Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutProject Information® anuaom Compliance Report J°b: L186Phase3'�Vatec°...
-�- wrightsoft Manual S CliR
p p Date: NOVEMBER 1, 2010 i
Entire House By: Dcs
DEL -AIR HEATING AND AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phore:407-333-2665 License: CMC 1249777
Project• •
For: ADAMSHOMES
5310 Vespera Street, Fort Pierce, FL 34951
Cooling Equipment
Design Conditions
Outdoor design DB:
90.4 OF
Sensible gain: 21807
Btuh
Outdoor design W B:
77.4 °F
Latent gain: 4581
Btuh
Indoor design DB:
75.0 °F
Total gain: 26388
Btuh
Indoor FIR
50%
Estimated airflow: 947
cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipmenttype:
SpIitASHP
Manufacturer:
Carrier
Model: 25HBC530AP03+FX4DNF031L00
Actual airflow:
947
cfm
Sensible capacity:
22791
Btuh
105% of load
Latent capacity:
4917
Btuh
107% of load
Total capacity:
27708
Btuh
1050%of load SHR: 82%
Heating Equipment
Design Conditions
design DB: 41.0 OF Heat loss: 23333 Btuh
Indoor design DB: 70.0 OF
Manufacturer's Performance Data at Actual Design Conditions
Equipmenttype: SpIitASHP
Manufacturer: Carrier Model: 25HBC530AP03+FX4DNF031 L00
Actual airflow: 947 cfm
Output capacity: 26689 Btuh 114% of load
Supplemental heat required: 0 Btuh
Backup equipment type: Elec strip
Manufacturer: Model:
Actual airflow: 947 cfm
Output capacity: 5.7 kW 83%of load Temp. rise: 19 OF
Meets all requirements ofACCA Manual S.
-�- wrightsoft®
�, Rig11-Sute6Uriversa12021 21.0.07 RSU23828
�'�...terstone1460AGRIot186Phs3Waterstore1480AGR.rup CaIc=MJ8 Housefaces:NE
Entering coil DB: 77.7OF
Entering coil WB: 63.9OF
Entering coil DB: 69.0°F
Capacity balance: 36 cF
Economic balance: -99 °F
2021-JLI-21 1033:55
Page 1
wrightsoft ® Project Summary
Job: Lot 186 Phase 3 Watersto...
Date: NOVEMBER 1, 2010
Entire House
By: DCS
DEL -AIR HEATING AND AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 License: CMC 1249777
Proiect Information
For: ADAMS HOMES
5310 Vespera Street, Fort Pierce, FL 34951
Notes: REVISED 3-23-12 SGT
L. S. 7-21-21 VW K
Design Information
Weather: St Lude Co Inti, FL, US
Winter Design Conditions
Summer Design Conditions
Outside db 41 OF
Outside db
90
OF
Inside db 70 OF
Inside db
75
OF
Design TD 29 OF
Design TD
15
OF
Daily range
L
Relative humidity
50
%
Moisture difference
57
gr/lb
Heating Summary
Sensible Cooling Equipment Load
Sizing
Structure 18513 Btuh
Structure
14615
Btuh
Ducts 4821 Btuh
Central vent (0 cfm) 0 Btuh
Ducts
Central vent (0 cfm)
7192
0
Btuh
Btuh
none
Humidification 0 Btuh
Blower
0
Btuh
Piping 0 Btuh
Equipment load 23333 Btuh
Use manufacturer's data
y
Infiltration
Rate/swing multiplier
Equipment sensible load
1.00
21807
Btuh
Method Simplified
Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 0
Structure
2774
Btuh
Ducts
1807
Btuh
Central vent (0 cfm)
0
Btuh
Heatingg Cooling
(none)
Area (ft2) 1484 1484
Equipment latent load
4581
Btuh
Volume (ft3) 13327 13327
Air changes/hour 0.45 0.23
Equipment Total Load (Sen+Lat)
26388
Btuh
Equiv.AVF (cfm) 100 51
Req. total capacity at 0.75 SHR
2.4
ton
Heating Equipment Summary
Cooling Equipment Summary
Make Carrier
Make Carrier
Trade
Trade
Model 25HBC530AP03
Cond 25HBC530AP03
AHRI ref 204840289
Coil FX4DNF031 L00
Efficiency 8.5 HSPF
AHRI ref 204840289
Efficiency 12.5 EER,15
SEER
Heating Input
Heating output 28200 Btuh @ 470F
Sensible cooling
Latent cooling
21300
7100
Btuh
Btuh
Temperature rise 27 OF
Actual air flow 947 cfm
Total cooling
Actual air flow
28400
947
Btuh
cfm
Air flow factor 0.041 cfm/Btuh
Static pressure 0.40 in H2O
Air flow factor
Static pressure
0.043
0.40
cfm/Btuh
in H2O
Space thermostat
Load sensible heat ratio
0.83
Capacity balance point = 36 OF
Iln ut =p6 kW, Output =19308 Btuh, 100AFUE
Calculations approved byACCA to meet all requirements of Manual J 8th Ed
-*- wrightsoft- 2021-JLI-21 1023:55
ACCP. e1480AGR1LRight-Sute®Uriversal2021 21.0.07 RSU23828 Page 1
terstorot186PFs3Waterstore1480AGR.rup Calc=MJ8 Housefaces:NE
- wrightsoft Right-M Worksheet
Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 Licerse: CMC 1249777
Job: Lot 186 Phase 3 Waterston 1...
