Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PROJECT INFORMATION
Project Summary • Entire House AIR CONCITIGNIN4, INC. Lindstrom Air Conditioning 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421.4117 Fax: 954-420.0064 Web www.lindstromair.com Proilect Information For: HOMECRETE Notes: LEWIS ST. Design Information Weather: Winter Design Conditions Outside db 42 Inside db 70 OF Design TD 28 OF Heating Summary Structure 20992 Btuh Ducts 3491 Btuh Central vent (65 cfm) 1999 Btuh Outside air Humidification 0 Btuh Pi in Equipment load 2W1 Btuh Infiltration Fort Pierce, FL, US Method Simplified Construction quality Average Fireplaces 0 Area ft� ( �ft3) He 2051 Cool Volume 20510 20510 Air changes/hour 0.32 0.16 Equiv. AVF (cfm) 109 55 Heating Equipment Summary Make CARRIER Trade Model CH16NA036 AHRI ref Efficiency 8.5 HSPF Heating input Heating output Temperature rise 34600 Btuh @ 47°F 26 OF Actual air flow 1200 cfm Air flow factor 0.049 cfm/Btuh Static pressure 0 in H2O Space thermostat Capacity balance point = 0 OF Backup: CARRIER 5 KW Input = 5 kW, Output = 16908 Btuh, 100 AFUE Job: Date: 6-2021 By: LINDSTROM Summer Design Conditions Outside db 90 OF Inside db 75 OF Design TD 15 OF Daily range L Relative humidity 50 % Moisture difference 61 gr/lb Sensible Cooling Equipment Load Sizing Structure 17156 Btuh Ducts 5762 Btuh Central vent (65 cfm) 1071 Btuh Outside air Blower 0 Btuh Use manufacturer's data n Rate/swing multiplier 0.95 Equipment sensible load 22790 Btuh Latent Cooling Equipment Load Sizing Structure 3285 Btuh Ducts 1669 Btuh Central vent.(65 cfm) 2713 Btuh Outside air Equipment latent load 7667 Btuh Equipment Total Load (Sen+Lat) 30456 Btuh Req. total capacity at 0.80 SHR 2.4 ton Cooling Equipment Summary Make CARRIER Trade Cond CH16NA036 Coil FX4DNF037 AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 16 SEER 28000 Btuh 7000 Btuh 35000 Btuh 1200 cfm 0.052 cfm/Btuh 0 in H2O 0.76 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft" 2D21-Jun-19 11:11:44 - Right-SuReO Universal 2019 19.0.12 RSU08398 ..oil= ENERGYIA- MANUAL JiHOMECRETE ENGLISH.rup Cat = MJ8 Front Door faces: N Page 1 Right-J® Worksheet Job: Entire House Date: 6-2021 - Lindstrom Air Conditioning By: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax 954-42n-nnF.4 WAh www linrictrmmni-m 1 2 Room name Exposed wall ire En tirelHouse BED 4 3 Room height 195.5 27ft 4 Room dimensions 10.0 ft 10.0 ft heat/cool 5 Room area 2051.0 ft' 12.8 x 14.0 ft 179.0 ft' Ty Construction U-value Or HTM Area (ft') Load Area (ft') Load number (Btuh/W-"F) (Btuhlft' or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V'J 13A-6ocs 1 D-h2cm 0.111 n 3.11 1.75 520 464 1442 814 150 134 416 235 1 i FO 0.330 0.280 n n 9.24 7.84 10.19 8.12 32 0 296 326 16 0 148 163 13A-6ocs 0.111 e 3.11 1.75 24 295 24 207 188 643 195 363 0 0 0 0 0 0 11 1013-b 0 750 e 21,00 24.63 24 29 504 591 0 0 0 0 0 0 VJ 1 D-h2om 13A-6ocs 0.330 e 9.24 10.91 64 123 591 698 0 0 0 0 I-D 11GO 0.111 0.540 s is 3.11 15.12 1.75 15.66 500 24 476 24 1479 363 835 0 0 0 0 W 13A-6ccs 0,111 w 3.11 1.75 560 489 1520 376 858 0 0 0 0 0 0 0 1 D-h2om 0.330 w 924 28.23 7 1 65 198 0 0 0 0 0 1D-h2om 0.330 w 9.24 28.68 16 1 148 469 0 0 0 0 P ID-h2omd 12B-Obw 0.330 w 9.24 10.19 48 96 444 489 0 0 0 0 1 -D 11 DO 0.097 0.390 - n 2.72 10.92 0.85 11.31 180 22 158 22 429 135 120 120 326 102 C F 1613-19md 0.049 n 1.37 2.57 2051 2051 240 2814 249 5276 0 179 0 179 0 246 0 460 22A-tfm 1.180 n 33.04 0.00 2051 196 6459 0 179 27 892 0 6 c) AED excursion 844 -31 Envelope loss/gain 17625 12704 2028 930 12 a) Infiltration