714
4'11"11 + 5'6"6
26" 1"10 32'6"
Cust: R761 JWAXW610013 T28 /
Dnallo: 011.22.1354.00096
SSB / DF 01/11/2022
G
2'1"6-
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Gravity Non -Gravity
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.179 D 999 360
Loc R+ / R- / Rh / Rw
/ U / RL
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.332 D 999 240
A 1216 /- /- /588
/659 /145
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.061 G - -
G 1349 /- /- /680
/755 /-
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.113 G - -
Wind reactions based on MWFRS
NCBCLL: 10.00
Mean Height: 30.00 ft
Building Code:
Creep Factor: 2.0
A Brg Wid = - Min Req = -
Soffit: 2.00
TCDL: 4.0 psf
BCDL: 4.0 psf
P
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.552
G Br Wid = 4.0
g
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.805
Bearing G is a rigid surface.
Members not listed have forces less
than 375#
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Rep Fee: Yes
Max Web CSI: 0.514
Maximum Top Chord Forces Per
Ply (Ibs)
Loc. from endwall: Any
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords
Tens. Comp.
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
VIEW Ver: 20.02.01A.1209.10
A- B 1369 -2520 D - E
1316 -2187
Lumber
B - C 1117 -1920 E - F
1223 - 2144
C - D 1145 -1872 F - G
1347 - 2493
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Maximum Bot Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
Hangers / Ties
A - M 2265 -1128 K - J
1937 - 889
(J) Hanger Support Required, by others
M - L 2261 -1130 J - 1
2238 -1117
L - K 2195 -1031 I - G
2240 -1115
Purlins
In lieu of structural panels use purlins to brace all flat
Maximum Web Forces Per Ply (Ibs)
TC @ 24" oc.
Webs Tens.Comp. Webs
Tens. Comp.
Wind
B -L 441 -615 L-D
575 -941
Wind loads based on MWFRS with additional C&C
C - L 1174 -650
member design.
Wind loading based on both gable and hip roof types
oW11111/o/
No 70773
STATE OF %A/
��'n�•• ��ORtOP'�C9?��
COA#0-2 8 Ss�ONAL �0
0 1111111� �a
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing BCSI. Unless noted otherwise, top chord shall have attached structural sheathing and bottom chord shall have a
per proper) properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
Apply face truss Details, Refer
as applicable. plates to each of and position as shown above and on the Join unless noted otherwise. to
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ALPINE
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
truss in ANSI/TPI 1, for handling, installation bracin trusses. A this drawin
AN,TW CGMPANY
conformance with or shipping,, and of seal on or cover page
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is
Iucture -Designer
6750 Forum Drive
Suite 305
drawing for any s is the responsibility of the Building per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org
Orlando FL, 32821
SEQN: 212137 SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T30
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1415.46023
Truss Label: T55 SSB / FV 01/11/2022
=4
7'0"6
7'0"6
13'2"8 17'11"
6'2"2 4'8"8
=5X5
C
24' 2T11"10 3Z6"
6'1" 3'11"11 4'6"6
5
12 =5X5 =4X8
D E
3X4
B T
1.5X4
F
A G ro
T19'10"
X4(A1) =5X5 =3X8 =5X5 =3X4 =4X4(A1)
32'6"
6'10"10 6'3"14 5' 5'9"8 8'6"
r 6'10"10 13'2"8 18'2"8 24' 32'6"
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.25 ft
Rep Fac: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SIP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.202 D 999 360
VERT(CL): 0.380 D 999 240
HORZ(LL): 0.063 G - -
HORZ(TL): 0.119 G
Creep Factor: 2.0
Max TC CSI: 0.638
Max BC CSI: 0.749
Max Web CSI: 0.756
EW Ver: 20.02.01A.1209.10
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
01111111� �a
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1221 /- /- /589
/663 /119
G 1222 /- /- /588
/665 /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
G Brg Wid=4.0
Bearing G is a rigid surface.
Members not listed have forces less
than 375#
Maximum Top Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
A - B 1377 - 2528 D - E
1565 - 2676
B - C 1127 -1935 E - F
1305 - 2336
C - D 1137 -1912 F - G
1448 - 2557
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
A - K 2273 -1178 1 - H 2126 -1051
K - J 2269 -1180 H - G 2312 -1263
J -1 2696 -1381
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
B - J 436 - 606 J - D 751 -1229
C - J 1135 - 602 1 - E 648 - 367
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204731 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T29 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01425
Truss Label: T56 SSB / DF 01/11/2022
7'0"6
TO"6
132"8 19111"
67"2 6'8"8
=4X5
C
26' 32,2„
6'1" 6,7,
4X4(A1) 1111.5X4 =6X8 -5X5 B3 G =4X4(B1)
III1.5X4
6'10"10
6'10"10
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.22 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Hangers / Ties
Simpson Construction Hardware is specified based on
the most current information provided by Simpson
Strong -Tie. Please refer to the most recent Simpson
Strong -Tie catalog for additional information.
Recommended hanger connections are based on
manufacturer tested capacities and calculations.
Conditions may exist that require different connections
than indicated. Refer to manufacturer publication for
additional information.
(J) Hanger Support Required, by others
Bearing F (31'11", 19'10") HUS26
Supporting Member: (2)2x6 SP #2
(14)1 148"X3" nails into supporting
member,
(4) 0.148"x3" nails into supported
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
327'
6'3'14 7' 57'12
13'2"8 T 207'8 25'10"4
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Pf: NA Ce: NA
VERT(LL): 0.251 D 999 360
Lu: NA Cs: NA
VERT(CL): 0.472 D 811 240
Snow Duration: NA
HORZ(LL): 0.066 F - -
HORZ(TL): 0.124 IF
Building Code:
Creep Factor: 2.0
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.676
TPI Std: 2014
Max BC CSI: 0.854
Rep Fee: Yes
Max Web CSI: 0.682
FT/RT:20(0)/5(0)
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
WAVE
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types
�N,�\Q'�P,cD
No 70773 `.
STATE OF
i�i,�.�•' c�OR1Oq.',O�
COA#0-2 8 s/ANAL �?��
/))lull\\
01/11/2022
6712
32'2"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1209 /- /- /584
/661 /119
F 1208 /- /- /580
/662 /-
Wind reactions based on MWFRS
A BrgWid= -
F BrgWid= -
Members not listed have forces less than 375#
Maximum Top Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
A - B 1367 - 2495 D - E
1869 - 3259
B-C 1126-1918 E-F
1313 -2396
C-D 1118 -1921
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
A-J 2242 -1176 H-G 2145 -1119
J - 1 2238 -1177 G - F 2142 -1123
I- H 3302 -1757
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
B - 1 422 - 585 D - H 342 - 407
C - 1 1059 - 532 H - E 1237 - 669
I - D 1040 -1723
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
lent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d ngid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
I for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204735 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T27 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1353.59877
Truss Label: T57 SSB / DF 01/11/2022
7'0"6 13'2"8 19'4"10 21'11" 24'11"8 28' 32'2"
7'0"6 6'2"2 6'2"2 2'6"5 3'0"8 3'0"8 4'2"
=4X5
C
4X4(A1) 1111.5X4 =5X8 =5X6 1111.5X4 B3 III1.5X4 =4X4(B1)
=3X12
6'10"10
6'101,10
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.22 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc
or (1) continuous lateral restraint equally spaced on
member.
Hangers / Ties
Simpson Construction Hardware is specified based on
the most current information provided by Simpson
Strong -Tie. Please refer to the most recent Simpson
Strong -Tie catalog for additional information.
Recommended hanger connections are based on
manufacturer tested capacities and calculations.
Conditions may exist that require different connections
than indicated. Refer to manufacturer publication for
additional information.
(J) Hanger Support Required, by others
Bearing H (31'11", 19'10") HUS26
Supporting Member: (2)2x6 SP #2
(14) 0.148"x3" nails into supporting
member,
(4) 0.148"x3" nails into supported
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
UY14
13'2"8
32'2"
6'5"10 2'4"9
19'8"2 22'0
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
2'10"I 2'10"12 4'3"12
24'11"8 27'10"4 32'2"
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.286 L 999 360
VERT(CL): 0.538 L 712 240
HORZ(LL): 0.070 C - -
HORZ(TL): 0.132 C
Creep Factor: 2.0
Max TC CSI: 0.701
Max BC CSI: 0.801
Max Web CSI: 0.556
EW Ver: 20.02.01A.1209.10
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
���� �PNDO •V/ti //��i
<G ;
No 70773 ', *
STATE OF
F40RIOP'
10 IN
COA#0-2 8 0/ O1111 \0
01/11/2022
T
f7
tV
a^a 1 �19'10"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1209 /- /- /584
/661 /119
H 1208 /- /- /580
/662 /-
Wind reactions based on MWFRS
A BrgWid= -
H BrgWid= -
Members not listed have forces less than 375#
Maximum Top Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
A - B 1368 - 2497 E - F
1924 - 3396
B - C 1124 -1915 F - G
1924 - 3396
C - D 1120 -1912 G - H
1300 - 2364
D - E 1950 - 3465
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
A - N 2243 -1177 K - J 4210 - 2268
N - M 2239 -1179 J - 1 2113 -1123
M-L 3119-1654 1 - H 2117 -1130
L - K 4210 - 2270
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp
B - M 427 - 590 L - E 768 -1344
C - M 1071 - 548 E - J 527 - 968
M - D 954 -1565 J - G 1524 - 834
D - L 1000 - 467
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204630 / SPEC Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T15 /
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01311
Page 1 of 2 Truss Label: T58 SSB / DF 01/11/2022
TOT
TOT
13'2"8 19'4"10
6'2"2 67"2
4X4
C
23'11" _ � 26'6"131, 29'2"2 1. 3Z2"
4'6"5 2'7"13 2'7"5 2'11"13
�T m 19'10"
=4X4(A1) O N M L B3 K J I
1111.5X4 =5X8 =6X10 -4X4 =3X8 =3X10 III1.5X6
6'10"l0
6'10"10
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.22 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1 x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 pIf at 0.00 to
55 pIf at
26.48
TC: From 28 pIf at 26.48 to
28 pIf at
32.17
BC: From 20 pIf at 0.00 to
20 pit at
26.48
BC: From 10 pIf at 26.48 to
10 pIf at
32.17
TC: 53 lb Conc. Load at 26.48
TC: 22 lb Conc. Load at 28.37,30.37
BC: 40 lb Conc. Load at 26.48
BC: 35 lb Conc. Load at 28.37,30.37
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
327'
6'3"14
13'2"8
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
6'5"10 4'6"5
19'8"2 24'78
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.436 E 881 360
VERT(CL): 0.818 E 469 240
HORZ(LL): 0.108 C - -
HORZ(TL): 0.203 C
Creep Factor: 2.0
Max TC CSI: 0.650
Max BC CSI: 0.882
Max Web CSI: 0.631
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF ;
j�ic� FLORkOix
COA#0-2 8 ////01111
01/11/2022
2'8"5 2'8"13 _ 2'6"5
?6'10"1 29'7"10 32'2"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1221 /- /- /-
/676 /-
1 1191 /- /- /-
/681 /-
Wind reactions based on MWFRS
A BrgWid= -
I BrgWid= -
Members not listed have forces less
than 375#
Maximum Top Chord Forces Per
Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
A - B 1424 - 2527 E - F
3571 - 6379
B - C 1102 -1943 F - G
2721 - 4817
C - D 1101 -1942 G - H
1473 - 2588
D - E 2016 - 3598
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
A - O 2271 -1258 M - L 6551 - 3681
O - N 2267 -1260 L - K 5024 - 2851
N - M 3217 -1799 K - J 2857 -1637
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp.