Date: NOVEMBER 1, 2010
By: DCS
1
2
3
4
5
Room name
Exposed wall
Room height
Room dimensions
Room area
Entire House
177.8 8
9.0 It d
1486.0 ft2
FAM
33.0 It
9.0 ft heat/000l
1.0 x 451.0 It
451.0 ft2
Ty
Construction
number
U-value
(BtuhRt2
Or
HTM
(Btuhftt2)
Area (ft2)
or perimeter (ft)
Load
(Btuh)
Area (ft2)
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/PS
Heat
Cool
6
11
Vf/
l—C
F _._ _.
C
Blkviall stuccoerd
2A2ov
26 2N
Blk wall, stuom erd
2A-2ov
2A-2ov
Blk wall stucco eM
tOC v
2A 2ov
2A 26v __
0.201
0330
0330,
0.201
0330
_ 0.330
0201
0550
'0330
__._6330
0.201
0330
___:0,091:
0.03P
ne
ne
ne
se
se
_ se
sw .
'sw:
sw,
_siv_
nw
nw
___
583
957
957
5.83
957
957
406
1947
2632
4.06
1621
_18.17
I 4.06
1620
,18.17
T.9.90
4.06
2024
s 131•
1.69
_.
160
16
14
400
7
_ 81
110
0
0
312
3
_ 21
642
155
129
1820
66
775
447
315
355
_356
1268
112
1471
0
0
0
120
0
16
0
0
0
104
0
4
_'__—. 0
0
0
605
0
155
___
0
0
0
�.__. 421
0
_ 294
447
288
0
0
0
852
5 63
15.95
957
..___957_.
5.83
9.57
2.84:
0.93
_
312
1.8
32
-_----16
336
7
------236
1618
246
18
8
.____ 16
329
0
_.__ _236
1618
1432
284
310
1919
66
___. 623
1501
w� 997
288
588
--_160
1336
_ _143
__ 309
2733
144
18
0..
0
0
: 11 q
'; 18'
0
__96
0
0
505
641
264
0
_._ 155
0
_ 0
_ 468
9_46
Blk wall, stucoo eM
2A-2ov
12C Osy,� Y
166 30ad
505
_
_ _ r
W_
6
c) AED exausion
151
192
Envelope losstgain
15327
11031
3255
2655
12
a) Infiltration
b) Room ventilation
3186
0
865
0
696
0
189
0
13
Internal gains: Occupants@ 230
Appliancestother
4
920
1800
2
460
0
Subtotal (lines6 to 13)
18513
14615
3951
3304
14
15
Less external load
Less transfer
Redistribution
Subtotal
Duct loads
26 %
49 %
0
0
0
18513
4821
0
0
0
14615
7192
26%
49 %
0
0
0
3951
1029
0
0
0
3304
1626
Total room load
Air required (cfm)
23333
9471
21807
947
4980
202
4930
214
Calculations approved byACCAto meet all requirements of Manual J 8th Ed.