b) Room ventilation 3366 902 269 72 0 Ol 0 0 13 Internal gains: Occupants @ 230 5 1150 1 230 Appi{anceslofher 2400 p Subtotal (lines 6 to 13) 20992 17156 2297 1232 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 20992 17156 2297 1232 171,0 34% 3491 5762 17% 34% 382 414 Total room load Air required (cfm) 24462 22919 2679 1645 1200 1200 131 86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed _ +}� wr�gl�tsoPt Right-SuileO Universal 2019 19.0 12 RSU08398 2021-Jun-19 11:11 44 �P` ..OJECTS ENERGYIA- MANUAL JIHOMECRETE ENGLISH rup Calc = MJ8 Front Door faces: N Page 1 I Right-J® Worksheet Entire House Lindstrom Air Conditioning 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954-49041.064 %A/Ph ... Job: Date: 6-2021 By: LINDSTROM 1 2 Room name Exposed wall LAUNDRY DINING KITCHEN 3 Room h~ght 10.0 ft 17.0 it 4 Room dimensions 10.0 ft heat/cool 10.0 ft heaUCool 5 Room area 6.0 x 7.0 ft 42.0 ft' 24.0 x 19.0 ft 456 0 ft` Ty Construction U-value Or HTM Area (ft') Load Area (ft') Load number (Btuh/ft2_ °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Gross N/P/S Heat Cool Gross N!P/S Heat Cool 6 U 13A-6ocs 0.111 n 0 0 0 0 0 0 1D-h2om 0.330 n T21.002�4.63 0 0 0 0 0 0 0 0 0 0 UrJ 11FO 13A-6ocs 0.280 OA11 n e 0 0 0 0 0 0 0 0 0 0 11 �L-�G 1OB-b 0.750 e 0 0 0 0 0 0 170 24 114 14 354 504 200 591 t—D ID-h2om 0,330 0.111 a s 9.24 3.11 10.91 1.75 0 40 0 0 0 32 31 296 $49 19G-06ocs 0.540 s 15.12 15.66 0 40 0 124 0 70 0 0 0 0 0 0 0 U,V 13A-6ocs 0.111 w 3.11 1.75 0 0 0 0 0 0 0 0 1 D-h2om 0,330 w 9.24 28.23 0 0 0 0 0 0 0 0 0 0 L��GGC 1D-h2om 0.330 w 9.24 28.68 0 0 0 0 0 0 0 0 PI L 1D-h2omd 12B-Obw 0,330 0.097 w - 9.24 2.72 10.19 0.85 0 60 0 38 0 103 0 32 0 0 0 0 --D c 11 DO 166-19md 0.390 n 10.92 11.31 22 22 240 249 0 0 0 0 0 0 0 0 F 22A-tpm 0.049 1.180 n n 1.37 33.04 2 57 0.00 42 42 42 10 58 330 108 0 456 456 626 1173 456 17 562 0 6 c) AED excursion 17 B9 Envelope loss/gain 856 443 2341 2224 12 a) Infiltration b) Room ventilation 72 19 305 82 0 C 0 0 13 Intemal gains: Occupants @ 230 0 0 0 Appliances/other 200 0 1200 Subtotal (lines 6 to 13) 928 662 2646 3506 Less external load 0 C Less transfer 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct 17% 34°c 928 154 662 222 171,0 34% 2546 440 3506 1177 Total room load Air required (cfm)---L 1082 884 3087 4683 53 46 151 245 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed _ "�i'f wrigFatsofet= • Right -Suite® 2021-Jun-191111:44 Universal 2019 19.0.12 RSU08393 ACC" ...OJECTS ENERGY\A- MANUAL J\HOMECRETE ENGLISH.rup Calc = MJ8 Front Door faces N Page 2 Oft w Job Right-J® Worksheet Entire House Date: 6-2021 --- Lindstrom Air Conditioning By: LINDSTROM 35B1 W MCNAB RD, POMPANO BEACH. FL 33069 Phone 954-421-4117 Fax 954-47n-nnac %.h 1 Room name 2 Exposed wall BED 3 BED 2 3 Room height 11.0 ft 29.0 ft 4 Room dimensions 10.0 ft heat/cool 10 0 ft heat/cool 5 Room area TO x 7.0 ft 16.0 x 13.0 ft 49.0 ft' 208.0 ft' Ty Construction U-value Or HTM Area (w) Load Area (ft') Load number (Btuhrft2-IF) (Btuhft) or perimeter (ft) (Stuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cc& Gross N/P/S Heat Cool 6VLG 13A-6ocs 1 D-h2cm 0.111 n 3.11 1.75 110 94 292 165 160 160 497 281 D 11FO 0.330 0.280 n n 9.24 7.84 10,19 16 0 148 163 0 0 0 0 13A-6ocs 0.111 e 3.11 8.12 1.75 0 0 0 0 0 0 0 0 0 0 0 11 106-b 0.750 e 21.00 24,63 0 0 0 0 0 0 0 0 0 0 1 D-h2om 13A-6ocs 0.330 0.111 e 9.24 10.91 0 0 0 0 0 0 0 0 0 0 0 D 11 G O 0.540 5 s 3.11 15.12 1.75 15.66 0 0 0 0 0 0 0 0 0 0 0 W 13A-6ocs 0.111 w 3.11 1.75 0 0 0 0 0 0 130 0 0 0 1D-h2om 0.330 w 9.24 28.23 0 0 0 0 114 354 200 ID-h2om 0.330 w 