Webs
Tens. Comp.
B - N
333 - 593
L - F
1501 - 798
C - N
1100 - 487
F - K
517 - 827
N - D
930 -1647
K - G
2170 -1200
D - M
1015 - 454
G - J
656 -1072
M - E
1909 - 3365
J - H
2795 -1589
E - L
437 - 682
H - 1
671 -1150
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
lent Safety Information, by TPI an SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
tl rigid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
cable. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
1is drawin indicates acceptance of professional engineering responsibility solely -for the design shown. The suitability and use of s
1 for any s ructure is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204630 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T15 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.01311
Page 2 of 2 Truss Label: T58 SSB / DF 01/11/2022
Hangers / Ties
Simpson Construction Hardware is specified based on
the most current information provided by Simpson
Strong -Tie. Please refer to the most recent Simpson
Strong -Tie catalog for additional information.
Recommended hanger connections are based on
manufacturer tested capacities and calculations.
Conditions may exist that require different connections
than indicated. Refer to manufacturer publication for
additional information.
(J) Hanger Support Required, by others
Bearing 1 (3111", 19'10") HUS26
Supporting Member: (2)2x6 SP #2
(14) 0.148"x3" nails into supporting
member,
(4) 0.148"x3" nails into supported
member.
N
f ' No 70773
Ir
'I*TJ STATE OFZZ
Z
G S/O N A1.
COA#0-2 8 r j j I II 110\\
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional enSeering responsibility solely -for the design shown. The suitability and use of fhis
any s r'ucture is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
N iTW COMPANY
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204727 / COMN Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T20 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02802
Truss Label: T59 SSB / DF 01/11/2022
rn
0
rq
a;s
7'0"6 13'2"8
7'0"6 67"2
=4X4
D
26'5"
19'4"10 26'5"
6'2"2 7'0"6
6'1010 6'3"14 6'3"14
21"6 6'10"10 1 i` 13'2"8 19'6"6
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.054 1 999 360
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.101 1 999 240
BCDL: 10.00
Risk Category: 11
Snow Duration: NA
HORZ(LL): 0.018 F - -
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.033 F
Building Code:
NCBCLL: 10.00
Mean Height: 30.00 ft
Creep Factor: 2.0
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.458
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.722
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fee: Yes
Max Web CSI: 0.493
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types
���PNDO •V�ti
<G ;
No 70773
STATE OF
co
to
6'10"10
26'5"
♦ Maximum Reactions (Ibs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 919 /- /- /466 /557 /137
J* 186 /- /- /91 /106 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
J Brg Wid = 76.6 Min Req = -
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B-C 817 -1415 D-E 572 -838
C - D 570 -836 E - F 305 -458
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - I 1244 - 654 H - G 386 - 201
I - H 1240 - 656
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
C - H 437 - 590 E - G 486 - 677
H - E 387 - 76
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s r'ucture is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204723 / SPEC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T17 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02592
Truss Label: T60 SSB / DF 01/11/2022
6'4"15 13'2"8 20'2"4 25'8"5 28'5"
6'4"15 6'9"9 6'11"12 5'6"2 2'8"10,
=4X5
D
28'5"
6'33 6'11 "5 6'11 "5
�— 2'1 "6
6'33 13'2"8 20'1"13
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.249 H 999 360
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.451 H 739 240
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.061 D - -
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.110 D
Building Code:
NCBCLL: 10.00
Mean Height: 30.00 ft
TCDL: 4.0 psf
Creep Factor: 2.0
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.537
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.695
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Max Web CSI: 0.549
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2; T3 2x8 SP SS Dense;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
No 70773
STATE OF ; %Ir
O'" ?
c�OR1Oq',
COA#0-2 8 s/ANAL
/llllllll�
01/11/2022
5'6"8 2'8"10
25'8"5 528'5"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1180 /- /- /567 1701 /163
G 1024 /- /- /471 /636 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
G Brg Wid = 6.0 Min Req = 1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1191 - 2091 E - F 1389 - 2417
C - D 936 -1514 F - G 255 - 383
D - E 934 -1526
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - J 1870 - 959 1 - H 2334 -1230
J - 1 1867 - 961 H - F 2339 -1241
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
C - 1 428 - 573 I - E 708 -1062
D -I 726 -349
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204634 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T7 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03056
Truss Label: T61 SSB / DF 01/11/2022
6'4"15 11' 11 "10 14'5"6
6'4"15 5'6"11 2-5"12
�— 2'1"6 6'3"3
6'3"3
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2; T4 2x8 SP SS Dense;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
=4X7 =4X5
D E
28'5"
207.4 25'8"5 28'5"
5'8"14 5'6"2 2'8"10
5'8"7 2'4" 510"3 56"8 2'8"10
11'1110 14'3"1 20'113 25'8"5 28'5"
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.242 1 999 360
Loc R+ / R- / Rh / Rw / U / RL
B 1180 /- /- /575 1703 /153
Lu: NA Cs: NA
VERT(CL): 0.438 1 760 240
Snow Duration: NA
HORZ(LL): 0.058 D - -
H 1024 /- /- /469 /640 /-
HORZ(TL): 0.105 D
Creep Factor: 2.0
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
Building Code:
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.503
H Brg Wid = 6.0 Min Req = 1.5
TPI Std: 2014
Max BC CSI: 0.639
Bearings B & H are a rigid surface.
Rep Fac: Yes
Max Web CSI: 0.689
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
B - C 1191 -2081 E - F 1000 -1619
C - D 985 -1583 F - G 1387 - 2403
WAVE
D - E 987 -1436 G - H 256 - 383
No 70773
STATE OF %40
i O.t� `.• R P �\2
COA#0-2 8 sLOR
SIO N AL
8011111
01/11/2022
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
B - L 1860 - 956 J - 1 2319 -1226
L - K 1856 - 958 I - G 2324 -1236
K - J 1402 - 616
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
C - K 380 - 504 J - F 644 - 970
J-E 391 -174
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
lent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204720 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T16 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01047
Truss Label: T62 SSB / DF 01/11/2022
5'3"3
5'3"3
9111"10 16'5"6
4'8"7 6'5"12
=4X8
D
28'5"
9111"10 6'4"
�— 2'1 "6 9111"10 16'3"10
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2; T4 2x8 SP SS Dense;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
5X5
E
'2"4 25'8"5 28'5"
20NT"11 5'6"2 2'8"10
3'10"3 56"8 2'8"10
20'1"13 25'8"5 28'5"
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
VERT(LL): 0.237 1 999 360
Loc R+ / R- / Rh / Rw / U / RL
B 1180 /- /- /586 1705 /136
VERT(CL): 0.428 1 778 240
HORZ(LL): 0.055 D - -
H 1024 /- /- /469 /641 /-
HORZ(TL): 0.099 D
Wind reactions based on MWFRS
Creep Factor: 2.0
B Brg Wid = 7.6 Min Req = 1.5
Max TC CSI: 0.536
H Brg Wid = 6.0 Min Req = 1.5
Max BC CSI: 0.870
Bearings B & H are a rigid surface.
Max Web CSI: 0.272
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
VIEW Ver: 20.02.01A.1209.10
B - C 1249 -2062 E - F 1147 -1851
C - D 1060 -1775 F - G 1360 - 2366
D - E 1107 -1677 G - H 257 - 383
\\
-N\\A'�?PNDo
No 70773
STATE OF Ir
Fss/O IN AL
�?\\��
COA#0-2 8 1///1()11111����
01 / 11 /2022
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - K 1851 -1014 J - 1 2278 -1196
K - J 1599 - 739 I - G 2285 -1205
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
D - K 403 -48 J - F 466 -729
J-E 452 -181
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204716 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T18 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01938
Truss Label: T63 SSB / DF 01/11/2022
7'11"10 A, 13'2"8 18'5"6 1 20'2"4_ 25'8"5 28'5"
T11"10 T 5'2"14 52"14 1'8"1 5'6"2 2'8"10
—2,1"6 1- 8'1"6
8'1"6
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2; T4 2x8 SP SS Dense;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
=4X8
C
1111.5X4 =4X7
D E
28'5"
5'1"2 5'2"14 1'8"7 5'6"8 2'8"10
13'2"8 18'5"6 20'1" 3 25'8"5 28'5"
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
Pf: NA Ce: NA
VERT(LL): 0.242 1 999 360
Loc R+ / R- / Rh / Rw / U / RL
B 1180 /- /- /593 1706 /119
Lu: NA Cs: NA
VERT(CL): 0.438 1 760 240
Snow Duration: NA
HORZ(LL): 0.054 C - -
H 1024 /- /- /475 /643 /-
HORZ(TL): 0.098 C
Creep Factor: 2.0
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
Building Code:
FBC 7th Ed. 2020 Res.
Max TIC CSI: 0.632
H Brg Wid = 6.0 Min Req = 1.5
TPI Std: 2014
Max BC CSI: 0.657
Bearings B & H are a rigid surface.
Rep Fac: Yes
Max Web CSI: 0.180
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
B - C 1144 -1991 E - F 1318 -2137
C - D 1343 - 2131 F - G 1358 - 2365
WAVE
D - E 1343 - 2131 G - H 257 - 383
�\\\\NAl
No 70773
STATE OF Ir
Fss/O IN AL
�?\\��
COA#0-2 8 1///1()11111����
01 / 11 /2022
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp
B - L 1762 - 888 J - 1 2274 -1193
L - K 1768 - 886 1 - G 2283 -1202
K - J 1922 - 976
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
C - K 432 - 286 J - F 368 - 598
E - J 558 - 284
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
lent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
1is drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204712 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T14 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00419
Truss Label: T64 SSB / DF 01/11/2022
T
51111,10 i 13'2"8
51111,10 7'2"14
20'5"6
7'2"14
=4X8 II 1.5X4 =4X8
12 C D E
26'5"
5'111,10
5 T
0
B F
7
A G19'10"
3X5(A1) III 1.5X4 = 5X8 III 1.5X4 =3X5(A1)
6'1 "6
2'V6 6'16
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
26'5"
T1"2
13'2"8
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
T1"2
20'3"10
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.182 D 999 360
VERT(CL): 0.332 D 944 240
HORZ(LL): 0.040 F - -
HORZ(TL): 0.074 IF
Creep Factor: 2.0
Max TC CSI: 0.679
Max BC CSI: 0.603
Max Web CSI: 0.547
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF
i O.t� `.• R P �\2
IONAL
//II1111\1\
6'1"6
22'1"6
6'5"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1115 /- /- /576 /667 /96
F 1115 /- /- /576 /667 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
F Brg Wid = 6.0 Min Req = 1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - C 1114 -1950 D - E 1569 - 2569
C - D 1569 - 2569 E - F 1114 -1950
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - J 1743 - 893 I - H 1749 - 890
J -1 1749 - 890 H - F 1743 - 893
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp. Webs Tens. Comp.