P. RigIY-Sute®Universal 2021 21.0.07 RSU23828 2021-JU-21 1 F 3e 5
A65terstore1480AGR\Lot186Pfs3Waterstore1480AGR.ngr Calc=MJ8 Hoisefaces:NE 9
+ wrightsoft,
Right-JO Worksheet
Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 License: CMC 1249777
Job: Lot 186 Phase 3 Waterston 1...
Date: NOVEMBER 1, 2010
By- DCS
1
2
3
4
5
Room name
Exposed wall
Room height
Room dimensions
Room area
BR 2
10.0 ft
9.0 ft heatbool
1.0 x 134.0 It
134.0 ftz
BR 3
242 ft
9.0 It heaVcool
1.0 x 146.5 It
1465 ft2
Ty
Construction
number
U-value
(Btuh/ tz-19
Or
HTM
(Btuh/Itz)
Area (ftz)
or perimeter (ft)
Load
(Btuh)
Area (III)
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/PiS
Heat
Cool
Gross
N/P/S
Heat
Cool
6
•
11
.-
P
C
Blk well stucco ext
2A2ov
2B-2fv
�11J0 ______-.
Blk velf stucco ext
2A-2ov
2A_2ov_ _
Blk vtall shi000 ext
10C v
2A 2ov -
2A2ov__ _..._ _._
Blk viall, stucco ext
ov
12C OS1N .
16B-30ad
WI.0989
0201
0.330
0 330
•.0600
0.201
0.330
0230,
0 201
0550
0.330
ne
ne
ne„
ney
se
se
se
sw
srv,
sw
_sw....,__.957
5 83
9571947
957
1740
5.83
9.57
,9_57,
y 5b3
1596
• 9.57
4 OB
2622
__ 1758.__..._..__0
4.06
1621
18.17
4.0'6
`, 1620
'18.17
—.9.90
0
0
0
0
0
0
80
0
16
__ ;___0
0
0
0
_,�.,_, 0.
0
0
0
64
0
4
__ 0
0
0
0'-
—.-_.�.—.0
0
0
_ 0
372
:. 0
155
_._____0
w 0'
0,
0
_.____ 0.:..,_—,._.._
0
0
0_
259
0
294
0
0
0
253
' 0
0
0
0
�
0
0
0
88
0
16
112
_ 0_
164
.'�
r _— , 0
0
0
_ :._._....�Q
0
0
0
72
0
' 4
112
0
164
._. 0
0
0
__---__: P...�_
0
0
0
419
0
155
653
_ ry 0
152
0
0
0
0
0
0
_ 0
2'92
0
294
455
0
_.
277
0201
0.330
0091
0032
nw
nw
�
._
5.83
957
6.93
28.68
4.06
20b4
169
0
0
150
�1.34
0
0
150
_ . _' 10
0
0
139
287
77.
excursion
6
c) AED
70
24
Envelope loss/gain
953
877
2093
1341
12
a) Infiltration
b) Room ventilation
211
0
57
0
527
0
143
0
13
Internal gains: OccupantsQn 230
Appliancesdother
0
0
0
0
0
0
Subtotal (lines 6to 13)
1164
934
2620
1485
14
15
Less external load
Less transfer
Redistribution
Subtotal
Duct loads
26%
49%1
0
0
0
1164
303
0
0
0
934
460
26 %
49%
0
0
0
2620
682
0
0
0
1485
730
Total room load
Airrequired (cfm)
1467
60
1394
61
3303
134
2215
96
Calculations approved byACCAto meet all requirements of Manual J 8th Ed
- wr➢ghtsoft^ 2021-JU-21 1033
Right -Suite® Universal 2021 21.0.07 RSU23828 :55
Page 2
terstorel480AGR\Lol186Pfs3Waterstorel480AGR.n¢) Calc=MJ8 Housefaces:NE
+ wrightsoft
Right-JO Worksheet
Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 License: CMC 1249777
Job: Lot 186 Phase 3 Waterston 1...
Date: NOVEMBER 1, 2010
By: DCS
1
2
3
4
5
Room name
Exposed wall
Room height
Room dimensions
Room area
DIN
8.0 It
9.0 ft heaV000l
10.0 x 8.0 It
80.0 ftz
Klr
10.0 It
10.0 ft heatbool
1.0 x 150.0 It
150.0 ftz
Ty
Construction
number
U-value
(Btuh/ftz-cq
Or
HTM
(Btuh/ft)
Area (ftz)
or perimeter (ft)
Load
(Btuh)
Area (ftz)
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
11
6
81k aslt st _000 ext
2A 20v
2MN
Blk wall, stucco ext
2A-2ov
2A 2ov_
0201
0330
0330
.____--0600.