9.24 28.68 0 0 0 0 0 16 0 0 0 0 P 1D-h2cmd 12B-Obw 0.330 w 9.24 10.19 0 0 0 0 0 0 148 0 459 0 L-D 11 DO 0.097 0.390 - n 2.72 10.92 0.85 11.31 0 0 0 0 0 0 0 0 0 0 C F 16B-19md 22A-tprn 0.049 1.180 n 1.37 2.57 49 49 0 67 0 126 0 208 0 208 0 285 0 535 n 33.04 0.00 49 11 363 0 208 29 958 0 6 c) AED excursion -18 178 Envelope lossigain 871 436 2243 1653 12 a) Infiltration b) Room ventilation 197 53 521 139 0 0 0 0 13 Internal gains: Occupants d, 230 1 230 1 Appliances/other 230 0 0 Subtotal (lines 6 t0 13) 1068 719 2764 2022 Less external load Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 1068 719 2764 2022 171/o 341,o 176 241 17% 34% 460 679 Total room load Air required (cfm) 1246 960 23 32141 2 50 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed ��: wYri9��tsott` �'�� ---Right-Bode2021-Jun-19 11:11 44 © Universal 2019 19.0.12 RSU08396 Page 3 ..OJECTS ENERGYIA- MANUAL JIHOMECRETE ENGLISH.rup Calc = MJ8 Front Door faces: N Right-J® Worksheet Job: Entire House Date: 6-2021 Lindstrom Air Conditioning By: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954-420-0064 Web: www lindstromaircom 1 2 Room name Exposed wall GREAT ROOM MASTER SUITE 3 Room height 24.0 ft 30.5 ft 4 Room dimensions 10.0 ft heat/cool 10.0 ft heat/cool 5 Room area x 20.0 ft x 18.0 ft 440.0 ft:22.0 252.0 n214.0 Ty Construction U-value Or HTM Area (ft2) Load Area (ft') Load number (Btuh/ft2-°F) (Btuhrft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/PIS Heat Cool 6 V)/ 13A-6ocs 0,111 n 3.11 1.75 0 0 0 0 0 (D 1D-h2om 0.330 n 9,24 10.19 0 0 0 0 0 0 0 0 0 0 IW 11FO 13A-6ocs 0.280 0.111 n e 7.84 3.11 8.12 1.75 0 0 0 0 0 0 0 0 0 0 11 L� 108-b 0.750 e 21.00 24.63 0 0 0 0 0 0 0 125 0 93 289 163 Uj1 1D-h2om 13A-6ocs 0.330 0.111 e 9.24 10.91 0 0 0 0 32 0 31 0 296 0 349 t-D 11GO 0.540 s s 3.11 15.12 1.75 15.66 0 0 0 0 0 0 0 180 180 559 316 IW 13A-6ocs 0,111 w 3.11 1.75 240 192 597 0 337 0 0 0 0 0 0 1 D-h2om ID-h2om 0,330 w 9.24 28.23 D 0 0 0 0 0 0 0 0 0 ID-h2omd 0.330 0330 w w 9.24 9.24 28.68 10.19 0 48 0 48 0 444 0 489 0 0 0 0 P L-D 12B-Obw 0.097 - 2.72 0.85 0 0 0 0 0 0 0 0 0 C 11 DO 0.390 n 10.92 11.31 D 0 0 0 0 0 0 0 0 0 0 F 16B-19md 22A-tpm 0,049 1.180 n 1.37 2.57 44D 440 604 1132 252 252 346 648 n 33.04 0.00 440 24 793 0 252 31 1008 0 6 c) AED excursion 846 52 Envelope losslgain 2437 28D4 2498 1424 12 a) Infiltration b) Room ventilation 431 115 548 147 0 0 0 0 13 Intemal gains. Occupants _O 230 0 0 2 Appliances/other 1000 460 0 Subtotal (lines 6 to 13) F2868 3920 3045 2031 Less external load Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 15 Subtotal Duct loads 0 2868 0 3920 0 3045 0 2031 179 34% 477 1317 17% 34% 506 682 Total room load Air required (cfm) 3345 5236 3552 2713 164 274 174 142 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed wrGgF�tsoft" 2021-Jun-1911*11:44 j4GC� - Right-SuiteW Universal 2019 19.0.12 RSU08398 ...OJECTS ENERGY\A- MANUAL JNHOMECRETE ENGLISH.rup Calc = MJ8 Front Door faces: N Page 4 Right-J® Worksheet Job: Entire House Date: 6-2021 Lindstrom Air Conditioning By: LINDSTROM 3581 W MCNAB RD. POMPANO BEACH FL 33069 Phone. 