C - 1 870 - 561 D - I 418 -429
I- E 870 -561
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
Is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
its drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204708 / HIPS Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T19 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.01190
Truss Label: T65 SSB / DF 01/11/2022
3'11"10
3'11"10
12 =5X12
5 C
T
N
B
a^e„a A
-3X8(B1) 1111.5X4
2'1"6 4'16
4'16
8'9"11 13'2"8
4'10"1 4'4.13
-3p4 T2
=3 8
4'4"5 4'8"13
8.5"11 13'2.8
177"5
22'5"6
4'4"13
=5X5 =3X4
E F T3
4'10"1
=5X12
G
=3X8 =H0510
1111.5X4
- 26'5"
5
4'4"13
17'10"13
22'3"10
26'5"
3'11"10
T
H
�\ N _419'10"
5(Al) 1
4'1 "6
25" 2'1"6
6
Loading Criteria (psf)
P
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactions (Ibs)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
Gravity Non -Gravity
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.383 E 817 360
Loc R+ / R- / Rh / Rw / U / RL
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.700 E 447 240
B 1685 /- /- /- /1008 /-
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.063 C - -
H 1605 /- /- /- /960 /-
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.115 C - -
Wind reactions based on MWFRS
NCBCLL: 10.00
Mean Height: 30.00 ft
Building Code:
Creep Factor: 2.0
B Brg Wid = 7.6 Min Req = 1.5
Soffit: 2.00
TCDL: 4.0 psf
BCDL: 4.0 psf
P
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.600
H Br Wid = 6.0 Min Re 1.5
g q =
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.570
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Varies by Ld Case
Max Web CSI: 0.513
Maximum Top Chord Forces Per Ply (Ibs)
Loc. from endwall: Any
FT/RT:20(0)/5(0)
Chords Tens.Comp. Chords Tens. Comp.
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE, HS
VIEW Ver: 20.02.01A.1209.10
B - C 1892 -3314 E - F 3219 -5603
Lumber
C - D 2859 -4986 F - G 2801 -4886
D - E 3219 - 5603 G - H 1780 - 3125
Top chord: 2x4 SP #2; T2,T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
Special Loads
B - N 3003 -1701 L - K 4980 -2880
-----(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
N - M 3015 -1690 K - J 2838 -1587
TC: From 55 plf at -2.11 to 55 plf at 3.97
M - L 5075 -2935 J - H 2829 -1597
TC: From 28 plf at 3.97 to 28 plf at 22.45
TC: From 55 plf at 22.45 to 55 plf at 28.53
BC: From 4 plf at -2.11 to 4 plf at 0.00
Maximum Web Forces Per Ply (Ibs)
BC: From 20 plf at 0.00 to 20 plf at 4.00
Webs Tens.Comp. Webs Tens. Comp.
BC: From 10 plf at 4.00 to 10 plf at 22.42
BC: From 20 plf at 22.42 to 20 plf at 26.42
C - M 2109 -1250 L - F 670 - 365
BC: From 4 plf at 26.42 to 4 plf at 28.53
M - D 462 - 541 F - K 480 - 574
TC: 156 lb Conc. Load at 4.00,22.42
D - L 568 - 305 K - G 2191 -1298
TC: 75 lb Conc. Load at 4.38, 6.38, 8.38,10.38
12.38,14.38,16.38,18.38,20.38
BC: 88 lb Conc. Load at 4.00,22.42
BC: 66 lb Conc. Load at 4.38, 6.38, 8.38,10.38
12.38,14.38,16.38,18.38,20.38
Purlins
\��
In lieu of structural panels use purlins to brace all flat
�\��fiQ',�,wpENaF•.'9iT
<G ,
TC @ 24" oc.
1 No 70773 • * `
_ * ;
Wind
of
Wind loads and reactions based on MWFRS.
STATE OF 1 `
Wind loading based on both gable and hip roof types.
Q'•• .�
COA#0-2 8 10NAI.
//siri»10
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
attached rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
as applicable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to ALPINE
drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Build ina_ Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the AN,rw CGMPANY
truss in conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover page 6750 Forum Drive
listing this drawin indicates acceptance of professional encLsneering responsibility solely -for the design shown. The suitability and use of g is Suite 305
drawing for any s Iucture is the responsibility of the Building -Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: al ineitw.com• TPI: t inst.or • SBCA: sbcacom onents.com• ICC: iccsafe.or AWC: awc.org Orlando FL, 32821
SEQN: 204594 / JACK Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T82 /
FROM: Qty: 2 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02241
Truss Label: T82 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
C
11'6"
12
5
90
LO M
CV �
B N
('M
9,4„
A
2X4(A1)
f 2-1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
3
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.004 B
HORZ(TL): 0.006 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.215
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
\\\ % i I I I I///,/00
No 70773
STATE OF ;
j0ic� FLOR�OPx C��=��
G jFS,,
SRO N AL \\\
COA#0-2
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 346 /- /- /216 /198 /169
D 86 /- /- /46 /- /-
C 106 /- /- /39 /116 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204597 / JACK Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T83 /
FROM: Qty: 2 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01919
Truss Label: T83 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
C
11'6"
12
5
90
LO M
CV �
B N
('M
9,4„
A
2X4(A1)
f 2-1"6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
3
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.004 B
HORZ(TL): 0.006 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.215
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
\\\ % i I I I I///,/00
No 70773
STATE OF ;
j0ic� FLOR�OPx C��=��
G jFS,,
SRO N AL \\\
COA#0-2
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 346 /- /- /216 /198 /169
D 86 /- /- /46 /- /-
C 106 /- /- /39 /116 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204602 / VAL Ply: 1 ob Number: 21-0845 Cust: R761 JWAXW610013 T46 /
FROM: Qty: 2 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00431
Truss Label: V1 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
T
0
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
1'11"6
V11"IS
3'10"13
V11"IS
12
5 �
3X4
B
A3X4(D1) 3X4(D1) C
22'7"13
D
3'10"13 -I
3'10"13
3'10"13
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004 C 999 360
VERT(CL): 0.008 C 999 240
HORZ(LL): -0.001 A - -
HORZ(TL): 0.003 A
Creep Factor: 2.0
Max TC CSI: 0.061
Max BC CSI: 0.094
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF %Al
COA#0-2 8 sS,O N AL �?\\\\
�8ir)1111\ �
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
D* 75 /- /- /30 /22 /3
Wind reactions based on MWFRS
D Brg Wid = 46.8 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204603 / VAL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T50 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00786
Truss Label: V2 SSB / DF 01/11/2022
3'11 "6 1 7'10" 13
3'11"6 3'11"6
12 =4X4
5 B
T
go--3X4(D1)=3X4(D1)C
21'9"4
-04 E
D
111.5X4
7'10"13
3'11 "6 3'11 "6
3'11 "6 7'10" 13
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.008 A 999 360
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.014 A 999 240
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): -0.003 C - -
Des Ld: 37.00
EXP: B Kzt: NA
HORZ TL C
( ): 0.005
Building Code:
NCBCLL: 10.00
Mean Height: 30.00 ft
2.0
Creep Factor: 2.0
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.152
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.150
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Max Web CSI: 0.035
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
No 70773
STATE OF
F�ORt�P'�
111110
01/11/2022
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
E* 75 /- /- /34 /33 /3
Wind reactions based on MWFRS
E Brg Wid = 94.8 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204619 / VAL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T51 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00658
Truss Label: V3 SSB / DF 01/11/2022
Loading Criteria (psf)
Wind Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
TCDL: 7.00
Speed: 160 mph
BCLL: 0.00
Enclosure: Closed
BCDL: 10.00
Risk Category: II
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
12
5' 11 "6
611 "6
611 "6
611 "6
=4X4
B
D
5X5
11'10"13
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
11'10"13
611 "6
611 "6
11'10"13
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.030 C 999 360
VERT(CL): 0.053 C 999 240
HORZ(LL): -0.010 A - -
HORZ(TL): 0.016 A
Creep Factor: 2.0
Max TC CSI: 0.423
Max BC CSI: 0.356
Max Web CSI: 0.075
_20'11 "4
♦ Maximum Reactions (Ibs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
E* 75 /- /- /34 /36 A
Wind reactions based on MWFRS
E Brg Wid = 142 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - B 470 - 274 B - C 470 - 274
EW Ver: 20.02.01A.1209.10 Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
A - D 321 - 389 D - C 321 - 389
No 70773
STATE OF
F�ORt�P'�
NAL
/1 11111
01/11/2022
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
B - D 424 - 575
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
o require extreme care in fabricating, handlin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
gent Safety Information, bVV TPI and SBCA) fo'r safety practices pnor to performing these functions. Installers shall provide temporary
per BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
d rigid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
cable. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
is 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
a division of ITW Build ina_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
conformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawin or cover pape
its drawino indicates acceptance of professional angpneering responsibilityy solely -for the design shown. The suitability and use of fhis
for any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204605 / VAL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T54 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01598
Truss Label: V4 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
T
w
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
2'11"11
2'11"11
12 =4X4
5 [--- B
5'11 "7
2'11Ill 1
III 1.5X4
5'11 "7
2'11I'll 1 2'11Ill 1
2'11"11 5'117
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fee: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.000 B 999 360
VERT(CL): 0.000 B 999 240
HORZ(LL): -0.000 A - -
HORZ(TL): 0.000 A
Creep Factor: 2.0
Max TC CSI: 0.114
Max BC CSI: 0.071
Max Web CSI: 0.021
EW Ver: 20.02.01A.1209.10
Do 1ll //,
///�
/��X
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 ss/ON►AL �0
01111111� �a
01/11/2022
21'9"13
♦ Maximum Reactions (Ibs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
C* 71 /- /- /34 All A
Wind reactions based on MWFRS
C Brg Wid = 71.4 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, hand lin shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204606 / VAL Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T53 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01796
Truss Label: V5 SSB / DF 01/11/2022
12
Is
2'11"11 5'117
2'11"11 2'11"11
=4X4
C
III 1.5X4
5'11"7
2'2"8
2'11"11
2'11"11
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
Fasten rated sheathing to one face of this frame.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
2'11"11
"7 2'2"8
5'11
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.000 D 999 360
VERT(CL): 0.000 D 999 240
HORZ(LL): 0.020 D - -
HORZ(TL): 0.026 D
Creep Factor: 2.0
Max TC CSI: 0.299
Max BC CSI: 0.079
Max Web CSI: 0.062
EW Ver: 20.02.01A.1209.10
\\A'�?PNDo
No 70773
STATE OF Ir
Fss/O N AL �?\\��
COA#0-2 8 1///1()11111����
01 / 11 /2022
_20"1"13
♦ Maximum Reactions (lbs), or *=PLF
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
F* 118 /- /- /43 /74 /12
Wind reactions based on MWFRS
F Brg Wid = 71.4 Min Req = -
Bearing H is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint olYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
fle. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s r'ucture is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
P AINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204598 / EJAC Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T84 /
FROM: Qty: 7 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01962
Truss Label: J1 SSB / DF 01/11/2022
5'11"4
f 2'1"6 T
5' 11 "4
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): -0.006 B
Des Ld: 37.00
EXP: B Kzt: NA
HORZ (TL ): 0.010 B
Building Code:
NCBCLL: 10.00
Mean Height: 30.00 ft
Creep Factor: 2.0
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.391
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.325
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Max Web CSI: 0.000
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord
\\\\\► i I l l f /!/I/�
� �Pp0O
No 70773
-
- J * d'
STATE OF J
O',
FtOR10P'.'G�
COA0-2 8 ONA ,1�?��
01 /11 /2022
C
11'10"11
M
O
CV 90
ti
ih
9-4"
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 376 /- /- /230 /209 /193
D 104 /- /- /56 /- /-
C 133 /- /- /49 /143 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204599 / EJAC Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T62 /
FROM: Qty: 8 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02143
Truss Label: J2 SSB / DF 01/11/2022
C
11'0"11
12
5 F::7—
M
O
B CV 00
N
a g'4°
A D
— X4(A1)
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
I� 211116
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
3' 11 "4
3' 11 "4
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.003 B
HORZ(TL): 0.004 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.117
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF ;
P
�i F,,LORtO, •' G ��
COA#0-2 8 ��//r N AL
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 314 /- /- /202 /187 /143
D 65 /- /- /35 /- /-
C 74 /- /- /30 /83 /-
Wind reactions based on MWFRS
B Brg Wid = 4.0 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204607 / EJAC Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T47 /
FROM: Qty: 13 /GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.02155
Truss Label: J3 SSB / DF 01/11/2022
C
22'8"9
12
5
04
MSO
T
r
M
B
k 19'10"
A D
2M(A1)
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
2,1"6 In 6,8"8
6'8"8
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): -0.010 B
HORZ(TL): 0.017 B
Creep Factor: 2.0
Max TC CSI: 0.538
Max BC CSI: 0.434
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
\\\\\%III I / / /////
oCENS
No 70773 ;
*rJ STATE OF /W
111000
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 402 /- /- /243 /219 /212
D 119 /- /- /64 /- /-
C 154 /- /- /59 /165 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204613 / EJAC Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T43 /
FROM: Qty: 1 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03539
Truss Label: J3A SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
6'4"
6'4"
5X5
CD
22'6"11
12
5 7--
M
O
M
M�
d)
B
19,10"
q E F
2X4(A1) III 1.5X6
2,1"6 65"12 "12
6'S" 12 "8
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types
Provide (3) 16d common (0.162"x3.5") nails
at top chord and bottom chord.