0201
0330
0330
'0201
0550
0330
__—_ 0330
0201
, , — 0330
0.032
ne„
ne
ne
_ne_
se
se
se
sw
sw `
sw`
_sw-
nw
nw
..•.
5 83
957
957
._ 1740
5.83
957
95718.17
5,83
1525
957;
_ _.957_
5.83
957
0.93
4.06
19 47
2632
17,58
4.06
1621
4,06
1620
18.17
._.,9.90
4.06
20B4
1.69
0
0
0
.._ -`-Jo
64
0
32
0
''0
0
_ _.___:0
0
0
89
0
0
: 0
� � 32
0
8
0
0
0
__.._� _._.0
0
0
89
0
0
v .,_w_ 0
184
0
310
0
0
0
__,_,__0
0
_ 0
83
0
0
:__ _0
128
0
_�588
0
, ° 0
0
-_ __ _0
0
0
-__ 0
151
0
0
_...; e_ 0
_..0
0
�.� 0
0
` . .0'
0
_0
0
0
_ _, 100
150
0
0
0
0
_ 0.
0
0
0
— __-_,_0
0
0
; _ __1_00
150
0
0
0
0
0
0
'0
0
0
0
0
D
—__: _0
0
0
. _-131-
253
_ tV1!
—lY—C
C
Blk Hell stu000 ext
10C v
2A2ov
2A2ov_�siucoo _ ._
Blk wall, e�
2A-2ov �._. _
16B-30ad
- 6
0
0
_ 0.
0
0
_._,..._264
139
_
c) AED
...-.. .-.r.
-_ -
163
excursion
-123
Envelope loWgain
807
1031
690
261
12
a) Infiltration
b) Roomventilation
169
0
46
0
0
0
0
0
13
Internal gains: Occupants@ 230
Appliances/other
1
230
0
0
0
1200
Subtotal (lines 6 to 13)
975
1307
690
1461
14
15
Less external load
Lesstransfer
Redistribution
Subtotal
Dud loads
26%
49 %
0
0
0
975
254
0
0
0
1307
643
26 %
49 %
0
0
0
690
180
0
0
0
1461
719
Total room load
Air required (ctm)
1229
50
1950
851
870
35
2180
95
Calculations approved byACCAto meet all requirements of Manual J 8th Ed.
-0 cur➢ghtsoft^
A RigM-Sute®Uriversal 2021 21.0.07 RSU23828 2021 JU 21 1 page 3
tefstore1480AGR1Lot186Pts3Watersbre1480AGR.np Calc=W8 Housefaces:NE 9
+ wrightsoft,
Right-JO Worksheet
Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY SANFORD, FL 32771 Phone:407-333-2665 License: CMC 1249777
Job: Lot 186 Phase 3 Waterston 1...
Date: NOVEMBER 1, 2010
By: DCS
1
2
3
4
5
Room name
Exposed wall
Room height
Room dimensions
Room area
BATH 2
9.0 It
9.0 ft heat/cool
5.0 x 9.0 It
45.0 ftz
UTIL
16.0 ft
9.0 8 heat/eool
9.0 x 7.0 It
63.0 ftz
Ty
Construction
number
U-value
(Btuh/ftz-fl
Or
HTM
(BtuhHtz)
Area (ftz)
or perimeter (ft)
Load
(Btuh)
Area (ftz)
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/PiS
Heat
Cool
Gross
N/P/S
Heat
Cool
6
11
Blk wall stucco ext F
2A2ov
26.2
0201
0,330
0330
__Q600
0201
0,330
0330
, 0 201
0550
0330
' 0330
ne'
ne
ne
_nes
se
se
_ se
sw
sw
sw t
_sw,,
R8
957
, 957
_ 1740
5.83
957
_ 957
5,B3
15.95
. ' 957
_,957_
4.06
19.47
2632
_
4.06
1631
18.17
4.08
1620
1,8.17
�.990
4.06
20B4
_,.;,. 1 31
1.69
yr _OOt1
" 0
'0
0
0
0
0
0
0
0
0
__. r0
72
7
0
50
0
0
, r 0
__L:_. �0
0
0
0
0
0
0
_. 0
65
0
_ .,L.0
50
—0-7
0
,0
_. 0
�m 0
0
_ _ . 0
0
0
0
__0
380
66
_w. - ___0
47
D
0
0
�. _0
0
0
0�^0
0
0
0
_ ___�0
264
w 143
85
0
0
0
�YM 0
0
0
°', 0'
, 0
__� _0
56
0
72
70
_
~ 0
0
: , 0
'0
0
0
'0
0
- 0
____�._.___0
56
0
.,_� _._ 72
70
_
D
0
10
0
0
_ 0
' . 0
0
, 0
4-�_�._0
326
0
:_ 190
65
0
0
,.0
0
0
_ _0
0
0
0
._-,. 0
227
0
__. 94
119
-
Lj
_;'11J0
Vf/
L—G
P
C
Blk well, stucco eM
2A-2ov
2A-2ov
Blk well stucco eM _
10C v
2A 2ov
2A2ov _: _ _
Blk well, stu000 e)d
2A2ov
, ._.