954-421-4117 Fax: 954-49110(19A woh -,,- 1 Room name 2 Exposed wall MASTER WIC MASTER BATH 3 Room height 0 ft 23.0 ft 4 Room dimensions 10.0 ft heat/cool 10.0 ft heat/coal 5 Room area 6.5 x 8.0 ft x 137ft 52.0 ft' 137.0 ft z10.0 Ty Construction U-value Or HTM Area (ftz) Load Area (ftz) Load Loadturvftz) number (3tuh/ft1-`F) (B or perimeter (ft) (Btuh) or perimeter (ft) Heat Cool Gross NIP/S Heat Cool Gross N/P/S Heat Cool 6 13A-6ocs 0.111 n 3.11 1.75 0 0 0 0 C 1D-h2om 0.330 n 9.24 10.19 0 0 0 0 0 0 0 0 0 D 11FO 13A-6ocs 0.280 0.111 n 7.84 8.12 0 0 0 0 0 0 0 0 0 0 11 108-b 0.750 e e 3.11 21.00 1.75 24.63 0 0 0 0 0 0 0 0 0 0 0 1 D-h2om 0.330 a 9.24 10.91 0 0 0 0 0 0 0 0 0 0 0 T -D 13A-60cs 11GO 0111 s 311 1.75 0 0 0 0 180 180 0 559 0 316 W 13A-6ocs 0.540 0.111 s w 15.12 3.11 15.66 1.75 0 0 0 0 0 0 0 0 0 1 D-h2om 0.330 w 9.24 28.23 0 0 0 0 0 0 0 50 7 43 134 75 1 D-h2om 0.330 w 9.24 28.68 0 0 0 0 0 0 65 198 P 1 D-h2omd 0.330 w 9.24 10.19 0 0 0 0 0 0 0 0 0 p 12B-Obw 0.097 - 2.72 0.85 0 0 0 0 0 0 0 C 1160 16B-19md 0.390 0.049 n 10.92 11.31 0 0 0 0 0 0 0 0 0 0 F 22A-tpm 1.180 n n 1.37 33.04 2.57 0.00 52 52 52 0 71 134 137 137 188 352 0 0 137 23 760 0 6 C) AED excursion -3 76 Envelope loss/gain 71 130 1706 1017 12 a) Infiltration 0 0 b) Room ventilation 413 111 0 0 p p 13 Intemal gains: Occupants @ 230 p p p Appliances/other 0 p 0 Subtotal (lines 6 to 13) 71 130 2119 1128 Less extemal load Less transfer o 0 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 l5 Duct loads 17�<; 34%1 71 12 130 44 17% 34%, 2119 352 1128 379 room load L.-Total Air required (cfm) 83 4 174 2471 15C6 4 i21 79 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed +}� wr�gF�tsolt �`""""'""'°"•"•'��-•^-^-Right-Suite® Universal 2019 19.0.12 RSU08398 2021-Jun-1911:11:44 ..OJECTS ENERGYIA- MANUAL J\HOMECRETE ENGLISH.rup Calc = MJ8 Front Door faces. N Page 5 Right-JO Worksheet Entire House Lindstrom Air Conditioning 3581 W MCNAB RD, POMPANO BEACH, FL 33069 Phone: 954-421-4117 Fax: 954-42n-nnea wPh: w,u,., i Job: Date: 6-2021 By: LINDSTROM 1 2 Room name Exposed wall MASTER TIOLET BATH AT BED 2 3 Room height sions 8.0 ft 10.0 ft heat/cool 6.0 ft 10.0 ft heat/cool 5 Room area 8.0 x 4.0 ft 10.0 x 6.0 ft 32.0 ft' 60.0 ftz Ty Construction U-value Or HTM Area ' (ft) Load Area (ft� Load nt'n� (Btuhlft Z `F) (BtuWft-) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 1QJ 13A-6ocs 0.111 n 3.11 1.75 0 0 0 0 0 0 ; L4G 1 D-h2om 0.330 n 9.24 10.19 0 0 0 0 0 0 0 0 0 0 11FO 13A-6ocs 0,200 0.111 n a 7.84 3.11 8.12 1.75 0 0 0 0 0 0 0 0 0 0 11 1013-1) 0.760 a 21.00 24.63 0 0 0 0 0 0 0 0 0 0 0 0 1qJ 1 D-h2om 13A-6oCa 0.330 0.111 a 9.24 10.91 0 0 0 0 0 0 0 0 0 0 11G0 0.540 s s 3.11 15.12 1.75 15.66 0 0 0 0 0 0 0 100 76 236 133 -D 13A-6ocs 0.111 w 3.11 1.75 80 60 249 0 140 24 60 24 60 363 186 376 105 1 D-h2om 0.330 w 9.24 28.23 0 0 0 0 0 0 0 0 1D-h2om 0.330 w 9.24 28.68 0 0 0 0 0 0 0 0 1 D-h2omd bw 0.330 0,097 w 9.24 2.72 10.19 0.85 0 0 0 0 0 0 0 0 0 11D0 0.390 n 10.92 11.31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C F 16B-19md 22A-tpm 0.049 n 1.37 2.57 32 32 44 82 60 60 82 0 154 1.180 n 33.04 0.00 32 8 264 0 60 6 198 0 6 c) AED excursion -6 21 Envelope loss/gain 557 216 1066 748 12 a) Infiltration b) Room ventilation 144 38 287 77 0 0 0 0 13 Internal gains: Occupants Qa 230 0 0 0 Appliances/other 0 0 0 Subtotal (lines 6 to 13) 700 255 1353 825 Less external load Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 17oro 34%1 700 1161 255 86 17% 34% 1353 225 825 277 Total room load Air required (cfm) 817 340 1578 1102 40 18 771 58 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed +�- 2021-Jun-19 11:11:44 wr-gtstsolt-- Right -Suite® Universal 2019 19.0,12 RSU08398 "4b ...OJECTS ENERGYW MANUAL J\HOMECRETE ENGLISH.rup Caic= MJ8 Front Door faces: N Page 6 OZ. Right-J® Worksheet Job: Entire House Date: 6-2021 Lindstrom Air Conditioning By: LINDSTROM 3581 W MCNAB RD, POMPANO BEACH. FL 33069 Phone: 954-421-4117 Fax 954-420-0064 Weh www IMn t-i- 1 2 Room name Exposed wall BATH AT BED 3 WIC BED 3 3 Room height Room dimensions 10.0 ft ft heat/cool 