Toe nailing allowed based on average reaction.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): 0.016 B 999 360
VERT(CL): 0.027 B 999 240
HORZ(LL): -0.009 B - -
HORZ(TL): 0.016 B
Creep Factor: 2.0
Max TC CSI: 0.502
Max BC CSI: 0.391
Max Web CSI: 0.124
EW Ver: 20.02.01A.1209.10
\\\\\%III I ///////
oCENS
No 70773 ;
*rJ STATE OF /W
111000
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 402 /- /- /244 /222 /204
E 412 /- /- /101 /550 /-
D 165 /-187 /- /407 /24 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
E Brg Wid = 1.5
D Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (Ibs)
Webs Tens.Comp.
C - F 563 - 342
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
AL E
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204616 / EJAC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T48 /
FROM: Qty: 3 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00681
Truss Label: J313 SSB / DF 01/11/2022
67'
67'
N
i+
4X4
2'1"6
67'
1 6"8
1
6'2"
6'8„
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.018 C
999 360
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.032 C
999 240
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): -0.018 D
- -
Des Ld: 37.00
EXP: B Kzt: NA
HORZ TL D
( ): 0.032
Building Code:
NCBCLL: 10.00
Mean Height: 30.00 ft
TCDL: 4.0 psf
2.0
Creep Factor: 2.0
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.459
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.378
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fee: Yes
Max Web CSI: 0.097
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131 "x3.0", min. toe -nails at top chord.
Provide (3) 0.131"x3.0", min. toe -nails at bottom chord.
���PNDO •V�ti
<G ;
No 70773
STATE OF I
co
to
COA#0-2 8 /ON0/11111 AI \\\���\
7 V
2 3 2
0
o
N
Cl)
19,10"
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 402 /- /- /243 /227 /191
E 244 /- /- /81 /268 /-
D 104 /-19 /- /125/-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
E Brg Wid=1.5
D Brg Wid=1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
01/11/2022
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204601 / EJAC Ply: 1 Job Number: 21-0845 Cust: R761 JRef:1Xc47610013 T25 /
FROM: Qty: 11 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.03110
Truss Label: J4 SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
A
21'6"13
12
5
O
0
(V
B T_
O)
04
19'10"
A D
2X4(A1)
211116
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
3'11"10
3'11"10
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.003 B
HORZ(TL): 0.004 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.120
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
\�\\ Pp00 1,/ //i
i
No 70773
CLO
J STATE OF ;
i Q'•,
N AL
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 315 /- /- /202 /187 /144
D 66 /- /- /36 /- /-
C 75 /- /- /30 /84 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204610 / EJAC Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T9 /
FROM: Qty: 2 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01898
Truss Label: J5 SSB / DF 01/11/2022
J-
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
l!
12 2011 "8
5
BLO
LO
cN\i 19110"
A D
= 2X4(A1)
1^ 211116
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
21611
21611
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.002 B
HORZ(TL): 0.002 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.065
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
\\w1i)ri/iil//
\�\\ Pp00 1,/ //i
i
No 70773
J STATE OF ;
N AL
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 283 /- /- /192 /183 /107
D 35 /- /- /29 /10 /-
C 22 /- /- /25 /32 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204622 / EJAC Ply: 1 JoNumber: 21-0845 Cust: R761 JRef:1Xc47610013 T12 /
FROM: Qty: 1 J
GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02427
Truss Label: J5A SSB / DF 01/11/2022
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SIP #2;
Bot chord: 2x4 SP #2;
4"8
A-
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131 "x3.0", min. toe -nails at top chord.
Provide (2) 0.131"x3.0", min. toe -nails at bottom chord.
12
5 � B
20' 11 "8
A
19,10"
C
2X4(A1)
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): -0.001 A
HORZ(TL): 0.001 A
Creep Factor: 2.0
Max TC CSI: 0.052
Max BC CSI: 0.040
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF
F�ORt�P'�
111110
01/11/2022
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 112 /- /- /58 /46 /61
C 40 /- /- /21 /- /-
B 53 /- /- /21 /61 /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5
C Brg Wid=1.5
B Brg Wid=1.5
Bearing A is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204643 / HIP_ Ply: 1 Job Number: 21-0845 Cust: R761 JWAXW610013 T85 /
FROM: Qty: 2 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01495
Truss Label: K1 SSB / DF 01/11/2022
4'9"
4'9"
8'4"12
3'7"12
n
11'10"7
12 ; 3X4
3.54 C
b� _o
N
t-
B Cl)
a a �9'4"
A G F E
2X4(A1) 1.5X4 2X4
2'11"14
47"4
�1, 3-1"4
47"4
7'8"8
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): 0.021 C 999 360
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): 0.036 C 999 240
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.006 B - -
Des Ld: 37.00
EXP: B Kzt: NA
HORZ(TL): 0.009 B
Building
g Code:
NCBCLL: 0.00
Mean Height: 30.00 ft
Creep Factor: 2.0
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.497
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.389
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: No
Max Web CSI: 0.046
Loc. from endwall: NA
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 5-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131 "x3.0", min. toe -nails at top chord.
Provide (2) 0.131"x3.0", min. toe -nails at bottom chord.
No 70773
STATE OF
F�ORt�P'�
111110
01/11/2022
8"5"5
8'4"12
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 468 /- /- /- /325 /-
E 192 /- /0 /- /47 /0
D 172 /- /- /- /153 /-
Wind reactions based on MWFRS
B Brg Wid = 10.8 Min Req = 1.5
E Brg Wid=1.5
D Brg Wid=1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
it Safety Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204640 / HIP_ Ply: 1 Job Number: 21-0845 Cust: R761 JWAXW610013 T63 /
FROM: Qty: 2 /GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.01227
Truss Label: K2 SSB / DF 01/11/2022
I� 2'11"14 66"13
66" 13
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
PP Deflection in loc Udefl L/#
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
VERT(LL): NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
VERT(CL): NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
HORZ(LL): 0.007 B
Des Ld: 37.00
B Kzt: NAn
HORZ(TL): 0.009 B
Building Code:
NCBCLL: 0.00
MeaHeight: 30.00 ft
Mea
Creep Factor: 2.0
TCDL: 4.0 psf
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Max TC CSI: 0.490
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.293
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: No
Max Web CSI: 0.000
Loc. from endwall: NA
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
VIEW Ver: 20.02.01A.1209.10
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131 "x3.0", min. toe -nails at top chord.
Provide (2) 0.131"x3.0", min. toe -nails at bottom chord.
oW 11111 /o//
Do �'��X//,
No 70773
STATE OF %A/
��'n�•• ��ORtOP'��C9?��
COA#0-2 8 Ss�ONAL �0
0 1111111� �a
01/11/2022
C
11'0" 7
LO
o
` V 91411
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 371 /- /- /- /274 /-
D 21 /- /- /31 /- /-
C 78 /- /- /- /72 /-
Wind reactions based on MWFRS
B Brg Wid = 5.7 Min Req = 1.5
D Brg Wid=1.5
C Brg Wid=1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted oyherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracing installed per BCSI sections B3, B7 or B10,
aid
AppTy plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s r'ucture is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204637 / HIP_ Ply: 1 Job Number: 21-0845 Cust: R761 JWAXW610013 T26 /
FROM: Qty: 2 /GROZA BUILDERS, INC. / /ROE RESIDENCE Dnallo: 011.22.1354.01135
Truss Label: K4 SSB / DF 01/11/2022
C
12 21'6"10
3.54 �
N
O N
B N r
9)
T''4 N 19,101,
A D
- 2X4(A1)
2'11"14
Loading Criteria (psf) Wind Criteria
TCLL: 20.00 Wind Std: ASCE 7-16
TCDL: 7.00 Speed: 160 mph
BCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
Des Ld: 37.00 EXP: B Kzt: NA
Mean Height: 30.00 ft
NCBCLL: 0.00 TCDL: 4.0 psf
Soffit: 2.00 BCDL: 4.0 psf
Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2
Spacing: 24.0 " C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-11-10 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131 "x3.0", min. toe -nails at top chord.
Provide (2) 0.131"x3.0", min. toe -nails at bottom chord.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
5'7"6
5'7"6
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.007 B
HORZ(TL): 0.009 B
Creep Factor: 2.0
Max TC CSI: 0.494
Max BC CSI: 0.295
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
No 70773
STATE OF ; %Ir
O', ?
c�OR1Oq'•
COA#0-2 8 s/ANAL
/lljlllll�
01/11/2022
♦ Maximum Reactions (lbs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 373 /- /- /- /275 /-
D 22 /- /- /32 /- /-
C 81 /- /- /- /74 /-
Wind reactions based on MWFRS
B Brg Wid = 10.8 Min Req = 1.5
D Brg Wid=1.5
C Brg Wid=1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing,and bracing. Refer to and follow the latest edition of BCSI (Building
quire
Information, bVV TPI and SBCA) fr safety practices prior to performing these functions. Installers shall provide temporary
r BCSI. Unless noted otherwise, top chord shall have proper) attached structural sheathing and bottom chord shall have a properly
aid ceiling Locations shown for permanent lateral restraint otYwebs shall have bracingq installed per BCSI sections B3, B7 or B10,
ale. Apply plates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Defer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
ivision of ITW Build inq_Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
lformance with ANSI/TPI 1, or for handling, shipping,, installation and bracin of trusses. A seal on this drawing or cover pape
drawin indicates acceptance of professional engpneering responsibility solely -for the design shown. The suitability and use of fhis
any s ructure is the responsibility of the Building esigner per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204592 / JACK Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T22 /
FROM: Qty: 6 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.02494
Truss Label: C1 SSB / DF 01/11/2022
48
T
12 C
5 F7_--
f 2'1'16
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord
911019
00
a' M 91411
1'
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.001 B
HORZ(TL): 0.001 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.034
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
i
No 70773
CLO
J STATE OF ;
p'•,
N AL
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 335 /- /- /249 /258 /6S
D - /-36 /- /45 /30 /-
C - /-102 /- /109 /89 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204593 / JACK Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T21 /
FROM: Qty: 6 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.00430
Truss Label: C2 SSB / DF 01/11/2022
C
12 T
10'8"
� 5
00
B co
QN 91411
A D a
2X4(A1)
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
211 "6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
3'
3'
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.002 B
HORZ(TL): 0.003 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.067
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
No 70773
Ir
J STATE OFZZ
�0%
SS�
COA#0-2 8 O N A1. r j j 1111 \0
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 291 /- /- /193 /182 /119
D 46 /- /- /27 /6 /-
C 42 /- /- /21 /51 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204595 / JACK Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T24 /
FROM: Qty: 6 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01380
Truss Label: C3 SSB / DF 01/11/2022
48
T
12 C
5 F7_--
f 2'1'16
Loading Criteria (psf)
Wind Criteria
Snow Criteria (Pg,Pf in PSF)
TCLL: 20.00
Wind Std: ASCE 7-16
Pg: NA Ct: NA CAT: NA
TCDL: 7.00
Speed: 160 mph
Pf: NA Ce: NA
BCLL: 0.00
Enclosure: Closed
Lu: NA Cs: NA
BCDL: 10.00
Risk Category: II
Snow Duration: NA
EXP: B Kzt: NA
Des Ld: 37.00
Mean Height: 30.00 ft
NCBCLL: 10.00
TCDL: 4.0 psf
Building Code:
Soffit: 2.00
BCDL: 4.0 psf
FBC 7th Ed. 2020 Res.