16B-30ad
0201
0330
w0091
0.032
-
nw
nw
`,
5.83
957
264
0.93
e
..._..._tr ...._ ,.._.... ,p...„-....__ <_..,......,. ._.«,..
c) AED excursion
._,.r._
.-_rat .-
-, �...
6
12
-84
Envelope loss/gain
750
504
1041
357
12
a) Infiltration
b) Room ventilation
190
0
52
0
148
0
40
0
13
internal gains: Oocupants@ 230
Applianoeslother
0
0
0
0
0
600
Subtotal (lines6 to 13)
940
556
11188
997
14
15
Less extemalload
Less transfer
Redistribution
Subtotal
Ductloads
26%
49%1
0
0
0
940
245
0
0
0
556
273
26%
49%
0
0
0
1188
309
0
0
0
997
491
Total room load
Air required (cfm)
1185
48
829
36
1498
61
1487
65
Calculations approved bvACCA to meet all requirements of Manual J 8th Ed
-�-^ wr➢gFmtsoft^
Right-Suite®Uriversal 2021 21.0.07 RSU23828 2021-Jtf-21 103Page 4ge 4
...terstone1480AGR1Lot186Pts3Waterstore1480AGR.rrp CaIc=MJB Hoisefaces:NE
+ wrightsoft
Right-M Worksheet
Entire House
DEL -AIR HEATING AND AIR
531 CODISCO WAY SANFORD, FL 32771 PCO
ho :407D3T-226665�INGnse: CIVIC 1249777
Job: Lot 186 Phase 3 Waterston 1...
Date: NOVEMBER 1, 2010
By: DCS
1
Room name
MBR
MBATH
2
Exposed wall
14,9 ft
30.0 ft
3
Room height
9.0 ft heaUcool
8.0 ft heaf/000l
4
Room dimareensions
1.0 x 190.5 ft
1.0 x 109.0 ft
5
Room
190.5 ft2
109.0 ft2
Ty Construction U-value
Or
HTM
Area
(ft2)
Load
Area
(ft2)
Load
number (Btuh/tz19
(Btuh/ft2)
or perimeter
(ft)
(Btuh)
or perimeter
(ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
" 'Bik v�ell sttf000 ext 0201
2A 2ov r3 0 330
2B2fv
� ,ne
ne
.583
95,7
4.06
19.47
0 ' 0
0 0
p
0 0
" 1p`4
'" 16
< 88
b12
0 155
357,
315
0330
ne
957
2632
'
0 0
0 0
0 ` 0
r 0_
0,
�o
0
v�ell, stucco ext 0.201
2A 2ov 0230
se
se
5.83
957
4.06
16.31
120
0
88
0
511
356
96
J ' 89
v 520
362
2A 2ov
0
0
7
3
66
112
0.330
se
957
18.17
32
8
310
0
0
0
0
Blkvsll stu000ext 0201
10C v 0550
sw
sw,
563
1595
406
' 1620
0
0
0
0
07510
0
0
0
0.0
0
0
02A0.330
S'v
957
1817
0
0
z Q
p
0
0
:0
2A2ov �_ _ ��..0330
VI/ Blk wall, stu000 ext 0.201
�sw
nw
5B
4.06
0
_ �0
0
v� 0
0
�_._D
a �w:0
D
_ _:..:0
�'-0
L—G 2A 2ov 0.330
nw
957
20.84
0
0
0
0
0
40
0
40
0
233
0
162
P 0091
AZCZ „_
264
0
C 16&30ad 0032
F
093
169
000
213
213
198
360
109
109
101
�184
_a191
wK
109
v _3q
860
LFE:'=
,
Y
...+..«..,d,c__.,e..�....._,�,�..e....
