Loading...
HomeMy WebLinkAboutBuilding Permit Checklistt BOARD OF . _ PLANNING & DEVELOPMENT COUNTY SERVICES DEPARTMENT COMMISSIONERS . . Building & Code Regulation CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT r Proiect Location:. Date: ReC'LTWE® Permit Number:. Technician: MAR 2 3 822 Ae,rMI f p.9 Rye uired Documents: Application completely filled out with Notarized Signatures ............................ YesX No N/A Sub Agreements with Notarized Signatures (prior to issuance) .......................... v Yes ^ No N/A Owner / Builder Affidavit (signed in office). ................................................ Yes No_ N/A Filled Land Affidavit (prior to issuance) ................................................... Yes No _ N/A Recorded Warranty Deed, if applicable ......................................................Yes No _ N/A X Recorded Notice of Commencement (prior to issuance or inspection).... .............. Yes "`�No N/A 7 Utility Agreement or Payment Receipt (prior to issuance).................:....:........:.Yes -No N/A v. Vegetation Removal Application with copy of survey.....................................Yes^. No N/A Plans, Calculations & Attachments ( 3 copies commercial, 2 copies residential) Complete set of plans with Engineer / Architect Raised Seal ........................... Yesy No N/A Truss Plans reviewed and approved by Engineer / Architect ............................ Yes^ No N/A Landscaping and Parking plan (under 6,000 sgft)......................................... Yes No _ N/A X Approved Site Plans........................................................................... YesX No N/A Sealed Survey with Dimensions, Finished floor ........................................... Yesn No N/A Elevations and Setbacks ................................................... ........ Yes^ No N/A Plot plan with Setbacks............................................................... Yes^ No N/A Health Department approval stamped on survey and floor plan ......................... Yes No N/A Health Department —No —N/A Food Establishment Permit stamped on floor plan ................ Yes Manual "J" or Manual "N" Calculations.................................................... Yes^ No N/A Signed Energy Calculations (1 set original signatures & signed in 2 spots) ........... . Yes ^ No N/A Sealed Wind Load Compliance CertiIfication............................................... YesX No N/A Product Review Affidavit..................................................................... Yes^ No N/A Excavating a pond for fill: Site plan showing 25-foot(minimum) set back from all property boundaries, size, Yes_ No_ N/A shape, location and quantities of proposed excavation and fill areas Side slopes not to exceed 4 to 1 to a minimum of 3 feet below water level......... Yes No N/A Depth of excavation does not exceed 12 feet in depth .................................... Yes No N/A If Hauling fill off site (excess of 100 cubic yards) you must have a mining permit Yes_ No_ N/A _-Other: Health Department Permit Paperwork....................................................... Yes No N/A CD for Fire Department if commercial or multi -family ................................... Yes —No —N/A DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............ Yes —No —N/A Pool Barrier Affidavit ......................................... ............................... Yes —No —N/A Ground Sign Landscape Affidavit (signs) ................................................... Yes No N/A Burn Rate for Sign Cabinets.................................................................. Yes No N/A