Load Duration: 1.25
MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Spacing: 24.0 "
C&C Dist a: 3.00 ft
Rep Fac: Yes
Loc. from endwall: Any
FT/RT:20(0)/5(0)
GCpi: 0.18
Plate Type(s):
Wind Duration: 1.60
WAVE
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord
911019
00
a' M 91411
1'
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.001 B
HORZ(TL): 0.001 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.034
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
00
No 70773
STATE OF ;
j0ic� FLOR�OPx C��=��
G jFS,,
SRO N AL \\\
COA#0-2
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 335 /- /- /249 /258 /6S
D - /-36 /- /45 /30 /-
C - /-102 /- /109 /89 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
SEQN: 204596 / JACK Ply: 1 Job Number: 21-0845 Cust: R 761 JRef:1Xc47610013 T23 /
FROM: Qty: 6 /GROZA BUILDERS, INC. / /ROE RESIDENCE DrwNo: 011.22.1354.01046
Truss Label: C4 SSB / DF 01/11/2022
C
12 T
10'8"
� 5
00
B co
QN 91411
A D a
2X4(A1)
Loading Criteria (psf)
TCLL: 20.00
TCDL: 7.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 37.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
211 "6
Wind Criteria
Wind Std: ASCE 7-16
Speed: 160 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 30.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe -nails at top chord.
Provide (2) 0.131 "x3.0", min. toe -nails at bottom chord.
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std: 2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
3'
3'
Defl/CSI Criteria
PP Deflection in loc Udefl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.002 B
HORZ(TL): 0.003 B
Creep Factor: 2.0
Max TC CSI: 0.272
Max BC CSI: 0.067
Max Web CSI: 0.000
EW Ver: 20.02.01A.1209.10
N
f ' No 70773
Ir
'I*TJ STATE OF ;41
ZZ
SS/O N A1.
COA#0-2 8///r
01/11/2022
♦ Maximum Reactions (Ibs)
Gravity Non -Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 291 /- /- /193 /182 /119
D 46 /- /- /27 /6 /-
C 42 /- /- /21 /51 /-
Wind reactions based on MWFRS
B Brg Wid = 7.6 Min Req = 1.5
D Brg Wid = 1.5
C Brg Wid = 1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
**WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
quire extreme care in fabricating, handling,shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
t Safety Information, by TPI an SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly
lid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or B10,
ile. Apply Oates to each face of truss and position as shown above and on the Join Details, unless noted otherwise. Refer to
60A-Z for standard plate positions. Refer to job's General Notes page for additional information.
vision of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the
iformance with ANSI/TPI 1, or for handling, shipping,. installation and bracin44 of trusses. A seal on this drawinc] or cover par
irawintq indicates acceptance of professional engineering responsibilityy solely -for the design shown. The suitability and use of s
any s ructure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
ALPINE
6750 Forum Drive
Suite 305
Orlando FL, 32821
CLR Reinforcing
This detail is to be used when a Continuous Lateral Restraint (CLR)
is specified on a truss design but an alternative web
reinforcement method is desired.
Notes:
This detail is only applicable for changing the specifled CLR
shown on single ply sealed designs to T-reinforcement or
L-reinforecement or scab reinforcement,
Alternative reinforcement specified in chart below may be conservative,
For minimum alternative reinforcement, re -run design with appropriate
reinforcement type.
Use scabs instead of L- or T- reinforcement on webs with intersecting
truss joints, such as K-web joints, that may interfere with proper
application along the narrow face of the web.
Web Member
Specified CLR
Alternative Reinf orecement
Size
Restraint
T- or L- Reinf.
Scab Reinf.
2x3 or 2x4
1 row
2x4
1-2x4
2x3 or 2x4
2 rows
2x6
2-2x4
2x6
1 row
2x4
1-2x6
2x6
2 rows
2x6
2-2x4OK)
2x8
1 row
2x6
1-2x8
2x8
2 rows
2x6
2-2x6010
T-reinforcement, L-reinforcement, or scab reinforcement to be same
species and grade or better than web member unless specified
otherwise on Engineer's sealed design,
010 Center scab on wide face of web. Apply (1) scab to each
face of web.
Member Substitution
T-Reinforcement
Or T-Reinf,
L-Reinforcement; or
L-Reinf,
Apply to either side of web narrow face.
Attach with 10d (0.128'x3,0',min) nails
at 6' o.c, Reinforcing member is
a minimum 80% of web
member length.
Scab Reinforcement:
Apply scab(s) to wide face of web.
No more than Q) scab per face.
Attach with 10d (0.128'x3.0',min) nails
at 6' o.c, Reinforcing member is a
minimum 80% of web member length,
MVARNDN3a READ AND FOLLOW ALL NOTES ON THIS DRAWDIIi
=DFORTANfa FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS.
Trusses require extreme care in fabricating, handling, shipping, Installing and bracing. Refer to and
follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety
temporary bracing per m c
practices prior to wise, top
these functions. Installers shall structural
Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom cha
shall have a properly attached algid ceiling. Locations shown for permanent lateral restraint of webs
shot( have bracing installed per DCSI sections B3, B7 or B10, as applicable. Apply plates to each face
of !ruts and position as shown above and on the Joint Details, unless noted otherwise.
E
Refer to drawings I60A-Z for standard plate positions.
160 i
LPI
N
Alpine, a division of ITV Building Components Group Inc. shall not be responsible for any deviation fr,
this drawing, any failure to build the truss In conformance with ANSI/TPI 1, or for handling, shipping,
AN ITW COMPANY
Installation S. bracing of trusses.
A seal on this drawling or cover page listing this dravi Indicates acceptance of professional
514 Earth City Expressway
ergIneer4g responsblith solely for the deslgi shown The suitability and use of this drawing
Suite 242
For any structu^e k the responsblity of the Building Designer per ANSLTPI 1 Sec.? -
Earth City, MO 63045
For more Information see this Job's general notes page and these web sites-
ALPINE1 www.alpineitw.comt TPI: www.tpinst.org; SBCA, www.sbcacomponents.com; ICC, www.iccsafe.org
T-Reinf. L-Reinf,
Scab
`t1%4111111T11r
..Ifl(I Ar 'FF.
E N3F`'.�'��'G
1���'•v�G
• No 70773 �
C LL PSF
REF CLR Subst,
DATE 01/02/19
yF
�_ C DL PSF
.�'. `�!
STATE OF
C DL PSF
DRWG BRCLBSUB0119
%�<+'•� •
BC LL PSF
..
4,i�_hS� O 1
T❑T, LD, PSF
�c�]11f''1111iu1o+1! �2
22
DUR, FAC,
COA#0-278
SPACING
System 42 Ply to Ply Connection Detail
Using GRK (RSS) JTS 1/4x6-3/4 or Simpson SDS25600 or SDW22634 Strong Drive Screws or Equal,
Max, ConcentratedlLoad per Chart Below
F
12' mint
L
Apply screws to top chord within 12' of the
concentrated load location @ 4' o,c„ min,
evenly distributing them to each side of the
concentrated load. A maximum of 6 screws
may be applied to the top chord for each
concentrated load.
For double top chords, evenly distribute the
screws over both top chords, using same
spacing guidelines specified above, The max
number of top chord screws is 6 per chord
member for a total maximum of 12 screws.
Refer to Alpine sealed drawing
for individual truss design.
Load Applied to This Ply
3 1/2'-1-3 1/2'�
Truss IMember (Chord) Shown)
3/4'
1/2'
If the concentrated load connection requires more
screws than 6 per top chord member and the load
Is located at a panel point where webs intersect
the top chord, the remainder of required screws
may be applied to those webs below the
concentrated load location evenly spaced @ 4' o,c.,
min, keeping the 3' min end distances. Each additional
screw is worth 474 lb for SP webs, 442 lb for DFL
webs, and 400 lb for SPF webs.
# of
Screws
Maximum Concentrated
Load (lbs) (1.00 DF)
SIP
DFL
SPF
1
474
442
400
2
984
884
800
3
1422
1326
1200
4
1896
1768
1600
5
2370
2210
2000
6
2844
2652
2400
7
3318
3094
2800
8
3792
3536
3200
9
4266
3978
3600
10
4740
4420
4000
11
5214
1 4862
1 4400
12
5688
1 5304
1 4800
General Notes,
Screw Position in the Truss
JTS or Strong -Drive Screw
1. Screws centered along the 1.5' dimension of the 4x2 member,
2. Minimum end distance of 3'.
3. Screws installed with head in loaded member,
4. Gap between plies not to exceed 1/8'.
5. Screw location may be adjusted up to 1' to avoid conflict
with other hardware or to avoid lumber defects,
Max. Uniform Load per Chart Below
lllllll
For single top chord, see chart below for screw
spacing, For double top chord the screw spacing
may be doubled (but may not exceed 24' o.c. per
chord), Screw spacing shall be offset by 1/2 the
o.c, spacing in each chord,
Screws need only apply to the extents of that load,
For chord sections supporting less than 100 plf apply
one screw at each top chord joint location.
6. Do not Install screws in areas where lumber wane exceeds 1/4',
7. Equal loads from both faces or loads that are evenly
distributed to each ply do not require connections per this detail,
8. For 3x2 members use GRK (RSS) JTS 1/4x5 screws, or Simpson's
SDS25412 or SDW22500 screws or equal. ��ti++
9. Contact Alpine for special connections not
detail,
MWARNINGIM READ AND FOLLOW ALL NOTES ON THIS DRAVINGI
■IMPORTANTa FURNISH INS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS.
Trusses require extreme care In fabricating, handling, shipping, Installing and bracing. Refer to and
follow the latest edition of BCSI (Bu0.ding Component Safety Information, by TPI and SBCA) for safety
temporary bracing per BCSI.
practices prior to pee, top these functions. Installers shall structural
Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom cha
shall have a properly attached algid ceiling. Locations shown for permanent lateral restraint of webs
shall have bracing installed per BCSI sections B3, B7 or BIO, as apptkoble. Apply plates to each face
of !ruts and position as shown above and on the Details, unless noted otherwise.