I_� r3�'...,
d.,.,,..,.v...
i.. a..«...w
.,.mrv.«wen
..,.._a_.t>...
......_.r...r..
..._..._......._
_�.�...,
s1,.., �-
v,�_......_
l ti
.^_._. :, ...-..vim.._..!.'_....,. .....�..�4:..�^ ...,.1
-...
...
t
:;"
_...
_
2
R.
EDE
r.
77
c) AED excursion
6
126
-121
Envelope loss/gain
1446
1430
2447
1371
12
a) Infiltration
316
86
633
172
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants@ 230
1
230
0
Appliancesbther
0
0
0
Subtotal (lines 6 to 13)
1763
1746
3080
1543
Less extemal load
Lesstransfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
0
0
0
0
15
Dud loads
1763
746
1746
3080
1543
26 %
49 %
459
859
26%
49 %
802
759
Total room load
Air required (cfm)
22
2606
3882
2302
90
1 13
158
100
Calculations approved byACCAto meet all requirements of Manual J 8th Ed
�- wr➢ghtsoft Right-Su2021-JU-211038:55
te®Uriversal 2021 21.0.07 RSU23828 Page 5
terstore1480AGR\Lot186PFs3Watersfone1480AGR.rup Calc=MJ8 Housefaces:NE
-+�- wrightsoft® Right-M Worksheet
Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 License: CMC 1249777
Job: Lot 186 Phase 3 Waterston 1...
Date: NOVEMBER 1, 2010
By: DCS
1
Room name
WIC
FOYER
2
Exposedwall
7.0 It
15.0 It
3
Room height
8.0 ft heaticool
8.0 It heat/000l
4
Room dimensions
1.0 x 47.0 It
7.0 x 10.0 It
5
Room area
47.0 ftz
70.0 ft2
Ty
Construction
U-value
Or
HTM
Area (ft)
Load
Area (ft2).
Load
number
(Btuhlft2-'q
(Btuh/ft2)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
Blkvvall stuccoeM ar
2A 2ov
A201
-0 330
ne
ne
583
957.
406
1947
0
O
: 0
0
0
0
0
0
56
0
22
'. 0
130
0
' 9q
0
0
0
0
0
14
0
122
355
1J0
00
_ne
_„L 1740
1758
_0
4.�w U
_w Q
.0
u ?4
_2Q
: _ �2
_2g?6
11
Blk vdl, stucco ext
0.201
se
5.63
4.06
0
0
0
0
0
0
0
.__
0
2A-2ov
0230
se
9.57
1621
0
0
0
0
0
0
0
0
2A 2ov_
0.330
se
957
18.17
0
0
0
0
0
0
0
Blkwall siu000eM
10C v ti
2A
0201
0550
sw
sw
583'r
15.9'5
406
1620
_0
1'1-0
0
0
0
0
0
0
Y 0
0
0
0
,� 0
_0
s 0
_
0
0
--G
I�
2ov
0 330
0
sw
957
1817
0
0
0
0
0
0.
0
0
Vdl
Blk Ml, stu000 ext
330
0.201
sw
nw
.957
5B3
_ 9 90
4.06
.0
56
_. ., 0
56
�.0
326
_ __ .0
227
_ .0
0
%_w0
0
0
0.
0
—G
2A-2ov
0.330
nw
957
20B4
0
0
0
0
0
0
0
0
84
C
1_66-30ad
0.032
-
0.93
1.69
47
47
44
79
70
70
65
118_
F=.�I_..,
a?
u0989
`a
2868
000
47
7
201
0
ZO
"' 15
430
Q
w....._..n...-....-,i.....y..._.,;.,».✓..,.....oi.af.-.Y•,3..
