Loading...
HomeMy WebLinkAboutR2C, Engineering.� : � � ƒ \ k ) 2 3 /\ f m )\ 2) { ; ) ®) ƒ» ® \ )) MIN. FILTER SIZE @ "ANSI 15 FLOW' (4) PIPE DIA. MIN. W - STRAIGHT PIPE SIZED BY"ANSI 15 FLOW' @ 6 FPS .� PUMP SIZED BY _ JD- ANSI 15 SELECTED FROM APSP - LISTING AT"ANSI 15 h FILTRATION FLOW' MIN. 18" STRAIGHT (HORIZ OR VERT.) SKIMMER SUCTION MIN SIZE PIPE SIZE CRITERIA (FPS) FOR FUTURE SOLAR PRIOR TO HEATER ANSI 15 FLOW' @ 6 FPS - Pressure Suction ANSI 5 RECIRCULATION RETURNS SWIMOUT WHEN POOL DEPTH EXCEEDS 5 FT ANS115 =,(; @ 8 FIPS ANSI 15 FLOW' RFCIR SURFACE SKIMMER (1) MIN PER 800 SF SUCTION MIN "ANSI 15 FLOW'6 C R SpIIT • MAY BE OMIT EID IF "NEGATIVE EDGE" ORS BSI OTHER WEIR USED #8 AWG SOLID COPPER "ANSI7 FLOW": DETERMINED ONLY BY r qUk ANOI Sp ag F OW' 15 TDH CALC E.G. MAX"ANSI 16 FILTRATON FLOWN 6 HRFLOW) SISFlO tOVy 9 6FP$ TURNOVER, MIN 36 GPM Po Fps "ANSI 16 AUXILIARY FLOW": GREATER BFps OF SPA JET OR OTHER FEATURE FLOW "ANSI 6 FLOW": 12 HR TURNOVER OR OTHER "ESTIMATED/ DESIGN" FLOW PPTIONAL VACUUM�I .^k .'•i LOADEDFITTING MUST HAVE SPRING PIPE FLOW AT GIVEN VELOCITY (GPM) PIPE 6 FPS 8 FPS SUCTION OUTLETS "ANSI 7 FLOW' ill16 22 1-1/2" 38 51 DRAIN BRANCH PIPING MIN. SIZE 2" 63 84 ANSI 15 FLOW' @ 6 FPS 2-1/2" 90 120 3" 138 185 4" 238 318 6" 541 721 TYPICAL RESIDENTIAL POOL / SP/ SCALE: N.T.S. v Il680.26(B)(2)(b) INSTALL I AFTER BACKFILL & COMPACTION \ SUNSHELFAS TOP STEP MAX 1 DECK TO SHELF - SEE ANSI 5 FOR STEP i REQUIREMENTS - MIN 240 SO IN, MAX 12" RISERS TO 4FT WD SPA WEI f: NOTE: CONT. 3 #3 STEEL OF SPA BEAIA VE ICALLY DOWN & UNDER THE ELEVATION OF THE SPA ✓VEIR IF NO WE R OVERFLOW TO POOL, A SKIMMER MUST BE USED IN SPA STEP REQ'D ON SPA BENCH UNLESS RAISED 12" OR MORE DIGIT/1, SIGNATURE INDEX SHEE"IFOR SH'I'S S I S2 PER RULE 611315-23.001(4)(b), F.A.C. FBC NO LONGER REQUIRES EXCAVATIONS OUT OF THE "ANGLE OF REPOSE PLUS 1 FT". THE CURRENT REQUIREMENT IN 7TH ED (2020) FBC, SECTION 1804.1 STATES THAT "EXCAVATIONS SHALL NOT REMOVE VERTICAL OR LATERAL SUPPORT FROM ANY FOUNDATION." THEREFORE THE FOLLOWING IS REQUIRED: OFFSET COMPLIANCE �R PRESUMED WHE ;y OFFSET=WATER, DEPTH "ANGLE OF REPOSE" OR SEE CONTRACTOR PLAN ITY TO STRUCTURE T.S. 1. WHEN THE POOL DECK DISTANCE IS EQUAL TO OR GREATER THAN WATER DEPTH, NO MITIGATION OF THE SHELL STRUCTURE IS REQUIRED, AND NO SHORING OR FOUNDATION SUPPORT INITIALLY REQUIRED. 2. WHEN THE POOL DECK DISTANCE IS LESS THAN THE WATER DEPTH, THE ENGINEER SHALL PROVIDE A MITIGATION SPECIFICATION, EITHER TO PROTECT THE FOUNDATION DURING EXCAVATION OR STRENGTHEN THE SHELL FROM STRUCTURE LOADS. 