E
160
Refer to drawings I60A-Z for standard plate positions.
ios.
L
P I
N
Alpine, a division of ITV Building Components Group Inc. shall not be responsible for any deviation fr,
this drawing, any failure to build the truss In conformonce with ANSI/TPI 1, or for handling, shipping,
AN ITW COMPANY
Installation S. bracing of trusses.
A seal on this draw4g or cover page listing this drawing, Indicates acceptance of professional
514 Earth City Expressway
ergIneer4g responsb+ity solely for the deslgi shown The suitobliity and use of this drawing
Suite 242
For any structu^e k the responsbpity of the Building Designer per ANSLTPI 1 Sec:.? -
Earth City, MO 63045
For more Information see this Job's general notes page and these web sites -
ALPINE, www.alpineitw.comt TPI: www.tpinst.org; SBCA, www.sbcacomponents.com; ICC, www.iccsafe.org
E N
No 70773
• ,k
STATE OF
AI 1112 '
Top Chord Screw
o.c. Spacing (inch)
Maximum Uniform Load (ptf)
Along Top Chord (1,00 DF)
SIP
DFL
SPF
4
1422
1326
1200
6
948
884
800
8
711
663
600
10
568
530
480
12
474
1 442
400
14
406
378
342
16
355
331
300
18
316
294
266
20
284
265
240
22
258
241
218
24
237
221
200
C LL
'* �C DL
C DL
1%1
BC LL
TOT, LD,
DUR, FAC, 1.00
SPACING
PSF REF SY42 Connect!
PSF DATE 01/19/2018
PSF DRWG CNSY42PLO118
PSF
PSF
Commentary: Deflection and Camber
Camber may be built into trusses to compensate L = Span of Truss (inches)
for the vertical deflection that results from the D = Depth of Truss at Deflection Point (inches)
application of loads. Providing camber has the -------------------------------------------------------------------------
following advantages
Recommended Truss Deflection Limits
• Helps to ensure level ceilings and floors after
dead loads are applied. Truss Type L/D Deflection Limits
• Facilitates drainage to avoid ponding on flat or Live Load Total Load
low slope roofs, Pitched Roof Trusses 24 L/240 (vertical) L/180 (vertical)
• Compensates for different deflection Floor of Room -In -Attic 24 L/360 (vertical)
L/240 (vertical)
characteristics between adjacent trusses, Trusses
• Improves appearance of garage door headers Flat or Shallow Pitched 24 L/360 (vertical)
L/240 (vertical)
and other long spans that can appear to 'sag,' Roof Trusses
• Avoids 'dips' in roof rigelines at the transition Residential Floor Trusses 24 L/360 (vertical)
L/240 (vertical)
from the gable to adjacent clear span trusses,
Commercial Floor Trusses 20 L/480 (vertical)
L/240 (vertical)
In accordance with ANSI/TPI 1 the Building Designer,
through the Construction Documents, shall provide the Scissors Trusses 24 0,75' (horizontal)
1,25' (horizontal)
location, direction, and magnitude of all loads attributable
to ponding that may occur due to the design of the roof -------------------------------------------------------------------------
drainage system, The Building Designer shall also specify Truss Type Recommended Camber
any dead load, live load, and in-service creep deflection Pitched Trusses 1,00 x Deflection from Actual
Dead Load
criteria for flat or low -slope roofs subject to ponding
loads,
Sloping Parallel 1,5 x Vertical Deflection from
Chord Trusses Actual Dead Load
The amount of camber is dependent on the truss type,
span, loading, application, etceteras,
Floor Trusses (0,25 x Deflection from Live Load) +
More restrictive limits for allowable deflection and Actual Dead Load
slenderness ratio (L/D) may be required to help
control vibration, Flat Roof Trusses (0,25 x Deflection from Live Load) +
(1,5 x Design Dead Load Deflection)
The following tables are provided as guidelines for
limiting deflection and estimating camber, Conditions or Note: The actual dead load may be considerably less than
codes may exist that require exceeding these the design dead toad.
recommendations, or past experience may warrant using% pd ,yt.,
more stringent limitations. �C:t, XNGENgF!/, ,,��i
sUVARN11N3a READ AND FOLLOW ALL NOTES ON THIS ixlAvnui
"I POlTANIsa FURNISH THIS BRAVING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
F(Building
* .•
No 74OF
REF DEFLEC/CAMB
DATE 10/O1/14
aComponentllSafetypInformation,m yTPIbandM BCA)Refer
followTrus the latesto extreme edition ofcare BCSI for safety
practicespriortowise, t p these functions. Installers shall provide temporary bracing per m chordUnless noted otherwise, top chord shall nave properly attached structural sheathing and bottom chord
have Locations for lateral
STATshop
DRWG DEFLCAMB1014
shot( a properly attached rigidBCSI ceiling. shown permanent restraint of webs
hove install.ased pwr BCSI Apply prates to roach fncw
th J or BIB, ils
truss thw Joint Dwtalls,
ALPINEof
nd pog and on unlessapplicable.no
and position nsshown above and on
unlwss noted otnwrwis¢.Refer to drnwNgs I60A-Z for standard pinle positions.Alpine,adivision
-01sc�
of ITV Building Components Group Inc. shall not be responsible for any deviation from
drawing, any failure to build the truss In conformonce with ANSI/TPI 1, or for handling, shipping,AN
•this
ITW COMPANY
InsAta�lreln ` on bhis drnwogf torucows.
ver page lists g !Ns dravi Indicates acceptance of professional
1f
514 Earth City Expressway
Suite 242
ergIneer4g responsbpith solely for the design shown The suitability and use of this drawing
For any structu^e k the responsbpity of the Building Designer per ANSI/TPI I Sec.?.
Earth City, MO 63045
For more Information see this Job's general notes page and these web sites-
ALPINE, www.alpineitw.comt TPI: www.tpinst.org; SBCA, www.sbcacomponents.com; ICC, www.iccsafe.org
COA#0-278
'T'
Reinforcing
Member
Gable
Truss
Gable Detail
For Let -in Verticals
Gable Truss Plate Sizes
:)propriate Alpine gable detail for
e sizes for vertical studs,
Engineered truss design for peak,
b, and heel plates,
vertical plates overlap, use a
to that covers the total area of
apped plates to span the web,
2X4
2X4 *-2
rrovlae connecTions ror upurT specnnea on tine engmeerea Truss aeslgn,
Attach each 'T' reinforcing member with
End Driven Nailsi
IOd Common (0,148'x 3.',min) Nails at 4' o.c. plus
(4) nails In the top and bottom chords.
Toenailed Nails-
10d Common (0,148'x3',m1n) Toenails at 4' o.c. plus
(4) toenails in the top and bottom chords.
This detail to be used with the appropriate Alpine gable detail for ASCE
wind load.
ASCE 7-05 Gable Detail Drawings
A13015051014, A12015051014, A11015051014, A10015051014, A14015051014,
A13030051014, A12030051014, A11030051014, A10030051014, A14030051014
ASCE 7-10 & ASCE 7-16 Gable Detail Drawings
A11515ENC100118, A12015ENCI00118, A14015ENC100118, A16015ENC100118,
A18015ENC100118, A20015ENC100118, A20015END100118, A20015PED100118,
A11530ENCI00118, A12030ENCI00118, A14030ENCI00118, A16030ENCI00118,
A18030ENCI00118, A20030ENCI00118, A20030END100118, A20030PED100118,
S11515ENC100118, S12015ENC100118, S14015ENC100118, S16015ENC100118,
S18015ENCI00118, S20015ENCI00118, S20015ENDI00118, S20015PEDI00118,
S11530ENC100118, S12030ENC100118, S14030ENC100118, S16030ENC100118,
S18030ENC100118, S20030ENC100118, S20030END100118, S20030`,F�1;jAft811,+er
See appropriate Alpine gable detail for maximum unreinforc QeA*a �tEjigth
■wWARNINGIa READ AND FOLLOW ALL NOTES ON THIS DRAWING
■EDFORTANTM FLRMISN INS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care In fabricating, handling, shipping, Installing and bracing. Refer to and
follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety
practices prior to performing these functions. Installers shall provide temporary bracing per BCSI.
Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom cha
shop have a properly attached rigid ceiling. Locations shown for permanent lateral restrolnt of webs
® shop have bracing installed per BCSI sections B3, B7 or BIO, as opplkoble. Apply plates to each face
LPI N E of truss and position 16O as shown above and on the Joint Details, unless noted otherwise.
Refer to drawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation fr,
this drawing, any failure to build the truss In conformance with ANSI/TPI 1, or for handling, shipping,
AN ITW COMPANY Instolla'tlon 6 bracing of trusses.
A seal on this drawing or cover page Usting this drawing, Indicates acceptance of professional
514 Earth City Expressway engkkeM-sponTly solely for the design shown The suitability and use of this drawing
Suite 242 for any sir Is the respone6Nty of the &Ylding Designer per ANSI/TPI 1 Sec.&
Earth City, MO 63045 for more information see this Job's general notes page and these web sites.
ALPINE, www.alpineitw.comi TPI, www.tpinst.orgi SBCA, www.sbcacomponents.com; ICC, www.iccsafe.org
No 70773
►'�]
STATE OF ♦'f,
2
COA#0-278
'T' Reinforcement Attachment Detail
'T' Reinforcing 'T' Reinforcing
Member Member
Toe -nail - Or - End-nall
To convert from 'L' to 'T' reinforcing members,
multiply 'T' increase by length (based on
appropriate Alpine gable detail).
Maximum allowable 'T' reinforced gable vertical
Length is 14' from top to bottom chord,
'T' reinforcing member material must match size,
specle, and grade of the 'L' reinforcing member.
deb Length Increase w/ 'T' Brace
Example
ASCE 7-10 Wind Speed = 120 mph
Mean Roof Height = 30 ft, Kzt = 1.00
Gable Vertical = 24'o.c. SIR#3
'T' Reinforcing Member Size = 2x4
'T' Brace Increase (From Above) = 30% = 1.30
(1) 2x4 'L' Brace Length = 8' 7'
Maximum 'T' Reinforced Gable Vertical Length
1.30 x 8' 7' = 11' 2'
'T' Relnf.
Mbr, Size
'T'
Increase
2x4
30
MAX, TOT, LD, 60 PSF
DUR, FAC, ANY
MAX, SPACING 24,0'
REF LET -IN VERT
DATE 01/02/2018
DRWG GBLLETIN0118
SY32/SY42 PLY TO PLY LSC CONNECTION DETAIL
FOR DOWNWARD LOADS ONLY
Uniform Load A1212lication
1 r 4 r,r,1,e,4
Max. T,C. Uniform
Load (plf)
Clip Spacing
Along
Top Chord
SP
DF
SPF/HF
935
810
585
12' oz.
625
540
390
18' o,c.
470
405
295
24' o.c.
375
j 325
j 235
30' o.c,
Maximum LSC spacing is 30' o,c,
Concentrated Load A1212(ication
Load applied
to this ply
Max Load
(lbs)
SP
DF
SPF/HF
1870
1620
1170
Note:
Install LSC adjacent, equidistant,
and not more than 6' on each
side of concentrated load,
►DO M.
Installation Instructions:
1, Position and attach LSC
to loaded ply with (3) 0,131'x1,5'
nails into narrow face.