0 ft10.0 10.0 ft heat/cool 5 Room area 12.0 x 6.0 ft 12.0 x 6.0 ft 72.0 ft2 72.0 ft' Ty Construction U-value Or HTM Area (ft2) Load Area (ft') Load number (Btuh/ft'-'F) (BtutVft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross NIP/S Heat Cool 6 V�j 13A-6ocs 0.111 n 3.11 1.75 100 76 236 133 0 0 0 iD-h2om 0.330 n 9.24 10.19 0 0 0 0 0 0 0 0 11FO 13A-60cs 0.280 0.111 In e 7.84 3.11 8.12 1.75 24 24 188 195 0 0 0 0 0 11 1OB-b 0.750 e 21,00 24.63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10-h2om 0,330 e 9.24 10.91 0 0 0 0 0 0 0 0 0 t 13A-6ocs 0.111 s 3.11 1.75 0 0 0 0 0 0 0 W 11 G O 13A-6ocs 0.540 0.111 s w 15.12 3.11 15.66 1.75 0 0 0 0 0 0 0 0 0 0 0 1 D-h2om 0,330 w 9.24 2823 0 0 0 0 0 0 0 0 0 0 0 0 0 1 D-h2om 0.330 w 9.24 28.68 0 0 0 0 0 0 0 0 1 D-h2omd 0.330 w 9,24 1019 0 0 0 0 0 0 0 0 0 0 P l-D 128-Oi w 0.097 - 2.72 0.85 0 0 0 0 0 0 0 C 11 DO 0.390 n 10.92 11.31 0 0 0 0 0 0 0 0 0 F 16B-19md 22A-tpm 0.049 1.180 n 1.37 2.57 72 72 99 185 72 72 99 185 n 33,04 0.00 72 10 330 0 72 0 0 0 6 c) AED excursion -14 -5 Envelope loss/gain 854 4991 99 181 12 a) Infiltration ISO 48 0 0 b) Room ventilation 0 0 0 0 13 Intemal gains: Occupants @ 230 0 0 0 Appliances/other 0 0 0 Subtotal (lines 6 to 13) 1033 548 99 181 Less external load Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 0 0 0 0 15 Duct loads 17% 34% 1033 172 548 184 17% 34% 99 16 181 61 Total room load Air required (cfm) ::77 1 1205 731 115 241 59 38 6 13 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed -�'�- wrigF�tsoft•' �•• - Right-Suite2021-Jun-19 11:11:44d Universal 2019 19.0.12 RSU08398 ...OJECTS ENERGY\A- MANUAL J\HOMECRETE ENGLISH.rup Cale = MJ8 Front Door faces: N Pages 7 FORM R405-2020 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: HOMECRETE ENGLISH RES Builder Name: HOMECRETE HOMES Street: LEWIS ST. Permit Office: City, State, Zip: FORT PIERCE, FL, Permit Number: Owner: ENGLISH RES Jurisdiction: Design Location: FL, Fort Pierce County: St. Lucie (Florida Climate Zone 2 ) I. New construction or existing New (From Plans) 10, Wall Type$1755.0 sqft.) Insulation Area 2. Single family or multiple family Detached a. Concrete Block - Int Insul, Exterior R=6.5 1575.00 ft2 3. Number of units, if multiple family 1 b. Frame - Wood, Adjacent R=11.0 180.00 ftz 4. Number of Bedrooms 3 c. N/A d. N/A R= ft2 R= ft2 5. Is this a worst case? No 11. Ceiling Types (1971.0 sqft.) Insulation Area 6. Conditioned floor area above grade (ft2) 2051 a. Roof Deck (Unvented) b. N/A R=20.0 1971.00 ftZ Conditioned floor area below grade (ft2) 0 c. N/A R= ft2 R= ft2 7. Windows(197.7 sqft.) Description Area 12. Ducts R ft2 a. U-Factor: Dial, U=0.31 197.67 ft2 a. Sup: GREAT ROOM, Ret: DINING KITCHEN, AH 6 300 SHGC: SHGC=0.19 b. U-Factor: N/A SHGC: ftZ 13. Cooling systems kBtu/hr Efficiency C. U-Factor: N/A a. Central Unit 35.0 SEER:16.00 ft2 SHGC: Area Weighted Average Overhang Depth: 6.640 ft. 14. Heating systems kBtu/hr Efficiency Area Weighted Average SHGC: 0.190 a. Electric Heat Pump 34.6 HSPF:8.50 8. Skylights Area c. U-Factor:(AVG) N/A ft2 SHGC(AVG): N/A 15. Hot water systems 9. Floor Types (1971.3 sqft.) Insulation Area a. Electric Cap: 50 gallons a. Slab -On -Grade Edge Insulation R=0.0 1971.30 ftz b. Conservation features EF: 3.000 b. N/A R= ftz None c. N/A R= ft2 16. Credits Pstat Glass/Floor Area: 0.096 Total Proposed Modified Loads: 54.02 PASS Total Baseline Loads: 61.99 I hereby certify that the plans and spec' cations covered by Review of the plans and EKE S7,q?, this calculation are in compliance with Code. a Florida E ergy specifications covered by this O� calculation indicates compliance PREPARED BY: with the Florida Energy Code. Before i~ ,,,,,,�-„ •=`;-,;;, ``„ p construction is completed DATE: this building will be inspected for 1' compliance with Section 553.908 I hereby certify that this build' s n d, is in compliance Florida Statutes. �~ with the Florida Energy Cod WE OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). 