.n..__,v.n.-.:..d...x_.
....
..
i --.
..
,. ..
_.:.......
......P....,.�us�...,a._.-....-..t_.......
r
-._. �,�.
�� LS
w, .s..Y..._
.-,..-..,-..
Se.a«.....
.....,......�_
.....,.-. _..:�x
.r,........+�.
......._ ,.-
c....v.-
...��
.....-r_.-..w-.c.,_.a.vvL..
_..✓. ..,...,..e.r�.
.i.dri
_.Se
_...ram,....
._..., .... _
..»...w.....e..
....»._._-.,-
........_ _
�.+..._..
,..__...
.._...-......
....-..s...a
77
r
Y
_. �... _a,:....:�«.,..._.»r..w-:w
_....,..�,�_.
.,,�.,........�.... .. ,�
�. «.r
.4.,.. a.._.�
..,........
... ss<-_a,,:.:.,
L
.-....a.....,... "w,....._
..... s.:._...:.._..>.a
9
k
-: �?..,....... u. .a.... �,-..-_..o-�
.._..�.......af
_
wit
v,n ..-r.�..1'
-�+..
-.3......,.....-i
.,.�-:...,..v....
�+_. ....
,
u.....z"l
_
a..,a..ti-,-.....a
.........n..,..
...• ,. wr..:;.....�
_._....::,
.....u..a.,6..a
�....-.,_,.a..:..
...._..d.,_ .vw.
a. ..a....}_:, _....
.
�..ws »:�«,....-...».�..�.....-.-.
.._.......+.......:-L
_...._.«-..�,.�......
v
........1„�..._
.�.�_. _.v......:
..- ...
._ .._+...a..._.._.. -+a...
.. ..:.._..$:w -
,....
.Ln, ,,.r.�
��..,...s..
.«a.kr�,
u..,L.:,-.y
�_.v✓
,.t .._.L
.....u....
- ...._.,__....,
_.--....v.-.
.,......._..,.:..,_.»....._...w....._.,:�_.a._,_..«.:......,..,:...,.....,..mot::_...
.:
._._.,....�.m_t
.a,w..... �s
..
=17
........
«.
1
.
_..^-----r
-•-_-
_.,—......
6
c) AED excursion
-27
_81
Envelope loss/gain
571
2801
1275
923
12
a) Infiltration
148
40
148
40
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants; @ 230
0
0
0
0
Applianoeslother
0
0
Subtotal (lines 6 to 13)
718
320
1423
963
Less extemalload
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
718
320
1423
963
15
Duct loads
26%
49%1
187
157
26%
49%
371
474
Total room load
906
477
1794
1436
Air required (ctm)
37
21
173
62
Calculations approved bvACCA to meet all requirements of Manual J 8th Ed.
-*- wrigtitsoft® 2021-Jt1-21 1033:55
P. Rgfrt-Sute®Uriversal202121.0.07RSU23828 Page
terstone1480AGR\Lot186Pts3Waterstore1480AGR.rup Calc=MJB Housefaces:NE
Duct System Summary Job: Lot 186 Phase 3 Watersto...