3, IF DURING EXCAVATION, SOIL CONDITIONS APPEAR TO LEAD TO LOSS OF FOUNDATION SUPPORT, THE CONTRACTOR SHALL CEASE EXCAVATION AND CONTACT THE ENGINEER FOR MITIGATION SPECIFICATIONS. 4. IF AFTER EXCAVATION THE CONTRACTOR OR INSPECTOR FIND A LOSS OR THREATENED LOSS OF SOIL SUPPORT AT THE FOUNDATION, CONTACT THE ENGINEER FOR MITIGATION SPECIFICATION. i ¢1ETERMINE PIPE SIZING FROM ATTACHED ANSI WORKSHEETS. SPA PIPING DETERMINED FROM ATTACHED WORK SHEETS. DUAL MAIN DRAINS SHALL HAVE A MINIMUM SEPARATION OF 3 FT, UNLESS ONE IS LOCATED ON A VERTICAL WALL OR A SINGLE UNBLOCKABLE DRAIN IS USED. • ALL SUCTION COVERS SHALL MEET ANSI/APSP/ICC-16 2017 • ALL PIPING SHALL BE NSF-PW APPROVED & MEET THE REQUIREMENTS OF 7TH ED, (2020 FBC. • ELECT ICAL EQUIPMENT, WIRING, & INSTALLATION SHALL CONFORM TO THE NFPA 70- 2017 EDITION. • BONDING OF POOL STEEL & LIGHT TO FOOTING STEEL SHALL BE CONTINUED TO & INCLUDE ALL PUMPS & HEATERS. • TEMPORARY FENCING SHALL BE INSTALLED & MAINTAINED UNTIL PERMANENT CHILD SAFETY FEATURES ARE INSTALLED. • THERE SHALL BE A PASSING ELECTRICAL & CHILD SAFETY FINAL INSPECTION PRIOR TO FILLING THE POOL OR SPA WITH WATER. POOL SHALL MEET THE APPLICABLE CRITERIA IN ANSI/APSP 3,4,5S, 7 & 15 STANDARDS ADOPTED IN 7TH ED. (2020) ANSI 7 NOTE TO REVIEWER: DETAILED TDH CALCULATIONS ARE REQUIRED TO DETERMINE ANSI 7- SUCTION ENTRAPMENT COMPLIANCE COMPLIES WITH 7TH ED. ((2020) FBC, ALL VbLUMES 20RQW2C099 „N �ve� cr" i9 U a bb � D ¢E (� Cn E s Z ro a Lux 2 j Y W 55 i�WZ Yy Z sgoe a" r ®�E t✓ mat � O ti N tiY U) d Z U) O U 0 wO_ U) D- 06a Z H- J W ao a WLU U f-- 0 -S 1 SHEET 1 OF 2 EXTERNAL BONDING LUG FROM "LISTED" J-BOX WHEN PROVIDED BONDED WITHIN J BOX. POOL DECK W/ NON SLIP FINISH SLOPED 2%-4 % AWAY FROM POOL (3) #3 REBAR BUNDLED AT RIM OF POOLLGRADE & SPA. CONT. #3 STL. OF SPA BEAMVERT. DOWN & UNDER ELEV. OF SPAWEIR. (OPTION:]CONTRACTORS MAYCHOOSE TO USE #3 BARS WITHINTOP (3) OF BEAM SPACE 1" APART+OR - �' E WALL y ( .v x. INLET w'',z OPTIONAL VACUUM LINE & FITTING o'j,� W/ SPRING LOADED COVER z UNDERWATER LIGHT 18" MIN BLW w — NORMAL WATER LEVEL (TYP) >.m NOTE: NEW NICHELESS POOL z',r LIGHT PRODUCTS THAT HAVE NO g ¢ BONDING REQMTS MAY BE USED a. 3/8 SMOOTH SLIP RESISTANT w. FINISH TO COVER WALLS FI nnP RTFPR & RIIMP JUNCTION BUX OUTSIDE OF DECK (TYP.) GROUNDNG /BONNDING WIRE-.0 EXIT J-BOX PASS] dG THROUGH TRANSFORMER