2, Bend clip over adjacent ply
and attach with (3) 0.131'x1,5'
nails into wide face,
emu
LSC42 for single 4x2 chords
LSC32 for single 3x2 chords
gh
LSC42-2 for stacked 4x2 chords
LSC32-2 for stacked 3x2 chords
Refer to Alpine sealed drawing for
�';�+�4bl�Ni'Fvj�•,design,
aVARNINaa READ AND FOLLOW ALL NOTES ON THIS DRAVDIGi
aDPORTANTse FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDDIG THE DISTALLERS
TPI and and BCA)Refer
followTrusses the latest edition ofcare BCS1 Y<BuNding Comp,onentllSafety shipping, Installing
for safety
I+io 70773 -:
= * .•
*
-
REF SY42 Connection
DATE 10/01 /14
ALPINE
AN ITW C(DMI)AVY
514 Earth City Expressway
Suite 242
Practices prior to performing these functions. Installers shop provide temporary bracing per BCSI.
Unless noted otherwlse, top chord shall have properly attached structural sheathing and bottom chord
shall have a properly attached rigld celling. Locations shown for permanent lateral restraint of webs
shall have bracing Installed per BCSI sections B3, B7 or B10, as applicable. Apply plates to each face
of truss and position as shown above and on the Joint Details, unless noted otherwise.
Refer to drnrings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from
this drawing, any (allure to build the truss in conformance with ANSI/TPI 1, or for handling, shipping,
Intaceal on this lng of trusses.
or
4 sver page listing this drawing, indicates acceptance of professional
engineering responsibility solely for the design shown The suitability and use of this drawing
for any structure Is the responsibility of the Building Designer per ANSI/TPI 1 Sec2.
r 'fl • i �,
+► ,A• r..
W+ ', STATE O F • `V
+ O .•
• �L
� •
Wj • a `
�,N � +,1
"I'
I N I 1 NTU 1 /``yy1 1l 2
DRWG LSCSYX2A1014
DUR, FAC. ALL
Earth City, MO 63045
For more Information see this Job's general notes page and these web sites,CQf�#�-278
ALPINE, www.alpineltw.comt TPIi www,tpinst.orgi SBCA, www.sbcoconponents.comt ICC, www.iccsafenrg
Gable Stud Reinforcement Detail for Stucco Cladding
ASCE 7-16: 160 mph Wind Speed, 30' Mean Height, Enclosed, Exposure C, Kzt = 1.00
Or: 140 MPH Wind Speed, 30' Mean Height, Partially Enclosed, Exposure C, Kzt = 1.00
Or: 140 Mph Wind Speed, 30' Mean Height, Enclosed, Exposure D, Kzt = 1.00
Or: 120 moh Wind Speed, 30' Mean Heloht, Partially Enclosed, Exposure D, Kzt = 1.00
S
2x4 Brace
Gable Vertical
Spacing Species Grade
No
Braces
(1) 1x4 'L' Brace W
(1) 2x4 'L' Brace x
(2) 2x4 'L' Brace IKIK
(1) 2x6 'L' Brace x
(2) 2x6 'L'
Brace
x
Group A
Group B
Group A
Group B
Group A
Group B
Group A
Group B
Group A
Group
B
_P
#1 / #2
3'
2'
5'
6'
5'
8'
6'
5'
6'
8'
7'
8"
8'
0'
10'
1'
10'
6'
12'
0'
12'
6'
S P P
#3
3'
1'
5'
5"
5'
7'
6'
4'
6'
7"
7'
7'
7'
11'
10'
0`
10'
4"
11'
11'
12'
5"
r
Stud
3'
1'
5'
4"
5'
7`
6'
4"
6'
7"
7'
7"
7'
11'
10'
0'
10'
4'
11'
11'
12'
5"
O
r
Standard
1
'
1
1
1
4
1
11
1
# 1
'
4"
'
1'
1
1
1
1'
a
S P
#2
1
1
1
1
#3
(U
D L
Stud
Standard
U
#1 / #2
3'
8'
6'
3"
6'
6'
7'
5'
7'
8"
8'
9"
9'
2'
11'
7'
12'
0'
13'
9"
14'
0'
_P
S P P
#3
3'
6"
6'
2"
6'
6'
7'
3'
7'
7'
8'
8'
9'
1"
11'
5`
11'
11'
13'
7`
14'
0`
U
I� P
Stud
3'
6"
6'
2'
6'
5'
7'
3"
7'
7"
8'
8"
9'
1'
11'
5'
11'
11'
13'
7"
14'
0'
Q)
O
I
Standard
3'
6"
5'
8'
6'
0"
7'
3"
7'
7"
8'
8"
9'
1`
11'
5`
11'
11"
13'
7`
14'
0`
#1
3'
10'
6'
4"
6'
7'
7'
6'
7'
9'
8'
11"
9'
3"
11'
9'
12'
2"
13'
11'
14'
0'
S P
#2
1
1
1
1
#3
11"
4'
'
4'
1'
11'
11'
11"
D P L
Stud
11
4
4
1
1
1'
1"
1
1
75
Standard
#1 #2
S P F
#
3
U
I I r
Stud
O
I� r
Standard
X
#1
d
S P
#2
#3
DLL
Stud
Standard
Diagonal brace option:
vertical length may be
doubled when diagonal
brace is used. Connect
diagonal brace for 690#
at each end. Max web
total length is 14'.
Vertical length shown
In table above.
aymm
About
18,
L
'L' Brace End
Zones, typ,
2x6 DF-L #2 or
better diagonal
I
bracer single
8,
or double cut
(as shown) at
upper end.
30
Connect diagona/Continuous Benrhn�„X�'� ••%•.,
l at �� ,G �'At
midpoint of vertical web. Refer to chart above for ?td�.ga6ie vertl�zl'
wwWARNINGI" READ AND FOLLOW ALL NOTES ON THIS DRAWINGI No 70773
NNIMPORTANTow FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS * �'
Trusses require extreme core In fabricating, handling, shipping, Installing and bracing. Refer to and _
follow the latest edition of BCSI (Bullding Component Safety Information, by TPI and SBCA) for safety : 'k
Practices prior to performing these functions. Installers shall provide temporary bracing per HCSI. -Q
Unless noted otherwise, top chord shot( have properly attached structural sheathing and bottom chord
shall have a properly attached rigid celling. Locations shown for permanent lateral restraint of webs O �' STATE F
shall have bracing Installed per BCSI sections B3, B7 or 310, as applicable. Apply plates to each face
LPI N E offer
f truss nntl position as shown above and a the Joint Details, unless noted otherwise �' f
Refer to drawings 160A-Z for standard plate positions, �
Alpine, a dlvlslon of ITW Building Components Group Inc. shall not be responsible for any deviation from -0 O,, `
this drawing, any Fnllure to build the truss in conformance with ANSI/TPI 1, or for handling, shipping, / U
AN ITW COMPANY Installation & bracing of trusses. page g g acceptance professional ,,
f
A seal on this drawl or cover a e listing this drawing, Indicates acc tance of
514 Earth City Expressway engineering responsibility solely for the design shown. The sultabRity and use of this drawing
Suite 242 for any structure Is the responsibility of the Building Designer per ANSI/TPI I Sec.2.
Earth City, MO 63045 For more Information see this Job's general notes page and these web sites,
-Qf�#�-Z7c�
ALPINE: www.atpineltw.com; TPI, www.tpinst.org; SBCA, www.sbclndustry.org) ICC, www.Iccsafe.org
Bracing Group Species and Grades;
Group Al
S ruce-Pine-Fir Hem -Fir
#1 / #2 Standard #2 Stud
#3 Stud #3 Standard
Dou Las Fir -Larch Southern Plnexxx
#3 #3
Stud Stud
Standard Standard
Group B:
Hem -Fir
#1 & Btr
#1
Do", u Las Fir -Larch Southern Plnexxx
#1 #1
#2 #2
1x4 Braces shall be SRB (Stress -Rated Board).
■wFor lx4 So. Pine use only Industrial 55 or
Industrial 45 Stress -Rated Boards. Group B
values may be used with these grades,
Gable Truss Detail Notes:
Wind Load deflection criterion Is L/360,
Provide uplift connections for 135 plf over
continuous bearing (5 psf TC Dead Load).
Gable end supports load from 4' 0' outlookers
with 2' 0' overhang, or 12' plywood overhang.
Attach 'L' braces with 10d (0.128'x3,0' min) nails.
)K For (1) 'L' brace, space halls at 2' o.c.
In 18' end zones and 4' o.c, between zones.
)K )KFor (2) 'L' braces, space nails at 3' o.c.
In 18' end zones and 6' o.c, between zones.
'L' bracing must be a minimum of 80% of web
member length.
Gable Vertical Plate Sizes
Verticath + Refer to common truss design for
peak, splice, and heel plates.
Refer to the Bullding Designer for conditions
not addressed by this detail.
l Len
No S lice
Less than 4' 0'
2X4
Greater than 4'
0', but
qX4
I— than 12'
0'
MAX. T❑T, LD, 60 PSF
MAX, SPACING 24,0"
REF ASCE7-16-GAB16030
DATE 01/26/2018
DRWG S16030ENC160118
STRONGBACK BRIDGING REC❑MMENDATI❑NS
BUTT STRONGBACK
BRIDGING TOGETHER
4'
ATTACH SCAB WITH IOd BOX/GUN
4' —0' 2x6 (0.128'x3.0') NAILS IN 2 ROWS AT
SCAB 6' O.C.
NOTEi IN LIEU OF SPLICING AS SHOWN,
LAP STRONGBACK BRIDGING MEMBERS
FOR AT LEAST ONE TRUSS SPACING
STRONGBACK BRIDGING SPLICE DETAIL
NOTE: Details 1 and 2
(2) 10d COMMON (0.148'x3,0') OR
BOX/GUN (0.128'x3.0') NAILS AT
TOP AND BOTTOM OF 2x4
SCAB —ON BLOCK, ATTACH
STRONGBACK TO BLOCK W/ (3)
IOd COMMON (0.148'x3,0') NAILS
OR (4)10d BOX/GUN (0,128'x3.0')
NAILS,
are the preferred
ATTACH STRONGBACK TO
WEB W/ (3) 10d COMMON
(0,148'x3') NAILS OR
(4) 10d BOX/GUN
STRONGBACK BRIDGING ATTACHMENT
attachment methods
STRONGBACK BRIDGING
SPACING REQUIREMENTS
Up to 10'
None required
10' to 20'
1 row (at center of span)
20' to 30
2 rows (1 at each 1/3 ts)
30' to 40
3 rows (1 at each 1/4 ts)
Over 40'
Space rows at 10' oz, ts)
ATTACH STRONGBACK
TO BOTTOM CHORD w
(2) #10 — 3' SCREW:
ALTERNATIVES 11
No -AU scab -on blocks shall be a minimum 2x4
"stress graded lumber,'
► All strongback bridging and bracing shall be a
minimum 2x6 'stress graded lumber.'
No -The purpose of strongback bridging is to
develop load sharing between individual trusses,
resulting in an overall increase in the
stiffness of the floor system. 2x6
strongback bridging, positioned as shown in
details, is recommended at 10' -0' o,c, (max,)
op -The terms 'bridging' and 'bracing' are sometimes
mistakenly used interchangeably, 'Bracing' is an
important structural requirement of any floor
or roof system, Refer to the Truss Design
Drawing (TDD) for the bracing requirements for
each individual truss component. 'Bridging,'
particularly 'strongback bridging' is a
recommendation for a truss system to help
control vibration, In addition to aiding in the
distribution of point loads between adjacent
truss, strongback bridging serves to reduce
'bounce' or residual vibration resulting from
moving point loads, such as footsteps,
The performance of all floor systems are
enhanced by the installation of strongback
bridging and therefore is strongly recommended
by Alpine.