wrightsoft� Date: NOVEMBER 1, 2010
Entire House By: DCS
DEL -AIR HEATING AND AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phx e:407-333-2665 License: CMC 1249777
Project• •
For: ADAMS HOMES
5310 Vespera Street, Fort Pierce, FL 34951
External static pressure
Pressurelosses
Available static pressure
Supply / return available pressure
Lowest friction rate
Actual airflow
Total effective length (TEL)
Heating
0.40
in H2O
0.06
in H2O
0.34
in H2O
0.170/0.170
in H2O
0.294
in/100ft
947
cfm
116
Supply Branch Detail Table
Cooling
0.40 in H2O
0.06 in H2O
0.34 in H2O
0.170 / 0.170 in H2O
0.294 in/100ft
947 cfm
Name
Design
(Btuh)
Htg
(cfm)
Clg
(cfm)
Design
FR
Diam
(in)
H x W
(in)
Duct
Mat
Actual
Ln (ft)
Ftg.Egv
Ln (ft)
Trunk
BATH
h 1185
48
36
0.336
4.0
Ox0
VIFx
16.2
85.0
sti
BR2
c 1394
60
61
0.457
6.0
Ox0
VIFx
4.5
70.0
BR3
h 3303
134
96
0.333
7.0
Ox0
VIFx
17.0
85.0
sti
DIN
c 1950
50
85
0.421
6.0
Ox 0
VIFx
10.8
70.0
FAM
c 4930
202
214
0.429
9.0
Ox 0
VI Fx
9.2
70.0
FOYER
h 1794
73
62
0.311
5.0
Ox 0
VIFx
24.5
85.0
s2
Krr
c 2180
35
95
0.343
6.0
Ox0
VIFx
14.2
85.0
sti
M BATH
h 3882
158
100
0.294
7.0
Ox 0
VI Fx
30.5
85.0
st2
M BR
c 2606
90
113
0.318
7.0
Ox 0
VIFx
22.0
85.0
st2
UTIL
c 1487
61
65
0.324
5.0
Ox 0
VIFx
19.9
85.0
st1
Wic
h 906
37
21
0.299
4.0
Ox0
VIFx
28.7
85.0
st2
Supply Trunk Detail Table
Trunk
Htg
Clg
Design
Veloc
Diam
H x W
Duct
Name
Type
(cfm)
(cfm)
FR
(fpm)
(in)
(in)
Material
Trunk
st2
PeakAVF
357
296
0.294
455
12.0
0 x 0
VinlFlx
sti
PeakAVF
278
291
0.324
660
9.0
0 x 0
VinlFlx
,` -*- wrightsoft0 2021-JU-211033:56
�s <.R.t• �.aM12„,M1,« gym„ Right-Sute®Uriversal2021 21.0.07 RSU23828 ICCN ...terstore1480AGR\Lot186PFs3Waterstone1480AGR.rup CaIc=MJ8 Housefaces:NE Page 1
Return Branch Detail Table
Name
Grille
Size (in)
Htg
(cfm)
Clg
(cfm)
TEL
(ft)
Design
FIR
Veloc
(fpm)
Diam
(in)
H x W
(in)
Stud/Joist
Opening (in)
Duct
Mat
Trunk
rb-I
Ox 0
947
947
0
0
0
0
Ox 0
VI Fx
,` ft * wrightso,
^. Right-Sute®Uriversal 2021 21.0.07 RSU23828
...terstore1480AGR\Lot186Phs3Waterstore1480AGR.rLp Calc=MJ8 Housefaces:NE
2021-JU-21 1033:56
Page 2
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA a
Project Name:
Lot 186 Phase 3 Waterstone 1480 AGR
Builder Name: ADAMS HOMES
Street:
5310 Vespera Street
Permit Office:
City, State, Zip:
Port Saint Lucie , FL, 34951
Permit Number: Y
Owner:
Jurisdiction: 661000 w
Design Location:
FL, ST_LUCIE_CO_INTL
2
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in an dropped g
Y aped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
Bs.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire Rprmnkler cover platpq and walls or rpffilengs
a. in audition, inspection of log walls shall be in accordance with the provisions of ICC-400.
7/21/2021 10:47 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1
FORM R405-2020
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the
Residential Simulated Performance Alternative shall include:
❑ This checklist
❑ Form R405-2020 report
❑ Input summary checklist that can be used for field verification (usually four pages/may be greater)
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page)
❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4
allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to
comply with Section C402.5
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
2020 Duct Leakage Test Report - Performance Method (usually one page)
7/21/2021 10:46:56 AM EnergyGauge@ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1
Duct Leakage Test Report
Residential Prescriptive, Performance or ERI Method Compliance
2020 Florida Building Code, Energy Conservation, 7th Edition
System 1
cfm25
System 2
cfm25
System 3
cfm25
Sum of others
cfm25
I Total of all
cfm25
.1484 = Qn
Total of all Total Conditioned
systems Square Footage
1:1 PASS ❑FAIL
ptlVe Method.= cfm25 (Total)
'7
as "substantially leak ,',Qh'T0ta1 rfiustbeless than,'or
_qn(is not_''
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either individuals as defined in Section
553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes.
Testing 14� 7
Company
Company Name: Phone:
I hereby verify that the above duct leakage testing results are in accordance with the Florida Building Code requirements with the
selected compliance path as stated above, either the Prescriptive Method or Performance Method.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
7/21/2021 10:48:03 AM EnergyGauge@ USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1