6/19/2021 11:31 AM EnergyGaugee USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 6 FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: HOMECRETE ENGLISH RES Bedrooms: 3 Address Type: Street Address Building Type: User Conditioned Area: 2051 Lot # Owner Name: ENGLISH RES Total Stories: 1 Block/Subdivision: # of Units: 1 Worst Case: No PlatBook: Builder Name: HOMECRETE HOMES Rotate Angle: 180 Street: LEWIS ST. Permit Office: Cross Ventilation: No County: St. Lucie Jurisdiction: Whole House Fan: No City, State, Zip: FORT PIERCE, Family Type: Detached New/Existing: New (From Plans) FL, Comment: CLIMATE Design Temp Int Design Temp Heating Design Daily Temp Design Location TMY Site 97.5 % 2.5 % Winter Summer Degree Days Moisture Range FL, Fort Pierce FL_VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume 1 Entire House 2051 20510 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 BED 3 188 1880 No 1 3 1 No Yes Yes 2 LAUNDRY 42 420 No 0 1 No Yes Yes 3 DINING KITCHEN 634 6340 No 0 1 No Yes Yes 4 BATH TUB 49 490 No 0 1 No Yes Yes 5 BATH SINK 49 490 No 0 1 No Yes Yes 6 BED 2 208 2080 No 1 1 No Yes Yes 7 GREAT ROOM 204 2040 No 0 1 No Yes Yes 8 GRT RM HALF 204 2040 No 0 1 No Yes Yes 9 MASTER SUITE 252 2520 No 2 1 No Yes Yes 10 MASTER WIC 52 520 No 0 1 No Yes Yes 11 MASTER BATH 137 1370 No 0 1 No Yes Yes 12 MASTER TIOLET 32 320 No 0 1 No Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab -On -Grade Edge Insulatio BED 3 27 ft 0 188.3 ft2 ____ 0 0 1 2 Slab -On -Grade Edge Insulatio LAUNDRY 10 ft 0 42 ft2 -___ 1 0 0 3 Slab -On -Grade Edge Insulatio DINING KITCHE 17 ft 0 456 ft2 _--- 1 0 0 4Slab-On-Grade Edge Insulatio BATH TUB 7 ft 0 49 ft2 _ 1 0 0 5SIab-On-Grade Edge Insulatio BATH SINK 1 ft 0 49 ft2 _-__ 1 0 0 6/19/2021 11:31 AM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 6 FORM R405-?ron IAIDI IT 4211nAnnnov d-Urrowt ic+-r ...... ■ v■ I 1AL-1 - vn 1 FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 6 Slab -On -Grade Edge Insulatio BED 2 29 ft 0 208 ft2 0 0 1 7 Slab -On -Grade Edge Insulatio GREAT ROOM 12 ft 0 302 ft2 ___ 0 0 1 8SIab-On-Grade Edge Insulatio GRT RM HALF 12 ft 0 204 ft2 0 0 1 9 Slab -On -Grade Edge Insulatio MASTER SUITE 30.5 ft 0 252 ft2 0 0 1 10SIab-On-Grade Edge Insulatio MASTER WIC 1 ft 0 52 ft2 ____ 0 0 1 11SIab-On-Grade Edge Insulatio MASTER BATH 23 ft 0 137 ft2 ____ 1 0 0 12SIab-On-Grade Edge Insulatio MASTER TIOLET 8 ft 0 32 ft2 -___ 1 0 0 ROOF Roof Gable Roof Rad Solar SA Emitt Emitt Deck Pitch v # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 Hip Metal 2222 ft2 0 ft2 Medium N 0.9 No 0.9 No 20 22.6 ATTIC / V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 Full attic Unvented 0 2051 ft2 N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic (Unvented) BED 3 0 Blown 188 ft2 0.1 Wood 2 Under Attic (Unvented) LAUNDRY 0 Blown 42 ft2 0.1 Wood 3 Under Attic (Unvented) DINING KITCHE 0 Blown 456 ft2 0.1 Wood 4 Under Attic (Unvented) BATH TUB 0 Blown 49 ft2 0.1 Wood 5 Under Attic (Unvented) BATH SINK 0 Blown 49 ft2 0.1 Wood 6 Under Attic (Unvented) BED 2 0 Blown 208 ft2 0.1 Wood 7 Under Attic (Unvented) GREAT ROOM 0 Blown 302 ft2 0.1 Wood 8 Under Attic (Unvented) GRT RM HALF 0 Blown 204 