For additional information regarding strongback
bridging, refer to BCSI (Building Component
Safety Information).
ITW
514 Earth City Expresw yCOMPANY
suite 242
■EWARNINGME READ AND FOLLOW ALL NOTES ON THIS DRAWM
"INPOtTANTa FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
ComponentllSafetypInformatioln, by PIand band SBCA)Refer
fo(towsthe Latest editiorequire nmofcare BCSI infor safety
these functions. Installers shall provide temporary bracing per BCSI.
practices prior to wise, top
Unless noted otherwise, top chord shall have property attached structure) sheathing and bottom chord
shall have a properly attached rlgld celgng. Locations shown for permanent lateral testtolnt of webs
have bracing Installed per BCSIsections B3, B7 or H30, as applicable. Apply plates to each face
and position as shown above and on the Joint Details, unless noted otherwise.
Refer to drawings ioL as for standard plate positions,
a division of ITW Building Components Group Inc, shall not be responslble for any deviat�gfron�
this drawing, any failure to build the truss In conformance with ANSI/TPI 1, or for handing, shl
InVneerinong 6eat on�rponi � olelyver f pathe design shorn Ththis hee, Indicates suitability and use of this ddrawYp tance of '
for any structure Is thsiblittye responsibility of the Building Designer per ANSIMI I Sect
No 70773
= * .•
: *
r _U
+► OF.
S, = STATEshall
�O'erALPINEoftruss
i A`C
AN •.Alpine,
�IS
UAN
��`''�N11
C LL PSF
TC DL PSF
$C DL PSF
LL PSF
T❑T, LD, PSF
REF STRONGBACK
DATE 10/01/14
DRWG STRBRIBR1014
DUR, FAC, 1,00
SPACING
Earth City, MO 63045
For more information see this ,Job's general notes page and these web sites
ALPINE. w—alpinekw,coml TPI- www,tpinst,orgl SBCA, www.sbcacomponents,coml ICC, www.Icc.afe.org
CQ;�#0-2%g
Valley Detail - ASCE 7-16: 180 mph, 30' Mean Height, Partially Enclosed, Exp, C, Kzt=1,00
Top Chord 2x4 SP #2N, SPF #1/#2, DF-L #2 or better,
Bot Chord 2x4 SP #2N or SPF #1/#2 or better,
Webs 2x4 SP #3, SPF #1/#2, DF-L #2 or better,
3NO Attach each valley to every supporting truss with:
535# connection or with (1) Simpson H2,5A or
equivalent connector for
ASCE 7-16 180 mph. 30' Mean Height, Part. Enc,
Building, Exp. C, Wind TC DL=5 psf, Kzt = 1.00
Or
ASCE 7-16 160 mph. 30' Mean Height, Part. Enc.
Building, Exp. D, Wind TIC DL=5 psf, Kzt = 1.00
Bottom chord may be square or pitched cut
as shown.
Valleys short enough to be cut as solid triangular
members from a single 2xG, or larger as required,
shall be permitted in lieu of fabricating from
separate 2x4 members.
All plates shown are Alpine Wave Plates.
3X4
12
12 Max.
2X4 X4
8-0-0 max
4X4
12
12 Max, I
1X3
Unless specified otherwise on engineer's sealed design, for vertical
valley webs taller than 7-9' apply 2x4 'T' reinforcement, 80% length of
web, same species and grade or better, attached with 10d box
(0.128" x 3,0') nails at 6' o,c, In lieu of "T" reinforcement, 2x4 Continuous
Lateral Restraint applied at mid -length of web is permitted with diagonal
bracing as shown in DRWG BRCLBANC1014,
Top chord of truss beneath valley set must be braced with;
properly attached, rated sheathing applied prior to valley truss
installation,
Or
Purlins at 24' oz. or as otherwise specified on engineer's sealed design
Or
By valley trusses used in lieu of purlin spacing as specified on
Engineer's sealed design,
www Note that the purlin spacing for bracing the top chord of the truss
beneath the valley is measured along the slope of the top chord,
++ Larger spans may be built as long as the vertical height does
not exceed 14'-0",
Pitched Cut
Bottom Chord
Valley
1X3 (Max Spacing) \\2X4
1X3 5X4/SPL 1X3
Valle
Spacing
SP°
Square Cut
Bottom Chord
Valeev
2X4 4X4
Stubbed Valley Optional. Hip
End Detail Joint Detail
mat 24"uo�
e e e e e e e e e
i �� ommon Tr usses Partial Framing
20-0-0 (++) 0" p r�.,.at 24" O.C. Plan
Supporting trusses at 24' o,c, maximum spacing,
aVARNDJGIa READ AND FOLLOW ALL NOTES ON THIS nRAWDaa
NNIMPORTANT" FURNISH THIS BRAVING TO ALL CONTRACTORS INCLUDING THE INSTALLERS.
zNo 70770
IX LL 30
30
40PSF
REF VALLEY DETAIL
DATE 01/26/2018
followTru ion,lntses Quire extreest edtionmofcare BCSIICB (Building Cor�iponen{lSnfetypI fOrnntioln, by Pland banB BCA)Refer
for safety
*
TZ DL 20
15
7PSF
®
ALPINE
AN ITW COMPANY
514 Earth City Expressway
Suite 242
Earth City, MO63045
temporary bracing per m chord
Lines, no prior he performing these functions. Installers shall structural
Unless noted otherwise, top chord shall have properly attached permanent sheathing and bottom chord
shall have a property attached rigid cellWg. Locations shown for permanent lateral restraint of webs
shall have bracing Installed per BCSI sections B3, B7 or BIO, as applicable. Apply plates to each face
of truss and position as shown above and on the Joint Details, unless noted otherwise.
Refer !o drawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from
this drawing, any failure to build the truss In conformance with ANSI/TPI 1, or for handling, shipping,
installation & bracing of trusses.
A seal on this drawing or cover page Ustirg this drawing, Indicates acceptance of professional
engMxerkg resporws6Blty solely for the tlesign shown. The suitability and use of this drawling
for any structure Is the responsEllity of the BuI1Wg Designer per ANSI/TPI 1 Sec2.
For more Information see this Job's general notes page and these web sites,
ALPINE: www.alpineitw.comi TPI, www.tpinst.orgi SBCAt www.sbcacomponents.comi ICG wwwJccsafe.org
fl • ;
,A
i Y ', STATE OF
O . (�
�•''�<
�S • .
I40 lS a/
�1
f��111111 kO1i 2 22
COA#0-278
B'i DL 10
C LL 0
T❑T, LD, 60
10
0
10 PSF
0 PSF
57PSF
DRWG VAL180160118
55
DUR.FAC.1.25✓1.33
1.15
1.15
SPACING
24,0"
Valley Detail - ASCE 7-16: 30' Mean Height, Enclosed, Exp, C, Kzt=1,00
Top Chord 2x4 SP #21N, SPF #1/#2, DF-L #2 or better,
Bot Chord 2x4 SP #21N or SPF #1/#2 or better.
Webs 2x4 SP #3, SPF #1/#2, DF-L #2 or better,
34�31`� Attach each valley to every supporting truss with:
(2) 16d box (0,135' x 3,5') nails toe -nailed for
ASCE 7-16, 30' Mean Height, Enclosed Building, Exp. C,
Wind TC DL=5 psf, Kzt = 1.00, Max, Wind Speed based on
supporting truss material at connection location:
170 mph for SP (G = 0,55, min,),
155 mph for DF-L (G = 0.50, min,), or
120 mph for HF & SPF (G = 0.42, min.).
Maximum top chord pitch is 10/12 for supporting trusses
below valley trusses.
Bottom chord of valley trusses may be square or
pitched cut as shown,
Valleys short enough to be cut as solid triangular
members from a single 2x6, or larger as required,
shall be permitted in lieu of fabricating from
separate 2x4 members,
All plates shown are Alpine Wave Plates,
3X4
12
12 Max, I
2X4 X4
8-0-0 Max
4X4
12
12 Max. I
1X3
1X3
1X3 5X4/SPL
3
(Max Spacing)
1X3
20-0-0 (++)
Supporting trusses at 24' o,c, maximum spacing,
2X4
Unless specified otherwise on engineer's sealed design, for vertical
valley webs taller than 7-9' apply 2x4 'T' reinforcement, 80% length of
web, same species and grade or better, attached with 10d box
(0,128' x 3.0') nails at 6' o.c. In lieu of 'T' reinforcement, 2x4 Continuous
Lateral Restraint applied at mid -length of web is permitted with diagonal
bracing as shown in DRWG BRCLBANC1014.
Top chord of truss beneath valley set must be braced with:
properly attached, rated sheathing applied prior to valley truss
installation.
Or
Purlins at 24' o.c, or as otherwise specified on engineer's sealed design
Or
By valley trusses used in lieu of purlin spacing as specified on
Engineer's sealed design,
www Note that the purlin spacing for bracing the top chord of the truss
beneath the valley is measured along the slope of the top chord.
++ Larger spans may be built as long as the vertical height does
not exceed 14'-0'.
Valle
Spacing
Pitched Cut
Bottom Chord
Valley
oe-nailed /
12
10 Max. I Q��\\fig
G
SQo-
MWARNINGIa READ AND FOLLOW ALL NOTES ON THIS DRAWIM
■MIIFORTANTM FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS.
Trusses require extreme care In fabricating, handling, shipping, Installing and bracing. Refer to and
follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety
Practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. structural
noted Unless otherwise, top chord shall have properly attached structural sheathing and bottom chord
shall have a properly attached rigid ceiling. Locations shown for permanent lateral restraint of webs
shalt have bracing installed per BCSI sections B3, B7 or B10, as apptkoble. Apply plates to each face
LPI N E of truss and pas shown above and on the Joint Details, unless noted otherwise.
Refer to drawingsgs 160 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from
this drawing, any failure to build the truss In conformonce with ANSI/TPI 1, or for handling, shipping,
AN ITW COMPANY Instatlatlon S. bracing of trusses.
A seal on this drawing or cover page Usting this drawing, Indicates acceptance of professional
514 Earth City Expressway ergIneer4g responsbpity solely for the design shown The suitability and use of this drawing
suite 242 For any structure k the responsbpity of the Building Designer per ANSI/TPI 1 Sec2.
Earth City, MO 63045 For more information see this Job's general notes page and these web sites -
ALPINE, www.elpineitw.com; TPIt www.tpinst.org; SBCA, www.sbcacomponents.con) ICC, www.iccsafe.org
Square Cut
Bottom Chord
\/ ,11-
2X4
Stubbed Valley
End Detail
�..J._. Common Tf usses I
No 70773
• ,k
SCTAOTE O
0ON"tii
COA#0-278
Optional Hip
Joint Detail
24'
Partial Framing
Plan
*TC LL 30 30 40PSF REF VALLEY DETAIL
'TC DL 20 15 7PSF DATE 01/26/2018
' BC DL 10 10 10 PSF DRWG VALTN160118
BC LL 0 0 0 PSF
T❑T, LD, 60 55 57PSF
DUR,FAC,1,25/1.3311.1511.1'
SPACING 24,0'