T) ELECTRICAL PANHL , #8 AWG BOND WIRE TO ALL POOL EQUIP. CAPABLE OF BONDING n ' i INSTALL#8 AWG WIRE EQUIPOTENTIAL BONDING LOOP 4"-6" BLW. SUBGRADE, 18 -24" FROM POOL, BONDED s (� (4) PTS. TO POOL SHELL -yIII)— PER NEC 680.26(B) 3/4" CONDUIT W/ LUMINARY WIRING �-_ I HARNESS THAT INCLUDES GROUND WIRE INTERNAL BOND LUG IN NICHE W/ INSUL #8 M SOLID OR STRANDED WIRE TO J-BOX WHEN REQD BY BLDG. OFFICIAL POOL WALLS USE MIN. 6" 4.000 PSI CONCRETE W/#3 REINFORCING STL. III... PLACED R 12"x12" O.O,E.W. TIED EVERY _ OTHER CiiOSSING W/ 2-1/2"MIN. I CLEARANCE r ENSURE SOILS ARE FREE OF ORGANICS, aT COMPACTED TO 95% PROCTOR PER ASTM D-1557 SUMP PER ANSI/APSP/ICC-16 2017 W/ TESTED, LISTED, AND LABELED MAIN DRAIN COVER MAIN DRAIN TO PUMP wmvvnl�n..v i �— HYDROSTATIC RELIEF DEVICE HYDROSTATIC RELIEF MAY BE A ;NOTE DEADLINE" OR PLUG IN SLOTTED NOTE PIPE IN BOTTOM OF SUMP >SUL&I POOL DEEP END S SCALE: N.T.S. OTHER METHOD WHEN WATER ,EEDS 5 FT 1.18 SHOOTTO UNDISTURBED EARTH PLACE FOOTING STRUCTURE ON UNDISTURBED EARTH MEETING 2,000 PSF OR COMPACTED FILL MEETING 95% MODIFIED PROCTOR BENCH SEC 3 SCALE: N.T.S. I! NCE& PER !!/' "RAME � HGpAXB 1 1 nYY 4n nvi�+ixr. :I : pt4wc8llmunMlnewta d NOTES: APPROVED PRODUCT SPECIFICATION MAY DIFFER FROM FIELD BUILT SUMPS SHOWN ON THIS PAGE SPECIFIED PVC PIPE SIZE (d1 MIN. SUMP DEPTH 1 5z(d) MIN. LEDGE DEPTH (d) -OR- FOR FIELD BUILT SUMPS SEE PRODUCT INSTALLATION INSTRUCTIONS FIELD BUILT SUMP 2 SCALE: N.T.S. TRUNK SUCTION PIPE SIZE MIN AT 6 FPS ANSI 15 FLOW SUCTION OUTLETS W/ ANSI/APSP/ICC-16 2017 ANTI -ENTRAPMENT COVER, (2) REQD OR (1) UNBLOCKABLE DRAIN SUMP PER ANSI/APSPIICC-16 2017 OR COVER MFR. SPECS ANSI 15 BRANCH PIPE SIZE MIN AT 6 FPS AT FLOW BY: • MAX 6 HOUR TURNOVER MI�AL MOINDAYBE MITTEDIENTIRELY BRANCH PIP SCALE: N.T.S. LAP #3 LAP #5 6 SHE CON( USE4J CONTF cor PL DE 2,( •• WHI EN C( W C( C( B( T( CL VE •• ALL 3" L VERT. W/ MIN. (2)) #3 BARS CONT. @ TOP o, -� #3 BARS @ 12"O.C. HORIZ., 6„ TYP. U.N.O. _ TO: MEET THE POOL BEAM C 8"x12" OPTION 5 SCALE: N.T.S..T.S NOTE'.THIS DETAIL'ISIFOR MAYS 6 FT DEEP SOIL MUPPOR7ED p.00L;SHELLw S UP,PL MENTAL SPECIFICATIONS F4)R 6EPER STRUCTURES; LOAD SUIRGHARtzEc 5T}7.UC,TURES, OR : =APPUFtTENA 'CISTi2UCTURES COMPLIES WITH 7TH ED. (2020) FBC, ALL VOLUMES SEE DIGITAL SIGNATURE ON INDEX SHT SI 3 o O G7 a N u �maN s ffi g mo NLLn¢ &o �N m xvU g`m 9. ag m N V, Z wWW a W ° 1' Z g m'y a O yawl ` EL (U) (n J o_EL ~ J U W Q (n F J LU Q W (.)2 }a co F � K O LL S2 SHEET 2 OF 2