ft2 0.1 Wood 9 Under Attic (Unvented) MASTER SUITE 0 Blown 252 ft2 0.1 Wood 10 Under Attic (Unvented) MASTER WIC 0 Blown 52 ft2 0.1 Wood 11 Under Attic (Unvented) MASTER BATH 0 Blown 137 ft2 0.1 Wood 12 Under Attic (Unvented) MASTER TIOLET 0 Blown 32 ft2 0.1 Wood WALLS Adjacent Space Cavity Width - Height Sheathing Framing Solar Below o _ 1 S=>N Exterior Concrete Block - Int Insul BED 3 6.5 15 0 10 0 150.0 ft2 0 0 0.5 0 2 N=>S Exterior Concrete Block - Int InsuLAUNDRY 6.5 4 0 10 0 40.0 ft2 0 0 0.5 0 _, 3 W=>E Exterior Concrete Block - Int InsDBNING KITC 6.5 17 0 10 0 170.0 ft2 0 0 0.5 0 _ 4 S=>N Exterior Concrete Block - Int InsuBATH TUB 6.5 7 0 10 0 70.0 ft2 0 0 0.5 0 6/19/2021 11:31 AM EnergyGaugeV USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 6 FORM R405-2020 INIDI IT cl I11AAAAOV i+uct11.r1 ic•-r oCr%r%mT - - - .-... ■ v■ ■a�vr��w 1XLf VR 1 WALLS Adjacent Space Cavity Width - Height Sheathing Framing Solar Below o _ 5 E=>W Exterior Concrete Block - Int Insul BED 2 6.5 13 0 10 0 130.0 ft2 0 0 0.5 0 6 S=>N Exterior Concrete Block - Int Insul BED 2 6.5 16 0 10 0 160.0 ft2 0 0 0.5 0 7 E=>W Exterior Concrete Block - Int InsGREAT ROO 6.5 12 0 10 0 120.0 ft2 0 0 0.5 0 _ 8 E=>W Exterior Concrete Block - Int InsQRT RM HAL 6.5 12 0 10 0 120.0 ft2 0 0 0.5 0 - 9 N=>S Exterior Concrete Block - Int InsMASTER SUI 6.5 18 0 10 0 180.0 ft2 0 0 0.5 0 _ 10 W=>E Exterior Concrete Block - Int InsMASTER SUI 6.5 12 6 10 0 125.0 ft2 0 0 0.5 0 _ 11 N=>S Exterior Concrete Block - Int InsMASTER BA 6.5 18 0 10 0 180.0 ft2 0 0 0.5 0 _ 12 E=>W Exterior Concrete Block - Int InsNASTER BA 6.5 5 0 10 0 50.0 ft2 0 0 0.5 0 _ 13 E=>W Exterior Concrete Block - Int InsMASTER TIO 6.5 8 0 10 0 80.0 ft2 0 0 0.5 0 _ 14 E=>W Garage Frame - Wood BED 3 11 18 10 180.0 ft2 0.23 0.75 0 DOORS # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft In 1 E=>W Wood BED 3 None .46 2.8 8 22.4 ft2 2 S=>N Wood BED 3 None .46 6 8 48 ft2 WINDOWS Orientation shown is the entered orientation => changed to As Built rotated 180 degrees). / V/ Wall Overhang # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 S=>N 1 Vinyl Double (Tinted) Yes 0.31 0.19 N 31.7 ft2 1 ft 4 in 1 ft 0 in None None 2 W=>E 3 TIM Double (Tinted) Yes 0.31 0.19 N 24.0 ft2 7 ft 0 in 1 ft 0 in None None 3 W=>E 3 Vinyl Double (Tinted) Yes 0.31 0.19 N 32.1 ft2 7 ft 4 in 1 ft 0 in None None 4 S=>N 4 Vinyl Double (Tinted) Yes 0.31 0.19 N 7.0 ft2 1 ft 4 in 1 ft 0 in None None 5 E=>W 5 Vinyl Double (Tinted) Yes 0.31 0.19 N 15.8 ft2 1 ft 4 in 1 ft 0 in None None 6 E=>W 7 Vinyl Double (Tinted) Yes 0.31 0.19 N 24.0 ft2 12 ft 4 in 1 ft 0 in None None 7 E=>W 8 Vinyl Double (Tinted) Yes 0.31 0.19 N 24.0 ft2 12 ft 4 in 1 ft 0 in None None 8 W=>E 10 Vinyl Double (Tinted) Yes 0.31 0.19 N 32.1 ft2 7 ft 4 in 1 ft 0 in None None 9 E=>W 12 Vinyl Double (Tinted) Yes 0.31 0.19 N 7.0 ft1 ft 4 in 1 ft 0 in None None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 413ft2 413ft2 64ft loft 1 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000444 2392.8 131.28 246.46 .1381 7 6/19/2021 11:31 AM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 6 FORM R405-2020 INP11T SI IMIUeDV ruGrvt ieT oponoT -- -- - -- .--a%. .V 1 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split Singl HSPF:8.5 34.6 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ Split Singl SEER: 16 35 kBtu/hr 1050 cfm 0.77 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric Heat Pump Garage 3 50 gal 60.9 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Cert # Company Name Collector Storage System Model # Collector Model # Area Volume FEF None None ft2 DUCTS / --- Supply --- ---- Return ---- Air CFM 25 CFM25 HVAC # # Location R-Value Area Location Area Leakage Type Handler TOT OUT ON RLF Heat Cool 1 GREAT ROO 6 300 ft2 DINING KITC 1 ft' Default Leakage DINING KIT (Default) (Default) 1 1 TEMPERATURES Programable Thermostat: Y Ceiling Fans: Cooling Jan Feb Mar Venting an Jan Feb ki Mar Apr Apr Jul X Augrl Se May X Jun rl May Jun Jul Aug Sep Oct Nov �X� Oct Dec € Dec Nov Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD) AM 78 PM 80 78 78 78 78 78 78 78 80 80 80 80 80 78 78 78 78 78 78 78 78 78 78 Cooling (WEH) AM 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AM 66 PM 68 66 66 68 68 66 66 68 68 68 68 68 68 68 68 68 68 68 68 66 68 66 66 Heating (WEH) AM 66 PM 68 66 66 68 66 66 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ft2 Off 0.3 BED 3 Default(8 Ibs/sq.ft. ft2 ft 0.3 LAUNDRY Default(8 Ibs/sq.ft. ft2 ft 0.3 DINING KITCHEN Default(8 Ibs/sq.ft. ft2 ft 0.3 BATH TUB Default(8 Ibslsq.ft. ft2 ft 0.3 BATH SINK Default(8 Ibslsq.ft, ft2 ft 0.3 BED 2 Default(8 Ibs/sq.ft. ft2 It 0.3 GREAT ROOM Default(8 Ibs/sq.ft. ft2 It n i ('-DT DhA LIAI C 6/19/2021 11:31 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 5 of 6 FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. ft2 ft 0.3 MASTER SUITE Default(8 Ibs/sq.ft. ft2 ft 0.3 MASTER WIC Default(8 Ibs/sq.ft. ft2 ft 0.3 MASTER BATH Default 8 Ibs/s .ft. ft2 ft 0.3 MASTER TIOLET 6/19/2021 11:31 AM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 6 of 6 FORM R405-2020 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 87 The lower the EnergyPerformance Index, the more efficient the home. 1. New construction or existing 2. Single family or multiple family 3. Number of units, if multiple family 4. Number of Bedrooms 5. Is this a worst case? 6. Conditioned floor area (ft2) 7. Windows— Description a. U-Factor: Dbl, U=0.31 SHGC: SHGC=0.19 b. U-Factor: N/A SHGC: c. U-Factor: N/A SHGC: d. U-Factor: N/A SHGC: Area Weighted Average Overhang Depth: Area Weighted Average SHGC: 8. Skylights Description a. U-Factor(AVG): N/A SHGC(AVG): N/A LEWIS ST., FORT PIERCE, FL, New (From Plans) 10. Wall Type and Insulation Insulation Area Detached a. Concrete Block - Int Insul, Exterior R=6.5 1575.00 ft2 1 b. Frame - Wood, Adjacent R=11.0 180.00 ft2 c. NIA R= ft2 3 d. N/A R= ft2 No 11. Ceiling Type and insulation level Insulation Area a. Roof Deck (Unvented) R=20.0 1971.00 ft2 2051 b. N/A R= ft2 Area c. N/A R= ft2 197.67 ft2 12. Ducts, location & insulation level R ft2 a. Sup: GREAT ROOM, Ret: DINING KITCHEN, AH 6 300 ft2 13. Cooling systems kBtu/hr Efficiency ft2 a. Central Unit 35.0 SEER:16.00 ft2 6.640 ft. 0.190 Area ft2 9. Floor Types Insulation Area a. Slab -On -Grade Edge Insulation R=0.0 1971.30 ft2 b. N/A R= ft2 c. N/A R= ft2 14. Heating systems a. Electric Heat Pump 15. Hot water systems a. Electric b. Conservation features None Credits (Performance method) kBtu/hr Efficiency 34.6 HSPF:8.50 Cap: 50 gallons EF: 3 Pstat certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the ove energy saving features which will be installed (or exceeded) �yO�HE S�^,q��o in this home before final in pection.9therwise, a new EPL Display Card will be completed ty no s ,• based on installed Cod pl, tf tures. � ,�� ,,� ,-: ;;.•,;;,��o Builder Signature: Date: Address of New Home:3 City/FL Zip: oD W'E� "Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. ""Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 6/19/2021 11:31 AM EnergyGaugee USA 7.0,00 - FlaRe52020 FBC 7th Edition (2020) Compliant Software Page 1 of 1